建设项目施工计划申报表表格格式
施工计划报审表范例
施工计划报审表范例英文回答:Construction Plan Submission Form Example.Name: [Your Name]Project: [Project Name]Date: [Date]1. Project Description:The project involves the construction of a new office building. The building will have five floors and will include office spaces, conference rooms, a cafeteria, and parking facilities. The project is expected to be completed within 12 months.2. Construction Schedule:The construction schedule is divided into different phases to ensure efficient progress. The first phaseinvolves site preparation, which includes clearing the land, leveling the ground, and setting up temporary facilities. This phase is estimated to take around one month.The second phase is the foundation construction, which includes excavation, pouring concrete, and constructing the building's foundation. This phase is expected to takearound two months.The third phase is the structural construction, which involves erecting the building's framework, installing walls, floors, and roofs. This phase is estimated to take around four months.The fourth phase is the interior construction, which includes installing electrical and plumbing systems, painting, and finishing touches. This phase is expected to take around three months.The final phase is the exterior construction, which includes landscaping, paving, and installing outdoor amenities. This phase is estimated to take around two months.3. Resource Allocation:To ensure the smooth progress of the project, the following resources will be allocated:Manpower: A team of skilled construction workers will be assigned to the project. This team will include carpenters, electricians, plumbers, painters, and other necessary professionals.Equipment: Various construction equipment such as excavators, cranes, concrete mixers, and scaffolding will be used throughout the project.Materials: High-quality construction materials will be sourced, including steel, concrete, glass, and finishing materials.4. Risk Management:Although we have taken measures to minimize risks, unforeseen circumstances may still arise during the construction process. To mitigate these risks, we have developed contingency plans and have insurance coverage in place.For example, if there is a delay in the delivery of construction materials, we have identified alternative suppliers to ensure timely completion. Additionally, we have implemented safety protocols to protect workers and prevent accidents on the construction site.中文回答:施工计划报审表范例。
工程资料报审表格模板
完成工程量报审表
编号
工程项目名称
工程项目地点
致:
已按施工设计图纸要求完成,并根据有关规范标准,自查验收合格,特 申报工程量,请审核检验。
