综合样本(英文版)

合集下载

产品说明书样本(英文版)

产品说明书样本(英文版)

The first summarizeToday,internal sample of liquid dielectric in the oiltank is performed by ISO3170(GB/T4756-1998)?Petrol liquid product handicraft sample law?.It is impossibly to control accurately sample ually the sample will not be exact.Performing personnels will feel tired as usual because of hardwork.When rain or snow,climb oiltank that is a very dangerous job.When getting a sample at top of oiltank,easily volatile and noxious dielectric will injure someones,at one time,it will not be in favour of environment and the medium of oiltank will be polluted by other things from environment.For solving these problem, we have developed 〞The auto control getting sample from oiltank〞that according to ?ISO3170(GB/T4756-1998 criterion?,it has achieved that liquid sample at different level of oiltank will be sampled. The machine operation is very simply、very accurate、excellently repeated,it’s structure is simple and it will be install very easily. It will not pollute the environment too. The sample machine has been awarded nationalpatent and the second prize of the sino petrol & chemical industry automation vocation 2021 year. The auto control getting sample from oiltank , it’s structure is sample, it will be install very easily、it’s operation i s very simply、very accurate and it will not pollute the environment. At present, it’s technology has been take the lead in the like product.We have gotten by the auto control getting sample from oiltank the patents and the credits that are:( 1 ) The liquid sample devicment from oiltank, the number of parent is . ( 2 ) The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is( 3 )The sample devicment of Multi-dimensional sampling valve, the number of parent is( 4 )The multichannel two globe valves, the number of parent is( 5 ) The nationalpatent and the second prize of the sino petrol & chemical industry automation vocation 2021 yearPatentee’s declaration:About the patents of oil tank sampler:( 1 ) The liquid sample devicment from oiltank, the number of parent is . ( 2 ) The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is( 3 )The sample devicment of Multi-dimensional sampling valve, the number of parent is( 4 )The multichannel two globe valves, the number of parent isThe 4 items’s using right has been awarded to Lan zhou GuKe chemical plant & apparatus Co.,Ltd by patentee for manufacture and sale. If others will manufacture and sell them ,they will break the law, the patentee will inquire their responsibility of law and call for economics compensation.The patentee’s signature:The designsketch in fact:The second sampler technology parameter:item parameterCarried standard ISO3170 GB/T 4756-1998?The petroleum liquid handicraft sample method?Usual sample dot distribution setting Upper sample、middles ample、lower sample、upper middles lowe’s 1:1:1uniform combination sample and bottoms ample、exits samples、upper sample〔reference〕Multilayer framemeans expansionsample allowablehightReaching to the bottom of oiltank is 600-25000mmApplicable medium Gas、kerosene、diesel、solvent oil、naphtha、petroleum aromatics、paraffindestillat、residual oil、heavy oil、crude oil、bitumen and so onSample hight locationerror±20mmOiltank connecting spool installional location Reach to the bottom of oiltank is 500-800mm〔convenient hight for sample operation〕Handpump GearpumpSpeed increasing ratio 3:1FlowDeliverylift 50mDisplacement pumpSpeed increasing ratio 1:1FlowDeliverylift 85mPneumatic pump GearpumpCompressed air pressureCompressed air maxlossm3/minSpeed reducingratio30:1Pneumatic motor torque 55N-mPneumatic pump 32mThe third type of sampleThe fourth applicable rangeThe self-tuning oil tank sampler is applicable to liquid medium of oiltank in the petroleum and chemical industry and so on.(for example:gas、kerosene、diesel、white oil、naphtha、crude oil、all kinds of residuum、slops、asphalt、petroleum aromatics、various solvent、thick vitriol、organic acid、lye、beer and so on)’s upper sample、middles ample、lower sample、upper middles lowe’s 1:1:1 uniform combination sample and bottoms ample、exits samples、upper sample and so on.Setting sample at the especial location by users’s require.Can setting 9 point for maxize.The fiveth The self-tuning oil tank sampler’s characteristic and virtue 1.Accurate sample locationThe sampler uses the patent technology〞The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is 〞.We establish the database of multilayer frame means expansion manufacture parameter by more and more test. We can assure that our multilayer frame means expansion can conquer connatural weak point that can not go up and down in ratio of equality by others. Assure every sample connection that been set in multilayer frame means expansion can automatically go up and down in ratio of equality with liquid level, to let it to truely get upper sample、middles ample、lower sample、upper middles lowe’s 1:1:1 uniform combination sample. If multilayer frame means expansion can go up and down in ratio of equality that will decide every connection’s definition of sample.For the drawing-1:the drawing-12. Independence ofsample mediumThe sampler uses thepatent technology〞Thesample