1.5兆瓦风力发电机组塔筒及基础设计

合集下载

兆瓦级风电机组基础环优化设计

兆瓦级风电机组基础环优化设计

兆瓦级风电机组基础环优化设计宋力兵;欧阳华【摘要】According to the foundation load bearing characteristics of wind turbine, this paper analyzes the foundation insert design points under normal and extreme load conditions, builds finite element model and engineering mechanics model, illustrates the upper and lower flanges load bearing variation with the parameters by calculating the data, researches on the interaction relationship between the lower flange and the concrete and offers feasibility recommendation for foundation insert optimum design.%根据风力机组基础的受力特点,分析了风电机组基础环在极端工况和正常工况下基础环的设计要点,建立了工程力学模型和有限元模型;通过计算数据说明了基础环上下法兰应力随着相关参数的变化规律.研究基础环下法兰与基础混凝土的相互作用,为基础环优化设计提出可行性建议.【期刊名称】《机械制造与自动化》【年(卷),期】2012(041)002【总页数】4页(P160-163)【关键词】风力发电机组;工程力学模型;有限元模型;优化设计【作者】宋力兵;欧阳华【作者单位】南车株洲电力机车研究所有限公司,风电事业部,湖南株洲412001;南车株洲电力机车研究所有限公司,风电事业部,湖南株洲412001【正文语种】中文【中图分类】TH12;TM6140 引言风力发电机组具有承受360°方向重复荷载和大偏心受力的特殊性,对地基基础的稳定性要求较高[1]。

1.5MW风力机组塔筒及基础设计

1.5MW风力机组塔筒及基础设计

1.5MW风力机组塔筒及基础设计1.5MW风力机组塔筒及基础设计摘要: 70年代初期,由于“石油危机”,出现了能源紧张的问题,人们认识到常规矿物能源供应的不稳定性和有限性,于是寻求清洁的可再生能源遂成为现代世界的一个重要课题。

风能作为可再生的、无污染的自然能源又重新引起了人们重视。

2006年中国共有风电机组6469台,其中兆瓦级机组占21.2%,2007年,这个比例跃升为38.1%,提高了16.9个百分点。

在国家政策支持和能源供应紧张的背景下,中国的风电特别是风电设备制造业迅速崛起,已经成为全球风电最为活跃的场所。

2009年5月,国家投资3万亿资金支持新能源,在整个投资中风力发电行业的投资在国家总投资中占了很大的一部分,进一步推动了风电行业的发展。

据国家能源局统计,中国风电2010年新增装机容量将超过1600万千瓦累计装机容量达到4182.7万千瓦。

预计在2020年末我国新增发电装机容量将达到6000万千瓦累计装机将超过1亿万千瓦。

随着国家“十二五”规划对风电行业的大力支持和政策的不断完善与调整,中国风电将又一次迎来黄金的发展期。

并且风机的制造企业技术也不断完善和创新,一批具有国家啊自主知识产权的产品纷纷亮相。

从600千瓦、750瓦、1500千瓦、2500千瓦到现在的5000千瓦,而且更大发电量的风机已经研制和立项。

大容量风机的出现让我国风机装备制造技术有了飞速的提高,使国产风机整体技术水平与西方国家进一步缩小,由于风机的容量的不断增大,使风力机的体积和重量不断增加,对塔架与塔架基础的结构强度、加工材料和整体设计都有了更高要求,在未来风机塔架将向着的大型化、人性化、科学化、和风机塔架基础的复杂化、重荷化、高抗化去发展。

由此看出1500千瓦的风机技术已经趋于成熟,其塔架与塔架基础设计也已经完备,根据现有的技术资料我将针对1.5MW风机塔架与塔架基础进行系统分析,并简述1.5MW风机的基础与塔架的设计。

风力机塔筒结构设计规范流程图

风力机塔筒结构设计规范流程图

风力机塔筒结构设计规范流程图英文回答:The design process for a wind turbine tower structure involves several steps to ensure that it meets the necessary safety and performance requirements. Here is a general outline of the design process:1. Requirements analysis: The first step is to understand the specific requirements for the wind turbine tower. This includes factors such as the turbine capacity, wind conditions, site location, and applicable design codes and standards. By understanding these requirements, the design team can establish the design goals and constraints.2. Preliminary design: Based on the requirements analysis, the design team can proceed with the preliminary design of the tower structure. This involves selecting the appropriate tower type (e.g., tubular steel, concrete, hybrid), determining the tower height, and estimating theloads that the tower will be subjected to (e.g., wind loads, gravitational loads). The preliminary design also considers factors such as foundation design and access requirements.3. Structural analysis: Once the preliminary design is established, the next step is to conduct a detailed structural analysis of the tower. This involves using computer-aided design (CAD) software to model the tower structure and applying loads to simulate various operating conditions. The analysis helps to determine the structural integrity of the tower and ensures that it can withstandthe expected loads without failure.4. Material selection: The choice of materials for the tower structure is crucial for its overall strength and durability. Common materials used in wind turbine towers include steel and concrete. The design team must consider factors such as material strength, corrosion resistance,and cost when selecting the appropriate materials for the tower.5. Detailed design: With the results of the structuralanalysis and material selection, the design team can proceed with the detailed design of the tower structure. This includes specifying the dimensions and thickness of the tower sections, reinforcement details, and connection design. The design must also consider factors such as fabrication and construction requirements.6. Manufacturing and construction: Once the detailed design is complete, the tower structure can be manufactured and constructed. This involves fabricating the tower sections, transporting them to the site, and erecting them according to the design specifications. Quality control measures should be implemented throughout the manufacturing and construction process to ensure that the tower meets the required standards.7. Testing and inspection: After the tower is constructed, it should undergo testing and inspection to verify its structural integrity and performance. This may involve non-destructive testing methods such as ultrasonic testing or visual inspection. Any deficiencies or issues identified during testing should be addressed before thetower is put into service.中文回答:风力机塔筒结构的设计流程包括以下几个步骤,以确保其满足必要的安全性和性能要求。

