锅炉安装胀管工艺标准

锅炉安装胀管工艺标准

校管平台应用δ=16~20mm 的平整钢板铺设,并应有足够的刚性和稳定度,表 面平面度应小于 1mm。 ② 检查、校管时,应在平台上按 1:1 比例划出上、下汽包及各对流管(胀接炉管) 的实样, 划线误差应小于 1mm, 复核无误后可按允许偏差范围沿炉管外圆在管端 两侧间断焊接角钢定位卡,所焊角钢定位卡应能可靠控制炉管弯管段的起止点; 同时,应按管端伸入汽包长度的标准值,在所划上、下汽包处各画一比汽包内 径小的同心圆作为管端基准线以检查炉管长度。 。
ON
① 为全面检查炉管的质量、彻底排除隐患,当无可靠证明文件证实制造厂已对胀
G.
4.2.3 炉管试压
CO
表面可铺一层厚 10mm 的石棉灰,以防止铅液氧化和飞溅。
M
锅炉安装胀管工艺标准
4.2.5 炉管通球 ① 炉管应作通球试验,试验用球不应使用易产生塑性变形的材料制作,通球直径 应符合表 4.2.5 规定。通球合格后的管子应有可靠封闭措施,以防异物进入管 内。



WW
锈蚀、铅渣等用半圆锉等工具清理干净。
W.
磨长度应为上、 下汽包壁厚之和加 50mm) ; 并应将距管口 100mm 范围内的管内壁
ZH
楞。打磨长度至少应比汽包壁厚长约 50mm(高参数锅炉胀接式炉管的穿管端打
UL
① 炉管胀管段的外表应打磨至出现金属光泽,外表应圆滑平直,不得有锥度及微
ON
4.2.6 管端清理
胀接管孔的直径与允许偏差
WW
W.
表 4.1.3 圆度 允许偏差(mm) 0 + 0.34 圆柱度 管子公称外径 (mm) 32 38 42 51 57 60 63.5 70 76 83 89 102 管孔直径 (mm) 32.3 38.3 42.3 51.3 57.5 60.5 64 70.5 76.5 83.6 89.6 102.7 0 + 0.46 0 + 0.40 0.15 0.19

换热器通用胀接工艺

换热器通用胀接工艺

胀管通用工艺规程一、胀接说明1 胀接胀接是换热管与管板的主要联接形式之一,它是利用胀管器伸入换热管管头内,挤压管子端部,使管端直径扩大产生塑性变形,同时保持管板处在弹性变形范围内。

当取出胀管器后,管板孔弹性变形,管板对管子产生一定的挤紧压力,使管子与管板孔周边紧紧地贴合在一起,达到密封和固定连接的目的。

由于管板与管子的胀接消除了弹性板与塑性管头之间的间隙,可有效地防止壳程介质的进入而造成的缝隙腐蚀。

当使用温度高于300℃时,材料的蠕变会使挤压残余应力逐渐消失,连接的可靠性难以保证。

因此,在这种工况下,或预计拉脱力较大时,可采用管板孔开槽的强度胀接。

胀接又分为贴胀和强度胀。

2 胀管率胀管率是换热管胀接后,管子直径扩大比率。

贴胀与强度胀的主要区别在于对管子胀管率 (管子直径扩大比率) 的控制不同,对冷换设备换热管来说,强度胀要求的胀管率H为1~2.1%,而贴胀要求的胀管率H为0.3~0.7%。

3 贴胀贴胀是轻度胀接的俗称,贴胀是为消除换热管与管板孔之间的缝隙,以防止壳程介质进入缝隙而造成的间隙腐蚀。

由于贴胀时胀管器给管子的胀紧力较小,管子径向变形量也就比较小。

因此换热管与管板孔之间的相对运动的摩擦力就比较小,所以它不能承受较大的拉脱力,且不能保证连接的可靠性,仅起密封作用。

贴胀时,管孔不需要开槽。

4 强度胀强度胀是指管板与换热管连接处的密封性和抗拉脱强度均由胀接接头来保证的连接方式。

强度胀接的管板孔要求开胀管槽,一般开两道胀管槽。

以使管子材料在胀接时嵌入胀管槽内,由此来增加其拉脱力。

特别是当使用温度高于300℃时,材料的蠕变会使挤压残余应力逐渐消失,连接的可靠性下降,甚至发生管子与管板松脱,这时采用强度胀接,其抗拉脱力就比贴胀要大得多。

胀管前应用砂轮磨掉表面污物和锈皮,直至呈现金属光泽,清理锈蚀长度应不小于管板厚度的2倍。

管板硬度应比管子硬度高HB20~30,以免胀接时管板孔产生塑性变形,影响胀接的紧密性。

管壳式换热器胀管工艺

管壳式换热器胀管工艺

1 胀管工艺规程编制审核2管子与管板“焊、胀”连接工艺一、原理及适用条件本工艺的实施步骤是焊-胀。

它巧妙地运用胀接过程的超压过载技术通过对管与管板的环形焊缝进行复胀造成应变递增而应力不增加即让该区域处于屈服状态在焊缝的拉伸残余应力场中留下一个压缩残余应力体系。

两种残余应力相互叠加的结果使其拉伸残余应力的峰值大减二次应变又引起应力的重新分布结果起到调整和均化应力场的效果最终将残余应力的峰值削弱到预定限度以下。

本工艺适用于管子与管板的胀、焊并用连接型列管式换热器的工厂或现场加工。

管板厚度范围为16100mm材质为碳钢者就符合GB150-98第二章2.2条的规定若采用16Mn时就分别符合GB3247—88和GBI51—99中的有关规定换热管束应符合GB8163、GB9948-88、GB6479-86、GB5310-85的规定。

