#____发电机启动前的准备工作操作
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
1.2
误拉、合开关。操作前核对设备的名称和编号后再操作,严格执行监护复诵制度
Don’t mistakenly open or close switch,verify the equipment name and code before operation. Strictly execute the supervision and recitation system.
2.19
检查#____发电机中性点接地刀闸____在分闸位置
Check Unit ____ Generator neutral grounding point disconnector is open.
2.20
检查#____发电机出口1PT在检修位置
Check Unit ____ Generator 1PT is in maintenance state.
Close theUnit ____ Generator UPS bus to Unit ____ Generator control cabinet power switch.
2.29
合上#____发电机USP母线至#____发电机电度表屏电源开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator kilowatt-hour meter cabinet power switch.
2.3
检查#____发电机密封油系统运行正常
Check theUnit ____ Generator sealing oil system is running normally.
2.4
检查#____发电机氢系统运行正常,氢气纯度98%
Check theUnit ____ Generator hydrogen system is running normally and the hydrogen purity is about98%.
检查#____发电机11kV B段母线工作电源开关确在合闸位置
Check and confirm Unit ____ Generator11kV A section working bus power switch is closed.
2.13
检查#____发电机#2高厂变(1B)运行正常
Check Unit ____ Generator#2 auxiliary transformer (1B) is running normally.
顺序
No.
操作内容
Operation contents
已执行
Completed
操作时间
Operating time
1
操作危险点、安全措施和注意事项
Operation danger points, safety measures and notes
1.1
核对所操作设备的名称、编号、位置及实际运行状态与操作票要求一致Verify the name, code, position and actual running state of equipment that is going to be operated is consisted with the operation permit requirements.
检查#____发电机启动工作母线电源开关确在合闸位置
Check and confirm Unit ____ Generatorstartup working bus power switch is closed.
2.16
检查#____发电机启动变压器运行正常
Check Unit ____ Generatorstartup transformer is running normally.
Close theUnit ____ Generator UPS bus to Unit ____ Generator fault recorder switch.
2.32
合上#____发电机220V#1直流屏至#____发电机保护A柜电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator protection cabinet A power switch.
2.11
检查#____发电机11kV A段母线备用电源____开关确在热备用状态
Check and confirm Unit ____ Generator11kV A section bus standby power switch ____ is in hot standby state.
2.12
2.30
合上#____发电机USP母线至#____发电机变送器屏开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator transmitter cabinet switch.
2.31
合上#____发电机USP母线至#____发电机故障录波器开关
2.23
检查#____发电机励磁开关____确在分闸位置
Check and confirm the Unit ____ Generator excitation switch____ is open.
2.24
检查#____发电机出口开关____确在分闸位置
Check and confirm the Unit ____ Generator outlet switch____ is open.
2.5
检查DCS上#____发变组所有参数测点显示正常
Check the all the parameter monitoring indications ofUnit ____ Generatorare normal on DCS.
2.6
检查#____发电机内冷水系统运行正常
Check Unit ____ Generator inner cooling water system is running normally.
2.17
检查#____机11kV启动母线至11KvA段工作母线备用电源_____开关确在热备用状态
Check and confirm Unit ____ Generatorstartup bus to 11kV A section working bus standby power switch ____ is in hot standby state.
2
操作项目
Operating items
已执行
Completed
操作时间
Operating Time
2.1
得令:#____发电机启动前的准备工作
Command is received to prepare to start Unit ____ Generator.
2.2
检查#____发变组一次回路完整,检修工作全部结束,工作票已收回,安全措施已拆除
操 作 票
OPERATION PERMIT
No:Pageof
操作开始时间:Operating Start time:年Y月M日D时H分Min
操作完成时间:Operating End time:年Y月M日D时H分Min
操作任务:Operation tasks:
#____发电机启动前的准备工作操作
Preparation work before unit____generator startup operation
2.25
检查#____发电机出口刀闸____确在分闸位置
Check and confirm the Unit ____ Generator outletdisconnector____ is open.
2.26
测量#____发电机及励磁回路绝缘合格
Measure theUnit ____ Generator and excitation circuit insulation for qualified.
