试样送检流程表
病房检验标本送检流程
病房检验标本送检流程英文回答:The process of sending specimens for laboratory testing in a hospital ward involves several steps to ensure accurate and timely results. First, the healthcare provider collects the appropriate specimen from the patient, such as blood, urine, or tissue. This is done following proper infection control measures to prevent contamination. Once the specimen is collected, it is labeled with the patient's identification details, including their name, unique identifier, and the date and time of collection.Next, the labeled specimen is securely packaged to prevent any leakage or damage during transportation. This may involve placing the specimen in a sealed bag or container and ensuring it is properly sealed. The package should also include the necessary documentation, such as a requisition form or laboratory request, which provides information about the tests to be performed and anyspecific instructions.After packaging, the specimen is then transported to the laboratory. This can be done through various means, depending on the hospital's protocols and resources. In some cases, a dedicated staff member may be responsible for transporting the specimens directly to the laboratory. In other cases, a pneumatic tube system or a designatedcourier service may be used for transportation.Once the specimen reaches the laboratory, it undergoes a series of processes to analyze and test it. This may include centrifugation, microscopy, culture, or molecular testing, depending on the type of specimen and the tests requested. The laboratory technicians or pathologists carefully follow standardized procedures to ensure accurate and reliable results.After the testing is complete, the laboratory generates a report with the results. This report is then sent back to the healthcare provider who requested the tests. The healthcare provider reviews the results and communicatesthem to the patient, along with any necessary interpretation or recommendations for further management.中文回答:在医院病房中,将标本送往实验室进行检验的流程涉及多个步骤,以确保准确和及时的结果。
公司样品检测流程
样品送检流程
1、送样人认真完整填写纸质版《***公司样品检测委托单》相关内容,连同送检样品一起交***审核。
2、样品经审核人初步判断筛选,对于不合格样品、无明确标识或会对仪器造成损害的样品将不予安排检测。
通过审核的样品,审核人确定检测项目及检测完成日期并进行登记编号,然后交由检测人员签收,安排检测。
3、检测人员需在规定日期内完成检测任务,将检测结果反馈给审核人和送样人,并详细记录检测结果,进行备案以便日后查询。
技术部
2013年8月21日
附件内容:
《***公司样品检测委托单》填写格式
模板中红色部分由送样人填写,带有□选项的只需勾选即可。
模板中绿色部分由审核人填写。