二、焊、胀工艺一准备工作1、对换热管和管板的质量检查1管子内外表面不允许有重皮、裂纹、砂眼及凹痕。

管端头处不得有纵向沟纹横向沟纹深度不允许大于壁厚的1/10。

管子端面应与管子轴线垂直其不垂直度不大于外径的2。

2换热管的允许偏差应符合表1-1要求。

3管孔表面粗糙度Ra不大于12.5μm表面不允许纵向或螺旋状刻痕。

管孔壁面不得有毛刺、铁屑、油污。

4管孔的直径允许偏差应符合表1-2规定。

3 换热管的允许偏差表1-1 Ⅰ级换热器Ⅱ级换热器材料标准外径×厚度mm 外径偏差mm ?诤衿 頼m 外径偏差mm 壁厚偏差mm19×2 25×2 25×2.5 ±0.2 ±0.4 32×3 38×3 45×3 ±0.3 12 10 ±0.45 15 10 碳钢GB8163-87 57×3.5 ±0.8 ±10 ±1 12 10 抽查区域应不小于管板中心角60。

胀管施工工艺

胀管施工工艺

引言:胀管施工工艺是一种常用的管道连接方法,具有施工简单、连接牢固等优点。

本文将从材料准备、工具器具、施工步骤、注意事项和效果评估五个方面详细介绍胀管施工工艺的具体内容。

概述:胀管施工工艺是一种利用压力将金属管道扩张,将连接管道或配件插入其中并实现连接的技术方法。

它广泛应用于建筑、石化、供水、暖通等领域。

本文将分别从材料准备、工具器具、施工步骤、注意事项和效果评估五个方面介绍胀管施工工艺。

正文内容:一、材料准备1.胀管工具:包括手持胀管器、电动胀管器等,根据实际需要选择合适的工具。

2.管道和配件:选择合适的材质和规格的管道和配件,确保其质量合格。

3.胀管药剂:根据材料的要求选用适当的药剂,常见的有胀管凝固剂和防腐剂。

二、工具器具1.手持胀管器:手持胀管器是一种常用的胀管工具,适用于小口径管道的胀管作业。

使用时需要掌握合适的力度和速度,避免过分用力导致管道变形。

2.电动胀管器:电动胀管器是一种高效的胀管工具,适用于大口径管道的胀管作业。

使用时需要注意电源稳定和转速控制,避免对管道造成损坏。

三、施工步骤1.准备工作:清洁管道和配件表面,确保无油、无尘和无杂质。

2.胀管操作:将胀管工具插入管道一段长度,以适当的力度和速度推进,直至达到胀管要求的直径。

3.连接管道:将需要连接的管道或配件插入胀管管道中,确保插入深度合适。

4.固定管道:使用合适的固定装置固定管道,确保连接牢固。

5.检查验收:对胀管连接进行检查,确保胀管质量符合要求。

四、注意事项1.安全注意:在使用胀管工具时要注意安全,避免因操作不当造成人身伤害。

2.材料选用:根据工程要求选择合适的材料,确保其质量和可靠性。

3.施工环境:确保施工环境干燥、清洁,避免灰尘和杂质对管道连接造成影响。

4.施工操作:掌握合适的力度和速度,避免过度胀管或胀管不足导致连接不牢固。

5.质量检查:在施工完成后进行质量检查,确保连接的牢固性和密封性。

五、效果评估胀管施工工艺连接的管道具有牢固、密封性好的特点,能够满足工程的要求。

胀管工艺

胀管工艺

胀管工艺工业锅炉的对流管束以及前、后水冷壁与锅筒的连接一般采用胀接法进行安装。

胀接是利用金属的弹性变形和塑性变形的物理性质,通过胀管器的外力作用,将管子胀在另一个物体上,实现两个物体的连接并达到承压和密封的目的的一种连接方法,它多用于工作压力小于2.5MPa的工业锅炉的受热面安装工程。