风力机塔筒结构设计规范流程图

风力机塔筒结构设计规范流程图

风力机塔筒结构设计规范流程图英文回答:The design process for wind turbine tower structures involves several steps and follows specific design codesand standards. Here is a general outline of the design process:1. Gather project information: This includes thelocation of the wind turbine, the expected wind conditions, the turbine specifications, and any site-specific requirements.2. Preliminary design: Based on the project information, an initial tower design is developed. This includes determining the tower height, diameter, and wall thickness. Factors such as the turbine weight, wind loads, and foundation type are considered in this stage.3. Load analysis: The next step is to analyze the loadsacting on the tower. This includes wind loads, gravitational loads, and any other relevant loads such as ice loads or seismic loads. Computer simulations and structural analysis software are commonly used for this analysis.4. Structural design: With the load analysis results, the tower structure is designed. This involves selecting the appropriate materials, such as steel or concrete, and designing the tower sections and connections. Design codes and standards, such as the International Building Code or the American Society of Civil Engineers (ASCE) standards, are followed to ensure structural integrity.5. Detailing and fabrication: Detailed drawings and specifications are created for the tower structure. This includes specifying the reinforcement details, welding requirements, and any other fabrication instructions. The drawings are then provided to the fabricator for construction.6. Quality control: During the fabrication process,quality control measures are implemented to ensure that the tower is built according to the design specifications. This may include inspections, material testing, and weld inspections.7. Installation: Once the tower is fabricated, it is transported to the wind turbine site and installed. This involves coordinating with crane operators and other construction personnel to safely erect the tower.8. Post-installation inspections: After the tower is installed, it undergoes a final inspection to ensure thatit meets all design requirements and is ready for operation.中文回答:风力机塔筒结构的设计流程包括以下几个步骤,并遵循特定的设计规范和标准。

1.5MW风力发电机塔架基础设计

1.5MW风力发电机塔架基础设计

-2-
内蒙古科技大学硕士学位论文
Key words:Wind turbine foundation;Tower foundation;Lattice wind turbine tower foundation;Optimal design
-3-
内蒙科技大学硕士学位论文



要 ........................................................................................................................ I
王创江
硕 士
学号: 201102455
建筑与土木工程 白利明 李 斌
职称: 高工 职称:
教授
2013 年 6 月 8 日
内蒙古科技大学硕士学位论文


随着风电技术的发展,风力发电机组的容量不断增大,塔架的高度逐渐增加, 塔架基础的受力也越来越复杂,对基础的强度、稳定性提出了更高的要求。目前, 风机基础结构设计技术不够成熟,基础设计的不合理,直接导致风机倒塌事故的发 生,所以需要对基础的受力特性进行分析研究,保证基础设计的合理性。 本文针对风力发电机塔架基础的受力特点,以及实际工程中出现的问题,对基 础的形式及各部分尺寸进行优化设计,得到了影响塔架基础的主要因素,研究结果 可供工程设计人员参考。 通过对锥台型塔筒方形和圆形扩展基础的分析可知:圆形基础的抗倾覆、抗滑 移稳定性均优于方形基础,选择圆形基础进行优化设计;随着基础台柱高度的增 加,基础底面的反力增加,脱开面积减小,抗滑移、抗倾覆稳定性更好,建议基础 台柱高度占基础埋深高度的比例宜控制在 0.3 左右。随着基础半径增加,基础底面 的反力减小,基础底面的脱开面积减小,抗滑移、抗倾覆稳定性增加,基础的稳定 性提高;随着基础环的埋置深度增加,基础环下混凝土的最大压应力增加,混凝土 局部受压破坏,建议基础环的埋深宜为基础埋深的 0.5 左右。对格构式塔架平板式 基础和独立基础进行了对比分析,在地质条件和荷载相同的条件下,独立基础可节 约混凝土用量 49.7%,基础开挖量减小 50%,钢材用量节约 30%。因此,格构式塔 架选择独立基础有良好的经济效益。

金风1.5MW风力发电机分体安装施工技术

金风1.5MW风力发电机分体安装施工技术

金风1.5MW风力发电机分体安装施工技术摘要:文章介绍了金风1.5MW风力发电机设备分体安装施工工艺流程以及吊装机械的选择方法。

对塔筒、机舱、发电机、叶轮等主要设备的安装顺序、方法、要点及其注意事项,均进行了详细叙述。

Abstract: The article described that JINFENG 1.5 MW wind turbine spilt installation and construction and process, as well as the choice methods of hoisting machinery. The installation order, methods, points and precautions of the major equipment (tower, nacelle, generator and impeller) are described in detail.关键词:分体安装、风力发电机;安装;施工技术Keywords:spilt installation ,wind turbine, installation ,construction technology 中图分类号: TM315 文献标识码: A文章编号:0.前言风能发电作为可再生能源,对改善能源结构,减少环境污染,促进经济发展等方面具有重要作用。

本文通过对中国十七冶集团有限公司承建的甘肃瓜州300MW自主化示范项目二期(250.5MW)风电场工程的实例,详细介绍了金风1.5MW风力发电机分体安装新型施工工艺技术和对风机设备吊装安全问题所采取的措施,为今后建设风电场提供了可行的技术实践。

1 工程概况甘肃龙源风力发电有限公司投资的甘肃瓜州300MW自主化示范项目二期(250.5MW)风电场,该项目位于甘肃省酒泉市瓜州县,由167台金风1.5MW 风力发电机组成,工程计划2010年6月1日开工,2010年11月10日竣工。

1.5MW风力发电机

1.5MW风力发电机

1.5MW双馈、恒频、变桨风力发电机国电联合动力技术有限公司培训中心1.5MW风力发电机一、风力发电机由叶轮、机舱、塔筒三大部分组成,1.5MW风力发电机满发时1小时可以向电网输送1500度电量。

一群风力发电机,组成风力发电场(一般5万千瓦以下风电场可由地方发改委审批,即可建风力发电场,即33台1。

5MW 4.95MW )国内风电场厂每年满发电为2000-3000小时(每年8760小时)按平均2300小时计算每度电0.56元,一个4.95万千瓦风电场年售电收入为6375.6万元风场建设费约4亿元,收回成本的6—8年风力发电场。

二、风力发电机整机主要包括:1.机座2.传动链(主轴、齿轮箱)3. 偏航组件(偏航驱动、偏航刹车钳、偏航轴承)4.踏板5.电缆线槽6.发电机7.联轴器8.液压站9.冷却泵(风冷型无)10.滑环组件11.自动润滑12.吊车13.机舱柜14.机舱罩15.机舱加热器16.轮毂1、机座:机座是风力发电整机的主要设备安装的基础,风电机的关键设备都安装在机座上。

(包括传动链(主轴、齿轮箱)、偏航组件(偏航驱动、偏航刹车钳、偏航轴承)、踏板和棒、电缆线槽、发电机、联轴器、液压站、冷却泵(风冷型无)、滑环组件、自动润滑、吊车、机舱柜、机舱罩、机舱加热器等。

机座与现场的塔筒连接,人员可以通过风电机塔进入机座。

机座前端是风电机转子,即转子叶片和轴。

2、偏航装置:自然界的风,方向和速度经常变化,为了使风力机能有效地捕捉风能,就相应设置了对风装置以跟踪风向的变化,保证风轮基本上始终处于迎风状况。

风力发电机的偏航系统也称为对风装置,其主要作用在于当风向变化时,能够快速平稳地对准风向,以便风轮获得最大的风能。

另外、当风机对风相同一个方向旋转几圈之后,向塔筒底部输送电力的线缆也会扭转,为了保护电缆,系统会控制风机向相反的方向旋转,既解缆。

为了使风机的桨叶转子工作事始终朝向某个方向,在风机内安设了偏航系统,风力机的偏航系统即对风装置。

风电机组地基基础设计规定FD003-2007

风电机组地基基础设计规定FD003-2007

1 范围1.0.1 本标准规定了风电场风电机组塔架地基基础设计的基本原则和方法,涉及地基基础的工程地质条件、环境条件、荷载、结构设计、地基处理、检验与监测等内容。