样品检测委托单
No:送检样品编号送检日期:年月日。
试样送检流程表
试样送检流程表试件送样及送检流程一、原材见证取样、送检流程及归档资料采供部:填写材料复试取样通知单试验员通知监理到场,材料员、质量员、试验员、监理共同取样封样见证取样,填写有见证取样标识试验员取回试验报告试验员将《见证取样记录》一式三份送交资料室归档采供部材料进场:采供部、项目部外观检查合格采供部建立物资监控台账送交试验员100%见证取样与取样通知单、委托试验合同书相符一致。
试验合格,由试验员送交(一式四份)1、试验员取样后填写试验台账及《见证取样记录》一式四份,加盖监理取样专用章。
2、试验员将上资料和试样(件)送检测试验单位通知采供部重新取双倍样复验双倍样复验质量监督站资质认可试验室进行检测试验双倍样复验试验不合格,及时上报项目经理审批双倍样取双倍样复验合格采供部材料退场取双倍样复验不合格二、施工过程质量检测试验送检流程及归档资料(现场制作)工程部填写施工过程检测试验取样通知单(钢筋焊接或连接件、混凝土、回填土、防水材料等)或委托到现场实体检测通知单(回弹、取芯、砼保护层测试、外墙砖拉拔检测等)项目部总工编制处置方案通知项目工程部重新双倍取样复验或实体检测(回弹、取芯)取回试验报告资料室归档与取样通知单、委托试验合同书相符一致。
试验合格,由试验员送交(一式四份)送交试验员100%见证取样试验员通知监理到场,工程部责任师、质量员、试验员、监理共同取样封样见证取样或委托现场实体检测1、试验员取样后填写试验台账及《见证取样记录》一式四联底单或现场实体检测监理旁站(工长、质量员在场);2、试验员将上述资料和试样(件)送检测试验单位。
试验不合格,及时上报总工审批取双倍样送检试验员将《见证取样记录》一式三份送交双倍取样复验或实体检测(回弹、取芯)质量监督站资质认可试验室进行检测试验或委托到现场实体检测取双倍样或实体检测(回弹、取芯)试验合格,由试验员送交(一式四份)取双倍取不合格,严重质量问题项目部编制处置方案现场实体检测(回弹、取芯)上报公司总工批准三、实验取样相关规定1、水泥的取样标准水泥出厂质量合格证的验收,水泥出厂质量证明合格证应由生产厂家的质量部门提供给使用单位,作为证明其产品质量性能的依据,(1)、取样①、散装水泥:对同一水泥厂生产的同期出厂的同品种同标号的水泥,以一次进场的同一出厂编号的水泥为一批,但一批的总量不得超过500t。
工程试验检测取样、送检指南及参考规范
一、水泥物理性能试验1. 取样频率:同一水泥厂、同期出厂、同一出厂编号及同强度水泥(散装≤500吨/批、袋装≤200吨/批)。
2. 取样方法:随机在不同部位至少20袋水泥中均匀抽样经搅拌均匀后,取10㎏试样。
二、钢筋原材力学性能试验普通钢筋:1. 取样频率:同一生产厂家、同一炉批号、同一规格、级别、同一交货状态及同一进场时间≤60吨/批。
这里的取样为普通钢筋,普通钢筋是指不经过特殊成型加工的钢筋,通常使用冷轧或热轧工艺生产,普通钢筋一般为圆钢,而成型钢筋具有复杂的几何形状,如六角形、四边形、扁平形等2. 取样方法:每批任意选取两钢筋切取两条用于拉伸试验,两条用于冷弯试验为一组,长度按不同试验室的检测仪器定。
3、超过60t的部分,每增加40t(或不足40t的余数,增加一个拉伸试验试样和一个弯曲试验试样)成型钢筋:1、成型钢筋进场时,应抽取试件作屈服强度、抗拉强度、伸长率和重量偏差检验,检验结果应符合国家现行相关标准的规定。
对由热轧钢筋制成的成型钢筋,当有施工单位或监理单位的代表驻厂监督生产过程,并提供原材钢筋力学性能第三方检验报告时,可仅进行重量偏差检验。
2、重量偏差检查数量:同一厂家、同一类型、同一钢筋来源的成型钢筋,不超过30t为一批,每批中每种钢筋牌号、规格均应至少抽取1个钢筋试件,总数不应少于3个。
3、成型钢筋的外观质量和尺寸偏差应符合国家现行相关标准的规定。
检查数量:同一厂家、同一类型的成型钢筋,不超过30t为一批,每批随机抽取3个成型钢筋。
三、钢筋单、双面搭接焊及电渣压力焊试验1. 取样频率:在现浇钢筋混凝土结构中,应以300个同牌号钢筋、同型式接头作为一批;在房屋结构中,应在不超过二楼层中300个同牌号钢筋、同型式接头作为一批,当不足300个接头时,仍应作为一批。
2. 取样方法:每批随机切取3个接头为一组,长度按不同试验室的检测仪器定。
四、钢筋闪光对焊试验1. 取样频率:同一台班内、由同一焊工完成的300个同牌号、同直径钢筋焊接接头作为一批。
试样送检流程表
号的水泥,以一次进场的同一出厂编号的水泥为一批,但一批的总量不得超过500t。
随机地从不少于3个车罐中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
②、袋装水泥:对同一水泥厂生产的同品种、同标号的水泥,以一次进场的同一出厂编号的水泥作为一批。
但一批的总量不得超过200t。
随机地从不少于20袋中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
③、对已进场的每批水泥,视在厂存放情况,应重新采集试样复试其强度及安定性,存放期超过三个月的水泥,使用前必须进行复验,并按复验结果使用。
④、取样要有代表性,所取试样总数不少于12Kg,拌和均匀后分成两等份,一份由试验室按标准试验,一份密封保存,以备复验用。
(2)、水泥重点检测指标抗折强度、抗压强度、凝结时间、安定性、细度2、钢筋原材的取样试验(1)、钢筋原材试验应按批进行。
(2)、每批由同一厂别、同一炉缸号、同一规格、同一交货状态、同一进场时间的钢筋组成。
