变电站设计文献综述毕业设计(最新整理)
(完整版)110kV变电站设计毕业设计(论文)
110kV变电站设计摘要本次毕业设计以110kV 变电站为主要设计对象,该110kV变电站是地区重要变电站,是电力系统110kV电压等级的重要部分。
该变电站设有2 台主变压器,站内主接线分为110kV、35 kV、和10 kV 三个电压等级。
本设计的第一章为绪论,主要阐述了变电站在电力系统中的地位。
设计变电站的原则和目的以及变电站的基本情况。
第二章是负荷计算及变压器的选择,根据已知变电站的负荷资料对变电站进行负荷计算。
通过得出的负荷确定了主变的容量和台数、主变的型式及主变阻抗。
第三章是变电站电气主接线的设计,分别通过对110kV、35kV、10kV侧电气主接线的拟定,选择出最稳定可靠的接线方式。
第四章是短流计算,首先确定短路点,计算各元件的电抗,然后对各短路点分别进行计算,得出各短路点的短路电流。
第五章是电气设备的选择,电气设备包括母线、断路器、隔离开关、电流和电压互感器、熔断器。
第六章是配电装置,主要对变电站的配电装置进行设计。
通过对110kV变电站设计,使我对电气工程及其自动化专业的主干课程有一个较为全面,系统的掌握,增强了理论联系实际的能力,提高了工程意识,锻炼了我独立分析和解决电力工程设计问题的能力。
关键词:电气主接线短路计算电气设备AbstractThis graduation project take the 110kV transformer substation as the main design object, this 110kV transformer substation is the local important transformer substation, is the electrical power system 110kV voltage rank important part. This transformer substation is equipped with 2 main transformers, in the station the first chapter is an introduction, mainly elaborated the transformer substation in electrical power system status. Designs the transformer substation the principle and the goal as well as the transformer substation basic situation. Second chapter is shoulders the computation and the transformer choice, carries on the load computation according to the known transformer substation load material to the transformer substation. Through the load which obtains , the winding wiring way, the accent press the way and the electricity , separately through to 110kV, 35kV, 10kV side electricity , first determined short-circuits the spot, calculates various parts reactance, then to respectively short-circuits separately to carry on the computation, obtains respectively short-circuits the short-circuit current. Fifthchapter is the electrical equipment choice, the electrical equipment including the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power distribution equipment. Seventh chapter is anti-radar with the earth, this chapter the choice to the arrester, as well as design, causes me electric power project design question ability.Key words: The electrical Electrical equipment目录1 绪论 (3)1.1变电站设计的原因和目的以及原则 (3)1.2变电站的基本情况 (3)1.2.1 原始资料 (3)1.2.2 所选地址及环境 (4)2 负荷计算及变压器选择 (5)2.1负荷计算 (5)2.1.1 负荷资料 (5)2.1.2 负荷计算 (5)2.2主变的选择 (7)2.2.1 主变压器容量和台数的确定: (7)2.2.2 主变压器型式的确定: (7)2.2.3 主变压器阻抗的选择: (8)2.3站用变压器的选择 (9)2.3.1 站用变台数的确定: (9)2.3.2 站用变的容量确定: (9)2.4无功补偿 (10)2.4.1 补偿作用 (10)2.4.2 无功补偿容量及电容器接线方式 (10)3 变电站主接线形式 (12)3.1变电站主接线的要求及原则 (12)3.1.1 设计要求 (12)3.1.2 设计原则 (13)3.2变电站主接线形式的选取 (14)3.2.1 110kV 侧主接线方案选取 (14)3.2.2 35kV侧主接线方案选取 (17)3.2.3 10kV 侧主接线方案选取 (18)4 短路电流的计算 (21)4.1短路电流计算的目的 (21)4.2短路电流计算 (21)4.2.1 各元件电抗计算及等值电路图 (21)4.2.2 110kV母线侧短路电流的计算: (23)4.2.3 35kV母线侧短路电流的计算 (24)4.2.4 10kV母线侧短路电流的计算 (25)5 电气设备的选择 (27)5.1电气设备选择的一般原则 (27)5.2载流导体的选择 (27)5.3断路器和隔离开关的选择 (30)5.4电流互感器的选择 (35)5.5电压互感器的选择 (38)5.6高压熔断器选择 (39)6 配电装置 (41)6.1配电装置概述 (41)6.2变电站各电压等级采用的配电装置 (41)6.2.1 110kV配电装置 (41)6.2.2 35kV~10kV配电装置 (42)总结 (43)致谢 (44)参考资料 (45)1 绪论变电站是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
文献综述-变电站设计
文献综述一、前言从十九世纪末期电力应用于生产以来,到今天已经成为当代世界物质生产的基本动力,电气化程度是各国国民经济现代化的重要标志。
电力工业是能源工业、基础工业,在国家建设和国民经济发展中占据十分重要的地位,是实现国家现代化的战略重点【1】。
近年来,随着我国国民经济的提高,工农业生产的机械化、电气化和自动化都对电力提出了越来越高的要求,人们日益丰富的物质文化生活也越来越依赖于电力的供应。
因此,我国的现代电力工业发展迅猛,同时电力行业的技术水平也逐步提高:巨大的水、火、核电联合电力系统形成;采用200~1000兆瓦大机组和1000兆瓦以上大电厂大量建设;超高电压在输变电方面广泛应用,因此需要建设相应的变电站。
变电所的分类:变电所在电力系统中的地位和作用是确定变电所属于那种类型的主要标志。
我国现今变电所的最高电压等级为330~500千伏,变电所可分为以下六种类型:1、枢纽变电所2、开闭所(开关站)3、中间变电所4、地区变电所5、企业变电所6、终端(包括分支)变电所【2】。
变电站是电网建设中非常重要的环节,而随着电力工业的发展,电力技术的提高,就使着变电所在建设中的技术要求也不断提高。
二、当前国内外变电站以及变电站设计现状1、国外变电站发展趋势。
近些年来,有一些发达国家的能源资源已经消耗的不少,因而不是很丰富,进而导致电力资源不是很充足。
为了满足他们国内的需求,减少在网路中的损耗,这些发达国家已经形成了完善的变电设计理论。
比较完善的变电站设计理论,是真正的做到了节约型,集约型,高效型。
发达国家通过改善优化变电站结构,降低变电站的功率损耗,尽可能地提高变电站的可靠性,尽可能地使变电站的灵活性提高,尽可能地提高经济性【3】。
2、变电站低压侧对短路电流的限制措施:变压器分裂运行,在变压器回路中装设分裂电抗器或电抗器,采用分裂变压器,在出线上装设出现电抗器。
除此之外,由于近代电力系统容量很大,大系统的电抗值很小,对比起来,220千伏及以下输电线路和电缆的电抗值就较大,从而起到良好的限流作用。
110kV变电站设计(毕业设计_毕业论文)
110kV变电站设计(毕业设计_毕业论⽂)题⽬:110kV变电站设计专业班级l 学⽣姓名学号摘要随着经济的发展和现代⼯业建设的迅速崛起,供电系统的设计越来越全⾯、系统,⼯⼚⽤电量迅速增长,对电能质量、技术经济状况、供电的可靠性指标也⽇益提⾼,因此对供电设计也有了更⾼、更完善的要求。
设计是否合理,不仅直接影响基建投资、运⾏费⽤和有⾊⾦属的消耗量,也会反映在供电的可靠性和安全⽣产⽅⾯,它和企业的经济效益、设备⼈⾝安全密切相关。
变电站是电⼒系统的⼀个重要组成部分,由电器设备及配电⽹络按⼀定的接线⽅式所构成,他从电⼒系统取得电能,通过其变换、分配、输送与保护等功能,然后将电能安全、可靠、经济的输送到每⼀个⽤电设备的转设场所。
