橡博电气PLUS母线连接器安装说明书
电缆连接器安装说明书
![电缆连接器安装说明书](https://img.taocdn.com/s3/m/475e2fc7690203d8ce2f0066f5335a8103d26656.png)
2. Strip back 1-1/4”of outer sheathing, cut off any excess wires,shield and ground. Strip off 1/4”insulation from remaining four wires. It is not necessary or recommended to tin the wires.1. Insert cable through Pressing Screw, Compression Ring,Seal Grommet, and Sleeve as shown below.CABLE REQUIREMENTS3 conductor, stranded, 18-24shielded with ground.Shown With Cap Removed3. Orient Connector end so that center pin connecting screw is horizontal facing right (see detail).4. Refer to pin detail.4A - Wiring for full (immersed) indication:Wire PWR+ to top right terminal (Pin 1)and PWR- wire to bottom left (Pin 3). Wire output to bottom right (Pin 4).4B - Wiring for empty (not immersed) indication:Wire PWR- to top right terminal (Pin1) and PWR+ to bottom left (Pin 3). Wire output to bottom right (Pin 4).5. Screw on the Sleeve. Hand-tighten only.6. Press the Seal Grommet into the Sleeve and hand-tighten the Pressing Screw against the compression ring.7. Use a wrench to tighten the Pressing Screw another 3/4 turn. Do not over-tighten!Connector EndSection 1 - Field Wireable ConnectorNCS31P Capacitive Point Level Quick Start Installation GuideRev. 1.0 Doc 1188 Page 1 of 2Technical BulletinAnderson Instrument Co., Inc.156Auriesville Road Fultonville, NY 12072Phone: 518-922-5315 or To install connector, simply line up key, press into receptacle, and the retaining ring.hand-tighten *Receptacle pins should be coated with USDA approved dielectric grease to Minimize possibility of corrosion.P/N: 5662400000Grommet-2 included choose one to accommodate cable OD4B - DETAILPin 3Section 2 - InstallationWHEN IMMERSEDHIGH ACTIVE FULL INDICATIONWHEN NOT IMMERSEDLOW ACTIVE EMPTY INDICATIONPNP - Sourcing18-36VDC(1W)4A - DETAIL ** Polarity determined by desired switch action.See switch action below.Field Wireable Connector (assembled)PWR (red) wire - Pin 1**PWR (green) wire - Pin 3**P/N: 42119B0000 (without cable)Switched Output (blue) wire - Pin 4Select Switch Action:- Switch action is determined by power supply polarity. If field wireable connector is used see instruction 4 in section 1 for wiring instructions. If assembly cable ispurchased connect Red conductor to PWR+ (18-36V) and Green conductor to PWR-for full (immersed) indication. Reverse these for empty (not immersed) indication.Rotory Switch Output Test &Threshold Adjustment:1. For installation testing sensor may be set for continuous output:Position 0 - output off Position 1 - output on2. Positions 2-9 act as a sensitivity adjustment, position selects a minimum dielectric recognized. Reducing dielectric threshold can help eliminate false readings.Position 2 -Dielectric 20 Position 6 -Dielectric 40≥≥Position 3 -Dielectric 25 Position 7 -Dielectric 50≥≥Position 4 -Dielectric 30 Position 8 -Dielectric 60≥≥Position 5 -Dielectric 35 Position 9 -Dielectric 70≥≥Output Circuit:Standard unit is PNP output see detail for connectionMisc:- Media must have water content or a dielectric constant 20>25%>- Coatings are generally ignored. Coatings of highly conductive media 30ms/cm may cause errors.≥- Foam is generally ignoredDielectric ThresholdMolded Cord Set42117H0100Switched Output (brown) wire PWR (red) wire - Pin 1**Note: White and Grey not used- Pin 4Rev. 1.0 Doc 1188 Page 2 of 2Section 3 - SpecificationOperation/Environmental Specifications Ambient Temperature Limits:14 - 140°F (-10 - 60°C)Pressure Rating:150 PSI (10 BAR) max Process Temperature Limits:32 - 212°F (0 - 100°C)CIP Cleaning:109°F (143°C) for 120 minute Function:Full/empty signal determined by wiringResponse Time:0.1sMinimum Dielectric Threshold:Selectable from 20-70Electrical Specifications Voltage Required:18 to 36 Vdc (≤20mA)Power Consumption:0.6 W Typ. (i.e. 25mA at 24 Vdc)Signal Output:PNP - Sourcing (active 50mA)Signal Transmission Power:≤1mwConnection:One 3 pin M12 Micro-mini electrical connector (QDR)Mechanical Specifications Wetted Materials:316L SS, USP class VI PEEK Material certificates includedWetted Finish:Metal Surfaces Ra = 8 microinch max Polymeric Surfaces = 25 microinch max Surface finish certificate included Housing Material:300 series Stainless Steel housing,lid and threaded connection(non contact surfaces)Enclosure Protection:NEMA 4X, IP69K Agency Approval:CE compliant;ASME BPE 2012 compliantVisual Indication Status LED:Red - Probe Immersed Green - Probe DryWarranty:2 yearsATTENTION: CONNECTOR WIRINGPin1 - 18-36 VDC VDC ComPin3 - VDC Com 18-36 VDC Pin4 - Switch Output MAX 50 mARefer to technical bulletin for Anderson cable color codingFull Ind Empty IndSENSOR ENDPIN 3PIN 1PIN 41.97”50mm1.97”。
橡博电气PLUS母线连接器安装说明书范文
![橡博电气PLUS母线连接器安装说明书范文](https://img.taocdn.com/s3/m/fb8af127905f804d2b160b4e767f5acfa1c78309.png)
橡博电气PLUS母线连接器安装说明书范文母线连接器主要用于充气环网柜顶部或侧面扩展用,母线连接器PLUS安装使用说明书ABB或仿ABB充气柜顶部扩展用概述开关柜PLUS型屏蔽母线连接器为屏蔽、防水设计,适用于满足DIN47636标准,套管额定电流为630A的SF6开关柜顶出型(PLUS)母线套管扩展连接.警告:在安装或维护期间,所有相连的电器设备必须断电;所有电器设备必须按照安全规程(使用者制定的、当地门、国家制定的)进行安装。