2.18
检查#____发电机11kV启动母线至11KvB段工作母线备用电源_____开关确在热备用状态
Check and confirm Unit ____ Generatorstartup bus to 11kV B section working bus standby power switch ____ is in hot standby state.
2.9
检查#____发电机11kV A段工作母线电源开关确在合闸位置
Check and confirm Unit ____ Generator11kV A section working bus power switch is closed.
2.10
检查#____发电机#1高厂变(1A)运行正常
Check Unit ____ Generator#1 auxiliary transformer (1A) is running normally.
2.33
合上#____发电机220V#1直流屏至#____发电机保护B柜电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator protection cabinet B power switch.
2.34
合上#____发电机220V#1直流屏至#____发电机控制屏电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator control cabinet power switch.
2.35
合上#____发电机220V#1直流屏至#____发电机励磁调节器屏电源开关
2.21
检查#____发电机出口2PT在检修位置
Check Unit ____ Generator 2PT is in maintenance state.
2.22
检查#____发电机出口3PT在检修位置
Check Unit ____ Generator 3PT is in maintenance state.
2.27
合上#____发电机UPS母线至#____发电机保护B屏电源开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator protection cabinet B power switch.
2.28
合上#____发电机UPS母线至#____发电机控制屏电源开关
2.7
检查#____发电机集电环、碳刷回路正常
Check Unit ____ Generator current collecting ring and carbon brush circuit are normal.
2.8
检查#____发电机大轴接地碳刷正常
Check Unit ____ Generator shaft grounding carbon brush is normal.
1.3
走错间隔。就地操作前核对设备的名称和编号后再操作,监护人做好监护。
Don’t mistakenly go to another power distribution room,verify the equipment name and code before operation. Supervisor shall seriously supervise the operation.
CheckUnit ____ Generator primary circuit is completed, all the maintenance work is finished and the work permits are all collected back. The safety measures are removed.
2.14ห้องสมุดไป่ตู้
检查#____发电机11kV B段母线备用电源____开关确在热备用状态
Check and confirm Unit ____ Generator11kV B section bus standby power switch ____ is in hot standby state.
2.15
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator excitation regulating cabinet power switch.
误拉、合开关。操作前核对设备的名称和编号后再操作,严格执行监护复诵制度
Don’t mistakenly open or close switch,verify the equipment name and code before operation. Strictly execute the supervision and recitation system.
2.19
检查#____发电机中性点接地刀闸____在分闸位置
Check Unit ____ Generator neutral grounding point disconnector is open.
2.20
检查#____发电机出口1PT在检修位置
Check Unit ____ Generator 1PT is in maintenance state.
Close theUnit ____ Generator UPS bus to Unit ____ Generator control cabinet power switch.
2.29
合上#____发电机USP母线至#____发电机电度表屏电源开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator kilowatt-hour meter cabinet power switch.
2.3
检查#____发电机密封油系统运行正常
Check theUnit ____ Generator sealing oil system is running normally.
2.4
检查#____发电机氢系统运行正常,氢气纯度98%
Check theUnit ____ Generator hydrogen system is running normally and the hydrogen purity is about98%.
检查#____发电机11kV B段母线工作电源开关确在合闸位置
Check and confirm Unit ____ Generator11kV A section working bus power switch is closed.
2.13
检查#____发电机#2高厂变(1B)运行正常
Check Unit ____ Generator#2 auxiliary transformer (1B) is running normally.
顺序
No.
操作内容
Operation contents
已执行
Completed
操作时间
Operating time
1
操作危险点、安全措施和注意事项
Operation danger points, safety measures and notes
1.1
核对所操作设备的名称、编号、位置及实际运行状态与操作票要求一致Verify the name, code, position and actual running state of equipment that is going to be operated is consisted with the operation permit requirements.
检查#____发电机启动工作母线电源开关确在合闸位置
Check and confirm Unit ____ Generatorstartup working bus power switch is closed.
2.16
检查#____发电机启动变压器运行正常
Check Unit ____ Generatorstartup transformer is running normally.
Close theUnit ____ Generator UPS bus to Unit ____ Generator fault recorder switch.
2.32
合上#____发电机220V#1直流屏至#____发电机保护A柜电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator protection cabinet A power switch.