作为电能传输与控制的枢纽,变电站必须改变传统的设计和控制模式,才能适应现代电⼒系统、现代化⼯业⽣产和社会⽣活的发展趋势。
随着计算机技术、现代通讯和⽹络技术的发展,为⽬前变电站的监视、控制、保护和计量装置及系统分隔的状态提供了优化组合和系统集成的技术基础。
随着电⼒技术⾼新化、复杂化的迅速发展,电⼒系统在从发电到供电的所有领域中,通过新技术的使⽤,都在不断的发⽣变化。
变电所作为电⼒系统中⼀个关键的环节也同样在新技术领域得到了充分的发展。
[关键词]变电站输电系统配电系统⾼压⽹络补偿装置AbstractAlong with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people.The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.Along with the high and quick development of electric power technique, electric power system then can change from the generate of the electricity to the supply the power.[key words] substation transmission system distributionhigh voltage network correction equipment.⽬录第1章原始资料及其分析 (3)1原始资料 (3)2原始资料分析 (4)第2章负荷分析 (5)第3章变压器的选择 (8)第4章电⽓主接线 (10)第5章短路电流的计算 (13)1短路电流计算的⽬的和条件 (13)2短路电流的计算步骤和计算结果 (14)第6章配电装置及电⽓设备的配置与选择 (17)1 导体和电⽓设备选择的⼀般条件 (17)2 设备的选择 (17)3 ⾼压配电装置的配置 (18)第7章⼆次回路部分 (21)1 测量仪表的配置 (21)2 继电保护的配置 (21)第8章所⽤电的设计 (27)第9章防雷保护 (39)结束语 (41)致谢 (42)参考⽂献 (43)附录⼀:⼀次接线图附录⼆:10KV配电装置接线图绪论电⼒⼯业是国民经济的⼀项基础⼯业和国民经济发展的先⾏⼯业,它是⼀种将煤、⽯油、天然⽓、⽔能、核能、风能等⼀次能源转换成电能这个⼆次能源的⼯业,它为国民经济的其他各部门快速、稳定发展提供⾜够的动⼒,其发展⽔平是反映国家经济发展⽔平的重要标志。
《变电站电气设计国内外文献综述3100字》
变电站电气设计国内外文献综述1.国外研究现状为了保证电力系统的一致性,欧美中等各个国家在电力的发展上采取了一定的同一措施,例如说力求技术整合标准,统一并共同研讨制定了变电协议基本标准之一的 eiec61850标准。
通过同一个紧密相关的系统功能处理模型,使不同国家不同电厂之间能够很好的进行整合,从而统一的进行质量控制和问题监控。
国外的很多制造商和厂家在这一方面已经做出了出色的成果,他们在不同的变电设备不同的电厂间进行良好的联合,并且生产出来智能的电器仪器设备和二次设备的技术。
我们很容易看到装置是朝着智能化的方向发展的,而且将在未来的很长一段时间都以这个方向进行发展,因为厂家都在寻找适合自己的生产人员,而如何对这些设备进行整合,朝着自动化的方向进步是需要专业人才的。
我们知道一些智能的小型组合开关键和小型智能组合开关柜是小型智能化的一些较特殊的例子,那么在能够看到变电站工作的过程中,就相当于是做了一次网络自动化智能评估。
在整体的个人感受上,经济相差不大,都大大提高了电力变电站的工程技术水平。
有不少的欧美国家把目标放在了智能控制系统上,而中国是在技术和管理得到优化后,再争取能够为正常的此类程序提供服务。
欧美,日本和北美等一些发达国家,他们的电力系统都比较强劲。
除了智能化之外,大多数的变电站都已经实现了无人值守这一特点。
通过统一的调度中心进行管理,所以说当他们的电网真的发生事故的时候,调动中心就可以利用机器来做出最及时的反应和应急处置。
在故障处理和预测方面,欧美国家做的比较先进,他们已经可以通过自动化和调度中心来进行对故障的预判和处理,防范风险等各项工作使得机器能够大规模的增强了可靠性,并可以利用科学的方法进行维护。
2.国内研究现状近些年来随着我们国民经济快速稳定的健康发展,对提高电能生产质量和电力供电系统可靠性建设提出了更高要求,电力工业的快速发展必须充分适应新的发展形势才能满足我们国民经济的快速发展和经济社会的不断进步的新时代要求。
毕业设计110 ∕35∕10kV降压变电站电气一次系统设计文献综述
文献综述1 变电站概述我国电力工业的技术水平和管理水平正在逐步提高,现在已有许多变电站实现了集中控制和采用计算机监控.电力系统也实现了分级集中调度,所有电力企业都在努力增产节约,降低成本,确保安全远行。
电力工业的发展,单机容量的增大、总容量在百万千瓦以上变电站的建立促使变电所建筑结构和设计不断地改进和发展。
变电站结构的改进、新型建材的采用、施工装备的更新、施工方法的改进、代管理的运用、队伍素质的提高、使火电厂土建施工技术及施工组织水平也相应地随之不断提高。
电力工业的迅速发展,对变电所的设计提出了更高的要求。
变电站是电力系统的重要组成部分,是电力网中的一个中间环节,它的作用就是通过变压器和线路将各级电压的电力网联系起来,以用于变换电压、接受和分配电能、控制电力的流向和调整电压,并起到联系发电厂和用户的中间环节。
2 110∕35∕10 KV降压变电站电气一次系统设计内容在电力系统中,变电站主要承担电压变换这一重要任务,其作用可以概括:1.提高输电电压,减少电能损失。
电能在输送过程中,由于电能的热效应,就要产生电能损失,且电能转化为热能的损失与电流的平方成正比。
因此,当输送功率一定时,提高输电电压就可以减少电流,电网就会相应减少电能损失。
2.降低电压,分配电能。
电能经升压输送到用户后,用户很难使用这些高压的电气设备,需要降压变电所把电压降低再分配到用户供用户使用。
3.集中电能,控制电力流向。
一个电网多数由多个电源点提供电能,这些电能的集中必须通过枢纽升压变电所来实现。
在用电地区,根据负荷情况,再由降压变电所来控制电力的流向。
4.调整电压,提高电能质量,满足用户的要求。
通过变电所的变压器调压装置和无功补偿设备,既可使用户得到稳定的电压,也可提高线路的输电功率。
变电站是电网建设和电网络改造中非常重要技术环节,所以变电站的设计是我国电网建设的重要环节。
其运行的安全与否,直接关系到电网的安全和稳定,对国民经济和社会的发展至关重要。
(完整版)110kV变电站设计毕业设计论文
*******大学毕业设计(论文)题目110kV变电站一次系统设计函授站学生姓名专业自动化层次本科年级指导教师******大学年月日摘要本毕业设计为110kV变电站一次系统设计,主要内容包括:变压器容量和主接线方式的选择;最大短路电流计算;一次设备的选择与校验。
变电站作为电力生产的关键环节,起着电压变换和电能分配的枢纽作用,其电气一次主接线形式直接决定着电力网的电压变换和电能分配。
本论文较好的应用了变电站设计基本理论知识,针对110kV高压配电变电站的基本特征,在仔细分析原始资料的基础上,确定了该站的一次主接线形式,能够充分保证电力系统安全稳定运行。
短路电流计算及设备选择校验保证了变电设备应用的安全稳定性及经济性。
关键词:变电站,电力系统,设计AbstractThe contents of this project is about the 110kV substation. The main programmers line’s choice , the short-circuit’s calculation and one-dimension equipments’s verification s election.The substation is the electrical production’s crucial sector , it’s impact is to transform the voltage and allocate the electric power.The substation’s one-dimension electrical main line directly determine the voltage’s transform and the electric power’s allocation.This article takes the 110kV substation’s basic feature as pedestal and apply the theory learning of substation’s design to assay primitive datum and undertake the electric system’s secure and equable operation.The short-circuit’s calculation and the equipments’s verification undertake the security, stability and economics for the transforming electric power facilities’s applyment.KEYWORDS: Substation,Electrical power system ,Design目录摘要 (1)Abstract (2)目录 (3)第1章设计基础资料及设计内容 (5)1.1设计基础资料 (5)1.2设计内容 (5)第2章电气主接线设计 (6)2.1主变压器的选择 (6)2.2断路器的选择 (6)2.3一次主接线选择 (6)第3章短路电流计算 (9)3.1计算说明 (9)3.2计算条件 (9)3.3计算等值电抗 (9)3.4绘制系统等值阻抗图 (10)3.5计算变电站110kV设备承受最大短路电流 (10)3.6计算10kV系统承受最大短路电流 (10)第4章一次设备选择与校验 (12)4.1选择的主要原则 (12)4.2断路器的选择与校验 (12)4.3隔离开关的选择与校验 (14)4.4硬母线的选择与校验 (15)4.510kV支持绝缘子选择与校验 (17)4.610kV穿墙套管选择与校验 (17)4.7其它设备参数选择 (17)第5章屋内外配电装置的确定 (19)5.1对配电装置的基本要求 (19)5.2屋外配电装置的确定 (19)5.3屋内配电装置的确定 (20)第6章变电站防雷保护 (21)6.1防雷保护的必要性 (21)6.2避雷针的设置 (21)6.3防雷保护范围计算 (21)6.4避雷器保护 (22)结论 (24)致谢 (25)参考文献 (26)附录1(译文) (27)附录2(原文) (29)第1章设计基础资料及设计内容1.1设计基础资料变电站建设规模:110kV 地区变电站(低压侧为10kV)该地区负荷:夏季Smax=90MV A cosφ=0.75 S min=75MV A cosφ=0.8冬季Smax=70MV A cosφ=0.85 S min=50MV A cosφ=0.9利用小时数:5400小时年进线回路数:110kV四回环境条件:海拔:60米年雷暴日数:25个月均最高温度:32℃历史最高温度:42℃历史最低温度:―19℃1.2设计内容本设计只作电气部分一次系统初步设计,不作施工设计和土建设计,主要设计范围包括:确定电气一次主接线、确定电气布置原则、短路电流计算、主导体和电气设备的选择及校验、防雷保护系统。
变电站 毕业设计
变电站毕业设计变电站是电力系统中的重要组成部分,它起到将高压电能转换为低压电能的作用。
在电力传输过程中,变电站起到了至关重要的作用,它不仅能够提供稳定的电力供应,还能够保护电力设备和维护电网的安全运行。
一、变电站的基本结构和工作原理变电站通常由变压器、断路器、隔离开关、电容器、电抗器等设备组成。
变电站的工作原理是将高压电能通过变压器降压转换为低压电能,然后通过断路器、隔离开关等设备进行分配和控制。
变压器是变电站的核心设备,它能够实现电能的变压和变流。
变压器通过磁场的变化来实现电能的传递和转换。
在变电站中,变压器起到了将高压电能转换为低压电能的作用,使得电能能够适应不同的用电需求。
断路器是变电站中的重要设备,它能够切断电路并保护电力设备。
当电力系统出现故障时,断路器能够迅速切断故障电路,保护电力设备和维护电网的安全运行。
断路器具有高断电能力和可靠的操作性能,能够在短时间内切断大电流。
隔离开关是变电站中的另一种重要设备,它能够切断和连接电路,并提供安全的操作环境。
隔离开关通常用于变电站的分段操作,当需要对某一部分电路进行维护或检修时,可以通过隔离开关将该部分电路与其他电路隔离开来,保证操作人员的安全。
二、变电站的分类和应用根据电压等级的不同,变电站可以分为高压变电站、中压变电站和低压变电站。
高压变电站通常用于电网的输电和变电,中压变电站用于城市和工业用电,低压变电站用于居民区和商业用电。
变电站在电力系统中起到了至关重要的作用。
它不仅能够提供稳定的电力供应,还能够保护电力设备和维护电网的安全运行。
变电站的建设和运行对于电力系统的稳定运行具有重要意义。
变电站的建设需要考虑多方面的因素,如地理条件、环境保护、安全性等。
在选择变电站的位置时,需要考虑到供电范围、电力负荷和输电距离等因素,以确保变电站能够满足用电需求并保证电力传输的稳定性。
三、变电站的发展趋势和挑战随着电力需求的增加和电力系统的发展,变电站也面临着一系列的挑战和发展趋势。
变电站设计参考文献(精选95个)
变电站是指电力系统中对电压和电流进行变换,接受电能及分配电能的场所。
在发电厂内的变电站是升压变电站,其作用是将发电机发出的电能升压后馈送到高压电网中。
其中,变电站设计是至关重要的。
以下是整理好的的关于变电站设计参考文献范例,供大家参考。
变电站设计参考文献一: [1]姜洋。
变电站数字化三维设计在220kV变电站设计的应用[J].科学技术创新,2018(35):15-16. [2]惠晓东。
智能变电站设计配置化技术分析[J].科学技术创新,2017(34):47-48. [3]滕军,张俊嵩,朱宁。
水利枢纽变电站设计优化的几点建议[J].中国高新区,2018(02):143. [4]张涛。
110kV金厂河变电站设计优化方案[J].科技风,2017(26):238. [5]侯升旗,苏耀国,赵雅媛,张沅。
三维设计技术在变电站设计中的运用[J].科技创新导报,2017,14(31):23-24. [6]沈毓,仇群辉,汤东升。
建筑信息模型技术在模块化变电站设计与施工中的应用[J].电力与能源,2017,38(06):671-675. [7]张萌,和小波,尚德。
变电站设计中噪音控制系统分析[J].建材与装饰,2018(01):241-242. [8]石星昊,曹景雷。
220kV智能变电站设计方案优化的分析[J].南方农机,2017,48(24):88. [9]李乾飞。
35kV变电站设计中的注意事项[J].上海电气技术,2017,10(04):39-40. [10]高岩。
景观式变电站设计方案研究[J].山东电力技术,2018,45(01):29-32+46. [11]杨道锦。
500kV智能变电站设计思路和建设模式[J].通讯世界,2018(01):185-187. [12]李宛潼。
220kV智能变电站设计及可靠性分析[J].中国新技术新产品,2018(05):27-28. [13]尧乐。
地下变电站设计施工技术相关问题的探讨[J].城市建设理论研究(电子版),2018(04):110. [14]宋祉明,张伟,徐肃,张轶,李智玲,付小平。
(完整word版)降压变电所的设计文献综述
专业文献综述题目:降压变电站的一次电气设计专业:电气工程及其自动化姓名:姚明降压变电站的一次电气设计摘要:随着我国国民经济的快速增长,用电已成为制约我国经济发展的重要因素。
为保证正常的供配电要求,各地都在兴建一系列的供配电装置。
本文针对220kV降压变电所的特点,阐述了220kV降压变电所的设计思路、设计步骤,并进行了相关的计算和校验。
文中介绍的220kV降压变电所的设计方法、思路及新技术的应用可以作为相关设计的理论指导。
关键词:降压变电所;设计方法;供配电1 前言近十年来,随着我国国民经济的快速增长,用电也成为制约我国经济发展的重要因素,各地都在兴建一系列的用配电装置。
变电所的规划、设计与运行的根本任务,是在国家发展计划的统筹规划下,合理开发利用动力资源,用最少的支出(含投资和运行成本)为国民经济各部门与人民生活提供充足、可靠和质量合格的电能。
这里所指的“充足”,从国民经济的总体来说,是要求变电所的供电能力必须能够满足国民经济发展和与其相适应的人民物质和文化生活增长的需要,并留有适当的备用。
变电所由发、送、变、配等不同环节以及相应的通信、安全自动、继电保护和调度自动化等系统组成,它的形成和发展,又经历规划、设计、建设和生产运行等不同阶段。
各个环节和各个阶段都有各自不同的特点和要求,按照专业划分和任务分工,在有关的专业系统和各个有关阶段,都要制订相应的专业技术规程和一些技术规定。
但现代变电所是一个十分庞大而又高度自动化的系统,在各个专业系统之间和各个环节之间,既相互制约又能在一定条件下相互支持和互为补充。
为了适应我国国民经济的快速增长,需要密切结合我国的实际条件,从电力系统的全局着眼,瞻前顾后,需要设计出一系列的符合我国各个地区的用以供电的变电所,用以协调各专业系统和各阶段有关的各项工作,以求取得最佳技术经济的综合效益。
本次所设计的课题是降压变电站的一次电气设计,假定变电所是一个地区性重要的降压变电所,它主要担任220kV及110kV两电压等级功率交换,把接受功率全部送往110kV侧线路。
220KV变电站电气部分毕业设计(完整版)(开题报告+任务书+设备清单+文献综述+毕业设计)
毕业设计(论文)说明书题目:220KV变电站电气部分设计系别:电子与信息工程系专业班级:电气工程及其自动化学生姓名:指导教师:教研室:电气教研室提交时间:2007年6月13 日摘要随着我国科学技术的发展,特别是计算机技术的进步,电力系统对变电站的更要求也越来越高。
本设计讨论的是220KV变电站电气部分的设计。
首先对原始资料进行分析,选择主变压器,在此基础上进行主接线设计,再进行短路计算,选择设备,然后进行防雷接地以及保护、配电装置设计。
关键字:变电站;短路计算;设备选择。
