防水透气膜施工方案
![防水透气膜施工方案](https://img.360docs.net/imgce/1o3k5ho0s0o07pnhn9dhzhrf0g8q206x-e1.webp)
![防水透气膜施工方案](https://img.360docs.net/imgce/1o3k5ho0s0o07pnhn9dhzhrf0g8q206x-42.webp)
防水透气膜施工方
案
目录
一、总则 ····································································错误!未定义书签。
二、一般规定 ····························································错误!未定义书签。
三、材料准备 ····························································错误!未定义书签。
四、施工方法 ····························································错误!未定义书签。
4.1基本做法 ······························································错误!未定义书签。
4.2细部处理 ······························································错误!未定义书签。
五、成品保护 ····························································错误!未定义书签。
六、工程验收 ····························································错误!未定义书签。
一、工程概况
工程名称:大连理工大学能源动力学院工程
建设单位:大连理工大学
设计单位:清华大学建筑设计研究院
监理单位:大连大工工程建设监理有限公司
施工单位:大连宏鑫建设工程有限公司
本工程为大连理工大学能源动力学院工程。工程位于大连理工大学新校区西侧,体育场南侧。建筑面积25000平方米。质量要求为鲁班奖。建筑层数A区为9~11层,B区为1层。结构形式为框架结构,地下部分局部有剪力墙。建筑高度:43.90 m设计使用年限:为50年。抗震设防烈度:为7度。
二、编制依据
1、《大连理工大学能源动力学院施工图》
2、国标图集《公共建筑节能构造》06J908-1
3、国标图集《防水透汽膜建筑构造——特卫强?防水透汽材料》07CJ09
三、一般规定
3.1铺设防水透汽膜之前,应对上道工序进行质量验收,合格后方可施工。
3.2防水透汽膜沿建筑立面按高度分段自下往上顺序施工。每段防水透汽膜自上而下铺装。段与段间按顺水方向上下搭接。如施工
流水安排无法满足自下而上的分段施工顺序,应保证防水透汽膜沿顺水方向上下搭接。
3.3防水透汽膜施工前——特别需与基层粘贴固定前,需对基层进行必要清理、除尘,保正施工基层平整、清洁,无尖锐突起物。
3.4宜在-5℃~40℃范围内施工(超出规定的温度范围时,可采取特殊的保温或降温措施)。
3.5尽量避免雨中作业。如工期紧迫或遇有特殊需要,应确保膜搭接处及穿孔处干燥后,再加以密封。
3.6应避免在五级风以上条件下施工。如遇异常天气应采取保护措施并增加临时固定。临时固定可采用双面胶带将膜粘贴于基层之上。
3.7应避免在膜上有明火、焊接或高温(>90℃)作业。如有特殊需要,应对膜加以有效遮挡及采取隔热措施,避免材料遇火或高温。
四、材料准备
4.1防水透汽膜:杜邦TM特卫强?(Tyvek?)防水透汽膜
4.2单面胶带:特卫强?(Tyvek?)胶带或杜邦中国集团有限公司认可之丙烯酸胶带。
4.3双面胶带:杜邦中国集团有限公司认可之双面胶带。
4.4单/双面丁基胶带:杜邦中国集团有限公司认可之单/双面丁基胶带。
4.5泛水:杜邦柔性泛水,杜邦直线泛水4.6辅助工具:剪刀,裁纸刀,压辊。