编号:×××××kV××线停电更换直线整串绝缘子或金具作业指导书

编写:年月日

审核:年月日

年月日

批准:年月日

作业负责人:

作业日期年月日时分至年月日时分

作业单位:××供电公司××工区(供电分公司)

目录

1工作任务······························································································第×页2作业准备阶段·························································································第×页

2.1 准备工作·······················································································第×页 2.2 召开班前会·····················································································第×页

2.3 填写并签发工作票··············································································第×页3作业实施阶段·························································································第×页

3.1 作业开工·······················································································第×页

3.2 危险点控制流程·················································································第×页

3.3 作业质量控制流程··············································································第×页4作业结束阶段·························································································第×页5作业总结阶段·························································································第×页

5.1 召开班后会·····················································································第×页

5.2 整理资料及归档·················································································第×页6附件··································································································第×页

6.1 工器具、机械清单··············································································第×页

6.2 施工材料清单···················································································第×页

6.3 作业人员分工明细表············································································第×页

1 工作任务

2作业准备阶段

2.1 准备工作

2.2 召开班前会(详见班组日志)

2.3 填写并签发工作票

完整填写工作票并履行审批、签发手续。详细内容见本次作业工作票。

3 作业实施阶段

3.1 作业开工

3.2 危险点控制流程(仅作为编制现场指导书的参考及培训、学习之用,若工作票中已明确此处可简写:见××号工作票)

3.3 作业质量控制流程

4 作业结束阶段

5 作业总结阶段

5.1召开班后会

总结本次作业安全、质量情况,以及经验、教训。详细内容记入“班组工作日志”中。

5.2整理资料及归档

将设备变动情况分别填入相应的记录及技术档案中。

6 附件

6.1 工器具、机械清单

6.2 施工材料清单

6.3 作业人员分工明细表(新增加表格,与其他专业统一)