一、管子的退火管端退火的目的是为了提高管子塑性,防止胀接时管端产生裂纹。

所谓管端退火就是将胀接管管端加热至600~650℃,经过保温、缓慢冷却等过程,使管端的金相组织发生变化,使得管端硬度降低,塑性增加。

退火过程中,要注意以下几点:(1)退火温度一定不可超过650℃;(2)加热管端的时间要足够;(3)管端冷却一定要缓慢;(4)保温用石棉灰要干燥。

如上述四点注意事项没有做到,退火工作就可能失败,还需重新退火。

当管端硬度比锅筒管孔硬度低时,可以省掉退火工序。

否则,还要对管端进行退火处理。

管端和管孔的硬度测量,应在锅炉安装之前随机抽样进行,样本总数不低于10%。

这样做,可以使施工作业指导书的编制更符合现场的实际情况。

退火后,要填写《管端退火记录》。

二、管子的放样与管端打磨管子的放样在放样平台上进行。

就是把某一规格的管子放进样板中。

如果能自然放进,说明该外形合格。

否则,就不合格,须进行冷调或热调。

管子的放样,力争误差最小,当弯管的角度较小时,变形的补偿能力差,放样不准确,易造成胀管不严,严重时,水压试验会产生泄漏。

然后还要做以下工作:1、测量管端伸出锅筒管孔的长度,伸出长度应符合下表规定。

多余部分应锯掉;短于规定数值时,应该从弯头以远800mm处进行换管。

换管的管子一定要用锅炉厂带来的备用管。

换管的管端应是经过退火的。

管子公称外径32~6570~102正常910伸出长度最大1112最小78管端伸出管孔的长度2、仔细检查每根管子裂纹、重皮、锈蚀凹坑等缺陷。

当缺陷严重时,应进行有缺陷管段的换管工作。

3、因胀接管端有氧化皮、锈蚀斑点、刻痕等污物和缺陷,胀接之前要将其彻底清除,以保证胀接质量。

04-胀管作业指导书

04-胀管作业指导书

04-胀管作业指导书引言概述:胀管作为一种常见的管道连接方式,广泛应用于建造、工程和创造业等领域。

本文将详细介绍胀管的作业指导,包括胀管的定义、作用、操作步骤、注意事项和常见问题解决方法。

一、胀管的定义和作用1.1 胀管的定义:胀管是一种通过压力或者力量作用,使管道末端的金属材料膨胀,从而与其他管道或者管件连接的方法。

1.2 胀管的作用:胀管能够实现管道的可靠连接,提高连接的密封性和强度,减少泄漏风险,并方便管道的拆卸和更换。

二、胀管的操作步骤2.1 准备工作:1. 确认所需胀管的规格和材料,并准备好相应的工具和设备。

2. 清洁管道末端,确保无杂质和污垢。

2.2 进行胀管:1. 将胀管工具的胀管头与管道末端对齐,并用力将其插入。

2. 调整胀管工具的力量和角度,根据需要逐渐施加压力,使管道末端膨胀。

3. 检查胀管是否达到所需的规格和强度,确保连接坚固。

2.3 完成胀管:1. 拆卸胀管工具,将其从管道末端取出。

2. 检查胀管是否平整,无明显变形或者损坏。

3. 清理胀管过程中产生的杂质和污垢,并进行必要的防腐处理。

三、胀管作业的注意事项3.1 安全注意事项:1. 在进行胀管作业前,确保操作人员佩戴合适的防护装备,如手套、护目镜等。

2. 注意胀管工具的使用方法和操作规程,避免误伤或者事故发生。

3.2 胀管规范:1. 根据具体管道和连接要求,选择合适的胀管工具和材料。

2. 严格按照胀管工具的使用说明书进行操作,确保胀管达到所需的规格和强度。

3.3 质量控制:1. 在胀管作业过程中,及时检查和调整胀管工具的力量和角度,确保胀管的质量。

2. 对胀管完成后的连接进行质量检测,确保连接的密封性和强度。

四、常见问题解决方法4.1 胀管不坚固:1. 检查胀管工具的力量和角度是否适当,调整至合适的状态。

2. 检查管道末端和胀管工具是否有杂质或者污垢,清洁后重新进行胀管。

4.2 胀管过度变形:1. 检查胀管工具的力量是否过大,适当减小施力。

换热器胀管工艺守则

换热器胀管工艺守则

广州广重企业集团有限公司技术管理文件Q/GZJ031-2004代替GYS13-83胀管工艺守则2004-01-05发布 2004-01-20实施广州广重企业集团有限公司发布广州广重企业集团有限公司胀管工艺守则Q/GZJ031-2004代替GYS13-83 1.总则1.1 本守则适用于列管式换热器管子与管板的机械胀接。

1.2 胀接要求除符合本守则外,还应适合以下文件中的有关规定。

a) 图样规定;b) GB151-1999《管壳式换热器》的技术要求。

2.胀前准备工作2.1 用于胀接的管子和管板须检查合格,符合第1.2条所列文件的要求。

2.2 碳钢管子两端须退火,一般情况其长度应大于2.5倍管板厚度。

对于一般低碳钢管退火温度为600-650C,管子加热到上述温度要不断翻动,经过不少于3分钟的保温后再缓冷。

堆放管子应以枕木或金属架支撑距离地面不少于150mm。

2.3 管端及管板孔必须清理干净,不得有油污、铁屑和锈蚀。

管端应打磨呈至金属光泽,一般情况其长度应不小于管板厚度的两倍。

打磨后管子表面应光滑,不得有纵向刻痕,环向波纹不超过0.1mm。

2.4 管子两端面应与管子轴线成直角,不得有毛刺和飞边。

2.5 管子如果有油膜保护时,供销科向生产科提出安排除油清洗工作。

2.6 固定管板换热器要求两端管板与筒体焊后才穿管。

浮头式换热器应先从支持圈侧穿入固定管板中,然后再装浮头管板,并将管子反穿入。

2.7 为了减少由于胀接所引起的管板变形,必须选择适当的若干管组予先胀接坚固。

对直径≥1200mm的管板,在予胀前应先用4条以上的螺杆收紧,且使管板内1-2mm。

带有膨胀节的换热器,可免去管板内凹要求,但仍须用螺杆收紧,胀后再拆除。

2.8 管子伸出长度如图样未作规定时,按表1选取。

表1 mm2.9 胀接长度如图样未作规定时,管板厚度B≤50mm,胀接长度L=B-3(mm),B>50mm,L=50mm.2.10 接管子内径,胀接长度及工艺规定选取胀管器,胀管器应在使用前经检查无缺陷时方可使用。

换热器通用胀接工艺

换热器通用胀接工艺

胀管通用工艺规程一、胀接说明1 胀接胀接是换热管与管板的主要联接形式之一,它是利用胀管器伸入换热管管头内,挤压管子端部,使管端直径扩大产生塑性变形,同时保持管板处在弹性变形范围内。