(3)、热轧带肋钢筋、热轧光圆钢筋,每批数量不得大于60T,每批取试样一组。
(4)、每一验收批中取试样1组(2根拉力、2根冷弯、1根化学)。
低碳钢热轧圆盘条时,拉力1根。
(5)、取样方法:①、按规定凡取2个试件的,均应从任意两根(或两盘)中分别切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
②、低碳钢热轧圆盘条冷弯试件取自不同盘。
③、试件在切取时,在钢筋任意一端截去500mm后切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
注意事项:①、钢筋的材质证明要“双控”,各验收批钢筋出厂质量合格证和试验报告单缺一不可,材质证明与实物应物证相符。
②、钢筋出厂质量合格证应有生产厂家质量检验部门的盖章,质量有保证的生产厂家,钢筋标牌可作为质量合格证。
③、钢筋试验报告单中应有试验编号,便于与实验室的有关资料查证核实。
试验报告单应有明确结论并盖章齐全。
④、钢筋试验不合格单后应附试件复试合格试验报告单或处理报告。
样品送检流程及采样规范
样品送检流程及采样规范样品送检流程及采样规范1.样品送检流程备注:1.2.样品送检登记表。
3.样品检测机构(1)⼟壤、⽔样、有机肥常规检测公司名称:xx公司地址:xx联系⼈:xx联系电话:xx(2)有机肥分析检测(肥料登记证书办理)公司名称:xx公司地址:xx联系电话:xx2.样品采样规范2.1采样标签样式采集样品应张贴信息标签,标签内容应⾄少包含:(1)样品名称(2)采样时间(3)采样地点(4)采样⼈(5)其他需要说明的信息2.2标准采样袋/瓶样品的采集原则上应采⽤⾃封袋或⽔样瓶。
未携带采样器具时,可采⽤塑料袋装固体样品,但应做好密封,⽔样可⽤矿泉⽔瓶代替,但在采集前,应⽤拟采集的⽔样润洗矿泉⽔瓶2-3次。
2.3样品采集细则(1)⼟壤样品⼀般农⽥⼟壤环境监测采集耕作层⼟样,种植⼀般农作物采0~20cm,种植果林类农作物采0~60cm。
每个⼟壤单元设3~7个采样区,单个采样区可以是⾃然分割的⼀个⽥块,也可以由多个⽥块所构成,其范围以200m×200m 左右为宜。
各分点混匀后⽤四分法取1kg ⼟样装⼊样品袋,多余部分弃去。
具体监测⽅案参考《⼟壤环境监测技术规范》(HJ/T 166 -2004)。
(2)⽔样⼀般取⽔⾯以下0.5m处⽔样,⽔深不到0.5m时,取⽔深1/2处。
具体监测⽅案参考《地表⽔和污⽔监测技术规范》(HJ/T 91—2002)。
(3)有机肥样品有机肥料⼀般呈堆积状态,必须采⽤多点采样。
点的分布应考虑到堆的上中下部位和堆的内外层,或者在翻堆时采样。
点的多少视堆的⼤⼩⽽定,⼀般⼀个肥料堆可取20-30点。
每个点取样0.5kg,置于塑料布上,将⼤块肥料捣碎,充分混匀后,以四分法取约5kg,装⼊⾃封袋中并编号。
(完整版)材料送检流程
号称证明文件送检规定送检数量1、产品合格证取样批量:同一水泥生产厂、同期出厂、同一出厂编号及同强度的水泥:2、出厂物理性能抽检报告(1)散装水泥:<500t批;(2)袋装水泥:<200t批;20个以上不同部位取1水泥3、建筑材料放等量样品不小于射性指标检验(3)当对水泥质量有怀疑或存放12kg。
报告期超过三个月(快硬硅酸盐水泥超过4、物理性能进一个月)必须复检。
场后检验报告做到先检验后使用,严禁先施工后检验同一生产厂、同一炉罐号、同一规格、级别、同一交货状态及同一进场时间的钢筋:1、钢筋2、预应1、产品合格证(a)热轧带肋、光圆钢筋、低碳钢拉伸L=200mm+10d钢筋2、出厂抽检报热轧圆盘条及余热钢筋:<60t批。
(2支/组)23、钢绞告(b )冷轧带肋钢筋:<501批。
弯曲L=140mm+6.2d线4、钢丝3、力学及工艺性能检验报告(c )钢筋焊接网应成批验收,每批应由同一厂家生产的、受力主筋为同一直径的焊接网组成,重量不应大于20t/ 批(2支/组)做到先检验后使用,严禁先施工后检验3钢筋化学成分检验钢筋的取样要求、产品合格证要求及检验报告填写要求详见同上。
有下列情况之一者,均需进行钢筋化学成份检验报告:(1 )进口钢筋焊接前,应进行化学成份分析及可焊性试验;6当梁板与柱的混凝土强度相差两个等级时,柱头 处应单独留置试件。
混凝土试件(同结构部位由监理和施工各方共同选定,同一强度等级 条件养 不宜少于10组,具不应于3组。
护)1、 同一强度等级、同一配合比、同种原材料的砂浆, 每台搅拌机、每一楼层或250m3砌体为一取样单位, 基础砌体可按一个楼层计。
6块70.7mm 立方体,2、 建筑地面与楼面按每一层建筑地面工程不少于一 20 ±50度的环境下养 组,当每层建筑地面工程面积超过1000 m2时,每增护24天丸天加1000 m2各增做一组试件,不足1000 m2按1000m2计算,当改变配合比时,亦应相应的制作试件组 数。
试样送检流程表
试样送检流程表-标准化文件发布号:(9456-EUATWK-MWUB-WUNN-INNUL-DDQTY-KII试件送样及送检流程一、原材见证取样、送检流程及归档资料二、施工过程质量检测试验送检流程及归档资料(现场制作)三、实验取样相关规定1、水泥的取样标准水泥出厂质量合格证的验收,水泥出厂质量证明合格证应由生产厂家的质量部门提供给使用单位,作为证明其产品质量性能的依据,(1)、取样①、散装水泥:对同一水泥厂生产的同期出厂的同品种同标号的水泥,以一次进场的同一出厂编号的水泥为一批,但一批的总量不得超过500t。