附:
实施单位负责人(签字):实施单位(童):
或施工单位人人",或施工单位(旱.
年月日
工程量报审表
序号
项目
计量单位
数量
自查完成数量
监理确认数量
审核意见:
监理工程师:监理组(章):
□708
验收时间:
本次报验内容系第次报验,本项目经理部已完成自检工作且资料完整,并
呈报相应资料。
实施单位负责人(签字):实施单位(童):
或施工单位负责人(签字):或施工单位(章):
年月日
监理审查意见:
0可进行后续施工。
0核验未通过,不得进入下道工序施工,整改后再报。
需整改的内容:
监理工程师:监理组(章):
附:
实施单位负责人(签字):实施单位(童):
或施工单位人人",或施工单位(旱.
2016年10月11日
工程款支付(预付、结算)证书
经审核,施工单位的申请符合条件,本标段合同价 元,按合同的规定,本期应 支付(预付)工程款为¥ 元(大写) 元整,本次付款后累计付款 元,付款 率达到合同价的 %。
监理意见:
编号
工程项目名称
工程项目地点
致:
(承包单位)
事由:开工申请
内容:
项目监理机构:
总/专业监理工程师:
日期:—
年月日
施工现场质量管理检查记录
工程名称
施工许可证
(开工证)
/
建设单位
项目负责人
施工进度计划报审表
审查审批意见
总监理工程师:
业主代表:
说明:本表适用于没有专用表格,根据合同规定和监理要求又必须书面向监理工程师、业主申请、报审、签报的事项等。根据申报事项的审批权限自行设置签字栏。
土桥子(福宝)至玉兰山改扩建公路(二期)工程
施工进度计划申ห้องสมุดไป่ตู้表
承包单位:中交第一航务工程局有限公司合同号:
监理单位:四川元丰建设项目管理有限公司编 号:JDJH-01
1、事由:关于上报总体施工进度计划的事宜。
2、申报内容:依据本项目施工图纸及合同文件要求,现编制上报项目总体施工进度计划,请与审批。
3、必要的说明:项目部依据合同文件要求,结合总体施工进度计划进行人、机、料资源配置,过程中落实计划保证措施并根据进度要求适时调整。
工程项目施工进度表模板
工程项目施工进度表模板
工程项目施工进度表是项目管理中非常重要的工具,它可以帮
助项目团队跟踪和监控项目的施工进度,确保项目按时按质完成。
一般来说,施工进度表模板应该包括以下内容:
1. 项目基本信息,包括项目名称、项目编号、施工单位、监理
单位、项目经理等基本信息。
2. 时间节点安排,列出项目的各个阶段和关键节点,包括计划
开始日期、计划完成日期、实际开始日期、实际完成日期等信息。
3. 工作内容和任务分解,详细列出项目的各项工作内容和任务,可以按工程量清单或工作包进行分解,确保每个任务都得到充分考虑。
4. 计划工期和实际工期,对比计划工期和实际工期,及时发现
施工进度偏差,采取相应措施进行调整。
5. 进度完成百分比,记录每个任务或阶段的完成百分比,以便
直观地了解项目整体进度。
6. 问题和风险记录,记录施工过程中出现的问题和风险,以及相应的应对措施和解决方案。
7. 资源分配和利用情况,包括人力、物力、财力等资源的分配和利用情况,确保资源合理配置,提高施工效率。
8. 图表和报表,可以包括甘特图、进度曲线图等图表,以及进度报表、周报等相关文档,直观地展示项目的施工进度情况。
在实际使用中,可以根据具体项目的特点和要求进行定制,确保施工进度表模板符合项目管理的实际需要,能够有效帮助项目团队进行施工进度的监控和管理。
希望以上内容能够对你有所帮助。
各项施工方案申请表
各项施工方案申请表申请表序号:
项目基本信息
•项目名称:
•申请单位:
•联系人:
•联系电话:
•项目地址:
•工程内容概述:
施工方案概要
•施工内容:
•施工地点:
•施工时间:
•人员配备:
–项目经理:
–技术负责人:
–施工人员:
–安全员:
•施工设备:
技术方案
•工程进度计划:
•施工方法及步骤:
•施工图纸及规划:
•安全措施:
环境保护措施
•施工过程中污水处理方式:
•施工废弃物处理方案:
•施工噪音、粉尘控制措施:
•其他环保要求:
风险评估
•可能存在的安全风险及应对方案:
•其他潜在风险及应对措施:
监理机构意见
•是否符合规定的施工条件:
•其他监理要求:
申报单位意见
•对施工方案的说明:
•法律责任承诺:
审批结果
•审批意见:
•审批单位:
•审批日期:
以上为《各项施工方案申请表》,请认真填写完整资料后提交。
水利工程建设项目施工规范表格
(承包[ ] 技案号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、(承包[ ] 进度号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、(承包[ ] 图计号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、CB04资金流计划申报表(承包[ ] 资金号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人各1CB05施工分包申报表(承包[ ] 分包号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人各1CB06 现场组织机构及主要人员报审表(承包[ ] 机人号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,随同审批意见,承包人、监理机构、发包人、CB07材料/构配件进场报验单(承包[ ] 材验号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人2份,监理机构、发包人各1份。
CB08施工设备进场报验单(承包[ ] 设备号)合同名称:合同编号:说明:本表一式份,由承包人填写。
监理机构审签后,承包人、监理机构、发包人各1份。
CB09工程预付款申报表说明:本表一式份,由承包人填写。
监理机构审签后,随同付款证书,承包人2份,监理机构、发包人各1份。