2.11
检查#____发电机11kV A段母线备用电源____开关确在热备用状态
Check and confirm Unit ____ Generator11kV A section bus standby power switch ____ is in hot standby state.
2.12
2.30
合上#____发电机USP母线至#____发电机变送器屏开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator transmitter cabinet switch.
2.31
合上#____发电机USP母线至#____发电机故障录波器开关
2.23
检查#____发电机励磁开关____确在分闸位置
Check and confirm the Unit ____ Generator excitation switch____ is open.
2.24
检查#____发电机出口开关____确在分闸位置
Check and confirm the Unit ____ Generator outlet switch____ is open.
2.5
检查DCS上#____发变组所有参数测点显示正常
Check the all the parameter monitoring indications ofUnit ____ Generatorare normal on DCS.
2.6
检查#____发电机内冷水系统运行正常
Check Unit ____ Generator inner cooling water system is running normally.
2.17
检查#____机11kV启动母线至11KvA段工作母线备用电源_____开关确在热备用状态
Check and confirm Unit ____ Generatorstartup bus to 11kV A section working bus standby power switch ____ is in hot standby state.
2
操作项目
Operating items
已执行
Completed
操作时间
Operating Time
2.1
得令:#____发电机启动前的准备工作
Command is received to prepare to start Unit ____ Generator.
2.2
检查#____发变组一次回路完整,检修工作全部结束,工作票已收回,安全措施已拆除
操 作 票
OPERATION PERMIT
No:Pageof
操作开始时间:Operating Start time:年Y月M日D时H分Min
操作完成时间:Operating End time:年Y月M日D时H分Min
操作任务:Operation tasks:
#____发电机启动前的准备工作操作
Preparation work before unit____generator startup operation
2.25
检查#____发电机出口刀闸____确在分闸位置
Check and confirm the Unit ____ Generator outletdisconnector____ is open.
2.26
测量#____发电机及励磁回路绝缘合格
Measure theUnit ____ Generator and excitation circuit insulation for qualified.
2.18
检查#____发电机11kV启动母线至11KvB段工作母线备用电源_____开关确在热备用状态
Check and confirm Unit ____ Generatorstartup bus to 11kV B section working bus standby power switch ____ is in hot standby state.
2.9
检查#____发电机11kV A段工作母线电源开关确在合闸位置
Check and confirm Unit ____ Generator11kV A section working bus power switch is closed.
2.10
检查#____发电机#1高厂变(1A)运行正常
Check Unit ____ Generator#1 auxiliary transformer (1A) is running normally.
2.33
合上#____发电机220V#1直流屏至#____发电机保护B柜电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator protection cabinet B power switch.
2.34
合上#____发电机220V#1直流屏至#____发电机控制屏电源开关
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator control cabinet power switch.
2.35
合上#____发电机220V#1直流屏至#____发电机励磁调节器屏电源开关
2.21
检查#____发电机出口2PT在检修位置
Check Unit ____ Generator 2PT is in maintenance state.
2.22
检查#____发电机出口3PT在检修位置
Check Unit ____ Generator 3PT is in maintenance state.
2.27
合上#____发电机UPS母线至#____发电机保护B屏电源开关
Close theUnit ____ Generator UPS bus to Unit ____ Generator protection cabinet B power switch.
2.28
合上#____发电机UPS母线至#____发电机控制屏电源开关
2.7
检查#____发电机集电环、碳刷回路正常
Check Unit ____ Generator current collecting ring and carbon brush circuit are normal.
2.8
检查#____发电机大轴接地碳刷正常
Check Unit ____ Generator shaft grounding carbon brush is normal.
1.3
走错间隔。就地操作前核对设备的名称和编号后再操作,监护人做好监护。
Don’t mistakenly go to another power distribution room,verify the equipment name and code before operation. Supervisor shall seriously supervise the operation.
CheckUnit ____ Generator primary circuit is completed, all the maintenance work is finished and the work permits are all collected back. The safety measures are removed.
2.14ห้องสมุดไป่ตู้
检查#____发电机11kV B段母线备用电源____开关确在热备用状态
Check and confirm Unit ____ Generator11kV B section bus standby power switch ____ is in hot standby state.
2.15
Close theUnit ____ Generator 220V No.1 DC cabinet to Unit ____ Generator excitation regulating cabinet power switch.