绿色施工管理措施
Green n Plan
XXX "n Site Environment and Health Standards" (146-2004) and implement the requirements of the "XXX" (ng Jian Jian Han [2007] No。
143)。
improve n management level。
maximize resource n。
ce XXX。
standardize green n。
XXX。
XXX。
and strengthen on-site civilized n and green n management。
We will usly implement the company's ISO management system。
ensure the XXX health and personal safety of n personnel。
XXX。
strictly control water n。
air n。
noise n。
and solid waste n。
increase management XXX such as land。
water。
electricity。
and resources n。
and create safe and XXX
4.14.64.756.16.56.66.89.19.210.1112 of this n are mandatory and must be strictly enforced.
1.Green n Management System and ns
1.1 Green n Management System
1) Based on the project manager and project safety director as the core。
XXX and safety environmental n management system that meets ISO standards in the project manager's office。
clarify the responsibilities and powers of each n in the system。
establish and maintain a set of work res。
XXX system.
Team Leader: Zhang Jingwei
Deputy Team Leader: XXX。
Shao Hui
XXX: Zhou Jie。
Zhou Tao。
Zhou Heng。
Huang XXX
2) XXX a good operating n during project XXX.
3) Manage the XXX of the nal environmental XXX.
1.2 Management ns
1) Hold a "Green n" project meeting once a week。
summarize the XXX of the us stage。
and arrange the work for the next stage.
2) Establish and implement a n site management n system。
XXX management in each nal department。
issue a "work contact form" for problems found during the n。
and each nal department should solve the problems according to the specific n。
time。
XXX of the project department should supervise the XXX.
2.Green n Management Measures
2.1 Resource n Measures
1) The on-site water XXX "Water-saving Life Water Appliances" (CJ164-2002) XXX-saving plans and technical measures。
XXX water management。
and strive to recycle and reuse water as much as possible.
2) XXX during the n stage。
compare the actual XXX。
and ce the total water XXX stage by 1% from the XXX.
1)在施工现场设立污水处理设备,对产生的污水进行处理,达到排放标准。
2)严格执行施工现场禁止乱倒污水的规定,建立污水收集、处理和排放制度。
3)对使用的化学品和涂料要进行分类管理,严格按照规定使用,避免对水环境造成污染。
4)加强对施工现场油污的管理,采取防漏、防渗、防溢措施,防止油污渗入地下水。
5)严格控制施工现场的垃圾和废弃物的产生,采取有效措施进行分类、收集、处理和处置,避免对水环境造成污染。
6)加强对施工现场周边水环境的监测,及时发现和处理
水污染问题,保护周边水资源的安全。
在施工现场,水污染和噪音污染是两个主要的环境问题。
为了防止水污染,应该按照国家标准《污水综合排放标准》(GB 8978—1996)的要求,对不同来源的工地污水采取有针对
性的处理方式,包括去除泥沙、去除油污、分解有机物、沉淀过滤、酸碱中和等。
对于噪音污染,应该严格按照国家标准《建筑施工场界噪声测量方法》(GB∕T-90)和《建筑施工场
界噪声限值》(GB∕l2523—1990)的要求,合理布局机具,安排
噪声作业时段,选用低噪声的电动工具,并设置噪音监控点。
同时,防止施工固体废弃物污染也是必要的。
施工现场应设立专门的废弃物临时储存场地,并对废弃物进行分类存放,单独储存有可能造成二次污染的废弃物,并采取安全防范措施。
废弃物应该进行正确的运输和处理,对可回收的废弃物应该做到再回收利用。
最后,为了控制环境影响,应采取有效措施,防止环境被雨水管道、地表径流和空气带来的杂质、颗粒所产生的沉淀物污染。
对于不可再生利用的施工废弃物,应符合国家及地方法
律、法规要求,防止土壤和地下水被污染。
危险品、化学品存放处和危险性废物堆放场应有严格的隔水层设计,做好渗漏液收集和处理工程,防止土壤被污染。
During the n d。
XXX sand。
XXX-growing grass species to
ce XXX n。
the XXX.
Special measures must be established for the procurement。
n。
storage。
n。
and disposal of XXX person must manage these activities.
9.Safety n XXX Measures
9.1 XXX Management
⑴ XXX established by the command center when XXX.
⑵ During n。
XXX。
safety helmets。
and XXX。
and XXX.
⑶ When workers enter the anti-XXX。
XXX underway。
workers must wear gas masks.
⑷ High-altitude work must be performed while wearing safety belts and double safety ropes。
A safety main cable must be set up on the working surface and securely fixed and regularly inspected。
During work。
the safety rope must be fixed to a secure point (including the safety main cable)。
All n tools used must also be tied to the safety belt or other fixed points to prevent falling from a high altitude。
When moving at a high altitude。
two safety XXX fixed to secure points for movement。
and one safety rope must be fixed to a secure point at all times.
⑸ During n。
XXX。
such as dust (gas) masks and gloves.
⑹ A full-time XXX。
electric tools。
and cables。
XXX.
⑺ XXX when workers enter the anti-XXX.
⑻ XXX.
⑼ A strict work le must be maintained。
and all safety measures must be met before n can begin.
⑽ ns before each shift。
and all safety XXX.
⑾ The project manager must hold a safety XXX。
XXX.
⑿ XXX during n。
and the safety area for cross-XXX.
9.2 Temporary Electricity Management
1) XXX with the "Technical XXX" (46-2005) XXX。
and XXX.
2) XXX。
and an XXX room and n room established。
with XXX for all types of n and switch boxes on-site.
3) XXX.
4) n machinery。
vehicles。
XXX a safe distance from internal and external power lines。
XXX when the minimum distance XXX.