当取出胀管器后,管板孔弹性变形,管板对管子产生一定的挤紧压力,使管子与管板孔周边紧紧地贴合在一起,达到密封和固定连接的目的。

由于管板与管子的胀接消除了弹性板与塑性管头之间的间隙,可有效地防止壳程介质的进入而造成的缝隙腐蚀。

当使用温度高于300℃时,材料的蠕变会使挤压残余应力逐渐消失,连接的可靠性难以保证。

因此,在这种工况下,或预计拉脱力较大时,可采用管板孔开槽的强度胀接。

胀接又分为贴胀和强度胀。

2 胀管率胀管率是换热管胀接后,管子直径扩大比率。

贴胀与强度胀的主要区别在于对管子胀管率 (管子直径扩大比率) 的控制不同,对冷换设备换热管来说,强度胀要求的胀管率H为1~2.1%,而贴胀要求的胀管率H为0.3~0.7%。

3 贴胀贴胀是轻度胀接的俗称,贴胀是为消除换热管与管板孔之间的缝隙,以防止壳程介质进入缝隙而造成的间隙腐蚀。

由于贴胀时胀管器给管子的胀紧力较小,管子径向变形量也就比较小。

因此换热管与管板孔之间的相对运动的摩擦力就比较小,所以它不能承受较大的拉脱力,且不能保证连接的可靠性,仅起密封作用。

贴胀时,管孔不需要开槽。

4 强度胀强度胀是指管板与换热管连接处的密封性和抗拉脱强度均由胀接接头来保证的连接方式。

强度胀接的管板孔要求开胀管槽,一般开两道胀管槽。

以使管子材料在胀接时嵌入胀管槽内,由此来增加其拉脱力。

特别是当使用温度高于300℃时,材料的蠕变会使挤压残余应力逐渐消失,连接的可靠性下降,甚至发生管子与管板松脱,这时采用强度胀接,其抗拉脱力就比贴胀要大得多。

胀管前应用砂轮磨掉表面污物和锈皮,直至呈现金属光泽,清理锈蚀长度应不小于管板厚度的2倍。

管板硬度应比管子硬度高HB20~30,以免胀接时管板孔产生塑性变形,影响胀接的紧密性。

换热器管子与管板胀接工艺分析

换热器管子与管板胀接工艺分析

换热器管子与管板胀接工艺分析管子与管板的连接是管壳式换热器生产中最主要的工序之一。

由于这类工程需耗费大量工时,更重要的是,连接的地方在运行中容易发生故障。

因此,发展高效率、高质量的连接技术已成为制造中的重点研究课题。

根据换热器的使用条件不同,加工条件不同,连接的方法基本上分为胀接、焊接和胀焊结合三种,由于胀接法能承受较高的压力,特别适用于材料可焊性差及制造厂的焊接工作量过大的情况。

因此该方法在实际生产中运用广泛。

随着技术的不断发展,现已相继开发出滚柱胀管、爆炸胀管及液压、液袋和橡胶胀管等新工艺。

本文拟对这几种胀管工艺进行比较,为实际生产选择合理的胀管工艺提供参考。

1传统胀接工艺1.1 滚柱胀管法该方法是在一个构架上嵌入三个小直径的滚子,中间有一根锥型心轴的胀管器,如图1所示。

胀管时将胀管器的圆柱部分塞入管孔内,利用电动、风动等动力旋转心轴,通过滚子沿心轴周向旋转,使心轴挤入管内面并强迫管子扩大,达到一定的胀紧度,使管子紧紧地胀接于管板的孔上。

胀管操作可分为前进式和后退式两种,前进式是将构架插入管内,旋转心轴,前进挤大,达到所定的紧固程度后电动机反转,由管中拔出完成胀管过程。

反转式和前进式一样旋转心轴前进,达到原定的紧固程度后电动机停止,同时后退装置的离合器啮合反转,滚子和心轴的相对位置保持不变,一边反转一边由该深度到入口处连续均匀地进行平行胀管。

由于这种胀接过程是由里至外,管子的伸长,发生在管板外侧,可以消除管束的受力状态,提高产品质量[2],故用于胀接长度大于60cm的连接。

1.2 爆炸胀管工艺该方法是利用高能源的炸药,使其在爆炸瞬间(10×10-6~12×10-6s)所产生冲击波的巨大压力,迫使管子产生高速塑性变形,从而把管子与管板胀接在一起,实现管子与管板的连接。

图2为爆炸胀接的示意图,图中柱状炸药放置于管端的中心,为防止冲击波对管壁的损伤,炸药的周围有一管状缓冲填料(粘性物或者塑料),使压力能均匀地传递到管壁上。

胀管工艺

胀管工艺

GB151-1999标准中规定,强度胀接适用于设计压力≤4MPa、设计温度≤300℃、无剧烈振动、无过大温度变化及无应力腐蚀的场合;强度焊接适用于振动较小和无间隙腐蚀的场合;胀、焊并用适用于密封性能较高、承受振动或疲劳载荷、有间隙腐蚀、采用复合管板的场合。

