编号:×××××kV××线停电更换直线整串绝缘子或金具作业指导书
编写:年月日
审核:年月日
年月日
批准:年月日
作业负责人:
作业日期年月日时分至年月日时分
作业单位:××供电公司××工区(供电分公司)
目录
1工作任务······························································································第×页2作业准备阶段·························································································第×页
2.1 准备工作·······················································································第×页 2.2 召开班前会·····················································································第×页
2.3 填写并签发工作票··············································································第×页3作业实施阶段·························································································第×页
3.1 作业开工·······················································································第×页
3.2 危险点控制流程·················································································第×页
3.3 作业质量控制流程··············································································第×页4作业结束阶段·························································································第×页5作业总结阶段·························································································第×页
5.1 召开班后会·····················································································第×页
5.2 整理资料及归档·················································································第×页6附件··································································································第×页
6.1 工器具、机械清单··············································································第×页
6.2 施工材料清单···················································································第×页
6.3 作业人员分工明细表············································································第×页
1 工作任务
2作业准备阶段
2.1 准备工作
2.2 召开班前会(详见班组日志)
2.3 填写并签发工作票
完整填写工作票并履行审批、签发手续。详细内容见本次作业工作票。
3 作业实施阶段
3.1 作业开工
3.2 危险点控制流程(仅作为编制现场指导书的参考及培训、学习之用,若工作票中已明确此处可简写:见××号工作票)
3.3 作业质量控制流程
4 作业结束阶段
5 作业总结阶段
5.1召开班后会
总结本次作业安全、质量情况,以及经验、教训。详细内容记入“班组工作日志”中。
5.2整理资料及归档
将设备变动情况分别填入相应的记录及技术档案中。
6 附件
6.1 工器具、机械清单
6.2 施工材料清单
6.3 作业人员分工明细表(新增加表格,与其他专业统一)
注:6.1、6.2和6.3表使用时,应根据实际情况填写。本文来自网络,版权归原作者所有,请下载后,尽快删除。