暖通施工分包合同范文
英文回答:
Subcontracting Agreement for HVAC Construction.
This Subcontracting Agreement (the "Agreement") is entered into between [Main Contractor], hereinafter referred to as the "Contractor", and [Subcontractor], hereinafter referred to as the "Subcontractor", collectively referred to as the "Parties".
1. Scope of Work.
The Subcontractor shall perform all HVAC construction work as specified in the project plans and specifications provided by the Contractor. This includes but is not limited to the installation, maintenance, and repair of heating, ventilation, and air conditioning systems.
2. Duration of Work.
The Subcontractor shall commence work on [start date] and complete all required tasks by [end date]. The specific timeline and milestones shall be outlined in a separate work schedule agreed upon by both Parties.
3. Payment Terms.
The Subcontractor shall be paid in accordance with the agreed-upon payment schedule, which shall be based on the completion of specific project milestones. The payment terms and rates shall be detailed in a separate payment schedule attached to this Agreement.
4. Quality and Performance.
The Subcontractor shall perform all work in a professional and timely manner, adhering to industry standards and best practices. The Subcontractor shall be responsible for any defects or deficiencies in their work and shall promptly rectify any issues at no additional cost to the Contractor.
5. Insurance and Indemnification.
The Subcontractor shall maintain adequate insurance coverage, including but not limited to general liability insurance, workers' compensation insurance, and any other insurance required by law or deemed necessary by the Contractor. The Subcontractor shall indemnify and hold the Contractor harmless from any claims, damages, or
liabilities arising from the Subcontractor's work.
6. Termination.
Either Party may terminate this Agreement in the event of a material breach by the other Party. Termination shall be effective upon written notice to the breaching Party, specifying the nature of the breach and allowing a reasonable period for remedy. In the event of termination, the Subcontractor shall be entitled to payment for work completed up to the date of termination.
7. Confidentiality.
The Subcontractor agrees to keep all project-related information and documents confidential and shall not disclose any such information to third parties without the prior written consent of the Contractor.
8. Governing Law and Dispute Resolution.
This Agreement shall be governed by and construed in accordance with the laws of [jurisdiction]. Any disputes arising out of or in connection with this Agreement shall be resolved through arbitration in accordance with the rules of [arbitration institution], and the decision of the arbitrator shall be final and binding.
中文回答:
暖通施工分包合同范文。
本分包合同(以下简称“合同”)由[总包方],以下简称“总包方”,与[分包方],以下简称“分包方”,合称为“双方”。
1. 工作范围。
分包方应按照总包方提供的项目计划和规格说明书执行所有暖通施工工作。
包括但不限于供暖、通风和空调系统的安装、维护和修理。
2. 工作期限。
分包方应于[开始日期]开始工作,并在[结束日期]之前完成所有所需任务。
具体的时间表和里程碑将在双方达成一致的单独工作计划中详细说明。
3. 付款条件。
分包方应根据约定的付款计划支付报酬,该付款计划将根据完成特定项目里程碑而制定。
付款条件和费率将在附属的付款计划中详细说明。
4. 质量和绩效。
分包方应以专业和及时的方式执行所有工作,遵守行业标准和最佳实践。
分包方应对其工作中的任何缺陷或不足负责,并及时无
额外费用地纠正任何问题。
5. 保险和赔偿。
分包方应保持充足的保险覆盖,包括但不限于综合责任保险、工伤保险和总包方法律要求或认为必要的其他保险。
分包方应赔偿并使总包方免受因分包方工作而产生的任何索赔、损害或责任。
6. 终止。
任何一方如对方发生重大违约,均可终止本合同。
终止应以书面通知违约方为有效,通知应指明违约的性质,并给予合理的纠正期限。
在终止的情况下,分包方有权获得截至终止日期完成的工作的报酬。
7. 保密。
分包方同意保守所有与项目相关的信息和文件的机密性,并未经总包方事先书面同意不向第三方披露任何此类信息。
8. 法律适用和争议解决。
本合同适用并依照[jurisdiction]法律进行解释。
任何因本合同引起的争议应通过按照[arbitration institution]规则进行仲裁解决,并仲裁裁决为最终和绑定的决定。