由此可见,单纯胀接或强度焊接的连接方式使用条件是有限制的。

胀、焊并用结构由于能有效地阻尼管束振动对焊口的损伤,避免间隙腐蚀,并且有比单纯胀接或强度焊具有更高的强度和密封性,因而得到广泛采用。

目前对常规的换热管通常采用“贴胀+强度焊”的模式;而重要的或使用条件苛刻的换热器则要求采用“强度胀+密封焊”的模式。

胀、焊并用结构按胀接与焊接在工序中的先后次序可分为先胀后焊和先焊后胀两种。

1 先胀后焊管子与管板胀接后,在管端应留有15mm长的未胀管腔,以避免胀接应力与焊接应力的迭加,减少焊接应力对胀接的影响,15mm的未胀管段与管板孔之间存在一个间隙(见图1)。

在焊接时,由于高温熔化金属的影响,间隙内气体被加热而急剧膨胀。

据国外资料介绍,间隙腔内压力在焊接收口时可达到200~300MPa 的超高压状态。

间隙腔的高温高压气体在外泄时对强度胀的密封性能造成致命的损伤,且焊缝收口处亦将留下肉眼难以觉察的针孔。

目前通常采用的机械胀接,由于对焊接裂纹、气孔等敏感性很强的润滑油渗透进入了这些间隙,焊接时产生缺陷的现象就更加严重。

这些渗透进入间隙的油污很难清除干净,所以采用先胀后焊工艺,不宜采用机械胀的方式。

由于贴胀是不耐压的,但可以消除管子与管板管孔的间隙,所以能有效的阻尼管束振动到管口的焊接部位。

但是采用常规手工或机械控制的机械胀接无法达到均匀的贴胀要求,而采用由电脑控制胀接压力的液袋式胀管机胀接时可方便、均匀地实现贴胀要求。

采用液袋式胀管机胀接时,为了使胀接结果达到理想效果,胀接前管子与管板孔的尺寸配合在设计制造上必须符合较为严格的要求。

只有这样对于常规设计的“贴胀+强度焊”可采用先胀后焊的方式,而对特殊设计的“强度胀+强度焊”则可采用先贴胀,再强度焊,最后强度胀的方法。

胀管工艺流程及原理

胀管工艺流程及原理

胀管工艺流程及原理英文回答:Tube expansion is a process used in various industries, including manufacturing, construction, and plumbing, tojoin or seal tubes together. It involves expanding the end of a tube to fit another tube or fitting, creating a secure and leak-proof connection. The process is commonly used in HVAC systems, heat exchangers, and hydraulic systems.The tube expansion process typically involves the use of a tube expander, which is a tool designed to enlarge the diameter of the tube end. The expander is inserted into the tube, and then expanded using a hydraulic or mechanical force. This expansion creates a tight fit between the tube and the fitting, ensuring a strong connection.There are several methods used for tube expansion, including hydraulic expansion, mechanical expansion, and thermal expansion. Hydraulic expansion is the most commonmethod and involves using hydraulic pressure to expand the tube. Mechanical expansion, on the other hand, utilizes a mechanical force, such as a hammer or a mandrel, to expand the tube. Thermal expansion involves heating the tube and then expanding it while it is hot.The choice of tube expansion method depends on various factors, such as the type of tube material, the desired level of expansion, and the application requirements. Each method has its advantages and disadvantages. For example, hydraulic expansion offers precise control over the expansion process and is suitable for a wide range of tube materials. Mechanical expansion, on the other hand, is more suitable for thick-walled tubes and can provide a higher level of expansion. Thermal expansion is often used for joining dissimilar materials, as it allows for a secure bond between the materials.In addition to the method used, the tube expansion process also involves several steps. First, the tube end is prepared by removing any burrs or sharp edges. Then, the expander is inserted into the tube and expanded to thedesired diameter. The expansion is carefully controlled to avoid over-expansion or damage to the tube. Once the expansion is complete, the tube is inspected for anydefects or imperfections. Finally, the expanded tube is joined with another tube or fitting using welding, brazing, or other joining methods.Tube expansion is a critical process in many industries, as it ensures the integrity and reliability of tube connections. It allows for the efficient transfer of fluids or gases and helps to prevent leaks or failures. Theprocess requires skilled technicians who are familiar with the specific requirements of each application and canensure proper expansion and joining of the tubes.中文回答:胀管工艺是在制造、建筑和管道等多个行业中使用的一种工艺,用于连接或密封管道。