ABSTRACTWith the development of science and technology in China, particularly computing technology has advanced, the power system demands on substation more and more.The design is refer to the part of 220kV electrical substation design. First of all, analyze the original data and choose the main transformer, based on it , design the main wiring and Short Circuit Calculation, at last choose equipment, then mine and the protection of earth and distribution device.Key Words: Substation;Short Circuit Calculation;Equipment Selection目录摘要 (I)ABSTRACT (II)第1章引言 (3)第2章电气主接线的设计 (4)2.1 主接线概述 (4)2.2 主接线设计原则 (6)2.3 主接线选择 (6)第3章主变压器的选择 (9)3.1 主变压器的选择原则 (10)3.1.1 主变压器台数的选择 (10)3.1.2 主变压器容量的选择 (10)3.1.3 主变压器型式的选择 (11)3.1.4 绕组数量和连接形式的选择 (12)3.2 主变压器选择结果 (13)第4章所用电设计 (13)4.1 所用变选择 (13)4.2 所用电接线图 (14)第5章220KV变电站电气部分短路计算 (16)5.1 变压器的各绕组电抗标幺值计算 (16)5.2 10KV侧短路计算 (17)5.3 220KV侧短路计算 (20)5.4 110KV侧短路计算 (22)第6章导体和电气设备的选择 (24)6.1 断路器和隔离开关的选择 (25)6.1.1 220KV出线、主变侧 (26)6.1.2 主变110KV侧 (30)6.1.3 10KV限流电抗器、断路器隔离开关的选择 (32)6.2 电流互感器的选择 (37)6.2.1 220KV侧电流互感器的选择 (38)6.2.2 110KV侧的电流互感器的选择 (40)6.2.3 10KV侧电流互感器的选择 (41)6.3 电压互感器的选择 (42)6.3.1 220KV侧母线电压互感器的选择 (43)6.3.2 110KV母线设备PT的选择 (44)6.3.3 10KV母线设备电压互感器的选择 (44)6.4 导体的选择与校验 (44)6.4.1 220KV母线 (45)6.4.2 110KV母线 (46)6.4.3 10KV母线的选择 (47)6.4.4 变压器220KV侧引接线的选择与校验 (49)6.4.5 变压器110KV侧引接线的选择与校验 (50)6.4.6 变压器10KV侧引接线的选择与校验 (51)第7章防雷接地设计 (54)7.1 防雷设计 (54)7.1.1 防雷设计原则 (54)7.1.2 避雷器的选择 (54)7.1.3 避雷针的配置 (58)7.2 接地设计 (59)7.2.1 接地设计的原则 (59)7.2.2 接地网型式选择及优劣分析 (60)第8章电气总平面布置及配电装置的选择 (61)8.1 概述 (61)8.1.1 配电装置特点 (61)8.1.2 配电装置类型及应用 (61)8.2 配电装置的确定 (62)8.3 电气总平面布置 (65)8.3.1电气总平面布置的要求 (65)8.3.2电气总平面布置 (65)第9章继电保护的配备 (67)9.1 变压器继电保护配置 (67)9.2 母线保护 (67)第10章结束语 (68)致谢 (69)参考文献 (70)附录 (71)第1章引言毕业设计是我们在校期间最后一次综合训练,它将从思维、理论以及动手能力方面给予我们严格的要求。
35KV变电站电气主接线设计【文献综述】
35KV变电站电⽓主接线设计【⽂献综述】毕业设计开题报告电⽓⼯程及其⾃动化35KV变电站电⽓主接线设计⼀、前⾔随着我国经济建设的⾼速发展,现代电⽹结构⽇趋复杂,电⽹容量不断扩⼤,电⽹实时信息传送量成倍增多,对电⽹运⾏的可靠性要求也越来越⾼,变电站起了⼗分重要的作⽤。
然⽽变电站电⽓接线系统在很⼤程度上直接影响到变电站电⽓系统的⼯作性能。
变电所电⽓主接线系指变电所的变压器以及输电线路怎样与电⼒系统相连接, 从⽽完成输配电任务。
因为电能⽣产的特点是发电、变电、输电和⽤电是在同⼀时刻完成的,所以主接线的好坏不仅直接关系着电⼒系统的安全、稳定、灵活和经济运⾏,也直接影响到⼯农业⽣产和⼈民⽣活。
因此电⽓主接线设计在满⾜国家有关技术经济政策的前提下,还应⼒争使其技术先进、经济合理、安全可靠。
⼆、正⽂⼀般情况下,对变、配电所主接线的基本要求如下:变、配电所主接线应根据变、配电所的实际情况和⽤电的需要,尽量做到简单,供电⽅式可靠,主设备齐全;设备选择合理,运⾏安全经济、灵活,并适当的考虑远景规划;便于维护检修,操作步骤简单、⽅便;处理故障时,能保证安全,便于执⾏规定的安全措施,年运⾏损失⼩。
为次需要进⾏35KV 变、配电站常⽤主接线类型的选择,⽤户常⽤主接线的选择,变压器的选择及防雷接地⽅式的选择。
1、35KV 变、配电站常⽤主接线类型(1)单元接线,⼜称线路变压器组接线(如图1)这种主接线的特点是: 接线简单,使⽤设备少,投资省,维护简单,操作⽅便,但检修要全部停电。
(2)桥形接线(图2a)(图2b)此接线⽅式适⽤于电压为35KV 及以上双电源运⾏的变电所,有外桥和内桥两种接线形式。
内桥适⽤于输电距离较长,故障⼏率较多,⽽变压器⼜不需经常切除时,其特点为:设备简单,投资省。
运⾏灵活,检修时操作稍显复杂且继电保护复杂。
外桥适⽤于出线较短,且变压器虽经济运⾏需经常切换或系统有穿越功率流经本⼚时,其特点较内桥来讲检修操作⽅便,当主变断路器外侧短路时,影响整个系统供电可靠性。
110KV变电站设计文献综述
110KV变电站设计文献综述110KV变电站设计文献综述摘要:本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。
从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,从而完成了110kV电气一次部分的设计。
关键词:变电站变压器接线1变电站的概述纵观20世纪的社会和经济发展,一个突出的特点是,电力的使用已经渗透到社会经济,生活领域。
发电厂、变电站分工完成整个电力系统的发电、变电和配电的任务,而变电站更是电力工业建设中不可缺少的一个项目。
由于变电站的设计内容多,范围广,逻辑性强,不同电压等级,不同性质负荷的变电站设计时所侧重的方面不一样。
变电站是电力系统中变换电压等级、汇集电流和分配电能、控制电力的流向和调整电压的电力设施,它通过其变压器将各级电压的电网联系起来。
我国电力建设经过多年的发展,系统容量越来越大,短路电流不断增大,对电气设备、系统内大量信息的实时性等要求越来越高,而随着科学技术的高速发展,制造、材料行业,尤其是计算机及网络技术的迅速发展,电力系统的变电技术也有了新的飞跃。
对变电站的设计提出了更高的要求,更需要我们知识应用水平。
结合我国现状,为国民经济各部门和人民提供充足.可靠.优质.廉价的电能,因此新建变电站应充分体现出安全性、可靠性、经济性和先进性。
在此我为满某地区重点需要,提高电能的质量。
我拟建一座110KV变电站。
110KV变电站电气部分设计的内容通过查阅书籍,了解了电力工业的有关政策,技术规程等方面的知识,理清自己的设计思路,清楚设计任务,如电气主接线,短路电流计算,设备的选择,防雷接地等,涉及以下内容:1 现代电力系统是一个巨大的、严密的整体。
变电站一次系统文献综述
文献综述1、前言随着工业时代的发展,电力已成为人类历史发展的主要动力资源,要科学合理的驾驭电力必须从电力工程的设计原则和方法上理解和掌握其精髓,提高电力系统的安全可靠性和运行效率。
从而达到降低生产成本提高经济效益的目的。
变电所是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
合理的选择各种一次设备能够提高变电所的安全系数及其经济性。
电能是发展国民经济的基础,是一种无形的、不能大量存储的二次能源,同时也是现代社会中最重要也是最方便的能源。
电能的发、变、送、配电和用电,几乎是在同一时间完成的,须相互协调与平衡。
变电和配电是为了电能的传输和合理的分配,在电力系统中占很重要的地位,其都是由电力变压器来完成的,因此变电所在供电系统中的作用是不言而语的。
变电所是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
因此,变电所的作用变得尤为重要。
首先要满足的就是变电所的设计规范。
安全可靠地发、供电是对电力系统运行的首要要求。
(1)变电所的设计要认真执行国家的有关技术经济政策,符合安全可靠、技术先进和经济合理的要求。
(2)变电所的设计应根据工程的5~10年发展规划进行,做到远、近期结合,以近期为主,正确处理近期建设与远期发展的关系,适当考虑扩建的可能。
(3)变电缩的设计,必须从全局出发,统筹兼顾,按照负荷性质、用电容量、工程特点和地区供电条件,结合国情合理的确定设计方案。
(4)变电所的设计,必须坚持节约用地的原则。
其次,变电所所址的选择,应根据要求,综合考虑确定。
2、变电所设计内容设计一所安全、经济、灵活的变电站可以从以下几个方面着手。
一、电气主接线方案的选定电气主接线是整个变电所电气部分的主干。
变电所电气主接线指的是变电所中汇集、分配电能的电路,通常称为变电所一次接线,是由变压器、断路器、隔离开关、互感器、母线、避雷器等电气设备按一定顺序连接而成的。
变电站--文献综述
220KV降压变电所设计综述指导老师:摘要:电能的开发和利用,是人类征服自然过程中所取得的具有划时代意义的光辉成就。
它消除了黑夜对人们生活和生产劳动的限制,大大延长了人类用于创造财富的劳动时间,改善了劳动条件,丰富了人们的生活。
在现代文明中,电是不能被贮存的,只能当时生产然后马上投入使用。
所以,在电力系统中,变电站是不可或缺的。
现如今,电力工业在整个工业中所占比例也逐渐加大,各类发电厂、变电站分工完成整个系统的发电、变电和配电的任务。
变电站更是电力系统的中间传输者,而它的设计更是电力工业建设中不可去除的项目。
而变电站的设计容多,围涵盖广,对于不同电压等级、不同类型和不同性质负荷的变电站在设计的时候,侧重点也会有所差异。