CB10工程材料预付款报审表CB11施工放样报验单(承包[ ] 放样号)CB12联合测量通知单(承包[ ] 联测号)合同名称:合同编号:CB13施工测量成果报验单(承包[ ] 测量号)CB14合同项目开工申请表(承包[ ] 合开工号)说明:本表一式份,由承包人填写。
监理机构审签后,随同“合同项目开工令”,承包人、监理机构、发包人、设代机构各1份。
施工计划审批手续表模板
施工计划审批手续表模板英文回答:Construction Plan Approval Procedure Form Template.Title: Construction Plan Approval Procedure Form Template.Introduction:The construction plan approval procedure form template is a standardized document used to streamline the process of reviewing and approving construction plans. This form serves as a checklist to ensure that all necessary steps and requirements are met before granting approval for a construction project. It helps to maintain consistency and transparency in the approval process and ensures that all relevant stakeholders are involved.Purpose:The purpose of this form is to establish a clear and structured process for reviewing and approving construction plans. It outlines the necessary steps, documents, and approvals required at each stage of the process. By following this template, project managers can ensure that all necessary information is provided and all relevant parties are involved in the decision-making process.Components of the Form:1. Project Information: This section captures essential details about the construction project, such as project name, location, and description. It also includes information about the project manager and contact details.2. Plan Submission: This section outlines the requirements for plan submission, including the number of copies, format, and any additional documents that need to be attached. It also specifies the deadline for plan submission.3. Review Process: This section details the steps involved in the review process. It includes a checklist of items that need to be reviewed, such as architectural plans, structural plans, electrical plans, plumbing plans, andfire safety plans. Each item on the checklist should be marked as reviewed, approved, or rejected, along with comments or remarks.4. Approval Process: This section outlines the approval process, including the individuals or departments responsible for granting approval at each stage. It also specifies any additional requirements or conditions for approval.5. Signatures and Dates: This section provides spacefor the signatures of the individuals involved in the approval process, including the project manager, reviewing officers, and approving authorities. It also includesspaces for recording the dates of submission, review, and approval.Benefits of Using the Form:1. Standardization: By using a standardized form, the