1.0.2 本标准适用于新建的陆上风电场风电机组塔架的地基基础设计。

工程竣工验收和已建工程的改(扩建)、安全定检,应参照本标准执行。

1.0.3 风电场风电机组塔架的地基基础设计除应符合本标准外,对于湿陷性土、多年冻土、膨胀土和处于侵蚀环境、受温度影响的地基等,尚应符合国家现行有关标准的要求。

2 规范性引用文件下列标准中的条款通过本标准的引用而成为本标准的条款。

凡是注日期的引用标准,其随后所有的修改单(不包括勘误的内容)或修订版均不适用于本标准,然而,鼓励根据本标准达成协议的各方研究是否可使用这些标准的最新版本。

凡是不注日期的引用标准,其最新版本适用于本标准。

GB 18306 中国地震动参数区划图GB 18451.1 风力发电机组安全要求GB 50007 建筑地基基础设计规范GB 50009 建筑结构荷载设计规范GB 50010 混凝土结构设计规范GB 50011 建筑抗震设计规范GB 50021 岩土工程勘察规范GB 50046 工业建筑防腐蚀设计规范GB 50153 工程结构可靠度设计统一标准GB 60223 建筑工程抗震设防分类标准GB 50287 水力发电工程地质勘察规范GBJ 146 粉煤灰混凝土应用技术规范FD 002—2007 风电场工程等级划分及设计安全标准DL/T 5082 水工建筑物抗冰冻设计规范JB/T10300 风力发电机组设计要求JGJ 24 民用建筑热工设计规程JGJ 94 建筑桩基技术规范JGJ 106 建筑基桩检测技术规范JTJ 275 海港工程混凝土防腐蚀技术规范3 总则3.0.1 为统一风电场风电机组塔架地基基础设计的内容和深度,特制定本标准。

3.0.2 风电机组地基基础设计应贯彻国家技术经济政策,坚持因地制宜、保护环境和节约资源的原则,充分考虑结构的受力特点,做到安全适用、经济合理、技术先进。

1.5MW风力发电机

1.5MW风力发电机

1.5MW双馈、恒频、变桨风力发电机国电联合动力技术有限公司培训中心1.5MW风力发电机一、风力发电机由叶轮、机舱、塔筒三大部分组成,1.5MW风力发电机满发时1小时可以向电网输送1500度电量。

一群风力发电机,组成风力发电场(一般5万千瓦以下风电场可由地方发改委审批,即可建风力发电场,即33台1。

5MW 49.5MW )国内风电场厂每年满发电为2000-3000小时(每年8760小时)按平均2300小时计算每度电0.56元,一个4.95万千瓦风电场年售电收入为6375.6万元风场建设费约4亿元,收回成本的6—8年风力发电场。

二、风力发电机整机主要包括:1.机座2.传动链(主轴、齿轮箱)3. 偏航组件(偏航驱动、偏航刹车钳、偏航轴承)4.踏板5.电缆线槽6.发电机7.联轴器8.液压站9.冷却泵(风冷型无)10.滑环组件 11.自动润滑 12.吊车13.机舱柜 14.机舱罩 15.机舱加热器16.轮毂1、机座:机座是风力发电整机的主要设备安装的基础,风电机的关键设备都安装在机座上。

(包括传动链(主轴、齿轮箱)、偏航组件(偏航驱动、偏航刹车钳、偏航轴承)、踏板和棒、电缆线槽、发电机、联轴器、液压站、冷却泵(风冷型无)、滑环组件、自动润滑、吊车、机舱柜、机舱罩、机舱加热器等。

机座与现场的塔筒连接,人员可以通过风电机塔进入机座。

机座前端是风电机转子,即转子叶片和轴。

2、偏航装置:自然界的风,方向和速度经常变化,为了使风力机能有效地捕捉风能,就相应设置了对风装置以跟踪风向的变化,保证风轮基本上始终处于迎风状况。

风力发电机的偏航系统也称为对风装置,其主要作用在于当风向变化时,能够快速平稳地对准风向,以便风轮获得最大的风能。

另外、当风机对风相同一个方向旋转几圈之后,向塔筒底部输送电力的线缆也会扭转,为了保护电缆,系统会控制风机向相反的方向旋转,既解缆。

为了使风机的桨叶转子工作始终朝向某个方向,在风机内安设了偏航系统,风力机的偏航系统即对风装置。

1.5兆瓦风力发电机组塔筒及基础设计解析

1.5兆瓦风力发电机组塔筒及基础设计解析

1.5兆瓦风力发电机组塔筒及基础设计摘要:风能资源是清洁的可再生资源,风力发电是新能源中技术最成熟、开发条件最具规模和商业化发展前景最好的发电方式之一。

塔筒和基础构成风力发电机组的支撑结构,将风力发电机支撑在60—100m的高空,从而使其获得充足、稳定的风力来发电。

塔筒是风力发电机组的主要承载结构,大型水平轴风力机塔筒多为细长的圆锥状结构。

一个优良的塔筒设计,可以保证整机的动力稳定性,故塔筒的设计不仅要满足其空气动力学上得要求,还要在结构、工艺、成本、使用等方面进行综合分析。

基础设计与基础所处的地质条件密不可分,良好的地质条件可以为基础提供可靠的安全保证,从风机塔筒基础特点的分析可以看出,风机塔筒基础的重要性及复杂性是不言而喻的。

在复杂地质条件下如何确定安全合理的基础方案更是重中之重。

关键词:1.5兆瓦;风力发电机组;塔筒;基础;设计1、我国风机基础设计的发展历程我国风机基础设计总体上可划分为三个阶段,即2003年以前小机组基础的自主设计阶段,2003— 2007年MW机组基础设计的引进和消化阶段,2007年以后MW机组基础的自主设计阶段,在2003年以前,由于当时的鼓励政策力度不大,风电发展缓慢,2002年末累计装机容量仅为46.8万kw,当年新增装机容量仅为6.8万kw,项目规模小、单机容量小,国外风机厂商涉足也较少,风机基础主要由国内业主或厂商委托勘测设计单位完成,设计主要依据建筑类的地基规范。