关键字:电能;变电站;电力系统;220KV step-down substation design review Author: Hu Qiang Tutor: Li ChunlanAbstract:the development and utilization of electrical energy, is made in the process of human conquest of nature has the epoch-making significance of thebrilliant achievements. It eliminates the night for people to limit life and productive labor, greatly extended human for creating wealth labor time, improve working conditions, enrich people's life. In the modern civilization, electricity cannot bestored, only when the production and then immediately put into use. Therefore, in the power system, the substation is indispensable. Nowadays, the electric power industry in the whole industry proportion has gradually increased, all kinds ofpower plant, substation division to complete the whole system generation,substation and distribution task. Substation is the intermediate transmission of electric power system, and its design is not the removal of the project in the construction of electric power industry. The design content of substation, wide range, for different voltage levels, different types and different load substation at design time, the emphasis may vary.Keywords:electric energy; substation; power system;引言随着国民经济的发展和人民生活水平的提高,用户对供电质量的要求日益提高。
110KV变电站设计文献综述
重庆理工大学文献综述二级学院电子信息与自动化班级110070403学生姓名110kV变电站设计刘鸿瑞摘要:随着经济的迅速发展,供电系统的设计越来越全面和系统,工厂用电量迅速增长,对于电能的性能要求也越发的高,因此对于供电设计有了更高的要求。
变电站是电力系统的重要组成部分,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
这就要求变电站的设计必须安全,可靠,经济。
当今世界的变电站设计趋于简单化和智能化,所以变电所的设计也主要是电气主接线的选择,短路计算和继电保护的配置选择为主。
在对110KV变电站进行智能化的设计的同时,也能保证可靠的供电质量。
关键词:变电站,电气主接线,短路计算,继电保护,智能化Abstract:With the rapid development of economy, the design of the power supply system is more and more comprehensive and system, and factory electricity consumption is growing fast. The performance requirements of the electricity are increasingly high Therefore there are higher requirements for power supply design. Substation is an important part of power system, contacting power plants and users of the intermediate links, and it plays the role transformation and distribution of electricity. This requires that a substation design must be safe, reliable and economic. Substation design in today's world tends to simplify and intelligent, so the substation design is mainly based on the main electrical wiring configuration options, short circuit calculations and relay selection. While intelligently designing the 110KV substation, we can also to ensure reliable quality of power supplies .Key words: Substation, Main electrical wiring, Short-circuit calculation, relay selection, intelligent.1 引言我国电力工业的水平正在逐步提高,许多变电站已经实现了集中控制和计算机监控,所有电力工业都在努力降低成本,使用新设备,采用新技术。
(完整word版)变电站设计文献综述
变电站设计文献综述110kV变电站电气一次系统设计文献综述一、选题意义变电站是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。
变电站是电力系统中变换电压、接受和分配电能、控制电力的流向和调整电压的电力设施,它通过其变压器将各级电压的电网联系起来。
我国电力系统的变电站大致分为四大类:升压变电站,主网变电站,二次变电站,配电站。
我国电力工业的技术水平和管理水平正在逐步提高,对变电所的设计提出了更高的要求,更需要我们提高知识理解应用水平,认真对待。
现阶段:全面做好“十二五”发展规划,加快电网重点工程建设,进一步加强企业经营管理,推进“三集五大”体系建设,加大科技创新和管理创新力度,继续加强“三个建设”。
电力力布局由注重就地平衡向全国乃至更大范围优化统筹转变,电力结构由过度依赖煤电向提高非化石能源发电比重转变,推进集约化发展和标准化建设,充分发挥国家电网在电力市场化、能源清洁化、经济低碳化、生活方式现代化中的基础性作用;实现供配电输送无缝隙,无错误随着国民经济的发展和人民生活水平的提高,用户对供电质量的要求日益提高。
国家提出了加快城网和农网建设及改造、拉动内需的发展计划[1]。
变电站是电力系统中变换电压、接受和分配电能、控制电力的流向和调整电压的电力设施,它通过其变压器将各级电压的电网联系起来,在电力系统中起着至关重要的作用。
近年来110kV变电站的建设迅猛发展。
科学的变电站设计方案能够提升配电网的供电能力和适应性,降低配电网损耗和供电成本,减少电力设施占地资源,体现“增容、升压、换代、优化通道”的技术改造思路[2]。
同时可以增加系统的可靠性,节约占地面积,使变电站的配置达到最佳,不断提高经济效益和社会效益[3]。
本次设计是在掌握变电站生产过程的基础上完成的。
通过它可以复习巩固了专业课程的有关内容,拓宽了知识面,增强了工程观念,培养了变电站设计的能力。
变电站毕业设计文献综述
110kV变电站电气一次系统设计1.变电站的概述变电站是我国电力系统中变换电压、接收和分配电能、控制电流的流向、调整电压的电力设施,变电站通过变压器将各级电网的电压连接起来。
而我国的电力变压器等级大概分为四类:主网变电站,升压变压器,二次变电站,配电站四类【1】。
电力系统是我国的重要能源部门,而变电站设计,我国电力工业系统的技术和管理水平正在逐步提高,对变电站设计和运行提出了更高的要求,由于变电站的设计范围广,内容多,逻辑性强,不类型,不同性质符合,不同电压等级的变电站设计所侧重的方面是不一样的。
在设计过程中要根据变电站的形式和规模,具体问题具体对待,不能以偏概全【2】。
所以这更需要我们这些设计人员提高水平和预判的意识。
综合我国电力现状和人民生活水平,为国民经济各部门和人民生活有足够的供给、可靠、廉价、优质的电能,优化发展变电站,规划以110KV、10KV电压等级来设计变电站。
从我国目前大部分地区用电发展趋势来看,新建的变电站应该充分体现安全性、经济型、可靠性和先进性【3】。
所以,为了满足某地区的要点需要,提高电能的质量,需要设计一座110KV变电站。
近些年来我国国民经济迅速发展,同时电力工业的技术水平和管理水平也在逐步提高,但对电力方面的要求也越来越高,为保证电能的质量以及设备的安全,在变电所中还需进行电压调整、潮流控制以及输配电线路和主要电工设备的保护【4】。
电力行业也在我们的生产生活中所占的比重越来越大,所有电力企业都在努力增产节约,降低成本,确保安全远行。
现代电力系统是一个严谨的,巨大的整体网络,各类发电厂、变电站分工完成电力系统的各项任务【5】。
但电力工业的发展还远远不能满足远远不能满足人民的需要,虽然我国发电总量高,但平均水平还远远落后于发展国家,甚至落后于一些发展中国家,所以我国仍然要加强电力建设,搞好西电东送,继续深化电力体制改革,实行竞价上网,厂网分开【6】。