随机地从不少于3个车罐中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
②、袋装水泥:对同一水泥厂生产的同品种、同标号的水泥,以一次进场的同一出厂编号的水泥作为一批。
但一批的总量不得超过200t。
随机地从不少于20袋中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
③、对已进场的每批水泥,视在厂存放情况,应重新采集试样复试其强度及安定性,存放期超过三个月的水泥,使用前必须进行复验,并按复验结果使用。
④、取样要有代表性,所取试样总数不少于12Kg,拌和均匀后分成两等份,一份由试验室按标准试验,一份密封保存,以备复验用。
(2)、水泥重点检测指标抗折强度、抗压强度、凝结时间、安定性、细度2、钢筋原材的取样试验(1)、钢筋原材试验应按批进行。
(2)、每批由同一厂别、同一炉缸号、同一规格、同一交货状态、同一进场时间的钢筋组成。
(3)、热轧带肋钢筋、热轧光圆钢筋,每批数量不得大于60T,每批取试样一组。
(4)、每一验收批中取试样1组(2根拉力、2根冷弯、1根化学)。
低碳钢热轧圆盘条时,拉力1根。
(5)、取样方法:①、按规定凡取2个试件的,均应从任意两根(或两盘)中分别切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
②、低碳钢热轧圆盘条冷弯试件取自不同盘。
③、试件在切取时,在钢筋任意一端截去500mm后切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
试样送检流程表
试件送样及送检流程一、原材见证取样、送检流程及归档资料二、施工过程质量检测试验送检流程及归档资料(现场制作)三、实验取样相关规定1、水泥的取样标准水泥出厂质量合格证的验收,水泥出厂质量证明合格证应由生产厂家的质量部门提供给使用单位,作为证明其产品质量性能的依据,(1)、取样①、散装水泥:对同一水泥厂生产的同期出厂的同品种同标号的水泥,以一次进场的同一出厂编号的水泥为一批,但一批的总量不得超过500t。
随机地从不少于3个车罐中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
②、袋装水泥:对同一水泥厂生产的同品种、同标号的水泥,以一次进场的同一出厂编号的水泥作为一批。
但一批的总量不得超过200t。
随机地从不少于20袋中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
③、对已进场的每批水泥,视在厂存放情况,应重新采集试样复试其强度及安定性,存放期超过三个月的水泥,使用前必须进行复验,并按复验结果使用。
④、取样要有代表性,所取试样总数不少于12Kg,拌和均匀后分成两等份,一份由试验室按标准试验,一份密封保存,以备复验用。
(2)、水泥重点检测指标抗折强度、抗压强度、凝结时间、安定性、细度2、钢筋原材的取样试验(1)、钢筋原材试验应按批进行。
(2)、每批由同一厂别、同一炉缸号、同一规格、同一交货状态、同一进场时间的钢筋组成。
(3)、热轧带肋钢筋、热轧光圆钢筋,每批数量不得大于60T,每批取试样一组。
(4)、每一验收批中取试样1组(2根拉力、2根冷弯、1根化学)。
低碳钢热轧圆盘条时,拉力1根。
(5)、取样方法:①、按规定凡取2个试件的,均应从任意两根(或两盘)中分别切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
②、低碳钢热轧圆盘条冷弯试件取自不同盘。
③、试件在切取时,在钢筋任意一端截去500mm后切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
注意事项:①、钢筋的材质证明要“双控”,各验收批钢筋出厂质量合格证和试验报告单缺一不可,材质证明与实物应物证相符。
混凝土试件制作与送检流程ppt课件
同条件试块、拆模与标养
• 1)标准养护试块:标养试块是在标养室养护的, 规范规定试块在(20℃±2),湿度为95%以上 的养护室,须养护28d后进行送检。
• 2)同条件试块:是指在混凝土浇注现场取样制 作的试件,并依据现场结构实体的养护条件进 行养护(即放在构件附近养护),这种条件的 试块强度数值更能反应结构实体的混凝土强度, 累积养护温度一般是每开始 养护时起至每天室 外平均温度累计至600度天后开始试压,但是施 工温度特殊时,还应保证养护时间不少于14d, 不能高于60d。
THANK YOU
SUCCESS
2019/6/19
常见检 测 项 目 指 引
序 号
材料
取样批量
取样方法
1
砼
抗压 砼抗
折
每100盘且不超过100m3的 同配比的砼,其取样不 得少于一次;每工作班 拌制的同配比的砼不足 100盘时,其取样不得少 于一次;对现浇砼结构 ,其试件的留置尚应符 合以下要求:(1)每一 现浇楼层同配比砼,其 取样不得少于一次;(2 )同一单位工程每一验 收项目中同配比砼,其 取样不得少于一次。每 次取样应至少留置一组 标准试件,同条件养护 试件的留置组数,可根 据实际需要确定。(路面 抗折强度试件同上规定)
• 1)标准养护试块:浇筑同强度同配合比的 混凝土每100m³混凝土至少留一组,不足 100m³混凝土也应不少于一组。当筑同强度 同配合比的混凝土浇筑方量超过1000m³时 每200立方米留一组。
• 2)同条件拆模试块:同条件拆模试块留置 组数不得少于3组。