从2003年开始,由于电力体制改革形成的电力投资主体多元化以及我国开始实施风电特许权项目,尤其是2006年《可再生能源法》生效以后,国外风机开始大规模进入中国,且有单机容量600kw、750kw很快发展到850kw、1.0MW、1.2MW、1.5MW 和2.0MW,国外厂商对风机基础设计也非常重视,鉴于国内在MW风机基础设计方面的经验又不够丰富,不少情况下基础设计都是按照厂商提供的标准图、国内设计院根据风电场地质勘测资料和国内建筑材料的具体情况进行设计调整、厂商对国内设计院的设计调整成果进行复核确认模式。

1.5MW风力发电机组机械结构设计

1.5MW风力发电机组机械结构设计

1.5MW风力发电机组机械结构设计
刘旦;闫占辉;王伟
【期刊名称】《长春工程学院学报(自然科学版)》
【年(卷),期】2017(018)002
【摘要】详细介绍了1.5 MW风力发电机组机械结构设计,主要包括基于半直驱式变速恒频风电机组的总体方案设计、变桨减速器设计和主传动系统设计等,为加快风力发电机组机械结构国产化和风力发电机组的维修及维护提供依据.
【总页数】3页(P51-53)
【作者】刘旦;闫占辉;王伟
【作者单位】长春工程学院机电工程学院,长春 130012;长春工程学院机电工程学院,长春 130012;中国人民解放军95926部队,长春 130103
【正文语种】中文
【中图分类】TH122
【相关文献】
1.1.5MW风力发电机组变桨电机常见故障分析 [J], 咬登尚;苏小春;谢建成
2.1.5MW风力发电机组变流器的高原应用 [J], 殷彦翔;梅国刚
3.一起1.5MW风力发电机组火灾事故调查与分析 [J], 殷豪
4.1.5MW风力发电机组变桨轴承开裂失效分析 [J], 张新国; 姚兵印; 卢正欣
5.1.5MW风力发电机组偏航减速机第五级行星轮技术改造 [J], 刘朋朋
因版权原因,仅展示原文概要,查看原文内容请购买。

1.5MW风力发电机组设计报告

1.5MW风力发电机组设计报告

高速轴联轴器
刹车机构Βιβλιοθήκη 增速器低速轴主轴联轴器
主轴轴承
图 7、传动系统布置图 3.22 传动系统结构设计(见图 8)
z 传动结构类型:选择目前国内外风力发电机组常用的典型的传 动类型,即主轴、增速器形成三点支撑结构,辅助刹车机构。通过联 轴器将各个部件串联起来,把风轮捕获的能量传递给发电机。
z 刹车机构:传动系统高速轴上布置有由电气控制的液压刹车机 构,是风力发电机组安全保护的一个重要环节。在正常工作时自带的 弹簧把刹车机构打开,需要刹车时靠电气控制的液压刹车机构保持在 刹车状态。因为采用的是主动式控制程序,实现了软刹车,以减缓刹
12
z 低速轴联轴器:采用胀紧连接套,是当今国际上广泛应用 于重型载荷下机械联接的一种先进基础部件。它是靠拧紧高强度螺栓 使包容面产生压力和摩擦力来传递负载的一种无键联接方式,可传递 扭矩、轴向力或两者的复合载荷,承载能力高,定心性好,装拆或调 整轴与毂的相对位置方便,可避免零件因键联接而削弱强度,提高了 零件的疲劳强度和可靠性。
图 1、SUT—1500 型风力发电机组
二、主要技术数据: 风轮 叶片数量 3 支 风轮布置 水平轴上风向顺时针 发电转速 11-22rpm
2
额定转速 19.8rpm
图 2、风轮
风轮直径 70.5 m
扫风面积 3902m2
切入风速 3.0 m/s
额定风速 12.5 m/s
切出风速 25 m/s
安全风速 50 m/s
二点工艺开窗吊装
温度控制
自动换热排风控制
小吊车
200kg、70m、1.1kW、690V 电源
塔筒
塔筒高
63 m;
塔筒数量
3 节(20150、20150、22700)

1.5MW风力发电机总体设计

1.5MW风力发电机总体设计

I1.5MW风力发电机总体设计摘要风是一种永不枯竭的清洁能源,随着传统能源的日渐枯竭,人们对风能的利用也越来越重视。

特别是随着控制技术和制造技术的发展,风力发电机组的规模不断扩大,兆瓦级以上的风力发电机的研制已成为目前风电产业的主要发展方向。

本次设计对 1.5MW 的风力发电机机组结构的总体布局,总体参数的规划以及各组成部件的选型原则和设计要求进行阐述。

关键词:MW级风力发电机,总体设计II The overall Design of 1.5MW Wind Power GeneratorAbstractThe wind is an inexhaustible clean energy, Along with the traditional energy sources dried up with each passing day, people are paying more and more attention to the use of wind energy.Especially with the control technology and the development of production technology, expanding the scale of wind power generating unit,MW above the level of the development of wind turbines has become the main direction of the development of wind power industry.The design of1.5MW wind generator structure of the overall layout, the overall planning and the parameters of each component selection principles and design requirements .KEY WORDS: The MW class wind generator, Overall designIII目录摘要 (I)Abstract (II)1 绪论 (1)1.1 课题研究背景 (1)1.2 国外风力发电机发展现状 (1)1.3 国内风力发电机的研制情况 (2)1.3.1我国风力发电机发展历史 (2)1.3.2 我国风电发展存在问题 (5)1.4 本课题研究的意义 (7)2 1.5mw风力发电机组总体方案的设计 (8)2.1 风电机组功能的设计 (8)2.1.1 风电机组功率的调节方式设计 (8)2.2.2风力发电机组的系统选型设计 (9)2.2 风力发电机组总体布局 (10)3 风电机组的各组成部分的设计计算 (13)3.1风轮的设计估算................................. 错误!未定义书签。

东汽1.5MW风机

东汽1.5MW风机

一、FD70A/B型风机性能优越的FD70型1500KW风力发电机组拥有直径70米的风轮。

可变速发电机变频装置组合系统,以及单只叶片电动调节系统,是本系列产品技术的基本设计。

有3850平方米扫风面积和65至114.5米轮毂高度的FD70发电机组,非常适合用于几乎所有地区。

FD70A/B技术参数FD77A/B型风机性能优越的FD77型1500KW风力发电机组拥有直径77米的风轮。

可变速发电机变频装置组合系统,以及单只叶片电动调节系统,是本系列产品技术的基本设计。

有4657平方米扫风面积和61.5至111.5米轮毂高度的FD77发电机组,非常适合在风速水平中等或偏低的地区使用FD77A/B技术参数风轮轴承装置和风轮轴□ 高质量的摆动滚动轴承配有理想的轴承罩,并且采用持久润滑,增长使用寿命;□ 调质钢的风轮轴造型符合外力传导原理。

2、齿轮箱□ 1级行星斜齿轮和2级正齿轮,或者选择带1级正齿轮的多级行星斜齿齿轮箱;□ 符合REpower公司的齿轮箱规定,确保使用寿命和运转稳定性达到最高要求;□ 优化工作效率;□ 以转矩臂的弹性体支架有效阻止固体声传播;□ 通过高效的冷却油系统确保低的温度水平;□ 带旁路过滤器的两级滤油系统保证油液质量。