常用胀接方法与工艺要点

常用胀接方法与工艺要点

常用胀接方法与工艺要点无论采用何种方法的胀接工艺,必须做到:尺寸准确、结构牢固、对接严密、胀缩自由、内部清洁、外形美观。

一、胀管前的准备:1、管孔清洗、检查、编号首先应将管孔上的尘土、水分、油污、铁锈等用清洗剂或汽油擦干净,露出金属光泽。

管孔的表面光洁度应不低于12.5μm,边缘不得有毛刺,管孔不得有裂纹和纵向划痕。

允许有个别管孔存在一条螺旋向或环形划痕,但不得超过5mm。

划痕至管孔边缘距离不小于5mm。

管孔的几何形状和尺寸偏差应符合JB1622《锅炉章节管孔尺寸及管端伸出长度》的规定。

用经计量合格的内径千分表测量管孔的直径偏差、椭圆度、不柱度。

并将测量的数值,填写在胀管记录表中或管孔展开图上,做到清楚、正确,以便选配胀管间隙。

2、换热管的准备管子必须有材质证明书,其钢号与图样要求一致。

擦去表面污物,检查外表面不应有重皮、裂纹、压扁、严重锈蚀等缺陷。

如有缺陷,缺陷深度不得超过该标准厚度负偏差规定。

内表面也不得有严重缺陷。

检查管端外径偏差在标准范围内;检查管端壁厚偏差在标准范围内。

3退火一般要求管孔硬度大于管子硬度50HB左右,管板硬度与管子硬度不匹配时,应对管端进行“退火”,使其硬度降低。

3、清理胀管前,应对已经退火的管端打磨干净,露出金属光泽。

打磨长度应比管板厚度长50mm。

打磨应用磨光机打磨或手工打磨。

打磨后,外圆要保持圆形,外表面不得有起皮、棱角、凹痕、夹渣、麻点、裂纹和纵向沟纹。

打磨掉的壁厚不宜超过0.2mm。

打磨好的管端应用经校验过的卡尺测量其直径偏差、圆度、壁厚。

并做好记录和分组。

4、管孔和管子的选配按照管孔和管子的记录表,将管孔和管子选配,打孔配大管,小孔配小管。

力求管孔与管壁间的间隙适中,以利于胀管和控制胀管率。

经过选配后的管子应进行编号,以便胀管时“对号入座”,避免混装。

管子与管孔间的允许间隙5、试胀鉴定试胀是胀管工序的关键。

通过试胀可以掌握胀管器的性能了解所胀材质的胀接性能,确定合适的胀管率和控制胀管率的方法。

胀 管 工 艺 守 则

胀 管 工 艺 守 则

胀管工艺守则编制:审核:批准:江苏永泰压力容器有限公司二00九年十月1、主题内容与适用范围本守则规定了换热器与管板的胀接方法和家属要求。

本守则适用于额定工作压力不大于2.5Mpa以水为介质的固定锅炉。

2、引用标准GB231 金属布氏硬度试验方法GB2975 钢板力学及工艺性能试验取样规定。

GB3087 低中压锅炉用无缝钢管JB/T1611 锅炉管子制造技术条件JB/T1612 锅炉水压试验技术条件JB/T9619 工业锅炉胀接技术条件3、胀接操作人员3.1 胀接操作人员必须经过有关部门技术培训,考试合格后方能上岗。

3.2 胀接操作人员连续脱岗半年,应重新进行式培训,经考试合格后,方可回岗操作。

3.3 胀接操作人员应掌握所用胀接设备的使用性能,熟悉锅炉产品图样、工艺文件及标准要求。

3.4 胀接操作人员应认真做好胀接场地的管理工作,对所用工、量、检具能正确使用和妥善保管。

4、胀接设备与胀管器4.1 胀接设备与胀管器应能满足胀接技术条件及有关标准要求。

4.2 胀接设备一般有如下几种:a.无自动控制胀管率装臵的机械式胀管机;b.液压驱动扭矩自动控制胀管率的胀管机;c.微机控制胀管率的机械式胀管机;d.液压橡胶柔性胀管机;上述胀接设备可视产品情况选择使用。

4.3 胀管器可与相应胀接设备一同使用或直接用于手工胀接。

4.3.1 胀管器按用途一般分为:a.12°~15°扳边胀管器;b.90°扳边胀管器;c.无扳边胀管器;4.3.2 胀管器按胀柱数量一般分为:a.3个胀柱1个翻边柱胀管器;b.4个胀柱2个翻边柱胀管器;应优先选用4胀柱胀管器。

4.3.3 90°扳边胀管器一般有普通90°扳边胀管器与90°无声扳边胀管器之分。

应优先选用无声扳边胀管器。

5、胀接管子的技术要求5.1 胀接管子应符合GB3087的规定。

5.2 胀接管子的外表面不得有重皮、裂纹、压扁等缺陷,胀接管端不得有纵向刻痕。

锅炉胀管施工工艺11

锅炉胀管施工工艺11

锅炉胀管施工工法1、前言目前,锅炉设备日益广泛地应用于现代工业的各个部门,其中大型的散装锅炉具有功率大,效率高的特点,成为工业及采暖不可缺少的热源。

大型散装锅炉的安装中,锅炉管安装是最重要的分项工程之一。

2、工法特点锅炉胀管具有不易损坏管孔、更换管子方便的特点。

3、适用范围3.1 适用于工作介质压力小于或等于2.5Mpa,壁温不超过400℃的新装工业锅炉.3。

2 胀接管子的锅筒和管板的厚度不应小于12mm。

胀接管孔间的距离不应小于19mm。

外径大于102mm的管子不宜采用账接。

4、工艺原理锅炉壁是一种弹性变形材料,相对的说退火后的管端是塑性变形材料,胀接时,锅筒板孔内壁和管子外壁间就产生一对作用力.在该作用下,使板孔内壁与管外壁紧密啮全合达到密封作用的目的。

5、施工工艺流程及工艺要点5.1、工艺流程炉管检查、校正和被胀管端处理→锅炉管孔清洗、检查、处理、编号→管孔与炉管的选配→试胀试验→穿管→胀接→水压试验5。

1。

1、安装对流管和水冷壁管程序如图:5。

1.2、胀管工艺程序及质量控制如图:5.2、施工工艺要点5.2.1、管端退火处理当管子硬度值HB>170时或管子硬度>板孔壁处的硬度时,管端均需作退火处理温度控制在600~650℃,恒温10—15分钟. 管端退火处理方法一般有反射法,铅溶法及电加热法等.我们采用的是铅溶法管端退火法:(1)配备温度监测仪器,退火过程对退火温度进行适时监控. (2)布置加热铅浴箱、缓冷石棉灰保温棚和搭设退火管架。