本说明不能保证涵盖每一个可能发生的偶然件;请不要用手直接接触或拆卸带电部分;超出偏差的组装可能导致运行故障;安装前检查部件的损坏、额定参数以及结合件的兼容性;安装工作必须由经过良好的高压电器设备相关安全培训的人员进行;安装步骤请再次确认开关柜并柜工作已完成。
将随带的双头变径螺杆取出,用一字改锥将螺杆旋进设备套管螺孔内;旋进后M12端距设备套管端面长度为78mm.(螺杆M12端长度标称是80mm,请在实际拧进的时候多拧2mm,必要时检查长度,确保安装可靠。
)用随带的清洁巾或无水乙醇清洁设备套管表面,待溶剂挥发干净后用随带的绝缘润滑脂均匀涂抹在套管表面。
用随带的清洁巾清洁已安装好的母线接头内表面,待溶剂挥发干净后用随带的绝缘润滑脂均匀涂抹在接头内表面。
将已安装并润滑好的母线接头装入设备套管上。
在穿过接头母线夹的螺杆上,依次装上碟簧垫片,M12螺母,并用专用套筒扳手拧紧螺母,拧紧螺母的力拒要求大于200N。
清洁并润滑绝缘塞表面,先将放气用的尼龙绳放入接头内,再将已润滑的绝缘塞装入接头内,用扳手将其拧紧即可,拧紧力拒大于50N即可;将随带的屏蔽罩安装在已紧固的绝缘塞末端。
将接头上的接地线安装在设备箱体接地螺栓上并牢靠紧固。
注意:请勿用非指定或非随带的绝缘润滑脂作为接头安装的润滑剂。
说明:若接头与母线管之间的相交部位出厂前没有缠绕半导电胶带,请用半导电自粘带半搭接方式将接头与母线屏蔽表面相交周围缠绕3~4层。
电源系列T-OP II连接器安装说明书
![电源系列T-OP II连接器安装说明书](https://img.taocdn.com/s3/m/700df799c0c708a1284ac850ad02de80d4d806eb.png)
600 A 35 kV Class T-OP II connector assembly installation instructionsDISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITYThe information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation’s (“Eaton”) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser.THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALL Y SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other-wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations and descriptions contained herein. The information contained in this manual is subject to changewithout notice.iINSTALLATION INSTRUCTIONS MN650051EN May 2017ContentsDISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I SAFETY FOR LIFE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .III SAFETY INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .III Safety instructions (iii)PRODUCT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Introduction (1)Read this manual first (1)Additional information (1)Acceptance and initial inspection (1)Handling and storage (1)Standards (1)INSTALLATION PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Equipment required (1)Prepare the cable (2)Install T-body and reducing tap plug (4)Install T-OP II connector onto apparatus bushing (5)ii INSTALLATION INSTRUCTIONS MN650051EN May 2017iiiINSTALLATION INSTRUCTIONS MN650051EN May 2017Eaton’s Cooper Power series products meet or exceed all applicable industry standards relating to product safety. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing and service.We strongly urge that you always follow all locally approved safety procedures and safety instructions when working around high-voltage lines and equipment and support our “Safety For Life” mission.600 A 35 kV Class T-OP II connector assembly installation instructions1INSTALLATION INSTRUCTIONSMN650051EN May 2017Hazardous voltage . Contact with high voltage will cause death or severe personal injury . All associated apparatus must be de-energized during any hands-on installationor maintenance .capacitive test points can result in death, severe personal injury, and equipment damage . Use onlyvoltage indicating instruments specifically designed for test points . Use of conventional voltage sensing devices may provide false “No Voltage” indications .The test point must be dry and free of contaminant’s when checking for voltage . After indication is taken: clean, dry, and lubricate the test point cap with silicone grease and assemble to the test point .The capacitive test point is not sufficiently accurate, nor is it intended for, actual voltage measurements or phasing operations .A reading of no voltage from the test point should not be the only indication of a de-energized circuit obtained before touching the connector . Other procedures can include direct conductor voltage testing or groundingusing a live-line tool .Hazardous Voltage●●Failure to comply may result in death, severe personal injury and equipment damage .●●Follow all locally approved procedures when installing or operating this equipment .●●The 600 A T -OP II Connector System is designed to be operated in accordance with normal safe operating procedures .●●These instructions are not intended to supersede or replace existing safety and operating procedures .●●The elbow connector should be installed and serviced only by personnel familiar with good safety practices and the handling of high-voltage electrical equipment .Figure 1 . Line illustration of typical 35 kV T -OP II connector assemblyProduct informationIntroductionThe Eaton Cooper Power series 600 A, 35 kV Class T -OP II Deadbreak Connectors are used to terminate high voltage underground cables to deadfront ap p a r a t us such as transformers, switches, and switchgear. They are fully shielded, submersible, and meet the requirements of IEEE Std 386™ standard – Separable Insulated Connector Systems.Read this manual firstRead and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment.Additional informationThese instructions cannot cover all details or variations in the equipment, procedures, or process described nor provide directions for meeting every possible contingency during