3、止动刹车装置□ 特别宽敞的刹车盘使风轮的止动稳定安全;□ 软刹车的功能使齿轮箱不易损坏。

4、发电机/变频装置□ 转速范围灵活可变,有利于生产;□ 变频功率最多只需要百分之二十的总功率,即可减少变频装置的损耗和提高总效率;□ 全封闭的发电机装配有空气和空气热交换器;□ 即使外部温度升高,发电机仍保持理想的温度水平。

5、方位系统□ 采用外啮合的四支点轴承,由四台大型齿轮电机驱动;□ 带有故障保护功能的止动刹车装置,通过液压蓄压器消除驱动装置在静止状态下受到的负荷,并发挥稳定机器间的作用;□ 由极少数的四支点轴承和导向时刹车装置的通风,来减少驱动装置的负荷。

6、闪电保护装置□ 避雷装置的设计符合IEC的规定,有内外避雷保护;□ 外部避雷保护是通过叶片接收器和气象架上的避雷针;□ 在确定的导电距离,确保轴承;□ 由玻璃纤维增强塑料制成的联轴器可以切断发电机系统和齿轮箱之间的电流传输;□ 过压防护放电器用于保护电气系统;□ 有绝缘作用的轴承套用于保护发电机。

金风1[1].5兆瓦机组发电机介绍(郭建)1

金风1[1].5兆瓦机组发电机介绍(郭建)1

图1-1 同步发电机工作原理图
• • • • •பைடு நூலகம்•
按运行方式可以分为:发电机、 按运行方式可以分为:发电机、电动机和调相机 按结构型式分为: 按结构型式分为:旋转电枢式和旋转磁极式 凸极式 旋转磁极式 隐极式 按原动机类别来分:汽轮发电机、 按原动机类别来分:汽轮发电机、水轮发电机和柴油发电 机 • 基本结构:定子和转子 基本结构: • 定子由定子铁心、定子绕组、机座、端盖、挡风装置等部 定子由定子铁心、定子绕组、机座、端盖、 件 • 转子由转子铁心、励磁绕组、护环、中心环、滑环及风扇 转子由转子铁心、励磁绕组、护环、中心环、 等部件组成。 等部件组成。
金风1.5兆瓦风力发电机
• 输出电压应为考虑了系统运行要求的结果。这个 输出电压应为考虑了系统运行要求的结果。 电压属于低电压,对电气绝缘等要求低, 电压属于低电压,对电气绝缘等要求低,可以降 低其他部分的成本。 低其他部分的成本。根据这个输出电压和输出功 可以计算得到输出电流为: 率,可以计算得到输出电流为:
同步发电机的基本工作原理和结构
• (2)大小:由于定子三相绕组对称,它们切割同 )大小:由于定子三相绕组对称, 一个转子磁场,三相感应电动势也对称, 一个转子磁场,三相感应电动势也对称,大小均 为
E = 4 . 44 fN 1 K W 1 Φ 0
同步发电机的基本工作原理和结构
• (3)相位差和相序:由于定子绕组在空间位置上 )相位差和相序: 互差1200电角度,转子旋转磁场切割定子三相绕 电角度, 互差 电角度 组在时间上有先后顺序, 组在时间上有先后顺序,定子的三相感应电动势 在时间相位上就互差1200电角度,如果将先切割 电角度, 在时间相位上就互差 电角度 的一相定义为A相 则后切割的那两相就为B相和 的一相定义为 相,则后切割的那两相就为 相和 C相,因此三相电动势的相序与转子转向一致, 相 因此三相电动势的相序与转子转向一致, 其由转子转向决定; 其由转子转向决定;

风力发电塔架基础与塔架的设计

风力发电塔架基础与塔架的设计

`酒泉职业技术学院毕业设计(论文)09 级风能与动力技术专业[题目:风力机组塔筒及基础设计毕业时间: 2012 年 7 月学生姓名:***指导教师:任小勇班级:09 风电(4)班;年月日酒泉职业技术学院 09 届各专业毕业论文(设计)成绩评定表风力机组塔筒及基础设计摘要: 70年代初期,由于“石油危机”,出现了能源紧张的问题,人们认识到常规矿物能源供应的不稳定性和有限性,于是寻求清洁的可再生能源遂成为现代世界的一个重要课题。

风能作为可再生的、无污染的自然能源又重新引起了人们重视。

2006年中国共有风电机组6469台,其中兆瓦级机组占%,2007年,这个比例跃升为%,提高了个百分点。

在国家政策支持和能源供应紧张的背景下,中国的风电特别是风电设备制造业迅速崛起,已经成为全球风电最为活跃的场所。

2009年5月,国家投资3万亿资金支持新能源,在整个投资中风力发电行业的投资在国家总投资中占了很大的一部分,进一步推动了风电行业的发展。

据国家能源局统计,中国风电2010年新增装机容量将超过1600万千瓦累计装机容量达到万千瓦。

预计在2020年末我国新增发电装机容量将达到6000万千瓦累计装机将超过1亿万千瓦。

随着国家“十二五”规划对风电行业的大力支持和政策的不断完善与调整,中国风电将又一次迎来黄金的发展期。

并且风机的制造企业技术也不断完善和创新,一批具有国家啊自主知识产权的产品纷纷亮相。

从600千瓦、750瓦、1500千瓦、2500千瓦到现在的5000千瓦,而且更大发电量的风机已经研制和立项。

大容量风机的出现让我国风机装备制造技术有了飞速的提高,使国产风机整体技术水平与西方国家进一步缩小,由于风机的容量的不断增大,使风力机的体积和重量不断增加,对塔架与塔架基础的结构强度、加工材料和整体设计都有了更高要求,在未来风机塔架将向着的大型化、人性化、科学化、和风机塔架基础的复杂化、重荷化、高抗化去发展。

由此看出1500千瓦的风机技术已经趋于成熟,其塔架与塔架基础设计也已经完备,根据现有的技术资料我将针对风机塔架与塔架基础进行系统分析,并简述风机的基础与塔架的设计。