• 3)同条件试块留置组数:每浇筑一次混凝 土每个部位至少留一组试块。主要指基础、 柱、梁、板等主体结构构件。
根。
头以300件同类型预埋件
岩土工程试验样品采样及送检技术要求
(一)土样1、采样(1)采取原状土或者扰动土应根据工程性质决定.凡是建造物的天然地基,天然边坡,天然地层等应采取原状土;凡是路堤填料,桥头填土,地 基基础回填等可以采取扰动土。
如工程对象既属天然边坡稳定, 又作 土方调配作为填料, 除采取所需原状土外, 还需取满足扰动土取样数 量。
不论何种工程,如果只是要求进行土的分类 ,可只采取扰动土。
所取任何样品应具有一定代表性。
(2)土样可在试坑、平洞、竖井、天然地面以及钻孔中采取,所 取土样应具有一定代表性, 采取土样时, 应让土样受到最小程度扰动, 并保持土的原状结构及天然湿度;用钻机取样时,在钻孔中直径不宜小 于 12 厘米, 并使用专用薄壁取土器, 以减少土的受扰动影响;在试坑、 平洞、竖井、天然地面人工采样时 ,应将所取样品人工修削成土样筒 大小的土柱,然后装入土样筒中.(3)采取土样数量应满足所要求进行的试验项目和试验方法的需要.采取土样数量参考下表:不同试验项目所需土样数量表取样分量或者体积80— 100g80— 100 g备注兼做力学试 验时不单独取样土样类别砂类土粘性土 试验项目含水率状态扰动扰动最大粒径mm密度比重颗粒分析液、塑限相对密度收缩膨胀湿化毛细管水上升高度渗透砂类土粘性土砂、砾砂类土粘性土砂、砾砂类土粘性土粘性土砂类土粘性土粘性土粘性土砂类土粘性土砂类土粘性土原状原状扰动扰动扰动扰动扰动扰动扰动原状扰动原状扰动原状原状扰动原状扰动扰动原状扰动φ10×10 c m 1 筒φ10×10 c m 1 筒2—10kg50—100g50g1—7kg200—500g100g500gφ10×20cm1 筒1 。
5kgφ10×20cm1 筒1kgφ10×20cm1 筒φ10×20cm2 筒2 。
5kgφ10×20cm1 筒2kg2 。
5kgφ10×10cm1 筒2kg兼做力学试验时不单独取样兼做力学试验时不单独取样〈0.5〉5〈2>5击实压缩三轴剪切直接剪切残存强度无侧限抗压强度住手角有机质含量易溶盐砂类土粘性土粘性土砂类土粘性土砂类土粘性土粘性土粘性土砂类土粘性土粘性土扰动扰动原状扰动扰动原状扰动扰动原状扰动原状扰动原状扰动扰动扰动扰动扰动<2〈2〈2〈2〈2〈2<530kg30kgφ10×10cm1 筒2kg5kgφ10×20cm3 筒5kg3kgφ10×20cm2 筒3kgφ10×20cm2 筒5kgφ10×20cm2 筒2.5kg1kg3kg200g500g注:1 土样体积φ10×20cm 指标准取样筒一筒数量.2 表中所列“取样分量或者体积”均指对应项目一组土样所需数量,如工程需要做多种状态、方法试验时,应视具体情况多取样品。
原材料及试件抽样检验方案
原材料及试件抽样检验方案1 总则为了指导本工程项目部严格按要求做好各类原材料、试件的送检工作,保证工程结构安全和各项使用功能满足设计和规范要求,顺利实现工程建设质量控制目标,特制定本见证取样与送检制度及实施方案,本方案总包只对自己施工范围内的工程负责,各分包参照此方案另行制定相应的方案。
2 见证取样与送检制度2.1 施工人员应严格按照本取样和送检方案,对施工现场的取样和送检进行操作,取样人员应在试样或其包装上作出标识、封志。
标识、封志应标明工程名称、取样部位、取样日期、样品名称和样品数量,并由见证人员和取样人员签字、盖章。
2.2所取原材料、试件样品,必须送至具备有效资质的检测单位检测。
检测单位必须具备省级及以上相关行政主管部门颁发的检测资质证书和对外承接业务许可证书,并取得质量技术监督部门的计量认证合格证书,并经工商行政主管部门登记注册取得营业执照。
2.3涉及结构安全的试块、试件和材料见证取样和送检的比例不得低于有关技术标准中规定应取样数量的30%。
2.5 进行原材料、试件见证取样与送检时,质检人员必须按规定填写检验委托单,并在检验委托单上签字、盖章,同时现场监理出示“见证人员证书”。
见证人员对试样的代表性和真实性负有责任。
实体检验试验的选定:承担工程材料检验的试验室,必须具有相应的资质,本工程计划委托“攀枝花市建设工程质量检测中心”承担材料检验,该材料试验室已经通过国家试验室认可,并经四川省质量技术监督局的计量认证,具有CMA章资质,符合第三方检测的要求,将在监理全过程的见证下进行材料检验。
3 建筑原材料、构配件、半成品、成品见证取样要求及方法3.1 水泥3.1.1 水泥3.1.1.1 取样及检验依据标准1 《水泥取样方法》(GB12573—2008);2 《水泥细度检验方法》(GB/T1345—2005);3 《水泥标准稠度用水量、凝结时间、安定性检验方法》(GB/T1346—2011);4 《水泥胶砂强度检验方法》(GB/T17671—1999);5 《通用硅酸盐水泥》(GB175—2007)。
材料送检的标准操作流程
材料送检的标准操作流程目标本文档旨在规定材料送检的标准操作流程,确保操作的独立性,避免法律复杂性,并提供简单的策略。
流程概述以下是材料送检的标准操作流程:1. 准备材料:收集需要送检的材料,并确保它们符合送检标准。
2. 检查材料:对材料进行初步检查,确保其完整性和适用性。
3. 选择送检机构:根据材料的特性和检测要求,选择合适的送检机构。
4. 联系送检机构:与选择的送检机构联系,了解送检的具体要求和流程。
5. 准备送检材料:根据送检机构的要求,准备送检材料,包括填写必要的表格和提供相关的信息。