installation, operation, or maintenance. For additional information, contact your representative.Acceptance and initial inspectionEach deadbreak connector is in good condition whenaccepted by the carrier for shipment. Upon receipt, inspect the shipping container for signs of damage. Unpack the deadbreak connector and inspect it thoroughly for damage incurred during shipment. If damage is discovered, file a claim with the carrier immediately.Handling and storageB e careful during handling and storage of the deadbreakconnector to minimize the possibility of damage. If thedeadbreak connector is to be stored for any length of time prior to installation, provide a clean, dry storage area.StandardsISO 9001 Certified Quality Management SystemInstallation procedureEquipment required●●T -OP II connector assembly kit including●●T -Body ●●Cable Adapter●●Copper Top Compression Connector ●●Loadbreak Reducing Tap Plug (LRTP) with alignment segment●●Protective Cap (when furnished)●●Silicone Lubricant ●●Extended Copper Stud ●●Instruction Sheet600 A 35 kV Class T-OP II connector assembly installation instructions2INSTALLATION INSTRUCTIONS MN650051EN May 2017●●Tools●●1/2” Wrench●●Torque Tool (Catalog Number TQHD635)●●5/16” T -Wrench (Catalog Number TWRENCH)●●O & T Tool (Catalog Number OT635)●●Combined O & T/T orque T ool (Catalog Number OTTQ635)ote:N If a Combined O & T/Torque Tool is used, a separateO & T tool and torque wrench is not required.Prepare the cableote:N If concentric neutral cable is not being used, followcable preparation directions in shield adapter kit.Step 1Train cable●●Position cable vertically so that it is centered between apparatus bushing and parking pocket, parallel to, and 7” (178 mm) from apparatus frontplate.●●Provide adequate cable slack for cable movement between standoff bushing and apparatus bushing.●●Support cable as needed to maintain position.●●Cut cable 1 3/4” (45 mm) from centerline of bushing. (Refer to Fig u re 2.)1 3/4"± 1/4" (45mm ± 7 mm)Figure 2 . Line illustration for cable trainingStep 2Remove concentric neutral wires or jacketote:N Care should be taken to not cut or score the neutralconductors when cutting the cable jacket.●●Measure 13” (330 mm) from end of cable. (Refer to Figure 3.)●●If jacketed neutral cable, remove jacket to 13” dimension.●●If unjacketed neutral cable, bind neutral wires using (3) wraps of tape at 14 3/4” dimension.●●Pull back concentric neutral wires. Allow enough extra concentric neutral wires to connect to ground after installation and allow movement to insulated standoff bushing.± 1/4"Figure 3 . Line illustration of removing concentric neutral wiresStep 3Remove insulation shield.●●Remove insulation shield 10 1/2” (267 mm) from end of cable. (Refer to Figure 4.)ote:NDo not cut or nick insulation.Figure 4 . Line illustration of cable stripbackStep 4Put tape marker in place●●Measure 1” (25 mm) from end of insulation shield. (Refer to Figure 4.)●●Wrap two turns of tape to serve as marker for cable adapter location.Step 5Remove conductor insulationote:N Do not pencil cable.●●Remove insulation exposing bare conductor to length of 4 3/8” (111 mm). (Refer to Figure 5.)ote:N Do not unwind conductor strands.600 A 35 kV Class T-OP II connector assembly installation instructions3INSTALLATION INSTRUCTIONSMN650051EN May 2017Figure 5 . Line illustration of bare conductor lengthStep 6Bevel insulationote:N This step is for ease of installation only and has noeffect on electrical characteristics.●●Remove sharp edge of insulation by beveling at 45° angle for approximately 1/4” (6 mm). (See Figure 6.)Figure 6 . Line illustration of insulation bevelStep 7Clean insulationote:N Do not apply solvent directly to cable.●●Clean insulation thoroughly with solvent dampened rag, wiping from conductor end toward insulation shield. (Refer to Figure 7.)●●Ensure that all traces of conductive residue are removed.Figure 7 . Line illustration of insulation cleaningStep 8Lubricate and install cable adapter●●Lubricate exposed cable insulation.●●Lubricate inside of cable adapter.●●Slide small end of cable adapter over cable using twisting motion until small end is flush with tape marker.(Refer to Figure 8.)LUBRICATEFigure 8 . Line illustration of insulation cable adapter●●After sliding the cable adapter into position make sure that no bulge is present (see Figure 9).Equipment Damage/Personal Injury . Improperly positioned cable adapter may result in equipment damage or personal injury .Major OD flared out Figure 9 . Cross sectional view of cable adapter positioning600 A 35 kV Class T-OP II connector assembly installation instructions4INSTALLATION INSTRUCTIONS MN650051EN May 2017Step 9Install compression connectorote:N Refer to chart supplied with the crimp connector fortool and die to be used.●●Wire brush conductor, only if it is aluminum.●●Remove protective cap from compression connector.●●Insert conductor completely into compression connector and rotate connector to distribute inhibitor.ote:N Connector must be fully seated on cable conductor.