Cutler-Hammer ATC-400 控制转移开关快速操作指南说明书

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

IM01602001E
Effective July 2002
Cutler-Hammer
CUTLER-HAMMER ATC-400 CONTROLLED TRANSFER SWITCH QUICK START INSTRUCTIONS
THIS INSTRUCTION IS NOT A COMPLETE SOURCE OF INFORMATION ON THE TRANSFER EQUIP-MENT. INSTALLATION SHOULD NOT BE STARTED UNTIL THE ENTIRE INSTRUCTION BOOK HAS
BEEN REVIEWED AND UNDERSTOOD. FAILURE TO FOLLOW INSTRUCTIONS CAN RESULT IN DEATH,SEVERE PERSONAL INJURY, OR PROPERTY DAMAGE.
Step 1: Mount the transfer switch on a flat rigid surface (Figure 1). Shim if necessary. For seismic mounting
requirements, check the instruction book.
Figure 1 Mounting Details
Shim If Necessary
View A
See Detail A
Page 2
Effective 7/02
Figure 2 300A, 3 Pole, Automatic Transfer Switch Interior
Fuse Disconnect Block
Engine Start Contacts
Optional Feature 37Fuse Disconnect Block
Source (S2) Power Terminals
Page 3
Effective 7/02Tighten Cables Into Terminals
See Detail B
Detail B
Typical
Engine Start Contacts
(Red Terminals)
Page 4
Effective 7/02
Figure 6 ATC-400 Logic (Utility Supplying Load)
q
q
The following lights must be ON:q Source 1 Available q Source 1 Connected
Perform LED lamp test by depressing and holding. All LED’s should turn on.If not, contact factory for replacement.
Page 5
Effective 7/02
Page 6
Figure 7 ATC-400 (Rear View)
Effective 7/02
Page 7
Effective 7/02
q
q
q
The following lights must be ON:
q Source 1 Available
q Source 1 Connected
q Source 2 Available
The following lights must be ON:
q Source 1 Available
q Source 2 Available
q Source 2 Connected
q
q
q
IM01602001E
Page 8
Cutler-Hammer
Pittsburgh, Pennsylvania U.S.A.
Effective 7/02 (ISI)
Style IM01602001E H01Printed in U.S.A.
Step 10: ATH4/ATV4 Power Failure Test - Initiate a Load Test by simulating an actual power failure.
(1) This should be done by opening the upstream breaker or fused disconnect switch.
(2) If the ATS is Service Equipment Rated with no upstream disconnect, use the Normal Control Circuit Disconnect to simulate a power failure (Figure 10).
This can be found in one of two places. The first would be located directly beside the normal breaker. The second would be located on the transformer panel/customer connection panel. The normal con- trol circuit disconnect is the disconnect marked
Normal.The disconnect switch should be in the ON position for normal operation. Turning the switch to the OFF position will simulate a normal power out- age.
Figure 10 Control Disconnect
(3) The generator should start and the ATS should transfer to Emergency.
(4) After transfer, close the upstream breaker, or close the Normal Control Circuit Disconnect. The TDEN timer should begin counting, and, when com- plete, the ATS should transfer to Normal. The En- gine Cooldown Timer should time out and shut the emergency power unit down.
NOTICE
While performing testing, if an undesired or undoc-umented result occurs, first contact the local
Genset dealer. If the result is not corrected, contact the Cutler-Hammer Product Integrity Center at 1-800-210-6208.
OFF Position
ON Position。

相关文档
最新文档