简述明挖扩大基础的施工流程英文回答:
The construction process of cut and cover excavation and widening of foundations involves several steps. Here is a brief overview of the process:
1. Site Preparation: Before starting the excavation, the construction site needs to be properly prepared. This includes clearing the area of any obstructions, such as buildings, trees, or utilities. The site is also leveled and compacted to ensure a stable foundation.
2. Excavation: The next step is excavation, where the soil is removed to create a trench or pit. In the case of cut and cover excavation, this trench is typically wider and deeper than the existing foundation. Excavation can be done using various equipment, such as excavators or backhoes.
3. Shoring and Bracing: To support the walls of the excavation and prevent collapse, shoring and bracing systems are installed. These systems can be made of steel beams, wooden planks, or concrete panels. The shoring and bracing also provide a safe working environment for the construction workers.
4. Foundation Widening: Once the excavation is complete and the walls are supported, the existing foundation is widened. This involves removing a section of the existing foundation and pouring new concrete to extend its width. Reinforcement bars may also be installed to strengthen the foundation.
5. Waterproofing and Drainage: To prevent water infiltration and damage to the foundation, waterproofing measures are taken. This can include applying a waterproof membrane or coating to the foundation walls. Drainage systems, such as French drains or sump pumps, are also installed to redirect water away from the foundation.
6. Backfilling: After the foundation widening is
complete, the trench is backfilled with soil or other suitable materials. The backfill is compacted to ensure stability and prevent settling. This step is crucial in restoring the ground to its original level and providing support to the widened foundation.
7. Site Restoration: Finally, the construction site is restored to its original condition. This may involve landscaping, paving, or other finishing touches to make the area aesthetically pleasing and functional.
中文回答:
明挖扩大基础的施工流程包括以下几个步骤:
1. 场地准备,在开始挖掘之前,需要对施工场地进行准备。

这包括清理场地上的障碍物,如建筑物、树木或公用设施。

场地也需要平整和压实,以确保稳定的基础。

2. 挖掘,下一步是挖掘,将土壤移除以创建一个沟槽或坑。

在明挖扩大基础的情况下,这个沟槽通常比现有基础更宽更深。

挖掘可以使用各种设备进行,如挖掘机或铲斗。

3. 支撑和支撑,为了支撑挖掘的墙壁并防止坍塌,需要安装支
撑和支撑系统。

这些系统可以由钢梁、木板或混凝土板制成。

支撑
和支撑还为施工人员提供安全的工作环境。

4. 基础扩宽,挖掘完成并支撑墙壁后,现有基础被扩宽。

这包
括移除现有基础的一部分,并浇筑新的混凝土以扩展其宽度。

还可
以安装加固钢筋以增强基础。

5. 防水和排水,为了防止水渗透和对基础的损害,需要采取防
水措施。

这可以包括在基础墙壁上涂抹防水膜或涂层。

还会安装排
水系统,如法式排水沟或污水泵,将水从基础中引走。

6. 回填,基础扩宽完成后,沟槽被填充土壤或其他适合的材料。

回填土壤被压实,以确保稳定性并防止沉降。

这一步骤对于恢复地
面到原始水平并为扩宽的基础提供支撑至关重要。

7. 场地恢复,最后,施工场地被恢复到原始状态。

这可能包括
景观设计、铺设道路或其他装饰措施,使区域美观且功能完善。