设备的安装应符合规定,采用优质电器元件,并应定期检查和维护。
照明设备的安装位置应合理,光线均匀,不得产生眩光。
在施工现场,应采用36V低压照明,地上输电导线与
金属物靠近部位应加绝缘保护,并在用电箱加装漏电保护器。
高架坞灯应采用防风设计,固定牢固,不得有松动现象。
施工现场的电气设备必须采用接地和接零保护方式,并设逐级漏电保护装置,实行分级保护。
在总配电箱和开关箱内设置漏电保护器,形成完整的保护系统。
漏电保护装置的选择应符合规定。
配电系统应实行分级配电,分为总配电箱、分配电箱和开关箱三级。
各级配电箱、开关箱的箱体安装和内部设置必须符合有关规定,箱内装置必须可靠完好,其选型定值要符合规定,开关电气应表明用途,并在电源箱正面门内绘有接线图。
各类配电箱、开关箱外观应完整、牢固、防雨、防尘,箱体应外涂安全色标,统一编号,箱内无杂物,停止使用的配电箱应切断电源,箱门上锁。
固定式配电箱应设围栏,并有防雨措施。
所有现场用电设备均应做保护接零,并悬挂标志牌。
配电线路必须按规范架设整齐,架空线路必须采用绝缘导线,不得采用塑料软线。
电缆线路必须按规定沿附着物敷设或采用埋地方式敷设,不得沿地面明敷设。
所有电气设备的外露导电部分,均应做保护接零,对产生震动的设备其保护零线是接连点不少于两处。
电动工具的使用应符合国家标准、专业标准和安全技术规程,并应有产品合格证和使用说明书。
工具的电源线、插头、插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损。
维护和保管应有专人负责。
电焊机应单独设开关,并设防二次侧触电保护装置。
电焊机外壳应设接零或接地保护。
焊工必须按规定穿防护用品,持证上岗。
在安装高大设施时,必须按规定装设避雷装置。
检修各类配电箱、开关箱、电气设备和电力施工用具时,必须切断电源,拆除电气连接并悬挂警示标志牌。
试车和调试时应确定操作程序和设专人监护。
照明设备的安装应符合规定,采用优质电器元件,并应定期检查和维护。
照明设备的安装位置应合理,光线均匀,不得产生眩光。
在施工现场,应采用36V低压照明,地上输电导线与金属物靠近部位应加绝缘保护,并在用电箱加
装漏电保护器。
高架坞灯应采用防风设计,固定牢固,不得有松动现象。
食品安全和卫生合格。
①在一般场所的照明安装中,需要在电源侧安装漏电保护器,并配备分路开关和熔断器。
此外,照明灯具的外壳和金属支架也必须做好保护接零的措施。
②使用行灯和低压照明灯具时,应注意电源电压不应超过36伏,并且行灯灯体与手柄需要坚固、绝缘良好。
同时,电源线也应使用橡套电缆线,行灯和低压灯的变压器也应符合户外电气安装要求。
③现场使用移动式碘钨灯照明时,必须采用密闭式防雨灯具,并且碘钨灯的金属灯具和金属支架也需要做好接零保护。
此外,金属架杆手持部位也需要采取绝缘措施,电源侧也应装设漏电保护器。
10.施工机械管理
1)现场机械设备应按规定合理安排、正确使用,充分发挥设备效能,保证安全生产。
2)机械设备管理人员和操作人员应遵守安全操作规程,定期检查安全规程的执行情况,发现问题及时解决。
同时,所
有机械设备和电动工具都需要配备安全保护、接地装置和操作说明。
操作人员也需要持证上岗。
3)现场技术设备应有防雨防砸设施,并设专人管理。
机械设备操作人员要专机专人,严格执行“清洁、润滑、紧固、调整、防腐”的十字作业法。
对所有用于提升的挂钩、挂环、钢丝绳等也需要定期检测、检查和标定,严禁机械带病作业。
4)所有垂直和水平机械的搭设、顶升、使用和拆除,必须严格依照政府的法规、规章和条例的要求进行。
11.交叉作业安全防护
1)进行上下立体交叉作业时,不得在同一垂直方向上操作。
下层操作必须在上层高度确定的可能坠落半径范围以外,不能满足时,应设置硬隔离安全防护网。
2)拆除模板、脚手架等时,下方不得有其他人员操作,并指定专职人员进行检查协调。
12.职业健康和卫生防疫
1.职业健康
1)提供适当和充分的劳动保护,包括安全保护、防寒防雨、常用药品、急救设备、传染病预防、身体检查等。
2)现场工人的生活条件应符合政府卫生规定,并获得必
要的许可,保证工人的健康和防止传染病。
工人的食堂、厕所、工具房、宿舍等也需要保持卫生。
3)定期进行防疫和卫生专业检查处理,包括灭白蚁、鼠害、蚊蝇和其他害虫,以防对施工人员、现场和永久工程造成危害。
4)项目部应派专人负责管理和检查工地食堂环境和卫生,确保食品安全和卫生合格。
为了确保食品安全和员工健康,需要采取以下卫生防疫措施:
1.建立卫生防疫管理制度,制定应急预案,以防止法定传
染病、食物中毒和急性职业中毒等疾病的发生。
2.生活区应备有保健药箱、常用药品和急救器材,如绷带、止血带、颈托和担架等。
3.办公室、食堂、宿舍和浴室等场所应保持干净整洁,无
污染和异味,并符合卫生、通风和照明要求。
4.施工现场应制定卫生急救和卫生防疫措施,如发生法定
传染病、食物中毒或急性职业中毒等情况,应立即启动应急预案,并在2小时内向当地建设行政主管部门和卫生防疫部门报告,并积极配合调查处理。