approval process becomes consistent and predictable. All stakeholders are aware of the requirements and steps involved, reducing confusion and misunderstandings.2. Documentation: The form serves as a record of the approval process, documenting the decisions made, comments provided, and dates of approval. This documentation can be useful for future reference and audit purposes.3. Accountability: The form clearly identifies the individuals responsible for reviewing and approving the construction plans. This promotes accountability and ensures that the right people are involved in the decision-making process.4. Efficiency: The form helps streamline the approval process by providing a structured checklist and clear guidelines. This saves time and effort for both the project manager and the reviewing officers.中文回答:施工计划审批手续表模板。
施工常用各种表格
甘洛县开建桥水电站监理下发土建常用表格目录施工组织机构申报表工程项目负责人申报表施工组织设计(方案)报审表施工技术方案报审表施工质检员次质认证申报表进场施工设备申报表现场施工人员月报表工程承建单位提供施工图纸审签单施工测量成果报审单建筑材料质量检验合格证进场材料质量检验报告单工程主材供应签证单混凝土拌和配料报告表施工进度计划申报表(年月)单位工程开工申请单分部(分项)开工申请单水工建筑物岩石基础验收申报表岩石地基开挖工程联合检验签证表岩石地基开挖工程施工质量自检合格证工程质量缺陷处理申报单地质及施工缺陷处理联合检验认定表基础(隐蔽)工程验收报告单水工建筑物岩石基础验收证书工程基础验收证书施工质量合格(开工、开仓)证施工质量联合检验合格(开仓)证(隐蔽工程、关键部位、重要工序)混凝土浇筑、衬砌开仓证混凝土准证实际施工进度报告表(年月)工程材料消耗情况月报表( 年月)主要指标完成情况汇总表工程进度完成情况统计月报进度完成情况统计年报月工程变更情况一览表水工混凝土拌和质量检测报告单混凝土单元工程养护记录表工程质量缺陷处理申报表工程事故报告单工程变更申请报告单工程项目验收申报表计日工单价申报签证单计日工工作支付申报签证表(年月)工程复工申请书人工、机械及机械设备台班费合同单价调整申报表合同索赔申报表施工组织机构申报表工程项目负责人申报表施工组织设计(方案)报审表施工技术方案报审表工程名称:开建桥水电站厂房枢纽工程合同号:KJQ/CⅣNo。
工程承建单位提供施工图纸审签单施工测量成果报审单质量评定资料备查.进场材料质量检验报告单定资料备查。
建筑材料质量检验合格证量评定资料备查。
单位工程开工申请单Ⅳ分部(分项)工程开工申请单承建单位:湖北九洲工程建设有限公司合同编号:ⅣNo.水工建筑物岩石基础验收申报表水工建筑物岩石基础验收证书资料备查。
地质及施工缺陷处理联合检验认定表岩石地基开挖工程施工质量自检合格证岩石地基开挖工程联合检验签证表工程质量缺陷处理申报单基础(隐蔽)工程验收报告单单位工程名称:分部工程名称:工程基础验收证书施工质量联合检验合格(开仓)证(隐蔽工程、关键部位、重要工序)年月日水工混凝土拌和质量检测报告单时备查。
高标准基本农田建设项目施工档案表格
高标准基本农田建设项目施工档案表格2021年X月X日目录1、单位工程竣工报验单2、竣工验收申请3、技术复核申请4、开工申请5、开工批复6、进场通知7、合同项目开工申请8、合同项目开工令9、分部工程开工申请10、分部工程开工通知11、施工技术方案申报表、批复12、施工进度计划申报表、批复13、现场组织机构及人员报审表14、施工组织设计15、设备进场报验单16、材料、构配件、进场报验单17、中标通知书18、施工合同19、工程竣工报告XX市YY镇高标准基本农田建设项目第五标段工程质量评定资料施工单位:2021年X月X日目录1、工程项目划分表2、单位工程施工质量评定表3、单位工程施工质量检测资料审核表4、灌溉与排水分部工程施工质量评定表5、田间道路分部工程施工质量评定表6、支渠衬砌单元工程质量评定表7、斗渠衬砌单元工程质量评定表8、农渠衬砌单元工程质量评定表9、河道清淤单元工程质量评定表10、涵管单元工程质量评定表11、分水闸单元工程质量评定表12、田间道路单元工程质量评定表13、单元工程施工质量报验单14、灌溉与排水分部工程验收签证15、田间道路分部工程验收签证XX市YY镇高标准基本农田建设项目第五标段工程质量检测资料施工单位:2021年X月X日目录1.水泥产品质量合格证2.水泥物理性检测报告3.砂子检测报告4.卵石检测报告5.水泥质量评定表6.砂料质量评定表7.粗骨料质量评定表8.钢筋检测报告9.钢筋质量评定表10.砂浆配合比设计通知单11.砂浆抗压强度检测报告12.混凝土配合比设计通知单13.混凝土配合比设计通知单14.混凝土抗压强度检测报告15.混凝土拌和物质量评定表16.混凝土试块质量评定表17.水泥砂浆质量评定表18.工程基础验收证书19.隐蔽工程记录20.施工测量成果报验单21.土地开发整理项目单项工程质量监督表工程项目划分及编码一览表单位工程名称编号分部工程名称编号单元工程名称编号备注XX市YY镇高标准基本农田建设项目第五标段Ⅴ灌溉与排水工程Ⅴ-1斗渠衬砌Ⅴ-1-1-1~5每条斗渠为一个单元工程农渠衬砌Ⅴ-1-2-1~17每1000米为一个单元工程涵管Ⅴ-1-3-1~5每2处涵管为一个单元工程分水闸Ⅴ-1-4-1~3每座分水闸为一个单元工程田间道路工程Ⅴ-2田间道Ⅴ-2-1-1~5每条道路为一个单元工程审批、审核见签发单(监理[]审核签号)合同名称:合同编号:施工组织设计名称施工单位工程部位工程位置致:你单位报来的施工技术方案收悉。
