LEEDGA考试题库06
D
B
A
D
AB
C
Question 23 of 100
What is the result of increasing the floor area ratio (FAR) from 1.0 to 2.0 while maintaining the same gross floor area on a project being designed for a greenfield site?
A
The development density of the project increases
The gross floor area is the same so the density of the project does not change.
B Biodiversity is promoted
FAR is the total building square footage (building area) divided by the site size square footage (site area).
One of the objectives of green building is to build 'up' rather than 'out', thereby having a smaller building footprint to maximize open space and promote biodiversity. For example instead of having a 1 story building with a 10,000 SF footprint design a 2 story building with a 5,000 SF footprint. Both designs have 10,000 SF of total floor area but the
2 story building has a smaller footprint.
C The LEE
D project boundary changes
The project boundary would remain unchanged. Only the building footprint changes - not the site area.
D The building footprint increases
The building footprint would decrease because the project is building up rather than out.
Question 25 of 100
What are the benefits of becoming a tenant or owner of a building that is certified under LEED for New Construction if the project team wants to also certify under LEED for Commercial Interiors?
A There are no certification fees
B There is no registration fee
GBCI offers free registration for LEED for Existing Buildings: Operations & Maintenance for projects certified
under LEED for New Construction, LEED for Schools, and LEED for Core & Shell prior to January 1, 2011.
If the question had asked about the project team wanting to certify under LEED for Existing Buildings:
Operations & Maintenance, a correct answer choice would also be 'There is no registration fee'.
C The project will be well situated to earn the additional certification(s)
A building that has a prior LEED certification is in a better position to earn additional LEED certifications.
D Certification fees are reduced
C
D
C
A
Question 37 of 100
LEED Online can be used for all of the following except:
A Managing public facing project details
What are public facing project details?
You can search USGBC's website to find out about specific projects going on. LEED Online can be used to
show/limit what is displayed to the public. For example using LEED Online you would enter in 'Project ABC is going to have a budget of $10M'. You probably don't want anyone to see the project budget so you could hide that detail from public view.
Managing the public facing details of the project means this: The person who is the administrator of the project can use LEED online to pick and choose what details they want to make available to the public. For example, 'do you want everyone to know your project budget', check yes or no. 'Do you want everyone to know the project's
address', check yes or no. Using LEED Online the administrator restricts or allows access to this and other various project information. USGBC may then reveal any information that has been marked as publicaly available.
B Accessing online reference guides
Reference guides are not available in LEED Online.
C Submit technical inquiries regarding LEE
D Credits
D Document compliance with LEED Credit Requirements
B
B
A
AD
C
C
C
Question 58 of 100
The process of green building begins with the idea of the project and continues until:
A The schematic design is completed
B The project is reused or recycled
Green building continuously improves a project from when the idea is first realized in a person's head to when the project is finally either reused for a different purpose or it is demolished and hopefully recycled. This differs from conventional design where all trades are not involved in all parts of the process through the project's life cycle.
C The construction documents are prepared
D The project begins operating