1.5MW风力发电机组简介讲解

1.5MW风力发电机组简介讲解

10、机舱柜 机座设备的控制箱。 11、机舱加热器 为机舱加热
偏航的组成部件 整个偏航组件包括有偏航驱动电机、偏 航驱动齿轮箱、偏航轴承、偏航刹车盘、 偏航刹车钳、液压管路、回油管路、润滑 系统、偏航编码器等。部分部件如下图所 示:
• 3、传动轴链:主要包括主轴、齿轮箱、高 速刹车钳、浮动轴承及轴承座、止推轴承 及轴承座等。风力发电机的低速轴将转子 轴心与变速齿轮箱连接在一起。在一般的 风电机上,转子转速相当慢,大约为19至 30转每分钟。
联轴器 发电机 液压站 冷却泵 机座 偏航
1、机座:机座是风力发电整机的主要设备安 装的基础,风电机的关键设备都安装在机 座上。 ( 包括传动链(主轴、齿轮箱)、偏 航组件(偏航驱动、偏航刹车钳、偏航轴 承)、电缆线槽、发电机、联轴器、液压 站、冷却泵、滑环组件、自动润滑、吊车、 机舱柜、机舱罩、机舱加热器等。机座与 现场的塔筒连接,人员可以通过风电机塔 进入机座。机座前端是风电机转子,即转 子叶片和轴。
2、偏航装置:自然界的风,方向和速度经常变化, 为了使风力机能有效地捕捉风能,就相应设置了 对风装置以跟踪风向的变化,保证风轮基本上始 终处于迎风状况。风力发电机的偏航系统也称为 对风装置,其主要作用在于当风向变化时,能够 快速平稳地对准风向,以便风轮获得最大的风能。 另外、当风机对风相同一个方向旋转几圈之后, 向塔筒底部输送电力的线缆也会扭转,为了保护 电缆,系统会控制风机向相反的方向旋转,既解 缆。
齿轮箱可以将很低的风轮转速( 1500 千瓦的风机通常为12-22转/分)变为很高的 发电机转速(发电机同步转速通常为 1500 转/分)。 风机是有许多转动部件的,机舱 在水平面旋转,随时偏航对准风向;风轮 沿水平轴旋转,以便产生动力扭距。对变 桨矩风机,组成风轮的叶片要围绕根部的 中心轴旋转,以便适应不同的风况而变桨 距。在停机时,叶片要顺桨,以便形成阻 尼刹车。

1.5M风力发电机设计

1.5M风力发电机设计

1.5兆瓦风力发电机用永磁同步发电机的设计摘要2009年哥本哈根会议的召开,显示国际已经开始越来越重视环保。

环保、低碳将是未来能源发展的一个趋势。

而火力发电每年都要消耗大量的煤炭,产生严重的污染。

因此研制出能够代替火力发电的新能源就显得意义深远。

而风力发电且具有绿色环保无污染等特点,已日益得到关注,近年来,我国的风能开发正处在起步阶段,但发展速度很快,遍布许多沿海城市及偏远山区,正逐步为人类造福。

如何提高风能的利用和转化效率是目前技术方面重点研究方向,不仅符合了时代发展的潮流,也和我国的基本国情和战略方针相一致。

同时做好节能环保也是当前科研人员在研究过程中应尽的义务。

直驱永磁同步风力发电机去掉了风力发电系统中常见的齿轮箱,让风力机直接拖动电机转子运转在低速状态,这就没有了齿轮箱所带来的噪声、故障率高和维护成本大等问题,提高了运行可靠性。

采用高磁能积的永磁材料作为磁极,就省去了励磁绕组产生的损耗,使得电机的结构变得简单,效率也随之提高。

但由于其运行转速低,一般定子外径都比较大。

因此,为了减小电机尺寸和改善冷却效果,本文以内转子径向式永磁同步风力发电机为例进行分析。

先通过感应电机、永磁电机和水轮机等经验公式确定基本尺寸,又对电机进行磁路分析计算,最后又分别从轴向长度、气隙宽度、极弧系数和每极每相槽数参数等对电机进行了优化,以便使设计结果更加合理。

关键词直驱式;永磁同步;风能;风力发电机;内转子1.5 MW Wind Turbines with Permanent MagnetSynchronous GeneratorAbstractHeld in Copenhagen in 2009, showing more and more attention to international environmental protection has begun. Environmental protection, low-carbon energy development will be a future trend. The thermal power consumption of large amount of coal each year, resulting in serious pollution. Therefore developed a new energy to replace the thermal power generation becomes significant. The green wind power and has no pollution, has received increased attention in recent years, China's wind energy development is in its infancy, but rapid development around the many coastal cities and in remote mountainous areas, gradually the benefit of mankind. How to improve the efficiency of wind energy utilization and conversion technologies is the focus of research, not only the development trend of the times, too, and China's basic national conditions and the strategy and guiding principle. At the same time do a good job saving and environmental protection is currently in the process of research, scientists obligations.Direct drive permanent magnet synchronous wind turbine wind power system to remove a common gearbox, direct drive motor for wind turbine rotor is operating at low speed state, which no gearbox caused by noise, high failure rate and maintenance costs etc, and improved reliability. using the high-energy product of permanent magnets as pole, eliminating the need for field windings to produce the loss, the simple structure of the motor efficiency is improved.As drive permanent magnet synchronous wind turbine running speed is low, generally larger than the diameter of the stator.Therefore, in order to reduce the size of the motor and improve the cooling effect, within this radial permanent magnet synchronous wind turbine as an example for analysis. First through the induction motor, permanent magnet motors and turbines and other empirical formula to determine the basic size, then the motor magnetic circuit analysis and calculation, and finally from the axial length, respectively, air gap width, pole arc coefficient and the number of slots per pole per phase parameters the motor is optimized to make the design more reasonable results.Keywords Direct drive; Permanent magnet synchronous;Wind energy;Wind generator;Inner rotor目录摘要 (I)Abstract (II)第1章绪论 (1)1.1 风力发电的意义 (1)1.2 风力发电的发展 (3)1.2.1 中国及世界范围内风力发电发展历程 (3)1.2.2 我国及世界风力发电发展趋势 (4)1.3 风力发电机组的简介 (5)1.3.1 风力发电机组的结构及电能的储备介绍 (5)1.3.2 风力发电机组的典型结构 (6)1.4 本课题研究的背景意义和主要研究内容 (7)1.4.1 永磁材料及永磁电机的特点 (7)1.4.2 本课题的研究意义 (8)第2章风力发电机电磁设计过程及永磁材料介绍 (10)2.1 永磁风力发电机简介 (10)2.1.1 风力发电机的发展现状 (10)2.1.2 永磁电机的概述 (10)2.1.3 永磁同步发电机简介 (11)2.1.4 永磁同步发电机设计特点 (13)2.2 永磁材料的介绍 (14)2.2.1 永磁材料的分类 (14)2.2.2 永磁材料的发展概况 (14)2.2.3 永磁材料的主要参数 (15)2.2.4 永磁材料选择的原则 (17)2.2.5 永磁体形状和体积估算 (18)2.2.6 钕铁硼永磁材料 (18)2.2.7 永磁体的充磁 (18)2.3 主要设计目标 (19)2.4 永磁风力发电机的设计特点 (20)2.5 永磁同步发电机基本参数的确定 (21)2.6 本章小结 (22)第3章风力发电机电磁设计过程 (23)3.1 设计过程 (23)3.2本章小结 (39)第4章电磁设计比较分析及方案优化 (40)4.1电磁设计的比较 (40)4.2方案优化 (40)4.3本章小结 (42)结论 (43)致谢 (44)参考文献 (45)附录 (46)第1章绪论1.1风力发电的意义目前,在全世界范围内,风力发电发展势头迅猛。