(3) 将适量铅块置于退火铅浴箱内,并对铅浴箱进行加热。

(4)铅块完全溶解(温度约为350~400 ℃)后,将适量退火管子一端插入铅液中进行加热,控制插入深度不少于100 mm。

(5) 加热铅浴箱,使铅液温度升温至600 ℃后,控制铅液温度不超过650 ℃,持续时间不少于15 min;而后取出退火管子,清除挂铅插入干燥石棉灰中缓冷保温8 h以上。

(6)抽查退火后的管端硬度5。

胀管施工工艺

胀管施工工艺

胀管施工工艺第一章总则本工艺编制依据:1.《蒸汽锅炉安全技术监察规程》1996年276号;2.《工业锅炉胀接技术条件》ZJB980001—87;3.《低压水管锅炉胀接施工规程》.本工艺适用于工业锅炉管子与锅筒、管板胀接。

第二章胀管前的工量准备为了保证胀管质量,在胀管前必须做好工具、量具、操作人员确定工作。

4.胀管器胀管器选取必须符合ZJB980001-87规定,胀管器的胀珠、胀杆表面应光滑,不应有沟纹、撞伤、斑痕等现象;检查前清洗零件,同时查看各零件配合是否正确,胀杆不能弯曲,圆锥度一般为1:25,胀珠圆锥度为胀杆圆锥度的一半。

胀杆与胀珠装配时,其轴线有1。

5~2°的夹角,胀杆与胀珠基本上能保持线接触,以保证胀接质量。

5.自行制作管子夹具及靠模、排管、角铁靠样,能牢固稳定管子即可。

6.选用自行制作的“车床式”管子接头打磨机械,一端用龙门钳固定管头,露出长度200mm,实际打磨100~200mm,打磨靠装在滑动块上的电机带动三块活动砂轮块,根据向心旋转力打磨表面,依据滑块掌握打磨光度.7.管子内径用半圆锥清理干净。

8.管孔打磨用内圆磨包细砂纸进行.9.其他工具有小木锤、线锤、内径百分表、游标卡尺、不带丝化纤布、CCL4或汽油。

第三章管孔和管子第一节汽包上管孔的检查10。

汽包的内部装置应拆除,以便清洗和检查汽包管孔。

检查时应先清洗掉管孔壁上的防护涂料,检查管孔壁的加工质量,不得有砂眼、凹痕、边缘毛刺和纵向刻痕;纵向或螺旋形刻痕的深度不得大于0.5mm,宽度不得大于1mm,刻痕到孔边的距离不得小于孔壁厚度的1/3,并且不得小于4mm。

管孔壁如有锈蚀,应用细砂布等不致使孔壁产生明显刻痕的工具,将孔壁处理至发出金属光泽。

当距离胀管时间较长时,应涂好防锈油。

11。

用内径千分表测量每个管孔的直径、圆锥度和椭圆度,记在展开图或记录表上,其偏差不得超过表1的规定。

当偏差超过本规定时,应与锅炉使用单位协商处理.12. 有缺陷的管孔在缺陷未消除前不得胀管,消除较小的缺陷一般可用刮刀修刮。

胀管工艺方案

胀管工艺方案

引言概述:在工程制造领域中,胀管工艺是一项广泛应用的技术。

胀管工艺主要用于将管道连接头与管道本体进行可靠、牢固的连接。

本文将围绕胀管工艺展开详细探讨,包括其基本原理、工艺步骤以及应用范围。

正文内容:一、胀管工艺的基本原理1.胀管工艺的定义与作用2.胀管工艺的基本原理解析二、胀管工艺的工艺步骤1.准备工作:材料准备、设备准备2.加热和预热:加热的目的与方法3.胀管操作:使用合适的工具进行胀管4.冷却和固化:冷却过程中的注意事项5.检查与测试:对胀管工艺进行检测和验证三、胀管工艺的应用领域1.建筑工程领域中的应用:水暖管道、空调管道等2.工业制造领域中的应用:机械设备管道、汽车零部件等3.航空航天领域中的应用:飞机管道连接等4.能源领域中的应用:石油管道、天然气管道等5.其他领域中的应用:电力行业、化工行业等四、胀管工艺的优点与不足1.优点:连接牢固、耐用性好、工艺简单等2.不足:设备与材料的要求较高、操作技术要求较高等五、胀管工艺方案的选择与优化1.根据实际应用需求确定合适的胀管工艺方案2.优化胀管工艺方案以提高生产效率和质量3.胀管工艺的自动化与智能化趋势总结:通过对胀管工艺进行深入的研究与探讨,我们可以得出结论:胀管工艺是一种重要的连接方式,广泛应用于各个领域。

胀管工艺在使用过程中,需要按照一定的步骤和原则进行操作,以确保连接的牢固性和质量。

同时,随着技术的不断发展,胀管工艺方案将会越来越智能化和自动化,提高生产效率和质量。

因此,在实际应用中,我们应根据需要选择合适的胀管工艺方案,并对其进行优化,以满足生产需求。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

胀管工艺规程
一、胀接管子的技术要求
1、胀接管子外表面不得有重皮、压扁、裂纹等表面缺陷,胀接管端不得有纵向刻痕。

如有横向刻横、麻点等缺陷时,缺陷深度不超过管子公称壁厚的10%。

2、胀接管子的端面倾斜度应不大于管子公称外径的1.5%,且最大不超过1mm 。

3、管板材料的硬度高于换热管材料硬度即可,当换热管硬度大于管板硬度时,应进行退火处理,一般管端退火长度应不小于100mm,且比管板厚度多至少15~30mm。

4、胀管前应对管端进行清理
A、碳钢管端外表面进行除锈磨光,磨光长度不小于50mm.除锈磨光后的表面不得有起皮,
凹痕,裂纹和纵向沟槽等缺陷,磨光后的最小外径符合表1规定。

