Yeongam Wind power plant (Li)
Haenam PV power plant(Li)
July
July
21st
28
Sejong Asia Paper Mfg Co., Ltd. (Li)
1
Work place
Gochang substation
Purpose
Capacity (MWh)
8
Fire pictures(7/7)
Sejong Asia Paper Mfg Co., Ltd.
9
Checking
Geochang Wind Wind power plant
power plant
connection
9.6
Sejong Asia
Paper Mfg Co., For peak control
18
Ltd.
B
July 21, 2018 3 billion won
BMS error estimation
Gyeongsan substation
Frequency regulation
12
B
May 2, 2018 2.5 billion won
BMS error
Yeongam Wind power
plant
Wind power plant connection
15
B
June 2, 2018 8.8 billion won
BMS error
Gunsan
PV power plant
PV power plant
connection
19
C
June 15, 2018 900 million won
Checking
Haenam
PV power plant
PV power plant
connection
3
C
July 12, 2018 500 million won
Manufacturer
Offshore wind power connection
17
A
Date of fire Aug. 2, 2017
Property damage Cause of accident
1.5 billion won
Temperature rising (BMS error estimation)
Yeongam wind power plant
5
Fire pictures(4/7)
Gunsan photovoltaic power plant
6
Fire pictures(5/7)
Haenam PV power plant
7
Fire pictures(6/7)
Geochang wind power plant
Gyeongsan F/R Substation (Li)
Gunsan PV power plant (Li)
Geochang Wind power plant (Li)
2017
2018
Aug.
May
2nd
2nd
June 2nd
Leabharlann Baidu
June 15th
July 12nd
Gochang Test center (Li)
Worker
B
July 28, 2018
3 billion won
carelessness
estimation
2
Fire pictures(1/7)
Gochang substation
3
Fire pictures(2/7)
FR Gyeongsan substation
4
Fire pictures(3/7)