矿产

矿产

矿产资源开发利用方案编写内容要求及审查大纲
矿产资源开发利用方案编写内容要求及《矿产资源开发利用方案》审查大纲一、概述
㈠矿区位置、隶属关系和企业性质。

如为改扩建矿山, 应说明矿山现状、
特点及存在的主要问题。

㈡编制依据
(1简述项目前期工作进展情况及与有关方面对项目的意向性协议情况。

(2 列出开发利用方案编制所依据的主要基础性资料的名称。

如经储量管理部门认定的矿区地质勘探报告、选矿试验报告、加工利用试验报告、工程地质初评资料、矿区水文资料和供水资料等。

对改、扩建矿山应有生产实际资料, 如矿山总平面现状图、矿床开拓系统图、采场现状图和主要采选设备清单等。

二、矿产品需求现状和预测
㈠该矿产在国内需求情况和市场供应情况
1、矿产品现状及加工利用趋向。

2、国内近、远期的需求量及主要销向预测。

㈡产品价格分析
1、国内矿产品价格现状。

2、矿产品价格稳定性及变化趋势。

三、矿产资源概况
㈠矿区总体概况
1、矿区总体规划情况。

2、矿区矿产资源概况。

3、该设计与矿区总体开发的关系。

㈡该设计项目的资源概况
1、矿床地质及构造特征。

2、矿床开采技术条件及水文地质条件。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

1.5兆瓦风力发电机组塔筒及基础设计摘要:风能资源是清洁的可再生资源,风力发电是新能源中技术最成熟、开发条件最具规模和商业化发展前景最好的发电方式之一。

塔筒和基础构成风力发电机组的支撑结构,将风力发电机支撑在60—100m的高空,从而使其获得充足、稳定的风力来发电。

塔筒是风力发电机组的主要承载结构,大型水平轴风力机塔筒多为细长的圆锥状结构。

一个优良的塔筒设计,可以保证整机的动力稳定性,故塔筒的设计不仅要满足其空气动力学上得要求,还要在结构、工艺、成本、使用等方面进行综合分析。

基础设计与基础所处的地质条件密不可分,良好的地质条件可以为基础提供可靠的安全保证,从风机塔筒基础特点的分析可以看出,风机塔筒基础的重要性及复杂性是不言而喻的。

在复杂地质条件下如何确定安全合理的基础方案更是重中之重。

关键词:1.5兆瓦;风力发电机组;塔筒;基础;设计1、我国风机基础设计的发展历程我国风机基础设计总体上可划分为三个阶段,即2003年以前小机组基础的自主设计阶段,2003— 2007年MW机组基础设计的引进和消化阶段,2007年以后MW机组基础的自主设计阶段,在2003年以前,由于当时的鼓励政策力度不大,风电发展缓慢,2002年末累计装机容量仅为46.8万kw,当年新增装机容量仅为6.8万kw,项目规模小、单机容量小,国外风机厂商涉足也较少,风机基础主要由国内业主或厂商委托勘测设计单位完成,设计主要依据建筑类的地基规范。

从2003年开始,由于电力体制改革形成的电力投资主体多元化以及我国开始实施风电特许权项目,尤其是2006年《可再生能源法》生效以后,国外风机开始大规模进入中国,且有单机容量600kw、750kw很快发展到850kw、1.0MW、1.2MW、1.5MW 和2.0MW,国外厂商对风机基础设计也非常重视,鉴于国内在MW风机基础设计方面的经验又不够丰富,不少情况下基础设计都是按照厂商提供的标准图、国内设计院根据风电场地质勘测资料和国内建筑材料的具体情况进行设计调整、厂商对国内设计院的设计调整成果进行复核确认模式。

该模式不仅影响风机基础的自主设计,同时受制于厂商,甚至可能影响工程建设的决策、工期和投资效益。

以2005年我国南方某风电场的基础设计为例,当时该风电场已完成24个风机基础的施工,但国外风机厂商认为已建基础不能满足要求,并委托了第二家设计院进行了独立评估,由于当时没有专门的风机基础设计规范,设计单位只能参照国内建筑和电力行业的类似规范进行设计,且不同设计人员对具体条文的采用和理解也不尽相同,导致不同设计院设计同一基础的安全评价结论不尽一致。

随后国外风机厂商和项目业主又同时委托第三家设计单位进行复核。

由于种种原因,最终各方妥协的结果是在每个已施工基础上补浇了一些混凝土。

因此,由于没有统一的规范,由于国外厂商在基础设计方面的过多介入,导致了成本的增加和工期的延长。

鉴于当时风机基础设计的重要性且没有专门的设计规范,中国水电工程顾问集团公司作为我国水电和风电的前期工程归口管理单位,于2005年8月迅速启动了风机基础设计技术研究和规范的编制工作,经过广泛调研、专题研究和试设计,并经过几次全国性的研讨和评审,于2007年9月发布了《风电机组地基基础设计规定》(FD003-2007),并同期推出了配套的设计软件。

由于规范的统一指导和风电产业的不断成熟,并经过我国项目业主和勘测设计单位的共同努力,现在风电基础设计已步入自主设计的轨道。

2、我国最近的两起风机倒塌事故及其教训在《风电机组地基基础设计规定》编制过程中及颁布后不久,出现了两起风机倒塌事故,这两个项目都没有按照《风电机组地基基础设计规定》进行设计,事故的原因值得我们深思。

因此,本文对两起事故进行了简要介绍和分析。

2.1在桑美台风中破坏的风机及基础在2006年8月10日的桑美台风中,某风电场28台机组全部受损,其中5台倒塌(3台600kw风机钢塔筒被折断、2台刚完成吊装的750kw风机连地基被拔出)、5台风机机舱盖被吹坏、11台风机叶片被吹断。

据被吹到的测风仪留下的最后数据显示,山顶上风电场的瞬时风速达85米/秒。

该风电场的大部分基础承受了超设计风速的考验,但连根拔出的基础至少在设计和施工方面存在一下不安全因素:2.1.1基础环(法兰筒)的低端在基础台柱和底板的分界面,没有伸入基础底板与扩展基础形成整体。

2.1.2基础台柱和底板混凝土分两次浇筑,且没有采取可靠的缝面处理措施,缝面粘接质量差,影响了台柱与底板之间的整体性。

2.1.3从拉断的基础台柱底部断面看,穿越台柱与底板之间的圆周向配筋太少,钢筋见距达60cm左右,进一步削弱了台柱与底板混凝土之间的整体性连接,台柱高度方向的配筋很少,钢筋间距在40cm左右,消弱了台柱本身的刚度。

