工程师英文简历介绍
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
工程师英文简历介绍
工程师英文简历模板介绍
向大家推荐的是工程师的英文模板
Name : YjbysTEL:
EDUCATION Bachelor of Science in Electrical Engineering --University of Southern California 2000 Associate in Engineering Electronics --University of Southern California 1981 Job descriptions emphasize candidate's aomploshments.
ELECTRONICS ENGINEER(Experienced) Sandy Lin
15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING. BACKGROUND SUMMARY Over eleven years of extensive puter/electronics experience.Versed in both digital and analog electronics withspecific emphasis on puter hardware/software.Special expertise in system and ponent work supervisor responsible for installing/maintaining Aret LAN system.Proficient in assembly and C programming languages.Excelent munication skills including
written,verbal and interpersonal. PROFESSIONAL WORK EXPERIENCE Stevenson Data Systems,Los Angeles,CA-2003 Components Evaluation Engineer 2002-2003 Responsible for the characterization and evaluation of, and approved vendors list for:Power
supplies,oscillators,crystals,and programmable logic used
in desktop and laptop puters.Evaluated and remended quality ponents that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with ponents qualification.Technical advisor for Purchasing.Promoted to engineer II. Design Evaluation Engineer 2000-2002 Evaluated new puter product designs ,solving environmental problems on
prototype puters.Conducted systems analysis on new puter profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental
testing.Performed reliability lift testing on puter systems.Installed/maintained 20 user.Novell,Aret LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry
standards.Analyzed plete power and load of puter system and subsystem to verify power and load estimations.
模板,内容仅供参考