6. 安排送检时间:与送检机构协商,确定送检的具体时间和地点。
7. 送检材料:将准备好的材料送交给送检机构,并确保送检过程中的安全和完整性。
8. 等待结果:等待送检机构完成检测,并获取检测结果。
9. 分析结果:分析检测结果,根据结果制定相应的行动计划。
10. 结论与反馈:根据分析结果,得出结论,并将结论和反馈及时传达给相关人员。
注意事项在执行材料送检的标准操作流程时,应注意以下事项:- 确保材料的准确性和完整性,避免提供虚假或不完整的信息。
- 选择合适的送检机构,确保其具有合法资质和良好信誉。
- 与送检机构保持良好的沟通和合作,及时解决可能出现的问题和疑问。
- 遵守送检机构的要求和流程,确保材料的顺利送检和准确检测。
- 根据检测结果制定相应的行动计划,并及时传达结论和反馈给相关人员。
以上即为材料送检的标准操作流程,希望能对您有所帮助。
如有任何疑问,请及时与我们联系。
工程材料送检基本流程方式
工程材料送检基本流程方式工程材料送检基本流程方式工程材料有各种不同的分类方法。
一般都将工程材料按化学成分分为金属材料、非金属材料、高分子材料和复合材料四大类。
下面是店铺为大家整理的工程材料送检基本流程方式,欢迎大家阅读浏览。
一、混凝土试件的取样及制作(一)现场搅拌混凝土根据《混凝土结构工程施工质量验收规范》(GB 50204-2002)和《混凝土强度检验评定标准》(GBJ107-87)的规定,用于检查结构构件混凝土强度的试件,应在混凝土的浇筑地点随机抽取。
取样与试件留置应符合以下规定:1、每拌制100盘但不超过100立方米的同配合比的混凝土,取样次数不得少于一次;2、每工作班拌制的同一配合比的混凝土不足100盘时,其取样次数不得少于一次;3、当一次连续浇筑超过1000立方米时,同一配合比的混凝土每200立方米取样不得少于一次;4、同一楼层、同一配合比的混凝土,取样不得少于一次;5、每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定。
(二)结构实体检验用同条件养护试件根据《混凝土结构工程施工质量验收规范》(GB 50204-2002)的规定,结构实体检验用用同条件养护试件的留置方式和取样数量应符合以下规定:1、对涉及混凝土结构安全的重要部位应进行结构实体检验,其内容包括混凝土强度、钢筋保护层厚度及工程合同约定的项目等。
2、同条件养护试件应由各方在混凝土浇筑入模处见证取样。
3、同一强度等级的同条件养护试件的留置不宜少于10组,留置数量不应少于3组。
4、当试件达到等效养护龄期时,方可对同条件养护试件进行强度试验。
所谓等效养护龄期,就是逐日累计养护温度达到600℃.d,且龄期宜取14d~60d。
一般情况,温度取当天的平均温度。
(三)预拌(商品)混凝土预拌(商品)混凝土,除应在预拌混凝土厂内按规定留置试块外,混凝土运到施工现场后,还应根据《预拌混凝土》(GB14902-94)规定取样。
送检流程模版
送检流程模版
送检流程是指将需要检验的样品送交给检验机构进行检测的一系列操作流程。
送检流程的规范与否直接影响着检测结果的准确性和可靠性。
以下是送检流程的模版,以供参考:
1. 样品准备,确定需要检测的样品类型,按照检测要求采集样品,并确保样品
的完整性和代表性。
2. 填写送检单,填写送检单时要认真核对样品信息,包括样品名称、数量、采
样地点和时间等,确保信息的准确性。
3. 包装标识,将样品进行合适的包装,标明送检单编号和样品名称,并在外包
装上标注“易碎”、“易腐烂”等特殊要求。
4. 选择检测机构,根据样品的性质和检测要求,选择合适的检测机构进行检测。
确保检测机构具有相关资质和认证。
5. 送检递交,将包装好的样品和填写好的送检单送交给检测机构,并确认送检
单的复印件是否妥善保存。
6. 检测报告,等待检测机构出具检测报告,检测报告应包括样品信息、检测结
果和结论等内容。
7. 结果处理,根据检测结果进行相应的处理,如合格样品可继续使用,不合格
样品需进行退换或处理。
以上是送检流程的模版,送检流程的规范性对于保证检测结果的准确性和可靠
性至关重要。
希望大家在进行送检操作时能够严格按照流程要求进行,确保检测结果的准确性和可靠性。
混凝土试块送检流程(1)
混凝土试块送检流程一.工艺流程试块送检一>试验报告管理二.具体流程措施1试块送检现场试验人员应正确填写委托单,有特殊要求时应注明。
需要见证检测的检测项目,项目应在取样及送样前通知见证人员,见证人员应对见证取样和送检的全过程进行见证并填写见证记录。
办理委托后,现场试验人员应将送检试样的相关信息登记在试块台账上,并将试块送至检测单位进行检测试验。
对于标养室及施工现场过期试块进行及时清理。
2、试验报告管理现场试验人员及时与检测单位联系,获取检测试验报告,核查报告内容。
当检测试验结果为不合格或不符合要求时,及时报告项目总工程师及相关人员,做好对相应的材料或工程现场部位的应急处理。
对试块不合格的工程部位,应该按规范要求随机抽取点位,然后进行结构实体回弹检测,依据检测结果判断实体强度是否满足规范和图纸设计要求。
如果符合,则根据规范和设计要求,依据回弹检测报告对该工程部位混凝土强度进行评定。
经过实体回弹检测,如果混凝土强度不能满足规范和图纸设计要求,则要对该部位的混凝土构件进行实体抽芯检测,抽芯结构符合规范和设计要求,则可以根据抽芯检测报告对该工程部位混凝土强度进行评定。
如果实体抽芯检测结构仍不能满足规范和图纸设计要求,则需要将检测结果报告设计单位,由设计单位重新符合验算,确定工程部位是否安全可靠。
