Role of Role of Working Drawings
The drawings must provide and transmit a complete, faithful and accurate graphic depiction of the project design concept, to scale.
– March 6: Midterm Exam & Review #3 – foundation and roof plans
– March 27: Quiz #4
– April 3: Review #4 – reflected ceiling plans and exterior elevations
General
Even that small percentage of practitioners who will be involved only with design will benefit from knowledge of construction documentation, as it will help them to communicate more clearly with those who are preparing the construction documents.
– April 10: Quiz #5
– April 24: Quiz #6 & Review #5 – wall section(s), details, schedules and specification(s)
– May 1:
Submit semester Project in my mailbox (main office)
Course Assessment and Final Grade Determination
This class meets once per week, therefore in order to be successful the student must attend all 15 classes; missing more than 3 classes may result in failure.
Finally, the policies outlined in the NJIT Honor Code will be upheld in this class. Any perceived violations will immediately be brought to the attention of the Dean of Students.
Construction Documents & Contracts
General
In most architectural offices, between 40 and 50 percent of a project fee typically will be allocated to preparing Construction Documents.
Specifications
Part of the role of drawings is to crossreference information between drawings and between drawings and specifications.
Construction Documents & Contracts
Successful office contract document preparation involves interaction with various team members; therefore a portion of your grade includes your degree of meaningful class participation and discussion.
– floor plans – which deal with shape (configuration) and size in the form of length & width
– exterior elevations – add the element and relationship of height, giving the 3rd dimension of the project.
Thus, for any given project, almost half of an architect's time will be spent on construction documentation.
Poor skills in this area will hurt almost any practicing architect.
individual CD project using their own 2nd year design as a basis.
ቤተ መጻሕፍቲ ባይዱ
Relevant Dates
The instructor will monitor the progress of your semester long project at specific intervals. Quizzes, exams and reviews are administered and or due on the following dates.
Role of Working Drawings
The 3 primary aspects of a set of working drawings:
– configuration / size – height – construction
Role of Working Drawings
These translate into:
Role of Role of Working Drawings
The primary role or function of working drawings is to convert design data into construction information and to clearly communicate that information to building industry, code officials, product manufacturers, suppliers and fabricators.
The course will introduce the student to a logical approach of contract document preparation.
The student will develop their second year design project into a set of contract documents throughout the semester.
– Glenn E. Wiggins, AIA – Published by Whitney Library of Design / Watson-
Guptill Publications
The Professional Practice of Architectural Working Drawings – 3rd Edition
Course Description
Contract documents are the means by which architectural designs are communicated to the building industry, code officials, product manufacturers, suppliers and fabricators.
Role of Working Drawings
The essence of the working drawings is that they are the design professional’s interpretation of how the project should be built.
Assignments test and quiz allocations are as follows:
– Quizzes #1-#6 - 20% – Midterm Exam - 35% – Semester Project - 45%
Late work will not be accepted (refer to relevant dates above); missed quizzes, exams or assignments will be recorded as an ‘F’.
Working Drawings
To bring a design concept to reality, there must be a process of selecting the materials to be used for the project.
These materials must be combined into systems, where possible, or distinct details that gather and utilize them to formulate “pieces” of construction.
The course will run for 15 weeks with topical instruction and discussion, project pin-up reviews and films.
Textbooks/Readings
A Manual of Construction Documentation
– January 16 Review #1 – Present project / concept package & cartoon set
– January 30 Quiz #1
– February 13 Quiz #2 & Review #2 – floor plans
– February 27 Quiz #3
Course Description
Using the contract documents for the School of Architecture as an example, students will compare the architect’s construction documents to the actual finished construction.
Instructor – Office – Contact Information
Mark E. Bess, AIA, NCARB, CSI, CDT Office: Weston # 677 Hours by appointment e-mail: mbessnjit.edu web site: web.njit.edu/~mbess
– Osamu A, Wikita & Richard M. Linde – Published by John Wiley & Sons ISBN 0-471-
39540-4
Course Requirements
Quizzes – 6 open-note quizzes Midterm Exam – a closed-note exam Semester Project – students work on
Working Drawings
Fundamental to this entire process is a working knowledge of construction materials (production, fabrication, testing, availability, cost, etc.).