●●Align flats of compression connector and apparatus bushing for minimum conductor strain.●●Make first crimp 1/2” (13 mm) below shoulder ofcompression connector. (Refer to Figure 10.)Figure 10 . Line il l us t ra t ion of crimping area●●Rotate each successive crimp 90º on com p res s ion connector and allow 1/8” (3 mm) between crimps.●●Wipe excess inhibitor from connector and adapter surfac e s.Step 10Check dimensions●●Check length from end of compression connector to top of cable adapter.●●Length should be between 6 3/4” and 7 3/4” (171-197 mm). (Refer to Figure 11.)Figure 11 . Line illustration for dimensional checkInstall T-body and reducing tap plugStep 11Install T-body●●Clean and lubricate outside of cable adapter with lubricant supplied.●●Clean and lubricate inside of T -Body with lubricant supplied.ote:N If test point T -Body is used, insure test point isopposite front plate side of T -Body.●●Without moving the cable adapter, slide T -Body onto cable adapter until compression connector eye is centered in 600 A interfaces. (Refer to Figure 12.)ote:N The end of the cable adapter must line up with thetop edge of the tape marker after T -body assembly. Refer to Figure 9.●●Remove tape marker from cable.Figure 12 . Line illustration of BOL -T T -body installationStep 12 .Install loadbreak reducing tap plug (LRTP) into t-Body●●Clean and then lubricate mating 600 A interface of the LRTP and T -Body with lubricant supplied or CPS approved equivalent.●●Check that compression connector flats are parallel to apparatus bushing.●●Remove shipping cap from 200 A LRTP interface and thread protector from 15/16” threads.●●Insert T -Wrench into throat of LRTP and through rotating nut and engage alignment segment. (T -Wrench will not rotate without entire LRTP rotating.)●●Insert threaded ferrule end of LRTP into side of T -Body opposite apparatus bushing. (Refer to Figure 13.)600 A 35 kV Class T-OP II connector assembly installation instructions5INSTALLATION INSTRUCTIONS MN650051EN May 2017Figure 13 . Line illustration of LRTP installation●●Carefully thread alignment segment into threads of the compression connector by turning the T -Wrench clockwise until positive stop is felt●●Continue applying clockwise force to the T -Wrench until the pin shears and the T -Wrench and alignment segment rotate freely.●●Remove the alignment segment by applying pressure to the T -Wrench to separate the alignment segment from the LRTP . Discard the alignment segment.●●See Figure 14 for illustration of completedLRTP installation.-BODYFigure 14 . Line illustration of completed LRTP installation T -OP II T -bodyInstall T-OP II connector onto apparatus bushingStep 13Install stud into apparatus bushingote:N Ensure unit is de-energized.●●Thread the shorter threaded end of T -OP II stud into the apparatus bushing until hand tight. (Refer to Figure 15.)●●Engage the flats of the stud with a 1/2 wrench and thread the stud into the bushing an additional 1/4 revolution past hand tight.●●Remove any shavings that may have been raised duringthe threading procedure.Figure 15 . Line illustration of bushing stud installationStep 14Install t-op II body on apparatus bushingote:N T -OP II T -Body can be installed onto the apparatusbushing using either a separate operating and testing (O & T) tool and torque tool (refer to option A) or using a combined O & T/Torque Tool (option B).Option A - Installing T-OP II T-Body on apparatus bushing using a separate O& T Tool and torque tool●●Clean and lubricate mating interfaces of apparatus bushing and T -Body with lubricant supplied.●●Grasp eye of the O & T tool with a hotstick, pull eye fully into hotstick.●●Using hotstick, insert O & T tool into LRTP throat and engage rotating nut. (Refer to Figure 16.)●●While pushing T -Body onto apparatus bushing, turn O & T tool clockwise to make threaded connection. Turn until tight.●●Remove O & T tool from the LRTP .●●Insert the torque tool. Torque until tool ratchets (20-25 ft.-Ibs.).●●Remove the torque tool.600 A 35 kV Class T-OP II connector assembly installation instructions6INSTALLATION INSTRUCTIONS MN650051EN May 2017600 A Figure 16 . Line illustration of installing T -OP II T -body onto apparatus bushingOption B - Installing t-OP II T-body on apparatus bushing using a combined O & T/Torque tool●●Clean and lubricate mating interfaces of apparatus bushing and T -Body with lubricant supplied.●●Grasp eye of the O & T/Torque tool with a hotstick, pull eye fully into hotstick.●●Using a hotstick, insert the O & T/Torque tool into the LRTP throat and engage the rotating nut.●●While pushing the T -Body onto the apparatus bushing, turn O & T/Torque tool clockwise to make the threaded connection, turn until torque head ratchets (20-25 ft.-Ibs.). An audible click will be heard.●●Remove the O & T/Torque tool.Step 15Cap the 200 a interface●●Clean and lubricate the 200 A interface of the LRTP and mating apparatus (i.e., Protective Cap, Grounding Elbow or M.O.V .E. Arrester) with lubricant supplied. (Refer to Figure 17.)