建筑工程施工资料表格大全
年月份工程计量申报核定表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
项目月付款申报表索赔报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
延长工期报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
整改复查报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
施工组织设计报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
工程开工报审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
施工测量放样报验表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
复工申请表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
工程变更费用申请表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
分包单位资质报、审表工程施工进度计划(调整计划)报、审表成品、半成品供应单位资质报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
原材料报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
主要施工设备(仪器)进场报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
主要工程设备选型报、审表本表由施工单位填报一式三份,审核后,建设、监理、施工单位各留一份。
工程质量验收汇总表(表一)本表由监理单位填写,每个单位工程一张。
工程质量验收汇总表(表二)本表由监理单位填写,工程竣工验收时连同全部质量验收证明书、质量验收汇总表(一)和汇总表封面装订后交建设单位。
工程质量验收证明书市政工程竣工验收条件审查表。
建筑工程开工申请表
建筑工程开工申请表申请单位:__________________________联系人:____________________________联系电话:__________________________工程名称:_________________________工程地址:_________________________一、申请建筑工程的原因和必要性分析:(请简要描述建筑工程的目的、背景以及对当地经济、社会等方面的影响)二、工程概况:1. 建筑工程类型:(例如住宅、商业、教育、医疗等)2. 建筑工程规模:(例如总建筑面积、楼层数、用地面积等)3. 工程计划时间:- 开工日期:- 竣工日期:4. 工程预算及资金来源:三、环境影响评价情况:(如适用,请提供相关环境影响评价报告的摘要,包括评估结果以及采取的环保措施)四、工程施工组织设计:1. 施工组织机构:(请列出主要施工单位及其负责人)2. 施工现场平面布置图:(请提供工程现场平面布置图,标明各功能区域)3. 施工进度计划:(请提供详细的施工进度计划表)4. 安全措施:(请说明采取的安全预防措施,包括工人个人安全防护、施工现场环境安全等)五、相关证件及手续:(请提供以下证件及手续的复印件)1. 用地手续:(如有)2. 建设用地规划许可证:(如有)3. 施工许可证:(如有)4. 工程质量安全监督证书:(如有)六、附件清单:(请列出一份包括所有申请材料的附件清单)七、申请人声明:本人作为申请单位的合法代表,保证所提供的信息真实准确,并同意遵守相关法律法规和建设规范标准。
申请单位(盖章):日期:______________________。
农发高标准基本农田建设项目表格(2017版)
施工技术方案申报表(承包[ ]技案号)权№:CB01—(承包[ ]进度号)№:CB02—(承包[ ]图计号)№:CB03—资金流计划申报表(承包[ ]资金号)№:CB04—施工分包申报表(承包[ ]分包号)№:CB05—现场组织机构及主要人员报审表(承包[ ]机人号)№:CB06—材料/构配件进场报验单(承包[ ]材验号)№:CB07—施工设备进场报验单(承包[ ]设备号)№:CB08—工程预付款申报表(承包[ ]工预付号)№:CB09—工程材料预付款报审表(承包[ ]材预付号)№:CB10—施工放样报验单(承包[ ]放样号)№:CB11—联合测量通知单(承包[ ]联测号)№:CB12—施工测量成果报验单(承包[ ]测量号)№:CB13—(承包[ ]合开工号)№:CB14—(承包[ ]分开工号)№:CB15设备采购计划申报表(承包[ ]设采号)№:CB16—混凝土浇筑开仓报审表(承包[ ]开仓号)№:CB17单元工程施工质量报验单(承包[ ]质报号)№:CB18—施工质量缺陷处理措施报审表(承包[ ]缺陷号)№:CB19—事故报告单(承包[ ]事故号)№:CB20—暂停施工申请报告(承包[ ]暂停号)№:CB21—复工申请表(承包[ ]复工号)№:CB22—变更申请报告(承包[ ]变更号)№:CB23—施工进度计划调整申报表(承包[ ]进调号)№:CB24—延长工期申报表(承包[ ]延期号)№:CB25—变更项目价格申报表(承包[ ]变价号)№:CB26—合同名称:合同编号:索赔意向通知(承包[ ]索通号)№:CB27—索赔申请报告(承包[ ]索报号)№:CB28—工程计量报验单(承包[ ]计量号)№:CB29—计日工工程量签证单(承包[ ]计日证号)№:CB30—工程价款月支付汇总表(承包[ ]月总号)№:CB31—附表1—已完工程量汇总表(承包[ ]量总号)№:CB31—附表2--(承包[ ]单价号)№:CB31—附表3—(承包[ ]合价号)№:CB31—附表4--(承包[ ]新增号)№:CB31—附表5--计日工项目月支付明细表(承包[ ]计日付号)№:CB31—附表6--索赔项目价款月支付汇总表(承包[ ]赔总号)№:CB31—附表7--计日工工程量月汇总表(承包[ ]计日总号)№:CB31—附表61—工程价款月支付申请书( 年月)(承包[ ]月付号)№:CB31—施工月报(承包[ ]月报号)№:CB32—________年第____期________年____月____日至________年____月____日工程名称:_______________________合同编号:_______________________承包人:(全称及盖章)项目经理:(签名)日期:________年____月____日材料使用情况月报表(承包[ ]材料月号)№:CB32—附表1--主要施工机械设备情况月报表(承包[ ]设备月号)№:CB32—附表2—现场施工人员情况月报表(承包[ ]人员月号)№:CB32—附表3—现场质量检验月汇总表(承包[ ]质检月号)№:CB32—附表4—工程事故月报表(承包[ ]事故月号)№:CB32—ᙄ表5—完成工程量月汇总表(承包[ ]量总月号)№:CB32—附表6—K1+478~K1+5888段左侧片石混凝土挡土墙第1部分页脚内容施工实际进度月报( 年 月)(承包[ ]进度月 号) №:CB 32—附表7--2K1+478~K1+5888段左侧片石混凝土挡土墙第1部分施工月报( 年月)(承包[ ]月报号)№:CB32—页脚内容。
施工进度计划申报表(模板)
本表一式三份,建设单位、监理单位、施工单位各一份。
工程名称:
编号:
1
施工进度计划申报表(模板)
工程1
合同号: 20141222 施工单位:
致:
监理公司:
兹上报
XXXX
XXXX年季月程施工进度计划,请审查批准。
附件:
富卓花园广场8号楼 工
施工进度计划(包括形象进度、工程量、工作量、机械、劳动力计划)
年月日
编制说明:
施工单位
日期
1、与总施工进度计划的开完工时间一致 2、主要内容齐全
建设项目施工计划申报表表格格式
土地划拨或出让许可文件(文号):
规划部门审批情况
规划意见书(文号):
规划部门批准
的建筑面积: 平方米
市建委
审批情况
自有用地项目: 备案通知书文号: 京建计(备)字〔200〕号
新征(占)地目: 征地计划通知书文号: 京建计(地)字〔200〕号
(本栏由市建委填写)
4、新征(占)地的建设项目需提交国土资源行政主管部门的用地许可批复文件。
5、具有建设单位主管部门依权限批准的建设项目初步设计文件(部队建设项目应具备工程建设年度计划),建设项目不需批复初步设计文件的,提交建设单位主管部门的书面说明,消防行政主管部门批复的建设项目消防设计防火审核文件和人防行政主管部门批复的建设项目人民防空建设标准审查意见;
6、《城市基础设施建设费》缴纳凭证。
填表日期: 北京市建设委员会编制
建设项目施工计划通知书:
[ ] 京建计施 号
建筑面积: 平方米
批准日期:
申报建设项目施工计划通知书应具备以下材料:
1、具有已填写完整并加盖法人印章的《建设项目施工计划申报表》;
2、具有建设单位主管部门本年度申报建设项目施工计划的函;
3、自有用地的建设项目已经在市建委登记备案,属于划拨土地的,提交国土资源行政主管部门的用地预审文件,属于出让土地的提交国土资源行政主管部门的土地出让许可文件。
建设项目施工计划申报表
编号:
建设单位
(盖章)
建设单位
联系人
建设单位
联系电话
建设项目名称
建设地点
施工图面积
平方米
设计单位
出图日期
主管部门
审批情况
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
填表日期: 北京市建设委员会编制
(本栏由市建委填写)
建设项目施工计划通知书:
[ ] 京建计施 号
建筑面积: 平方米
批准日期:
申报建设项目施工计划通知书应具备以下材料:
1、具有已填写完整并加盖法人印章的《建设项目施工计划申报表》;
2、具有建设单位主管部门本年度申报建设项目施工计划的函;
3、自有用地的建设项目已经在市建委登记备案,属于划拨土地的,提交国土资源行政主管部门的用地预审文件,属于出让土地的提交国土资源行政主管部门的土地出让许可文件。
建设项目施工计划申报表表格格式
建设项目施工计划申报表
编号:建设Leabharlann 位(盖章)建设单位
联系人
建设单位
联系电话
建设项目名称
建设地点
施工图面积
平方米
设计单位
出图日期
主管部门
审批情况
初步设计文件批准文号:
计划总投资 万 元
批准建筑面积 平方米
年度投资计划文号:
资金来源:
当年计划投资: 万 元
国土部门审批情况
自有用地建设项目
用地预审文件(文号):
新征(占)地或自有用地以出让方式取得土地使用权的建设项目
土地划拨或出让许可文件(文号):
规划部门审批情况
规划意见书(文号):
规划部门批准
的建筑面积: 平方米
市建委
审批情况
自有用地项目: 备案通知书文号: 京建计(备)字〔200 〕 号
新征(占)地项目: 征地计划通知书文号: 京建计(地)字〔200 〕 号
4、新征(占)地的建设项目需提交国土资源行政主管部门的用地许可批复文件。
5、具有建设单位主管部门依权限批准的建设项目初步设计文件(部队建设项目应具备工程建设年度计划),建设项目不需批复初步设计文件的,提交建设单位主管部门的书面说明,消防行政主管部门批复的建设项目消防设计防火审核文件和人防行政主管部门批复的建设项目人民防空建设标准审查意见;