船级社: CCS
CLASS : CCS
焊接工艺规程说明书
对高强度钢CO2半自动对接焊(陶瓷衬垫)
Welding Procedure Specification
For Higher tensile steel for CO2 Semi-Automatic Arc Butt Welding
(With Ceramic Backing)
CONTENT
Plan Of Welding Procedure Approval Test (1)
1.范围
Scope (3)
1.1 焊接方法Welding
Process (3)
1.2 应用范围Application
Process (3)
2.试验日期及地点Date & Place Of
Test (3)
3.试板准备Test Piece
Preparation (3)
4.焊接材料Welding
Consumable (3)
5.焊接设备Welding
Equipment (3)
6.接头细节Joint
Detail (4)
6.1对接(平焊)Butt Joint (Flat
Welding) (4)
7.焊接条件Welding
Condition (4)
8.焊接与程序Welding Preparation &
Procedure (4)
9.试验与检查Test And
Examination (5)
10.试样准备The Specimen
Preparation (6)
11.试样尺寸Detail Of Test
Specimen (7)
11.1冲击试样缺口位置Notch Location Of Impact
Specimen (7)
11.2抗拉试样Tensile
Specimen (7)
11.3弯曲试样Bend
Specimen (7)
11.4冲击试样V-Notch Charpy Impact
Specimen (7)
12.检验结果Result Of
Test (7)
12.1外表目视检验结论Conclusion Of Appearance Visual
Test (7)
12.2机械检验结果Mechanical Test
Result (7)
12.3宏观硬度试验Macro-Etching
Test (7)
12.4无损探伤Non-destructive
Inspection (8)
13.结论
Result (8)
Plan Of Welding Procedure Approval Test
1、范围Scope
1.1焊接方法Welding Process
CO2半自动焊(带陶瓷衬垫)
CO2 Semi-automatic welding (with ceramic backing)
1.2应用范围Application Scope
钢材级别:EH36高强度钢
Steel Grade : EH36 Higher tensile steel
焊接位置:平置、横焊、垂直焊
Welding Position : Flat、Horizontal、Vertical
2、试验日期及地点Date & Place Of Test·
3、试板准备Test Piece Preparation
母材级别:EH36高强度钢
Base Metal Class : EH36 Higher tensile steel
厚度:35mm
Thickness : 35mm
尺寸:1000×300mm
Size : 1000×300mm
4、焊接材料Welding Consumable
5、焊接设备Welding Equipment
封底焊Back Cover Welding
型号Type : 焊机Welding Machine:YW-50KB1VTA
电源Power Source : YD-500KR1VTA
Plan Of Welding Procedure Approval Test 制造厂: 唐山松下产业机器有限公司
Manufacturer : Tang Shan Mastushita Industrial Equipment CO.,L TD
6、接头细节Joint Detail (详图)
6.1对接(平焊) Butt Joint (Flat Welding)
7、焊接条件Welding Condition
8、焊接与程序Welding Preparation & Procedure
8.1、检查与修补Checking and Repairing
⑴焊缝间隙最大为10mm。

Gap of root face is max. 10mm.
⑵清除坡口处油污、锈、灰尘等。

Remove the oil、dust、rust etc in groove.
⑶根据高强度钢焊接性要求,须对焊接区域进行预热至50-100℃,预热范围为焊缝两侧各50-100mm。

According to the requirement of high tensile steel weld ability , welding area must be carried out to fore-warm to 50-100℃, and the range of fore-warm is 50-100mm on each side of welding seam.
⑷根据焊缝宽度选择合适的陶瓷衬垫,然后均匀地粘贴于焊缝背面.
In accordance with the breadth of welding seam , choose fit ceramic backing and then averagely stick it on the back of welding seam.
8.2、焊接程序Welding procedure
⑴每道焊层须检验气孔、药渣等缺陷,待清除后方可进入下道焊接。

Plan Of Welding Procedure Approval Test
Each of the weld layer is disposed and inspected defects such as pores , overlaps, etc should be disposed of before continuing next layer.
⑵焊接后的缺陷如气孔等采用碳刨清除,再进行焊接。

After welding , the defeats such as pores etc will be disposed by digging and welded later.
8.3二氧化碳焊丝须谨慎使用。

Cautious to use CO2 wire.
⑴雨天、雾天及湿度大的天气不能焊接,焊缝表面如有水分,干燥后再进行焊接。

Welding work is not carried out in the rainy day , foggy day and heavy humidity day ,The welding seam to be welded shall be dried ,if there is water on the surface of the welding seam area.
⑵如遇气候有风,应采用挡风板,以防产生气孔等缺陷。

Plates of warding off wind will be adopted to avoid ing into being the defeats such as pores etc if it is windy.
⑶焊接结束后须对焊接区域进行保温,以期缓冷,防止骤冷产生裂纹。

After pleting weld, welding area must be carried out the heat preservation which can be cold slowly and prevent sudden cold from ing into being the crack.
9、试验与检查Test And Examination
Plan Of Welding Procedure Approval Test
10、试样准备Specimen Preparation
11、试样尺寸Detail of Test Specimen
11.1冲击试样缺口位置Notch Location Of Impact Specimen
A-- 焊缝中心Center line of the welds
B-- 熔合线Fusion Line (F.L.)
C-- 热影响区1mm 1 mm from the F.L.
D-- 热影响区1mm 3 mm from the F.L.
E-- 热影响区1mm 5 mm from the F.L.
Plan Of Welding Procedure Approval Test
11.2抗拉试样Tensile Specimen
11.3弯曲试样(侧弯) Bend Specimen (Side bend)
11.4冲击试样V-Notch Charpy Impact Specimen
12、检验结果Result Of Test
12.1外表目视检验结论:
Conclusion Of Appearance Visual Test:
12.2机械检验结果Mechanical Test Result:
12.2.1横向拉伸试验结论如下表:
Conclusion of transversal tensile test in the following table:
Plan Of Welding Procedure Approval Test
12.2.2侧弯试验结论如下表:
Conclusion of side bend test in the following table:
12.2.3冲击试验结论如下表:
Conclusion of impact test in the following table:
12.3宏观腐蚀试验Macro-Etching Test (Seeing attached table 3)
12.4无损探伤Non-destructive Inspection
12.4.1经X光射线探伤,并根据CB/T3558-93标准进行评定为Ⅰ级片。

AssessedⅠclass photo according to CB/T3558-93 standard after inspected by X-ray.
Plan Of Welding Procedure Approval Test
13、结论Result
13.1采用TY-YJ502(Q)CO2焊对EH36高强度钢进行平、横、立焊接,根据KR/GL规范截取的各种试样均通过了各项检验。

EH36 high tensile steel is to be welded in the flat、horizontal、vertical position by TY-YJ502(Q)CO2welding, all kinds of specimen intercepted according to KR/GL rules have passed items of tests .
13.2本工艺申请KR/GL船级社上海办事处认可。

This technology is to apply for approval of KR/GL Classification in Shanghai Office .
13.2.1适用于δ≤70的高强度钢平、横、立位置的焊接工艺。

It is fit for the welding technology ofδ≤70 high tensile steel in the flat、horizontal、vertical position .。