●●To cap interface, follow installation instructions suppliedwith apparatus used.Figure 17 . Line illustration of protective cap installationStep 16Ground system●●Connect tie-off tabs of the LRTP and T -Body with a strand of drain wire to the cable concentric neutral wires and/or to common ground point.●●Connect the 200 A apparatus (i.e., Protective Cap, Grounding Elbow, M.O.V .E. Arrester) drain wire to common ground.●●Connect concentric neutral wires to the common ground point leaving adequate slack for hotstick operation.(Refer to Figure 18.)Figure 18 . Line illustration of grounding600 A 35 kV Class T-OP II connector assembly installation instructionsThis page intentionally left blank.7INSTALLATION INSTRUCTIONS MN650051EN May 2017Eaton1000 Eaton Boulevard Cleveland, OH 44122United StatesEaton’s Power Systems Division 2300 Badger Drive Waukesha, WI 53188United States/cooperpowerseries© 2017 EatonAll Rights ReservedPrinted in USAPublication No. MN650051EN May 2017Eaton is a registered trademark.All trademarks are propertyof their respective owners.For Eaton’s Cooper Power series productinformationcall 1-877-277-4636 or visit:/cooperpowerseries.。
PSL 601_602_U说明书_V2[1].0_国网版
![PSL 601_602_U说明书_V2[1].0_国网版](https://img.taocdn.com/s3/m/88e8df34376baf1ffc4fad35.png)
2
技术性能及指标 ..................................................................................................................................................2 2.1 额定电气参数 .............................................................................................................................................2 2.2 主要技术性能及指标 .................................................................................................................................2 2.3 绝缘和耐湿热性能 .....................................................................................................................................3 2.4 电磁兼容性能 .............................................................................................................................................3 2.5 机械性能 .....................................................................................................................................................4 2.6 环境大气条件 .............................................................................................................................................4
橡胶接头安装说明
![橡胶接头安装说明](https://img.taocdn.com/s3/m/ed61aae6d05abe23482fb4daa58da0116d171f4e.png)
橡胶接头安装说明橡胶接头是一种常见的管道连接件,主要用于连接管道的两端或与设备连接处,具有良好的耐压、耐磨和耐腐蚀性能。
橡胶接头的安装是确保管道连接牢固、密封可靠的关键过程,下面将详细介绍橡胶接头的安装步骤和注意事项。
一、准备工作1. 检查橡胶接头的型号、规格和材质是否与管道相匹配,确保选择合适的接头。
2. 清理管道两端的焊缝、螺纹或法兰连接处,确保表面平整、干净,无杂质和尘土。
3. 检查橡胶接头是否有损坏或变形,如有问题应及时更换。
二、安装步骤1. 将橡胶接头的两端插入管道或设备的连接口,确保插入深度符合要求。
2. 检查接头的位置和方向是否正确,确保与相邻管道或设备对齐。
3. 使用扳手或扳手套筒逐步旋紧螺纹或法兰螺栓,注意力均匀施力,避免过度拧紧。
4. 安装完成后,检查接头是否处于正常位置,无松动、歪斜或变形现象。
5. 检查接头的密封性能,可通过压力测试或涂抹肥皂水等方法进行检测。
三、注意事项1. 在安装前应检查管道系统是否有压力,如有压力应先卸除压力,确保安全。
2. 接头安装时应注意保护接头的橡胶部分,避免受到损坏。
3. 安装过程中应避免接头与其他硬物碰撞,以免造成损坏或变形。
4. 定期检查橡胶接头的使用情况,如发现损坏或老化现象应及时更换,以确保管道系统的正常运行。
5. 在特殊环境或介质下使用橡胶接头时,应选择适合的材质和型号,以提高其耐腐蚀和耐高温性能。
总结:橡胶接头的安装是确保管道连接牢固、密封可靠的重要环节。
通过正确的安装步骤和注意事项,可以保证橡胶接头的正常使用和延长其使用寿命。
在实际操作中,应严格按照安装说明进行操作,并定期检查和维护橡胶接头,以确保管道系统的安全稳定运行。
nVent ERIFLEX 接地和中性母线连接器说明书
![nVent ERIFLEX 接地和中性母线连接器说明书](https://img.taocdn.com/s3/m/4cfce3301fd9ad51f01dc281e53a580217fc5071.png)
nVent ERIFLEX连接、接地和中性母线用于连接面板内的多个接地导体,并且可用于开关设备、控制设备、电气设备、风力和太阳能发电以及数据中心等各类应用。
CERTIFICATIONSFEATURES用于连接多个接地导体倒角孔可实现方便连接刚性棒符合《电气、电子设备中限制使用某些有害物质指令》(RoHS) 标准SPECIFICATIONS材料:黄铜DIAGRAMS警告应仅根据 nVent 的产品说明书与培训材料安装并使用 nVent 的产品。
可访问 获取说明书,或者向您的 nVent 客服代表索取。
错误安装、使用不当、滥用或未能完全遵守 nVent的说明与警告,可能会造成产品故障、财产损失、严重的人身伤害及死亡和/或使得保修服务无效。
北美+1.800.753.9221Option 1 – Customer Care Option 2 – Technical Support欧洲Netherlands:+31 800-0200135France:+33 800 901 793欧洲Germany:800 1890272Other Countries:+31 13 5835404APAC Shanghai:+ 86 21 2412 1618/19Sydney:+61 2 9751 8500© 2023 nVent. All nVent marks and logos are owned or licensed by nVent Services GmbH or its affiliates. All other trademarks are the property of their respective owners.nVent reserves the right to change specifications without notice.Our powerful portfolio of brands: CADDY ERICO HOFFMAN RAYCHEM SCHROFFTRACER2。
橡博电气美式箱变安装说明书
![橡博电气美式箱变安装说明书](https://img.taocdn.com/s3/m/7d81e1addd3383c4bb4cd2e2.png)
6. 从临时容器的底部将油泵回,注意不可让进油管吸入空气,补充油应与箱变运行油同种类,并通 过试验证明合格。若种类不同,则需进行混油试验。
注意:有时有必要在容器中加入一些储备油,以补充损失在泵及输油管中的少量油,并防止在输油管 中吸入气体。
7. 为防止高速油充气,应使油沿着铁心夹件的上表面流入。 8. 缓慢的泵入。达到油位计上 25℃时的正常油位指示。
3)拆卸及安装:打开箱盖前应释放压力,降低绝缘油位直到露出套管,断开所有内部外部电
缆和导线。
4)箱盖的拆卸:对已接入系统的箱变进行检查时,一定要先断电、接地并隔离。箱变的箱盖是用螺
栓固定的,没有检查孔,进行内检查时需卸下整个箱盖。一定要注意防止灰尘或水气进入打开的 设备。绝缘油的污染会妨碍箱变正常工作,而且可能导致箱变的严重损坏。 警告:在打开箱盖之前,必须拉起压力释放阀,使内部压力释放至零。如不这样做,可能导致人身伤
箱变附件根据订货情况可附有单通套管接头、双通套管接头、200A 肘形电缆头、T 型电 缆头、单通接头、双通接头、肘型避雷器、带电显示器、故障指示器、绝缘帽等,其安装方 法见附表。 4) 低压设备的安装
低压设备的安装方法与国内类似产品相同。 5) 安装注意事项
● 在作任何系统接线之前,先将箱体接地。箱变中性点接地,中性点与外壳连接起来。外壳 及电缆屏蔽层要良好接地。
