替代料逻辑与PLMSAP作业方式.
合集下载
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Page 3
ECOM Analysis
Reason Code
Component phase out
Percentage %
15.7% (438/2775)
Source Change
Others (BOM restructure, BOM correction, Bug fixing, Manufacturer enhancement…)
• •
Minimal part preparation L/T BOM configuration flexibility
–
–
Board product: Mosfet, TTL/CMOS IC, Diode, Transistor… System product: HDD, ODD, Memory…
Page 14
Q&A
Page 21
2.5% (70/2775)
81.8% (1751/2775)
Data Source: Released ECOM changes from 2008/01/01-2008/10/07.
Page 4
替代邏輯 (1/2) A
主料有足夠ATP時需求落於主料上
主料沒有足夠ATP時,而副料有足夠ATP時需求 落於副料上
Page 6
ECOP/ ECOM替代關係之設定
•
Key fields: Find num, Qty, Ref Des (Location).
– – –
Find num (Group): define the Alternative Group (1~256) Primary Item: maintain Qty & Ref Des Alternative items: Qty=0 & Ref Des keep Empty
Replaceable parts use automatically
•
Decrease ECO numbers
–
–
RD maintain the replaceable relationship between parts Multi-site production with one time setting
替代料邏輯與PLM/SAP作業方式
Lawrence Chang/ Poki Lee Product Lifecycle Management/ ITD
Page 1
Concept
• • •
RD set inter-replaceable part within one group Part will be inter-changed in the same group SAP will automatically choose part according to the ATP of parts.
Milestone Review
2008/03~2008/04
1. 2.
Discuss with RD/ PMC/ IT to define the Project target, scope. Take one project as a test case to check the feasibility in PLM and SAP. Establish detail ideal substitute logic with Advantech AKMU/ EPC/ PPC/ IA/ AWS/ ADMU PMC. AKMU IT code the AKMU IEB BOM program to adapt to the substitute part logic and decrease human effort. Communicate with group RD head’s advice and expectation of the substitute function. Meet and collect suggestions from INCG/ IAG/ ECG/ SAG/ group PM and RD separately.
AS-IS BOM structure
A B
TO-BE BOM structure
A B
Part is replaced!
Both are substitute!
Page 2
Expected Benefits
•
Better material utilization and control
– –
Fully utilize the replaced parts. Increase material turnover rate
2008/05~2008/06
1. 2.
3.
2008/07~2008/08
1.
2008/09~2008/10
1.
2. 3.
AKMU IEB BOM testing and online on 10/8. Online preparation meeting with IT/ PMC on 10/28. Substitute Part KM System online on Dec.
Page 10
工單用料畫面
有替代關係的料件會放在一起 Required quantity 會先放在主料 Item 點兩下可進去手動修改用料
Page 12
工單用料修正畫面
當手動修改用量後 建議再將此欄位改 為1 以避免又被系統自 動修正 工單release 後也 會自動改為1
Page 13
修改用量 用
主料沒有足夠ATP時,副料沒有足夠ATP時需求 落於主料上
B
C
Page 5
替代邏輯 (2/2) D
當需求落在phase out Item上, 且沒有任何量可供ATP時 存檔後,會將需求改到非phase out item的替代料上
E
Release 工單後存檔後,會將用料策略全部改回1(即手動決 定),避免上線工單用料亂跳