我国现在大部分变电站主要是老设备向新型设备的转变,有人值守向无人值守发展,交流送电向直流送电转变,而国外的现状主要是交流送电向直流送电转变【7】。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
文献综述摘要:随着工业时代的不断发展,人们对电力供应的要求越来越高,特别是供电的稳固性、可靠性和持续性。
变电站是电力系统的重要组成部分,它直接影响整个电力系统的安全与经济运行,电网的稳固性、可靠性和持续性往往取决于变电站的合理设计和配置。
降压变电所正朝着高效、模块、组合、通用、经济方向发展。
关键字:发展变电站高效稳定重要作用本课题来源及研究的目的和意义我国的变电站发展,至今为止,大约可以分为二个阶段:第一个阶段80年代末,我国的电网相当薄弱,南北电网处于分割状态,供需矛盾非常突出,随时都会拉闸限电;第二阶段,90年代中期,随着综合自动化变电站的建立,从35KV变电所到110KV甚至500KV的综合自动化变电站建立投用,我国的电力事业发生明显变化。
近年来,电网日益坚强,科技不断进步,变电站有着飞速的发展,变电站实现集控化已成为变电站的一种发展趋势。
近年来,各国均对变电站的设计及使用技术进行了深入的研究,并取得了卓越的理论成就,离高效稳定节能的标准逐渐缩小距离。
现在是跨世纪的时代,科技的发展使变电站设备的科技含量也越来越高,新型的、多功能的变电站设备也相继出现。
如沈阳昊诚ZB-F系列箱式变,体积仅为国产常规箱式变的1/3~1/5;安全性高,产品无裸露带电部分,为全封闭、全绝缘结构,完全能达到零触电事故;防渗漏、防腐蚀。
河北电力设备厂生产的10~110kV箱式变,设有“四遥”可无人值守。
VFI(Vacuum Fault Interrupter Transformer)美式箱式变也以其独到的优势挤身于中国市场,如:最大容量可达10000kVA,可用手动或电动操作,并进而与SCADA系统结合,使技术逐步升级。
此外,近年来, 计算机技术和电子信息技术在电力建设中的应用越来越广泛, 变电站自动化技术也已经达到一定的水平, 随着智能化开关、光电式电流电压互感器、一次运行设备在线状态检测、变电站运行操作培训仿真等技术日趋成熟, 以及计算机高速网络在实时系统中的开发应用, 势必对已有的变电站自动化技术产生深刻的影响, 全数字化的变电站自动化系统也即将出现。
电力工业是国民经济发展中最重要的基础能源产业,是国民经济的第一基础产业,是关系国计民生的基础产业,是世界各国经济发展战略中的优先发展重点。
作为一种先进的生产力和基础产业,电力行业对促进国民经济的发展和社会进步起到重要作用。
与社会经济和社会发展有着十分密切的关系,它不仅是关系国家经济安全的战略大问题,而且与人们的日常生活、社会稳定密切相关。
随着我国经济的发展,对电的需求量不断扩大,电力销售市场的扩大又刺激了整个电力生产的发展。
随着科学技术的发展和能源经济利用的需要,变电站的设计在逐步向经济、稳定的方向发展。
迄今为止,变电所的更新设计在国内外也正在逐渐形成一个与人类生活密不可分的行业。
优良更新的设计不仅具有标准化、高效化、组合化等当代先进设计思想,又符合节约有效利用资源的原则,更适合当代社会发展的要求。
所以是今后电力技术的一个重要发展方向。
变电站的发展现状变电站自动化技术经过10 多年的发展已经达到了一定的水平, 在我国城乡电网改造与建设中不仅中低压变电站采用了自动化技术, 实现无人值班, 而且在220kV 及以上的超高压变电站建设中也大量采用综合自动化新技术, 从而提高了电网建设的现代化水平, 增强了输配电的可能性, 降低了变电站建设的总造价。
随着智能化开关、光电式电流电压互感器、一次运行设备在线状态检测、变电站运行操作培训仿真等技术日趋成熟以及计算机高速网络在实时系统中的开发应用, 势必对已有的变电站自动化技术产生深刻的影响, 全数字化变电站自动化系统即将出现。
数字化变电站自动化系统发展中的主要问题:数字化变电站自动化系统的研究目前处于基础阶段, 主要集中在过程层方面, 诸如智能化开关设备、光电互感器、状态检测等技术与设备的研究开发。
目前存在的主要问题是:①研究开发过程中专业协作需要加强, 比如智能化电器的研究至少存在机、电、光三个专业协同攻关。
②材料器件方面的缺陷及改进。
③试验设备、测试方法、检验标准, 特别是EMC (电磁干扰与兼容) 控制与试验还是薄弱环节。
我国电力工业自动化水平正在逐年提高。
20 MW及以上大型机组以采用计算机监控系统,许多变电所以装设微机综合自动化系统,有些已实现无人值班,电力系统已实现调度自动化。
迄今,我国电力工业已进入了大机组,大电厂,大电力系统,高电压和高自动化的新阶段。
我国在城乡电网改造与建设中不仅中低压变电站采用了自动化技术实现无人值班,而且在220kV及以上的超高压变电站建设中也大量采用自动化新技术,从而大大提高了电网建设的现代化水平,增强了输配电和电网调度的可能性,降低了变电站建设的总造价,这已经成为不争的事实,也是目前变电站建设的主要模式. 综合自动化的系统性要求极强,特别是结合了全站的操作防误系统,要求变电站建设一期工程越齐越好,而这在高电压等级的变电站建设中几乎是不可能的;扩建工程的操作防误闭锁逻辑实际验证困难,特别是牵涉到母线类的;一次设备电动操作全部受控于监控系统.监控系统的误动出口必须绝对禁止,对IO设备的运行可靠性要求很高;这是目前国内外在变电所设计中所面临的问题与挑战。
变电所综合自动化已成为当前变电所设计应用中的热门课题和发展的必然趋势。
在一些工业发达国家中,配电自动化系统受到了广泛的重视,国外的配电自动化系统已经形成了集变电所自动化、馈线分段开关测控、电容器组调节控制、用户负荷控制和远方抄表等系统于一体的配电网管理系统(DMS),其功能已多达140余种。
从国外配电自动化系统采用的通信方式看,尚没有一种通信技术可以很好地满足于配电系统自动化所有层次的需要。
在一个配电自动化系统内,往往由多种通信技术组合成综合的通信系统,各个层次按实际需要采用合适的通信方式。
研究内容变电站设计主要根据用电的要求电压等级来选择合理的变压器和母线的设置,来实现变换电压、接受和分配电能、控制电力的流向和调整电压的电力设施,通过变压器将各级电压的电网联系起来。
主要解决的问题有:1、变压器的选择2、母线的选择3、短路电流的计算4、继电保护装置的选择5、隔离开关、断路器的选择6、避雷装置的选择7、输电线的选择 8、电流电压互感器的选型9、一次接线图、二次接线图的绘制对专变电站设计,可以了解变电所在变换和分配电能中的作用:可靠地保证整个电力系统的安全运行与经济效率,通过变电站的合理设计和配置充分发挥电网的稳固性、可靠性和持续性。
随着社会的发展,科技的不断提高,众多技术逐渐渗透到各个行业,如何利用这些高科技为人类服务,如何充分利用这些高科技在电气行业中,使之更好的为我们服务,这还需要电气行业人员不断的努力,开拓创新。
参考文献:[1]熊信银.《发电厂电气部分》.水利电力出版社,1992年[2]何仰赞等.《电力系统分析》.华中理工大学电力出版社,1991年[3]贺家李等.《电力系统及电保护原理》.水利电力出版社,1992年[4]吴广宁.《高电压技术》.浙江大学出版社,1994年[5]雍静.《供配电技术》.机械出版社,1994年[6]张冠生.《电器理论基础》.机械工业出版社,1991年[7]杨有启.《电气安全规程》.北京出版社,1991年[8]刘从爱.《电力工程》.机械工业出版社,1992年[9]王崇林、邹有明主编.《供电技术》.煤炭工业出版社,1996年[10]李军年.《电力系统继电保护》.水利电力出版社,1991年[11]国家标准GB50059-1992.《35-110kV变电所设计规范》.中国标准出版社,1992年[12]赵成军,解玉龙.电力系统继电保护方向性分析[J].科技资讯.2011(23)[13]薄艳云,王鹏,薄艳平.35KV变电站综自改造中常见问题改造对策及综自系统运行维护中常见问题[J].中国新通信.2013(05)[14]张宝归.35KV变电站的接地系统设计与施工问题研究[J].低碳世界.2013(12)[15]张华,郝建奇.35kV变电站防雷与接地分析[J].中国电业(技术版).2013(04)外文文献General Requirements to Construction of SubstationSubstations are a vital element in a power supply system of industrial enterprises.They serve to receive ,convert and distribute electric energy .Depending on power and purpose ,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations for110-220/6-10-35kV;deep entrance substations for 110-330/6-10Kv;distribution substations for 6-10Kv;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations, the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV) which is distributed among substations of the enterprise and is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it (without or with partial transformation) via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise territory .Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is at a voltage of 110-220kV;it features simplified switching circuits at primary voltage; it is fed from the power to an individual object or region .Low-and medium-power shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distance transmission .Converter substations are intended to convert AC to DC (sometimes vice versa) and to convert energy of one frequency to another .Converter substations with semiconductor rectifiers are convert energy of one frequency to another .Converter substations with semiconductor rectifiers are most economic. Distribution substations for 6-10kV are fed primarily from main distributionsubstations (sometimes from central distribution substations).With a system of dividing substations for 110-220kV, the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of substations their switch-gear may be outdoor or indoor. The feed and output lines at 6-10kV substations are mainly of the cable type .at 35-220kV substations of the aerial type .When erecting and wiring the substations ,major attention is given to reliable and economic power supply of a given production.Substations are erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry .Substations are usually designed for operation without continuous attendance of the duty personnel but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation .it is advisable to use light-weight industrial structures and elements (panels ,floors ,etc.) made of bent sections .These elements are pre-made outside the erection zone and are only assembled at site .This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a powersupply system of the enterprise .Substations feature primary voltage entrances .transformers and output cable lines or current conductors of secondary voltage .Substations are mounted from equipment and elements described below .The number of possible combinations of equipment and elements is very great .Whenelaborating a substation circuitry ,it is necessary to strive for maximum simplification and minimizing the number of switching devices .Such substations are more reliable and economic .Circuitry is simplified by using automatic reclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises for all voltages , the following basic considerations are taken into account:1. Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2. Wide use of unitized constructions and busless substations;3.Substantiated employment of automatics and telemetry ;if the substation design does not envisage the use of automatics or telemetry ,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work.e of simple and cheap devices-isolating switches ,short-circuiting switches ,load-breaking isolators ,fuses ,with due regard for their switching capacity may drastically cut the need for expensive and critical oil ,vacuum ,solenoid and air switches .Substation and switch-gear circuitries are so made that using the equipment of each production line is fed from individual transformers ,assemblies ,the lines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation, the most vital task is to properly choose and arrange switching devices(switches ,isolators ,current limiters ,arresters ,high-voltage fuses).The decision depends on the purpose ,power and significance of the substation.Many years ago, scientists had very vague ideas about electricity. Many of them thought of it as a sort of fluid that flowed through wires as water flows through pipes, but they could not understand what made it flow. Many of them felt that electricity was made up of tiny particles of some kind ,but trying to separate electricity into individual particles baffled them.Then, the great American scientist Millikan, in 1909,astounded the scientific world by actually weighing a single particle of electricity and calculating its electric charge. This was probably one of the most delicate weighing jobs ever done by man,for a single electric particle weighs only about half of a millionth of a pound. To make up a pound it would take more of those particles than there are drops of water in the Atlantic Ocean.They are no strangers to us, these electric particles, for we know them as electrons. When large numbers of