● 额定电压:10kV+2×2.5/0.4kV;10kV+5%/0.4 ● 最高电压:12kV ● 接线组别:Dyn11,YynO ● 额定容量:100 125 160 200 250 315 400 500 630 800 1000 1250 kVA; ● 额定频率:50Hz ● 绝缘水平:1 分钟工频耐压:35kV
电缆连接器安装指南说明书
![电缆连接器安装指南说明书](https://img.taocdn.com/s3/m/7a52300968eae009581b6bd97f1922791688befc.png)
2.P ele el forro externo 3,18cm (1,25pulg.),corte cualquier cable excedente,blindado y de conexión a tierra.P ele 0,64cm (1/4pulg.)de aislamiento de los cuatro cables restantes.No es necesario ni se recomienda estañar los cables.1.Inserte el cable por medio del tornillo de sujeción,el anillo de compresión,la arandela y el manguito,como se muestra.3.Oriente el extremo del conector de manera que el tornillode conexión de la clavija central estéde manera horizontal de frente al lado derecho (consulte el detalle).4.Consulte el detalle de las clavijas.4A -Cableado para indicación llena (sumergida):Cablee ENGÍA+hacia el terminal de la parte superior derecha (clavija 1)y el cable de ENGÍA-hacia el terminal de la parte inferior izquierda (clavija 3).Cablee la salida hacia la parte inferior derecha (clavija 4).4B -Cableado para indicación vacía (no sumergida):Cablee ENGÍA-hacia el terminal de la parte superior derecha (clavija 1)y ENGÍA+hacia el terminal de la parte inferior izquierda (clavija 3).Cablee la salida hacia la parte inferior derecha (clavija 4).5.Atornille el manguito.Sólo apriete de manera manual.6.Presione la arandela en el manguito y apriete el tornillo de sujeción con la mano contra el anillo de compresión.7.Utilice una llave para apretar el tornillo de sujeción otros 3/4de vuelta.¡No apriete demasiado!Extremo del conectorSección 1-Conjunto de conector con cable flexible aisladoNivel de punto capacitivo de LS Guía de instalación de inicio rápidoMod.3.0Doc 11381de 2Página Boletín técnicoAnderson Instrument Co.,Inc.156Auriesville Road Fultonville,NY 12072Teléfono ó:518-922-5315800-833-0081Fax:518-922-8997800-726-6733óP ara instalar el conector,simplemente alinee la llave,presioneal interior del receptáculo y apriete el anillo deretención .con la mano *Las clavijas del receptáculo deben estarrevestidas con grasa dieléctrica aprobada por el Departamento de Agricultura de los Estados Unidos (USDA,por sus siglas en inglés)para minimizar la posibilidad de corrosión.N /P °:5662400000deManguitode sujeciónelija uno para alojar el diámetro externo del cableClavija 1-ENGÍAClavija ENGÍA 318a 36V Salida4-Sección 2-InstalaciónDE ESTADOCUANDO ESTÁCUANDO ESTÁSUMERGIDOACTIVO ALTO INDICACIÓN LLENADE ESTADO -SECOCUANDO NO ESTÁSUMERGIDOACTIVO BAJO INDICACIÓN VACÍAPNP:Fuente18a 36V CC MÁX.(1W)NPN:Disminución18a 36V CCMÁX.(1W)VCC)**La polaridad estádeterminada por la acción deseada del conmutador.Consulte las acciones del conmutador a continuación.Conector con cable flexible aislado (ensamblado)Cable (rojo)de +ENGÍA –Clavija 1**Cable (verde)de +ENGÍA –Clavija 3**N /P °:42119B0000(sin cable)Cable (azul)de salida conmutada Clavija -4-1.1-2.2-206-403-257-504-308-605-359-70--.-La acción del conmutador estádeterminada por la polaridad del suministro de energía.Si se usa un conector con cable flexible aislado,consulte la instrucción 4en la sección 1para obtener las instrucciones de cableado.Si se compra un cable de montaje,conecte el conductor rojo a ENGÍA+(18a 36V)y el conductor verde a ENGÍA para una indicación llena (sumergida).Revierta esta instrucción para una indicación vacía (no sumergida).Se puede ajustar un sensor de prueba para la instalación,para obtener una salida continua:P osición 0-Salida apagada P osición Salida encendidaLas posiciones 2a la 9actúan como un ajuste de sensibilidad,la posición selecciona el mínimo dieléctrico que se reducción del umbral dieléctrico puede ser útil para eliminar las mediciones falsas.P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico P osición Dieléctrico La unidad estándar es la salida PNP ,consulte los detalles para la conexió unidad opcional es la salida NPN,consulte los detalles para la conexión.El medio debe contener agua o una constante dieléctrica 20P or lo general se ignoran los revestimientos.Los revestimientos de medios altamente conductivos de 30ms/cm pueden causar errores Generalmente se ignora la espuma≥≥≥≥≥≥≥≥Elija la acción del conmutador:Prueba de salida del conmutador giratorio y ajuste de umbral:Circuito de salida:Varios:Ajuste de Conjunto de cables moldeados(negro)de salida conmutada Clavija -4Cable (café)de +ENGÍA –Clavija 1**(azul)de +ENGÍA –Clavija 3**Nota:Los cables blanco y gris no se usan42117F007542117F0100Mod.3.0Doc 11382de 2Página Sección 3-EspecificacionesEspecificaciones de operación y medioambientalesLímites de temperatura ambiente Clasificación de presión 10barias (150PSI)máximo Límites de temperatura de proceso:0a 100C (32a 212F)Limpieza en el lugar 150ºC (302ºF)máximo 60minutosFunción El cableado determina si laseñal es llena o vacíaTiempo de respuesta 0,1seg.Umbral dieléctrico mínimo Seleccionable de 20a 70Especificaciones eléctricas Requisitos de voltaje Consumo de energía