DC Circuit Breaker Testing Plan.
Purpose:
The purpose of this testing plan is to outline the steps involved in testing a DC circuit breaker to ensure its proper operation and compliance with applicable standards.
Scope:
This testing plan applies to all DC circuit breakers used in the electrical system of the facility.
Responsibilities:
The following personnel are responsible for the
execution of this testing plan:
Electrical Maintenance Technician.
Electrical Supervisor.
Test Equipment:
The following test equipment is required for the performance of the tests outlined in this plan:
DC power supply.
DC voltmeter.
DC ammeter.
Insulation tester.
Megohmmeter.
Test Procedures:
1. Visual Inspection:
Inspect the circuit breaker for any physical damage or signs of wear.
Verify that all connections are tight and secure.
2. Insulation Resistance Test:
Disconnect the circuit breaker from the circuit.
Measure the insulation resistance between the terminals and the ground using a megohmmeter. The
insulation resistance should be greater than 1 megohm.
3. Continuity Test:
Connect a DC power supply to the circuit breaker.
Measure the resistance between the terminals of the circuit breaker. The resistance should be less than 0.01
ohms.
4. Trip Test:
Apply a DC current to the circuit breaker that is greater than the rated trip current.
Verify that the circuit breaker trips within the specified time.
5. Close-No Trip Test:
Apply a DC current to the circuit breaker that is less than the rated trip current.
Verify that the circuit breaker does not trip.
6. Overload Test:
Apply a DC current to the circuit breaker that is greater than the rated overload current.
Verify that the circuit breaker trips within the specified time.
7. Short Circuit Test:
Connect a short circuit across the terminals of the circuit breaker.
Verify that the circuit breaker trips instantaneously.
8. Ground Fault Test:
Apply a DC current to the circuit breaker that is greater than the rated ground fault current.
Verify that the circuit breaker trips within the specified time.
Test Report:
A test report shall be completed for each circuit breaker that is tested. The report shall include the
following information:
Date of test.
Circuit breaker identification number.
Test results.
Inspector's signature.
Frequency of Testing:
Circuit breakers shall be tested at the following frequencies:
New circuit breakers shall be tested prior to being placed into service.
Circuit breakers shall be tested annually thereafter.
Circuit breakers that have been subjected to a fault shall be tested immediately following the fault.
Corrective Actions:
If any of the tests fail, the circuit breaker shall be removed from service and repaired or replaced.
中文回答:
直流断路器测试计划。
目的:
本测试计划的目的是概述测试直流断路器以确保其正常运行和符合适用标准的步骤。
范围:
本测试计划适用于设施电气系统中使用的所有直流断路器。
职责:
以下人员负责执行本测试计划:
电气维护技师。
电气主管。
测试设备:
执行本计划中概述的测试需要以下测试设备:
直流电源。
直流电压表。
直流电流表。
绝缘测试仪。
兆欧表。
测试程序:
1. 目视检查:
检查断路器是否有任何物理损坏或磨损迹象。
确认所有连接牢固紧密。
2. 绝缘电阻测试:
断开断路器与电路的连接。
使用兆欧表测量端子与地之间的绝缘电阻。
绝缘电阻应大于 1 兆欧。
3. 通断性测试:
将直流电源连接到断路器。
测量断路器端子之间的电阻。
电阻应小于 0.01 欧姆。
4. 跳闸测试:
向断路器施加超过额定跳闸电流的直流电流。
验证断路器在规定时间内跳闸。
5. 合闸未跳闸测试:
向断路器施加小于额定跳闸电流的直流电流。
验证断路器未跳闸。
6. 过载测试:
向断路器施加超过额定过载电流的直流电流。
验证断路器在规定时间内跳闸。
7. 短路测试:
在断路器的端子上连接短路。
验证断路器瞬时跳闸。
8. 接地故障测试:
向断路器施加超过额定接地故障电流的直流电流。
验证断路器在规定时间内跳闸。
测试报告:
应针对每个接受测试的断路器填写一份测试报告。
报告应包括以下信息:
测试日期。
断路器识别号。
测试结果。
检查员签名。
测试频率:
应按照以下频率对断路器进行测试:
新断路器应在投入使用前进行测试。
此后应每年对断路器进行测试。
已发生故障的断路器应在故障发生后立即进行测试。
纠正措施:
如果任何测试失败,则应将断路器从服务中移除并进行维修或更换。