electrons break away from their atoms and move through a wire,we describe this action by saying that electricity is flowing through the wire.Yes,the electrical fluid that early scientists talked about is nothing more thanelectrical flowing along a wire.But how can individual electrons be made to break away from atoms? And how can these free electrons be made to along a wire? The answer to the first question lies in the structure of the atoms themselves. Some atoms are so constructed that they lose electrons easily. An atom of copper, for example ,is continually losing an electron, regaining it(or another electron),and losing it again. A copper atom normally has 29 electrons, arranged in four different orbits about its nucleus. The inside orbit has 2 electrons. The next larger orbit has 8.The third orbit is packed with 18 electrons . And the outside orbit has only one electron.It is this outside electron that the copper atom is continually losing, for it is not very closely tied to the atom. It wanders off, is replaced by another free-roving electron, and then this second electron also wanders away.Consequently,in a copper wire free electrons are floating around in all directions among the copper atoms.Thus, even through the copper wire looks quite motionless to your ordinary eye, there is a great deal of activity going on inside it. If the wire were carrying electricity to an electric light or to some other electrical device, the electrons would not be moving around at random. Instead, many of them would be rushing in the same direction-from one end of the wire to the other.This brings us to the second question .How can free electrons be made to move along a wire? Well ,men have found several ways to do that .One way is chemical. Volta,s voltaic pile,or battery, is a chemical device that makes electricity(or electrons)flow in wires. Another way is magnetic. Faraday and Henry discovered how magnets could be used to make electricity flow in a wire.MagnetsAlmost everyone has seen horseshoe magnets-so called because they are shaped like horseshoes. Probably you have experimented with a magnet, and noticed how it will pick up tacks and nails, or other small iron objects. Men have known about magnets for thousands of years.Several thousand years ago, according to legend, a shepherd named Magnes lived on the island of Crete, in the Mediterranean Sea .He had a shepherds crook tippedwith iron. One day he found an oddly shaped black stone that stuck to this iron ter, when many other such stones were found, they were called magnets(after Magnets).These were natural magnets.In recent times men have learned how to make magnets out of iron. More important still, they have discovered how to use magnets to push electrons through wires-that is, how to make electricity flow. Before we discuss this, there arecertain characteristics of magnets that we should know about.If a piece of glass is laid on top of a horse- shoes magnet, and if iron filings are then sprink ledon the glass, the filings will arrange themselves into lines. If this same thing is trid with a bar magnet(a horseshoe magnet straightened out),the lines can be seen more easily. These experiments demonstrate what scientists call magnetic lines of force. Magnets, they explain, work through lines of force that ext- end between the two ends of the magnet. But electrons seem to have magnetic lines of force around them, too.This can be proved by sticking a wire through a piece ofcard board, sprinkling iron filings on the cardboard, and connecting a battery to the wire. The filings will tend to form rings around the wire,as a result of the magnetism of the moving electrons(or electricity).So we can see that there is arelationship between moving electrons and magnetism, Magnetism results from the movement of electrons.Of course, electrons are not really flowing in the bar magnet, but they are in motion, circling the nuclei of the iron atoms. However, in the magnet, circling thelined up in such a way that their electrons are circling in the same direction. Perhaps a good comparison might be a great number of boys whirling balls onstrings in a clockwise direction around their heads.变电站建设的一般要求变电站(所)在电源系统的工业企业是一个至关重要的因素。