管端内表面应无严重腐蚀和铁屑等杂物并清除毛刺。

不锈钢管端应清除毛刺。

B、碳钢磨光后的管子应及时胀接,如不能则应妥善保管,防止再次生锈。

如生锈应重新打
磨,磨光后的最小外径符合表1规定。

二、胀接管孔的技术要求
1、用汽油等溶剂清洗管孔壁上的油污,再用细纱布打磨残留锈蚀,并去除管孔边缘毛
刺,打磨后管孔壁的最大粗糙度不大于6.3。

2、清理后的管孔壁不得有纵向刻痕,个别管孔允许有一条螺旋形或环形刻槽,刻槽深
度不超过0.5mm,宽度不得超过1mm,刻痕距管孔端部的距离不小于4mm。

3、管孔尺寸按GB151-1999 5.6.4规定。

见表2、表3。

4、如管孔直径超差,超差数值不得超过标准偏差值的50%。

当管孔不大于500时,超差孔数不得超过总数的2%,且不超过5个。

当管孔大于500时,超差孔数不得超过总数的1%,且不超过10个。

对于超差管孔,在管板上作出明显标记。

5、管孔加工后,宜采用机械式挤光器挤光管孔,以提高管孔内壁表面硬度和减少粗糙度,以利于胀接。

Ⅱ级管束表2
三、胀管设备
电动式机械胀管机和相应胀管器具
液压胀管机和相应胀管器具
四、穿管
1、按照每个胀接面总数的10%,且不多于30根,不少于5根,随机测量管孔直径D,管端壁厚t,计算出D和t的算术平均值,并做好记录。

2、穿管时应超穿一定距离,以再次清理穿管留下来的污物,清理后退回正确位置。

3、对于管端伸出长度超差要求的管子,应用机械方法去除超长部分,并清除毛刺。

五、胀接技术要求
1、胀接工艺评定
1)工艺评定内容要求

2)有工艺评定的情况下,按工艺评定参数进行胀接。

2、没有评定支持的情况下
试胀
1)正是胀接之强应进行试胀,以检查胀管器的质量,管材的胀接性能和确定最佳胀管率。

2)试胀每胀接面10个管口,选用不同的胀管参数,测量实际胀接后的内直径,与计算出的理论胀管内径值比较,并做好记录。

3)试胀后对各个管口进行比较性检查,检查胀口部分是否有裂纹,胀接过渡部分是否有剧烈变化,然后选定外观质量好,且留有充分补胀余地的胀口胀管率值作为最佳胀管率,待正式胀接时使用。

3、胀接
1)根据试胀所确定的最佳胀管率或者工艺评定给出的胀管参数进行正式胀接。

胀接过程严防油污,水以及灰尘渗入胀接面间。

2)胀接采用反阶式胀接顺序或者错列式胀接顺序。

3)胀接时每胀完15-20个管口,应对胀管器进行清洗,检查有无损伤,反之更换。

4、胀管率控制
①强度胀:换热管材料为铜、铜合金及不锈钢时,胀管率一般控制在0 .5%~1 .2%范围内,超胀不得超过2.0%;换热管材料为10钢或20钢时,胀管率一般控制在0 7%~2. 1%范围内,超胀不得超过2.8%;换热管材料为黄铜时,胀管率一般控制在1%~1 .8%范围内,超胀不得超过2.5%。

②贴胀:换热管材料为铜、铜合金及不锈钢时,胀管率一般控制在0. 2%~0.6%范围内,超胀不得超过1.0%;换热管材料为10钢或20钢时,胀管率一般控制在0.3%~1.0%范围内,超胀不得超过1.4%;换热管材料为黄铜时,胀管率一般控制在0.5%~0.9%范围内,超胀不得超过1.2%。

③胀后换热管理论内径计算公式和胀管率计算公式
×
×
式中Hn———胀管率,% t———未胀时的换热管实测壁厚,mmD———未胀时的管板孔实测直径,mmd———胀完后的换热管实测内径,mm
六、检验技术要求
1、管头连接形式仅为强度胀
1)水压按工艺试压卡进行。

2)检查在应在试验压力降至工作压力时进行,检查胀口有无漏水,应在相应管端作出标记。

3)在泄压放水后进行补胀,同时还应该对其临近的一些管口稍加补胀以免受到影响而松弛。

补胀前应测量胀口内径,确定合适的补胀量,以免超胀。

4)同一胀口漏水,补胀次数不应多于2次,补胀后重新进行水压试验。

对于补胀后仍有漏水且胀管率大于超胀指标的管子应换管重胀。

(在割除不合格的管子时,必须注意不损伤管孔壁)
5)应有专人负责记录胀接和水压试验结果,以作为验收依据并备案。

2、胀管率检验
1)每面管板按5%均布随机测量胀后换热管内径,且不少于20根,对少于20根的全部进行测量,比较理论胀管内径值,对于欠胀的管头进行补胀,补胀前应测量胀口内径,确定合适的补胀量,以免超胀。

2)超胀数量不得超过胀接总数的4%,且不超过15个。

允许超胀数量小于2个时,允许超胀2个。