防空地下室易地建设费征收流程英文回答:
Air Raid Shelter Relocation Construction Fee Collection Process.
1. Application for Relocation Construction Fee.
The property owner or authorized representative should submit an application to the local civil defense authority, along with the following documents:
Certificate of property ownership.
Construction plans and specifications.
Estimated cost of relocation construction.
2. Review and Approval.
The civil defense authority will review the application and supporting documents to determine if the relocation is necessary and feasible.
If approved, the authority will issue a relocation construction permit and determine the amount of the relocation construction fee.
3. Fee Calculation.
The relocation construction fee is typically calculated as a percentage of the estimated cost of relocation construction.
The percentage may vary depending on the specific circumstances and regulations of the local jurisdiction.
4. Payment of Fee.
The property owner is responsible for paying the relocation construction fee to the civil defense authority within the specified timeframe.
Payment can be made through various methods, such as cash, check, or electronic transfer.
5. Relocation Construction.
Once the fee is paid, the property owner is authorized to proceed with the relocation construction.
The construction must be completed according to the approved plans and specifications.
6. Inspection and Certification.
Upon completion of the relocation construction, the property owner must notify the civil defense authority for inspection.
The authority will inspect the facility to ensure it meets the required standards.
If satisfactory, the authority will issue a
certificate of completion.
7. Fee Refund.
In certain cases, the property owner may be eligible for a refund of the relocation construction fee.
This may occur if the relocation is canceled or if the facility is no longer required due to changes in regulations or circumstances.
中文回答:
防空地下室易地建设费征收流程。

1. 申请易地建设费。

产权人或授权代表应当向当地人防部门提交申请,并提交以下资料:
产权证明。

建设方案和图纸。

易地建设工程概算。

2. 审核批准。

人防部门对申请材料进行审核,确定是否符合易地建设条件。

经审核同意后,人防部门核发易地建设许可证,并确定易地建设费金额。

3. 计收费用。

易地建设费一般按易地建设工程概算的一定比例计收。

比例根据具体情况和地方规定不同而异。

4. 缴纳费用。

产权人应当在规定时限内向人防部门缴纳易地建设费。

缴费方式包括现金、支票、电子转账等。

5. 易地建设。

缴纳费用后,产权人即可进行易地建设。

建设应当按照经批准的方案和图纸进行。

6. 验收合格。

易地建设完成后,产权人应当向人防部门报验。

人防部门对该设施进行验收,符合要求的,颁发竣工证明。

7. 退还费用。

在一定情况下,产权人可以申请退还易地建设费。

包括易地建设被取消,或者因政策法规调整或其他原因,设施不再需要的。