如果能满足设计使用要求,则由设计单位出具书面意见说明,确认该部位结构不作处理;如果不能满足设计使用要求,则应该由设计单位提供整改意见,然后对结构实体做补强加固处理。
检测试验报告的编号和检测试验结果应在试验台账上登记,然后将检测试验报告及时移交资料室归档。
三安全保蹿施-安全生产教育与培训对所有员工进行岗前的安全教育,并做好记录。
经考核合格后,方可上岗作业。
由工程、技术管理部组^进行技术交底、说明操作程序要点、该工程的危险源采取的相应防范措施,施工a≡事项等。
对于从事电器、起重、焊接等麟工种的人员,经过专业培训,获得安全操作合格证后,方;解证上岗。
送检流程
送检流程送检分为常规送检和见证送检两类:一、常规送检流程1、取样人在施工工地或加工厂按照国家规范进行送检样品的取样: (1)钢筋原材进场时按钢筋炉(批)号及规格分批送检。
每60t为一批,每增加40t(或不足40t的余数)增加一个拉伸试验试样和一个弯曲试验试样,不足60t也按一批。
每批送检一组(7根,每根≥500mm)。
每批钢筋应由同一牌号、同一炉(批)号、同一规格、同一交货状态的钢筋组成。
(2)钢筋机械连接送检按部位(如基础、某层)进行。
同一部位采用同一批材料的同型式、同等级、同规格接头,以500个接头为一个验收批,不足500个接头也作为一批。
每批取一组试样,每一组3个。
2、送样人依据第三方检测单位提供的送检委托单进行填写,依次填写委托方、工程名称、样品名称、样品产地、牌号、规格、级别、数量以及送样联系人等,核对填写信息正确无误。
3、送样人将送检样品及送检委托单送达到第三方检测单位,第三方检测单位收样人员核对样品种类、规格等及委托单上面填写的相关信息,确认无误后签字。
一联给检测单位收样人,一联送样人自己保留。
4、第三方检测单位对送检样品进行试验并出具有效检测报告。
5、送样人致电第三方检测单位查询检测结果并确定领取检测报告的时间。
6、送样人在公司财务申请领取检测报告所需费用,到第三方检测单位领取检测报告,并核对检测报告上的信息是否有误,交付试验费用,办理相关签字手续。
7、送样人将第三方检测单位出具的检测报告进行分类汇总后交施工方相关负责人员,如施工方资料员。
并办理资料移交手续。
二、见证送检流程1、取样人员联系见证人员(如工地监理人员),见证人员在施工工地或加工厂以旁站形式按照国家规范进行送检样品的取样:(1)钢筋原材进场时按钢筋炉(批)号及规格分批送检。
每60t为一批,每增加40t(或不足40t的余数)增加一个拉伸试验试样和一个弯曲试验试样,不足60t也按一批。
每批送检一组(7根,每根≥500mm)。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
试件送样及送检流程
一、原材见证取样、送检流程及归档资料
二、施工过程质量检测试验送检流程及归档资料(现场制作)
三、实验取样相关规定
1、水泥的取样标准
水泥出厂质量合格证的验收,水泥出厂质量证明合格证应由生产厂家的质量部门提供给使用单位,作为证明其产品质量性能的依据,
(1)、取样
①、散装水泥:对同一水泥厂生产的同期出厂的同品种同标号的水泥,以一次进场的同一出厂编号的水泥为一批,但一批的总量不得超过500t。
随机地从不少于3个车罐中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
②、袋装水泥:对同一水泥厂生产的同品种、同标号的水泥,以一次进场的同一出厂编号的水泥作为一批。
但一批的总量不得超过200t。
随机地从不少于20袋中各取等量水泥,经混拌均匀后,再从中称取不少于12Kg水泥作为检验试样。
③、对已进场的每批水泥,视在厂存放情况,应重新采集试样复试其强度及安定性,存放期超过三个月的水泥,使用前必须进行复验,并按复验结果使用。
④、取样要有代表性,所取试样总数不少于12Kg,拌和均匀后分成两等份,一份由试验室按标准试验,一份密封保存,以备复验用。
(2)、水泥重点检测指标
抗折强度、抗压强度、凝结时间、安定性、细度
2、钢筋原材的取样试验
(1)、钢筋原材试验应按批进行。
(2)、每批由同一厂别、同一炉缸号、同一规格、同一交货状态、同一进场时间的钢筋组成。
(3)、热轧带肋钢筋、热轧光圆钢筋,每批数量不得大于60T,每批取试样一
组。
(4)、每一验收批中取试样1组(2根拉力、2根冷弯、1根化学)。
低碳钢热轧圆盘条时,拉力1根。
(5)、取样方法:
①、按规定凡取2个试件的,均应从任意两根(或两盘)中分别切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
②、低碳钢热轧圆盘条冷弯试件取自不同盘。
③、试件在切取时,在钢筋任意一端截去500mm后切取,即在每根钢筋上切取一个拉伸试件、一个弯曲试件。
注意事项:
①、钢筋的材质证明要“双控”,各验收批钢筋出厂质量合格证和试验报告单缺一不可,材质证明与实物应物证相符。
②、钢筋出厂质量合格证应有生产厂家质量检验部门的盖章,质量有保证的生产厂家,钢筋标牌可作为质量合格证。
③、钢筋试验报告单中应有试验编号,便于与实验室的有关资料查证核实。
试验报告单应有明确结论并盖章齐全。
④、钢筋试验不合格单后应附试件复试合格试验报告单或处理报告。
不合格单不允许抽撤。
⑤、热轧圆盘钢筋在送试前不得冷拉,而应该在盘上截下后人工调直。
(6)、钢筋重点检测指标
抗拉强度、屈服强度、伸长率、冷弯、最大力总伸长率、重量偏差
3、砂子试验