Tipo de 0,6W (es decir,de 25mAa 24V CC)Salida de señal Suministro (activo de 50mA)NPN opcional:Disminución (máximo de 50mA)Energía de transmisión de señal Conexión Un conector eléctrico micro miniM12de 3clavijas (RDR)°°PNP::14a 140F)::::::18a 36V CC (20mA):::1mw :°≤≤-10a 60C (°Especificaciones mecánicas Materiales bañados Acero inoxidable 316L,PEEK Acabado bañado Superior a Ra =32Material de la cubierta Cubierta,tapa y conexión roscada deacero inoxidable de serie 300(superficies que no son de contacto).Protección de caja Aprobación de agencia Cumple las normas CE Cumple las normas 3-A,verificado terceros de acuerdo con la norma 74-03Indicador visualIndicador LED de estado Rojo:Sonda sumergidaVerde:Sonda en seco Garantía:2añospor ::::NEMA 4X,IP69K :;:ATENCIÓN:CABLEADO DEL CONECTORClavija Salida de conmutador MÁX.50mAClavija Clavija 1-18a 36V CC V CC Com 3-V CC Com 18a 36V CC 4-Consulte un boletín técnico para obtener información sobre los códigos de color de Anderson.Ind.llena Ind.vacíaEXTREMO DE SENSORCLAVIJA 3CLAVIJA 1CLAVIJA 4lb)mm pulg.)。
GIS封闭母线安安装使用说明书
![GIS封闭母线安安装使用说明书](https://img.taocdn.com/s3/m/37171545767f5acfa1c7cd09.png)
ZF15-550型六氟化硫封闭式组合电器用封闭母线安装使用说明书OKB.412.339.2新东北电气集团高压开关有限公司目录1概述 (1)2主要技术参数 (1)3母线结构和工作原理 (2)4母线的安装 (4)5清单 (10)附图 (17)1 概述1.1 产品型号和名称ZF15-550/六氟化硫封闭式组合电器封闭母线。
1.2 主要用途及范围封闭母线是ZF15-550封闭式组合电器(GIS,同下)的重要组成部分,具体分为:主母线、分支母线、进出母线;详细分为:VI、VG、VT、VL、VW、VP、VQ、HT连接母线。
它们的主要用途是连接GIS中的各个元件(包括与主变间的连接),以满足GIS在布置上的各种要求。
不同形式的连接母线具有不同的作用,详见本说明书第3章。
1.3 使用环境条件见安装使用说明书总体部分2 主要技术参数2.1 额定电压 550kV2.2 额定频率 50Hz2.3 额定电流 2000A,3150A,4000A2.4 额定短时耐受电流 63kA2.5 额定短路持续时间 3s2.6 额定峰值耐受电流(峰值) 171kA2.7 额定绝缘水平额定雷电冲击耐受电压(峰值)(1.2/50μs) 1675kV额定操作冲击耐受电压(峰值)(250/2500μs) 1300kV1min工频耐受电压(有效值) 800kV六氟化硫气体零表压工频耐受电压(有效值): 320 kV 15min350 kV 5min2.8 六氟化硫气体额定压力(20B C,表压) 0.36MPa2.9 六氟化硫气体压力降低报警压力(20B C,表压) 0.31MPa2.10六氟化硫气体压力最低运行压力(20B C,表压) 0.29MPa2.11六氟化硫气体年漏气率:不大于0.5%/年2.12六氟化硫气体水分含量:交货验收值不大于250μL/L运行允许值不大于500μL/L2.13母线温升允许值(周围空气温度40B C时)a)主导电回路中的导体及触头连接处<65Kb) 主导电回路中的螺栓联结部位<65Kc)壳体可触及部位<30K2.14外壳感应电压不高于36V。
WavePro-II 密集型母线槽 安装维护说明书
![WavePro-II 密集型母线槽 安装维护说明书](https://img.taocdn.com/s3/m/9d12b7a9112de2bd960590c69ec3d5bbfd0ada3c.png)
• 更安全,更可靠,节能高效• 为客户创造更多价值—安装维护说明书WavePro-II 密集型母线槽—母线的起源,可以追溯到20世纪40年代的美国。
为满足当时蓬勃发展的汽车制造业低压配电的需求,最早的母线槽产品 - LVD系列金属铠装母线应运而生。
1989年,我们推陈出新,在LVD金属铠装母线的基础上,推出里程碑式的全新产品:SPECTRA 系列母线,率先采用铝合金外壳以及Blue Coat™环氧树脂涂层绝缘等多项创新技术,成为业界新标准的制定者。
随后,为了丰富母线产品线,更好的服务于GB/IEC市场客户的需求,我们推出了WAVEPRO系列母线产品。
今天,SPECTRA和WAVEPRO系列母线已经是ABB低压电气成套产品家族的重要成员,产品符合ANSI/UL、IEC 和GB 等主要的产品标准。
全方位服务于全球客户,业绩遍布全球,赢得了各行业客户的信任。
—目录004 本说明书中使用的警告、小心和注意标识005 存放注意事项005 搬运和装卸注意事项006 安装前准备007-018 母线槽安装007-011母线槽与连接器安装012-013母线槽水平安装014-015母线槽竖直安装016-018插接箱的安装019 母线槽调试运行与维护020 安全注意事项021 常见故障及处理办法022 附件警告WavePro-II 母线槽的安装必须由专业人员按照安装指导手册进行。
安装人员需经过电气产品安装培训,具备相关安装资质,操作时应穿戴相应的安全防护用具。
4WavePro-II 密集型母线槽 安装维护说明书— 本说明书中使用的警告、小心和注意标识本文件以在它出版时的可用信息为基准。
在努力保证准确性的同时,本说明书中的信息可能无法涉及所有硬件上的细节或者变化,也可能无法为与安装、使用和维护相关的所有情况提供帮助。
本说明书中的特征描述不是在所有母线槽系统中都出现的。
对于今后的更改,ABB没有义务告知本说明书的用户。
警告此说明中尽可能将所有在设备安装和使用时出现的危险电压、电流或其他可能造成人身伤害的情况予以警告和提醒。
pilzpsen14a-51接线说明书
![pilzpsen14a-51接线说明书](https://img.taocdn.com/s3/m/42a5d2c6aff8941ea76e58fafab069dc502247b3.png)
pilzpsen14a-51接线说明书
Pilz Psen 14A-51是一款安全模块,用于开关门,滑台等应用,旨
在提供安全和可靠的控制。
为了确保正确使用和安装,本文将概述Pilz Psen 14A-51电气连接的安装和操作说明。
一、安装要求
1. 安装Pilz Psen 14A-51之前,用户应熟知安装说明书中的所有内容。
2.安装时应注意电气安全,确保电源接线正确有效。
3. Pilz Psen 14A-51安装时应遵循安全技术和消防法规,避免无关
设备的有害影响。
4.由于不同控制系统和配置的不同,安装时应确保硬件系统正确有效。
二、电气配置
1. 为了合规,Pilz Psen 14A-51的电源接线应采用3C / H05 VV-F
3G料线,长度约2米。
2. 必须将Pilz Psen 14A-51连接到控制系统中,接地应使用镍金属
端子,每个端子均应有足够的压力紧固螺母,夹箍和接线盒。
3.为了安全有效地运行Pilz Psen 14A-51,接线应遵循电气图中的
插接标准。
4.使用防静电料线,防止静电干扰造成的故障。
三、指示灯配置
1.指示灯的配置应根据电气图中的指示灯配置说明进行连接,指示灯的使用也应符合电气图中的指示灯配置说明。
2. Pilz Psen 14A-51的指示灯共有五个。
软母线安装作业指导书(耐张线夹)
![软母线安装作业指导书(耐张线夹)](https://img.taocdn.com/s3/m/8be1ac7a1711cc7931b716ff.png)
作业指导书工程编号:工程名称: 110KV柳林变电所工程单位工程名称: 110KV、35KV屋外配电装置安装、主变压器安装分部工程名称:引下线及设备连接线安装作业项目名称:软母线安装编制单位:湖北电建二公司电气工程处编写:日期:审核:日期:会签:日期:批准:日期:实施日期:2002-6-1 版次 1目录1.编制依据2.施工内容3.施工条件4.施工程序和方法5.技术质量要求6.安全注意事项7.施工器具一、编制依据1.1 根据湖北电力勘测设计院设计图纸1.2 根据电气装置安装工程母线施工及验收规范DL/T 5161.2-2002、GBJ149-90。
1.3 火电施工质量检验及评定标准,电气装置篇。
二、施工内容35kV屋外配电装置和35KV屋外配电装置内所有软母线安装,屋外变压器软母线安装,共计安装LGJ-300/25型70米,LGJ-400/35型90米,2XLGJQT-1400型90米。
所使用金具是螺栓型金具。
三、施工条件3.1 土建施工已结束,并达到安装强度3.2 施工场地平整、道路通畅3.3 软母线安装应在变电所内设备安装后进行。
四、施工程序和方法施工程序如下所示:(4.1)施工准备→(4.2)测量、放线、下料→(4.3)组合安装→(4.4)引下线安装4.1 施工准备4.1.1 施工用绞磨、钢丝绳、起重滑车等器具应齐全4.1.2 检查清点金具、导线、绝缘子4.1.2.1 软导线不得有扭结、松股、断股及其它明显的损伤或严重腐蚀等缺陷4.1.2.2 金具应进行下列检查a.规格与设计相符,零件配套齐全b.表面光滑,无裂纹、伤痕、砂眼、锈蚀、滑扣等缺陷,锌层无脱落c.转动部分灵活4.2 测量尺寸及放线下料4.2.1 用盘尺测量两挂线点的距离4.2.2 根据测得的两挂点间的距离,利用下面公式计算导线长度:L=L0+8*F*F/3L0-L1L 导线实际长度L0两挂点间的距离F 设计要求弛度L1绝缘子串及金具长度4.2.3 设备引下线长度的测量根据线夹具体位置,用尺从线夹端到设备接线端子出线板上测量,由人观察其弧度来确定长度。
puls铝焊机中文说明书
![puls铝焊机中文说明书](https://img.taocdn.com/s3/m/83be140dccbff121dd368347.png)
高压橡套电缆敷设与电缆连接器连接标准作业流程
![高压橡套电缆敷设与电缆连接器连接标准作业流程](https://img.taocdn.com/s3/m/93bc7afc2e3f5727a4e9623f.png)
1)密封圈内径与电缆外径差小于1毫米;
2)电缆外套进入接线腔连接筒距离内壁15毫米;
3)塑料模壳高度90毫米,大口直径110毫米,小口直径为电缆外套直径,大口向上,小口套至电缆根部;