2.1.4混凝土级配和混凝土现场搅拌质量不理想另外,建议在经常遭遇台风地区的风电场必须要时刻考虑配置备用电源或柴油发电机,并对控制系统作适当改进,遭遇台风电网断电后,风机不会刹车抱死叶轮,以减少风机承受的风载荷。

2.2在正常运行中破坏的风机及基础某风电场同批次施工安装了59台850kw的风电机组并经过了72小时的试运行,在2008年4月正常运行时,一台风机突然倒塌,基础连根被拔出,倒塌时风速约12m/s,已进入风机的额定风速,塔筒底部(基础环)钢筋完全拔出。

如图所示:据初步了解,该风机基础至少存在以下不安全因素:2.2.1基础混凝土设计强度等级C30,事故后钻孔,事故后钻孔取芯实验得出的强度等级为C10-C25,基础混凝土实际标号偏低2.2.2塔筒底部混凝土搅拌、振捣不均匀,断面反映的混凝土级配较差。

2.2.3从断面看,基础可能不是一次性浇筑,存在施工冷缝,且因风沙天浇筑,缝面有沙土。

2.2.4钢筋数量减少、长度不足。

2.2.5胶凝材料用量和基础混凝土配合比可能不满足要求,塔筒底部(基础环)钢筋完整拔出,粘接质量有问题。

2.2.6初期运行时机组振动较厉害,且倒塌的风机换过叶片,可能与上部结构及基础的刚度有关。

另外,施工单位中标价格过低而导致其偷工减料、基础混凝土施工过程中监督不力也可能是引发事故的重要原因。

由于质量问题,同批施工中得59台风机,除倒塌的一台,其余58台风机上部结构全部拆卸,并炸除混凝土基础,重新施工基础,重新安装风机,重新调试后再投入运行。

给项目业主造成了巨大的经济损失。

3、风机基础设计分析与讨论由于风力发电机组轮毂高度大(一般在50m以上)、顶部质量大正常运行和极端风速情况承受的水平载荷大、机组正常运行时对倾斜控制严格、基础承受360°方向重复载荷和大偏心受力、基础的载荷重分布性低、地质条件复杂等特点,将风力发电机组基础设计做一简要分析,对几个热点问题进行讨论。

3.1关于基础类型的考虑设计规定考虑了方形扩展基础和方形轴台桩基础。

考虑到风机基础承受360°方向重复荷载以及不同的设计习惯,配套设计软件在借鉴化工高塔、烟囱、高耸结构等基础设计规范的基础上,除了方形基础外,还扩充了圆形、八边形扩展基础以及圆形和八边形承台桩基础的设计方法和设计软件,拓宽了风机基础的适应性。

3.2关于基础设计的步骤3.2.1扩展基础对于扩展基础,设计步骤可分为三大步:第一步,根据风机单机容量、轮毂高度、扫风面积、风速、荷载大小和地基情况,参考类似经验,初步拟定基础埋深、底板尺寸和高度等。

第二步,根据设计规定和风机承受的荷载等相关资料,分别计算基础基底反力、基础沉降和倾斜率、基础整体稳定性、基底脱开面积等,分别复核地基承受力是否满足要求、沉降和倾斜率是否满足规范和厂商要求、整体稳定性和基底脱开面积比是否满足规范要求。

如果四个条件同时满足要求,则说明拟定的基础底板尺寸合适,可进行下一步计算,如果四个条件不能同时满足要求,则需回到第一步,调整外型尺寸。

第三步,初选钢筋直径,进行截面抗弯计算,抗剪、抗冲切和疲劳强度验算,如果同时满足要求,则底板高度的拟定合适,否则,回到第一步,调整包括底板高度在内的外型尺寸,直至满足第二步和第三步的有关要求。

外型尺寸确定后根据裂缝宽度验算结果、构造要求等确定配筋布置,如果没有台柱,还需对台柱进行配筋计算和强度验算,对穿越法兰筒和基础环底部的局部配筋进行验算。

然后,计算基础的混凝土用量和配筋用量。

3.2.2桩基础与扩展基础类似,柱基础的设计也可以分为三大步:第一步,根据有关资料、规范和经验,拟定基础埋深、承台尺寸以及桩的布置,包括桩长(持力层)、中心距、排列的选择等。

第二步,计算桩顶作用反力,计算桩基础沉降和倾斜率,复核基桩承载力(包括竖向抗压承载力、水平承载力,抗拨承载力等)是否满足要求,桩基础沉降和倾斜率是否满足规范与厂商要求。

如果同时满足要求,则拟定的桩布置合适,进行下一步计算,否则,调整桩的布置。

第三步,初选钢筋直径,进行承台底板截面抗弯计算,抗剪、抗冲切和疲劳强度验算,如果同时满足要求,则承台底板尺寸的拟定合适,否则,许回到第一步,调整承台尺寸和桩布置,直至满足第二步和第三步的有关要求。

承台尺寸和桩布置确定后,对承台台柱进行配筋计算和强度验算,如果采用灌注桩则需要进行桩身配筋计算,根据裂缝宽度验算结果和有关构造要求,调整配筋布置,对基础环底部等部位进行布局配筋验算。

最后,计算基础的混凝土用量和钢筋用量。

3.3关于几个问题的讨论3.3.1修正标准值由于荷载的不确定性和随机性,计算扩展基础基底面积、计算桩基基础桩数和桩长时,荷载采用了标准值,但对上部结构传来的荷载标准值均进行了乘以1.35的修正,已达到一定的安全裕度。

国内风力发电成套技术还处于成长阶段,空气动力学计算理论和模型假定也存在着一定的误差和不确定性。

风电基础虽然在整个风机结构中的造价比重很小,但结构安全直接决定着整个结构的安全,在重要性方面与上部结构至少是等同。

因此,在目前有关技术有待进一步完善的阶段,基础设计适当留有安全裕度是必要的。

由于国内不少风机厂商提供的风机荷载资料都是引进机型的原产地厂商在特定轮毂高度、特定风速下计算的荷载资料,可能没有考虑国内特定风电场的特点,如轮毂高度、不同风速、风场在电网中的作用、风机控制系统等具体条件,可能对国内特定风场的风机和风机基础设计有一定的偏差,因此,在这种情况,考虑对风机厂商提供的荷载进行适当修正是必须的。

风荷载在一定的土木工程设计中都计入耦合系数后再与其他荷载进行组合,但在风力发电结构中,风荷载是风机正常运行所必须的基本荷载,因此,在有关计算中不能照搬有关规范的规定,应予以特别重视。

如果风电厂商针对国内特定风场情况,进行了专门、系统的荷载分析与测试,保证提供的荷载是基础设计所涉及工况的最不利荷载,且出具书面保证函,此时,这个荷载标准值修正系数可以在1.1—1.35之间进行调整。