(1)、砂试验以同一产地、同一规格、同一进场时间,每400m3或600t为
一验收批,不足400m3或600t为一验收批。
(2)、每一验收批取试样一组,数量为22Kg。
(3)、取样方法: 1)在料堆上取样时,取样部位应均匀分布,取样时先将取样部位表面铲除,然后由各部位抽取大致相等的试样8份(每份11Kg以上)搅拌均匀后用四分法缩分到22Kg组成一组试样。
4、石子试验
(1)、碎(卵)石试验应以同一产地、同一规格、同一进场时间,每400m3或600t为一验收批,不足400m3或600t时,亦为一验收批。
(2)、每一验收批取试样一组,数量40Kg(最大粒径20mm)或80Kg(最大粒径为40mm)。
(3)、取样方法:
在料堆上上取样时,取样部位应均匀分布。
取样时先将取样部位表面铲除,然后由各部位抽取大致相等的石子15份(在料堆的顶部、中部和底部各均匀分布的5个不同部位取得)组成一组试样。
(4)、碎石重点检测指标:
表观密度、堆积密度、含泥量、含水率、泥块含量、颗粒级配、紧密密度、针片状含量、压碎指标
5、砖试验
(1)、砌墙砖试验:
砌墙砖应以同一产地、同一规格、同一品种为一取样单位,具体规定如下:
①、烧结普通砖:每15万块为一验收批,不足15万块亦为一验收批。
随机从检验批中抽取10块砖做抗压强度试验。
②、烧结多孔砖:强度试验的砖样从尺寸偏差和外观质量检查合格的砖样
中随机抽取。
每5万块为一验收批,不足该数量时亦按一批计算。
每批取试样一组(10块)做抗压、抗折强度试验。
③、烧结空心砖和空心砌块:每3万块为一验收批,不足3万块亦为一验收批,每批取试样一组(10块)做强度试验。
(2)、砖重点检测指标:
抗压强度、干体积密度
6、回填土
回填土包括:素土、灰土、砂和砂石地基的夯实填方和柱基、基坑、基槽管沟的回填夯实以及其他回填夯实。
(1)、取样:
①、在压实填土的过程中,应分层取样检验土的干密度和含水率;
②、基坑每50~100㎡应不少于1个检验点;
③、基槽每10~20m应不少于1个检验点;
④、每一个独立基础下至少有1个检验点;
⑤、对灰土、砂和砂石等,每单位工程不应少于3点,1000㎡以上的工程每100㎡至少1个点,3000㎡以上的工程,每300㎡至少有1点;
(2)、场地平整:
各层取样点应错开,并应绘制取样平面布置图,标清各取样点位。
(3)、土重点检测指标:
最佳含水率、最大干密度
7、防水卷材
弹性体沥青防水卷材
批量:以同一类型、同一规格10000m2为一批,不足10000m2时亦可作为一
批。
抽样:在每批产品中随机抽取5卷进行卷重、面积、厚度与外观检查,在上述检查合格的卷材中随机抽取1卷,切除距外层卷头2.5m后。
顺纵向切取长度为0.8m的全幅卷材两块,一块用物理力学性能检测用,另一块备用。
8、砌筑砂浆
砌筑砂浆是指砖石砌体所用的水泥砂浆和水泥混合砂浆。
(1)、砌筑砂浆的配合比都应该试配确定。
施工单位应从现场抽取原材料试样,根据设计要求向有资质的实验室提出试配申请,由实验室通过试配来确定砂浆的配合比,砂浆的配合比应采用重量比。
(2)、砂浆试块的重点检测指标:28天抗压强度
(3)、试块留置及养护:
砌筑砂浆以同一强度等级、同一配合比、同种原材料每一楼层为一取样单位,其他超过250m³。
以250m³为一取样单位,余者为一取样单位。
每一取样单位标准养护试快的留置组数不得少于1组(每组6块),试样要有代表性,每组试块的试样必须取自同一次拌制的砌筑砂浆拌合物。
施工中取样应在使用第四按的砂浆槽、砂浆运送车或搅拌机出料口,至少从三个不同部位集取,数量应不多于试验用料的1~2倍。
试件在20±5℃环境停置24±2h拆模。
拆模前要先编号,写上施工单位、工程名称及部位强度等级、成型日期,标养试块移至标养室养护至28天。
9、混凝土试块
(1)、按照图纸向商砼站委托配合比。
(2)、预拌(商品)混凝土,除应在预拌混凝土厂内按规定留置试块外,
混凝土运到施工现场后,还应根据《预拌混凝土》(GB14902-94)规定取样。
①、用于交货检验的混凝土试样应在交货地点采取。
每100立方米相同配合比的混凝土取样不少于一次;一个工作班拌制的相同配合比的混凝土不足100
立方米时,取样也不得少于一次;当在一个分项工程中连续供应相同配合比的混凝土量大于1000立方米时,其交货检验的试样为每200立方米混凝土取样不得少于一次。
②、用于出厂检验的混凝土试样应在搅拌地点采取,按每100盘相同配合比的混凝土取样不得少于一次;每一工作班组相同的配合比的混凝土不足100盘时,取样亦不得少于一次。
③、对于预拌混凝土拌合物的质量,每车应目测检查;混凝土坍落度检验的试样,每100立方米相同配合比的混凝土取样检验不得少于一次;当一个工作班相同配合比的混凝土不足100立方米时,也不得少于一次。
(3)混凝土抗渗试块
根据《地下工程防水技术规范》(GBJ108-87),混凝土抗渗试块取样按下列规定:
①、连续浇筑混凝土量500立方米以下时,应留置两组(12块)抗渗试块。
②、每增加250~500立方米混凝土,应增加留置两组(12块)抗渗试块。
③、如果使用材料、配合比或施工方法有变化时,均应另行仍按上述规定留置。
④、抗渗试块应在浇筑地点制作,留置的两组试块其中一组(6块)应在标准养护室养护,另一组(6块)与现场相同条件下养护,养护期不得少于28天。
根据《混凝土结构工程施工质量验收规范》的规定,混凝土抗渗试块取样按下列规定:对有抗渗要求的混凝土结构,其混凝土试件应在浇筑地点随机取样。
同一工程、同一配合比的混凝土,取样不应少于一次,留置组数可根据实际需要确定。