GSMC

料( )

Outline

? ? ? ? 利 ? 量 ?

? ? ? 立 1997 年 3 2000 年 4 29 60 26 29

? ? ? ? ? 2003 數 500 樓 1 SGS ISO9001/ 14000 / RoHS 1998-2000 1000 562

度 度 路 漏 流

度 拉力

洞 力

降 度 拉力 良率

狀 狀

Item Eff(%) FF(%) Isc(A) Voc(V) Bowing@180um(mm)

GSMC 17.4 77.67 0.4 5.32 0.1 0.627 E-3 0.6 0.2mm

R COM. 17..2 0.2 77.34 0.4 5.30 0.1 0.624 E-3 1.3 0.2mm

T COM. 16. 0.2 77.50 0.4 5.19 0.1 0.626 E-3 1.6 0.2mm

Thermal Profile

– 拉力 3N – 率 – – ? 率 率

度75 .

度 . .

路 ? ? 90

10

11

( 率

>0.2%)

12

爐 – Wafer ? PECVD – Wafer ? – ? 爐–

P-N

13

Quality assurance system

ISO 9001 14000 Certification RoHS Compliant

QA / ? ECR/ECN ? QC ? SOP/SIP ? 錄 ? 料/ / ?

14

QA Organization

QA Depart. In-Process QC Section QE Team In-Coming & Outgoing QC Section AL Team In-Coming QC Team

QA Section

QS Team

AgAl Team

Out-Going QC Team

Ag Team

15

ECR/ECN

Timing:

– New Process, Equipment, Raw Material, Anything Improvement NG Apply ECR Approved Trial Run QA Evaluation Refuse the ECR Case

Trial Run Sample Collection

OK

Release ECN

16

Customers Customers Sales Sales

QA QA

Customer Complaint Handling Process

Quality issue

--Advance analysis in factory PE & QE

Customer Complaint

Clarify & Emergency Action

Root Cause Root Cause Analysis Process Analysis Process

--VQA co-work with vendor

Design issue:

--PE/QE co-work with RD

Issue a tracking No.

Process issue:

Action Plan

--QA co-work with MFG

Log-In Control Table

QA Confirmation &Verification Pass Action Follow up Closed-Loop

Fail

Update Control Table

17

& 量

Monitoring and measurement System

Measuring and test equipment list Annual plan Requirement

External ( Standard in CNS)

Internal (follow sop)

Scrap

Repair

Calibration report

Calibration label

18

Quality Abnormal Flow Chart

Quality Issue ON line

Raw material defect QA continual find the same defection customer complain quality issue when has safe issue or reliability issue happen

Material Issue ON line

Material shortage The SCH disconnect Wrong material on line

Equipment Issue ON line

Unused Affect the product quality

Process Issue ON line

The same defect happen OP can’t be train IPQC find a lot of process issue

Inform IPQC

Preliminary Judgment

Unreached Reach stopping line level

Continual track

Inform line leader

Sent abnormal stop line notice Stop line in time

Inform mfg supervisor Root cause analysis

Inform MFG manager

Call relation engineer analysis and corrective

Quality Issue

QA Engineer VQA Engineer

Material Issue

Purchase Engineer

Equipment Issue

PM Engineer

Process Issue

MFG Line Leader IPQC Engineer

19

QC Control plan

20

Measuring equipment

- 量 SiNx – EVA & Ribbon peeling test – - 量 I-V Curve

(TMA)

? ? 拉力 ? ? ? ?

(PGA)

… 裂 度