4)固化剂和环氧树脂复合物混合按照说明书要求操作;
5)环氧树脂固化时间为20-40分钟;
7)主线芯包绕自粘胶带。
1)根部环切平整,剥去长度为250毫米;
2)屏蔽网根编织整齐,绝缘管套到根部,另一端露出导线28毫米;
3)半导体胶处理干净、剥内护套时不能划伤线芯;
4)接地线露出导线28毫米;
5)主线芯绝缘层剥切长度为28毫米;
6)半导体层剥离干净,剥去长度为190毫米,半导体胶处理干净;
7)自粘胶带拉伸100%-200%,包绕2层。
矿井维修电工
做的电缆头工艺不符合要求可能造成漏电
6
浇注环氧树脂
1)安装喇叭嘴、挡圈、密封圈;
2)电缆穿入接线腔连接筒,紧固喇叭嘴螺栓;
3)电缆头末端朝上竖起、电缆根部套塑料模壳,主线芯、接地线、屏蔽线分布均匀;
4)混合固化剂和环氧树脂复合物;
5)注入环氧树脂;
6)去掉漏斗;
7)在伸出环氧树脂的主线芯上包绕聚氯乙烯带;
4
检查作业环境
检查作业区域水情况。
防淋水措施到位。
矿井维修电工
敷设电缆接线盒的地点有淋水,接线盒进水短路造成设备损坏
5-1
拆开电缆连接器
1)拆下连接器两端的喇叭嘴、密封圈、挡圈;
2)拆下连接器的连接筒、绝缘体。
1)螺栓、弹垫放在专用盒内;
2)连接筒、绝缘体放置处上方干燥无淋水。
矿井维修电工
拆卸下的零部件未集中摆放可能造成零部件丢失
6kV共箱母线安装作业指导书
![6kV共箱母线安装作业指导书](https://img.taocdn.com/s3/m/f3570341f7ec4afe04a1dfa4.png)
1.范围本作业指导书适用于云南滇东发电厂4×600MW机组#2机组6kV共箱母线的安装。
2.引用标准《电气装置安装工程质量检验及评定规程》(DL/T5161-2002)《电气装置工程施工及验收规范》母线安装篇(GBJ149-90)《电力建设安全工作规程》(DL5009.1-2002)3.编制依据根据上述引用标准和设计图纸50-F111S-D0402而编制。
4.工程概况主厂房共箱母线包括备用段至工作段6kV共箱母线、#2高压厂用工作变压器6kV共箱母线、起动/备用变压器6kV共箱母线。
其中,6kV配电室内共箱母线采用吊装结构支承,A列外6kV共箱母线采用支架结构支承。
5.工作量6kV共箱母线安装工程量包括制造厂供货设备材料和施工单位现场加工材料。
现分别列表如下:制造厂供货设备材料表:6.1人员配备需要电气一次设备安装人员8人(组长2人,配合及搬运工人6人),持有效证件电火焊工、起重工各1人。
6.1工机具配备见下表:6.3.1 制造厂供货材料应无缺陷、外观良好、设备尺寸应符合设计图纸尺寸,现场自备的安装材料也应按图纸尺寸加工完毕。
6.3.2室外6kV共箱母线基础、构架及6kV配电室的屋顶、楼板施工完毕,并经验收移交安装。
所有支吊点预埋铁件位置应与共箱母线支吊架安装尺寸大体吻合,所有共箱母线穿越的预留孔洞应符合设计要求.6.3.3 为便于主厂房A排柱外6kV共箱母线的安装,必须按规定搭设脚手架和竹跳板,并将竹跳板用#14铁丝绑扎牢固,经验收合格后方可使用。
6.3.4 加工2个活动人字梯,便于6kV配电室内共箱母线的安装。
(见附图)。
7.作业程序和方法7.1设备到货检查:7.1.1 检查厂家成套提供的产品合格证书,产品使用说明书,设备试验数据,图纸以及备品备件、专用工具并做好记录。
7.1.2检查设备型号、规格是否符合设计要求。
7.1.3检查设备缺件型号、规格、数量,并及时反馈给厂家。
7.1.4检查设备缺陷情况和原因,做好记录,向上级部门报告。
(1)LBG1-200.400高压电缆连接器说明书
![(1)LBG1-200.400高压电缆连接器说明书](https://img.taocdn.com/s3/m/c0698c294b35eefdc8d333c1.png)
十、
10.1
开箱后应检查产品是否与用户所定购的产品相符、产品合格证、使用说明书等重要文件。
额定电流(A)
极限通过电流
动热稳定电流
配用电缆
最大外径mm
有效值
峰值
热稳定
2秒
动稳定
2秒
橡套
LBG1-200/6
6
200
9千安
15千安
3.15千安
7.875千安
78
LBG1-400/6
6
400
9千安
15千安
6.3千安
14千安
78
LBG1-200/10
10
200
9千安
15千安
3.15千安
7.875千安
2.1.2接线装置为无缝钢管制造的中壳及螺栓固定于内腔的绝缘件组成。
2.1.3可动接触部分由装于绝缘件内的铜接线座、铜接线管(GT型外购件)、铜插座及接触杆组成;连接器在接触杆处分成各包有上述三部分的两段,接触杆为两段公用的连接装置;壳体外有铭牌,警告牌及防爆标志。
三、
3.1
表1
型 号
额定电压(kV)
5.2.18在连接器的绝缘体孔内全部插上接触杆,然后把另一段电缆的连接器插上,须注意不要漏掉中壳法兰面上的密封垫圈,并装好螺栓。
5.2.19当两个连接器相连成一个完整的连接器,并接入运行线路必须将连接器两端的外接地桩可靠接地,在井下应与下接地网可靠连接。
电气及自动化设备施工作业指导书滑接线及移动软电缆安装.docx
![电气及自动化设备施工作业指导书滑接线及移动软电缆安装.docx](https://img.taocdn.com/s3/m/5302f41aa36925c52cc58bd63186bceb18e8ed75.png)
电气及自动化设备施工作业指导书第十三册滑接线及移动软电缆安装中国建材工业建设苏州安装工程公司二OOo年五月第一版本幸讲述滑接线及移动软电缆施工中所常用材料的选用、施工作业过程要求,适用于电压在5000以下的各式起重机、电动葫芦和其它可移动用业设备如堆、取料机等。
一、施工常用材料1、通用橡皮软电境:主要有四芯软电缆;YC、YeW型软电缆:YZ、YZW型软电缆,均为铜芯橡皮绝缘护套软电缆,允许长期工作温度为+65°C,各型软电缆规格见表1.1、1.2、1.3。
表1. 1四芯电缆2才安全国通用标准图集D364,吊索选用φ6圆钢(A3材质) 或。
7.5、。
8.5、。
9.4钢丝绳68371-64),吊索的许用最大应力、最大拉力参见表2。
表23、移动式软电境吊索终端拉紧装置此套金具:见表3。
表中I型用手吊索跨距在30米以内,Il型用于吊索跨距在60米以内,川型用于吊索跨距在100米以内。
4、滑接线及移动软包缆施工常用材料还有:花篮螺栓、钢丝绳、轧头、钢丝绳用套环、扁钢、热轧等边角钢、WX-01 绝缘子、并沟线夹等。
二、施工条件1、施工图纸齐全、设计交底纪要已收到,施工方案已审批下达。
2、所使用的包器设备及器材,均应符合国家或部颁的现行技术标准,并具有合格证件。
3、相关建筑物和构筑物的土建工程质量应符合现行的建筑工程施工及验收规范中的有关规定。
4、土建工程已具备下列条件:a.混凝土梁上预留的滑接线支架安装孔和悬吊式软电缆滑接线端拉紧装置的预埋件、预留孔位置应正确,孔洞无堵塞,预埋件应牢固;b.安装滑接线的混凝土梁应完成粉刷工作;5、组织施工人员熟悉施工现场,了解设计技术要求,准备好施工机具及器材。
三、施工过程1、布置清接线滑接线距地面高度不得低于3. 5米;在汽车通过部分不得低于6米,不满足条件的要采取措施。
滑接线距离一般管道不小于1米;距离设备和氧气管头不应小于1.5米;距离易燃气体、液体管道不应小于3米。
橡博电气T型头_T-II型头_安装说明书
![橡博电气T型头_T-II型头_安装说明书](https://img.taocdn.com/s3/m/742889e79b89680203d825b7.png)
MT-15/600 MT-II-15/600预制插入式电缆终端头一、特点采用预制热(冷)缩技术;进口橡胶,高抗撕阻燃配方, 防洪可触摸,可在水中安全运行。
二、用途本终端为屏蔽型螺栓式连接;它适用于环网开关柜、电缆分接箱、箱式变电站的(交联电力电缆)进出线终端,与双通绝缘套管用螺纹联接。
额定电压8.7/15KV (或8.7/10KV ),额定电流630A ,适用电缆截面25-500mm 2。
相对配套应力锥与电缆截面配制关系如下:(应力锥端面有相应标示,请安装使用前核对)应力锥内径MM12 15 18.5 21.5 25.5 29电缆截面(平方MM) 25~5070~95120~150185~240300 400~500三、结构1.本产品采用美国进口橡胶制作,无毒,无味;下部的应力锥均匀了电缆终端的外屏蔽切断处的电场;2.上部的屏蔽型前接头使带电部分全部密封绝缘,外表面有半导电屏蔽层,工作时外表面接地,可在水中安全运行。
四、安装:安装前先确认应力锥,1、电缆分相处理(见图1)1. 1按图1尺寸剥去电缆外护套,长度为按图示尺寸距外护套端部20mm 钢铠端部10mm 1. 2清除填料,将三相分开,并用PVC 间一相(B 相)应锯短,使其三相平齐。
2、防水处理(见图2)`2.1热缩方法:1) 采用一条地线(25mm 2)的方法:并渗锡焊牢,同时,在距外护套35mm 2)采用两条地线的方法:一条16mm 2的铜编织带用于钢铠接地,一条编织带用于三相铜屏蔽层接地。
注意:不要让两条地线短路连接。
3)清理掉焊锡头及扎线部的扎头,用PVC 4)套上热缩三指手套,均匀加热使其收缩,然后套上热缩绝缘管,均匀加热使其收缩。
美式T 型头/T-II 型头安装说明书注意:涂有热熔胶的一端分别套至三指套根部。
2.2冷缩方法:2.1、把铜编织带(地线)末端插入电缆三叉处,并绕包三相铜屏蔽一周后引出,再用两个大恒力弹簧分别卡紧铜编织带于屏蔽层及钢铠上,两个大恒力弹簧间用填充胶填充间隙,并在钢铠处的恒力弹簧下约35mm 处缠绕密封胶。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
概述
开关柜PLUS型屏蔽母线连接器为屏蔽、防水设计,适用于满足DIN47636标准,套管额定电流为630A的SF6开关柜顶出型(PLUS)母线套管扩展连接.
警告:
在安装或维护期间,所有相连的电器设备必须断电;
所有电器设备必须按照安全规程(使用者制定的、当地门、国家制定的)进行安装。
本说明不能保证涵盖每一个可能发生的偶然件;
请不要用手直接接触或拆卸带电部分;
超出偏差的组装可能导致运行故障;
安装前检查部件的损坏、额定参数以及结合
件的兼容性;
安装工作必须由经过良好的高压电器设备相
关安全培训的人员进行;
安装步骤
请再次确认开关柜并柜工作已完成。
将随带的双头变径螺杆取出,用一字改锥
将螺杆旋进设备套管螺孔内;旋进后M12端
距设备套管端面长度为78mm.(螺杆M12端
长度标称是80mm,请在实际拧进的时候多拧
2mm,必要时检查长度,确保安装可靠。
)
用随带的清洁巾或无水乙醇清洁设备套管表
面,待溶剂挥发干净后用随带的绝缘润滑脂
均匀涂抹在套管表面。
用随带的清洁巾清洁已安装好的母线接头内表面,待溶剂挥发干净后用随带的绝缘润滑脂均匀涂抹在接头内表面。
将已安装并润滑好的母线接头装入设备套管上。
在穿过接头母线夹的螺杆上,依次装上碟簧垫片,M12螺母,并用专用套筒扳手拧紧螺母,拧紧螺母的力拒要求大于200N。
清洁并润滑绝缘塞表面,先将放气用的尼龙绳放入接头内,再将已润滑的绝缘塞装入接头内,用扳手将其拧紧即可,拧紧力拒大于50N即可;
将随带的屏蔽罩安装在已紧固的绝缘塞末端。
将接头上的接地线安装在设备箱体接地螺栓上并牢靠紧固。
注意:请勿用非指定或非随带的绝缘润滑脂作为接头安装的润滑剂。
说明: 若接头与母线管之间的相交部位出厂前没有缠绕半导电胶带,请用半导电自粘带半搭接方式将接头与母线屏蔽表面相交周围缠绕3~4层。
附录:母线接头组装示意图(反面)
步骤5
步骤4
步骤2/3
放气及安装绝缘塞装屏蔽帽对接终端安装完毕。