devicment of Multi-dimensional sampling valve, the number of parent is 〞that is independent shunting plant of multilayer sample in the valve. It can take sample of every location independently shunt to lofting valve and can mix upper sample、middles ample、lower sample by the rate of 1:1:1 and take it to lofting valve, sample personnel can get every independent sample and 1:1:1 uniform combination sample from lofting valve exit.3、Security and reliabilityA) The self-tuning oil tank sampler uses the patent technology〞The multichannel two globe valves, the number of parent is 〞that can fast cut off the communication of guitar pipe and pipe of outside, make sure that medium of oiltank will not leak out.The globe valves’s button run reliably and accurately, it’s operation is simple and convenientB) The sampler only need be operated on the ground, and operationer need not climb to the top of oiltank to sample. Eliminate the danger of climbing in the rain or snow. Eliminate the danger when getting a sample at top of oiltank,easily volatile and noxious dielectric will injuresomeones. Take humanized and reliable environmental sample come true.4.Reasonable structure and simple operationThe sampler uses the patent technology〞The sample devicment of Multi-dimensional sampling valve, the number of parent is 〞that take multilayer sample oil pipes scientifically and possibly combine into one of circular operation hand-actuated wheel. Operate the rated hand-actuated wheel to choice sample point. Take complex operation process to simple action.For drawing-2Drawing-25.Hes-cling structure and little leaking pointScience and reasonable The self-tuning oil tank sampler structure, Can the DuoGe sampling output line and a circulation return pipe road high oil chips in cluster. Make DuoGe independent sample line compact from a took over, the output to tank through within the operation of the DuoWei sampling valve ,This compact structure tell the DuoGe lofting, thus greatly reducing valve sealing the number of points. In normal conditions using zero leakage .For drawing-3For drawing-36.Sample pipe road has reverse wash function:The self-tuning oil tank sampler take SKC-HF structure circulating pump But through the cycle of the pump valve or reverse rotation oil change realize tank Sample pipe road, reverse through media Thus will CaiYangGuan way or tank sampling injector mesh on the plugging of dirt reverse wash to tanks, at any time to sampling the pipeline the cleaning7.Replacement old way of the operation is simple:The self-tuning oil tank sampler used specially developed for sampling convenient and special two tee lofting valve, Made with a conversion between lofting cycle is very simple, just press the valve for the arrows spin an Angle start after circulating pump can.8.Convenient installation:The sampler can be set up special steam heating device, oil tank external sampler components have straight heat conduction heat tracing of. For drawing-4 Use electric heating, in the valve body sampler exclusively electric tracing band through the heating channel, the heating effect ideal. A heating device can be used for the sampler asphalt, and so easy as the medium tank.For drawing-49. Meet of the medium to samplingThe sampler can be set up special steam heating device, oil tank external sampler omponents have straight heat conduction heat tracing of. Use electric heating, in the valve body sampler exclusively electric tracing band through the heating channel, the heating effect ideal. A heating device can be used for the sampler asphalt, and so easy as the medium tank.The sixth.T he self-tuning the composition of the oil tank samplerThe self-tuning oil tank sampler The composition of the oil tank sampler as shown in figure 5 shows1, extendable frame; 2, float group; 3, circulating pump 【manual pump, pneumatic pump 】; 4, sampling combination tube; 5, sampling distribution device; 6, the integrated oil, a choice of the directional control valve, valve, sample combination distribution on a stop valve, no drop leak lofting valve combination together; 7, operation box; 8, adjustable bearing; under the plane 9, small tube resistance metal hoseFor drawing-5The seventh.working principleThe self-tuning oil tank sampler is through the float group in the expansion set drive tank with oil level within the truss and sample, the upper or lower, middle kind, samples and top samples (optional) sampling mouth all fixed in telescopic rack, telescopic frame in liquid is according to the proportion of sampling, ensure that came out of the position accuracy. The sampling location is determined according to the ISO3170 (GB/T4755 1998) "oil liquid product manual sampling method" regulation of sampling location of the design. For drawing-6 showsFor drawing-6Different sample position of the pipeline is independent sample through sampling combination tube transfer to oil chips, again through the DuoWei reversing valve handwheel control of their respective independent leads to the valve, again by lofting lofting valve control lofting or cycle will turn to cycle the valve, start lofting circulation pump can turn number after the part of the old way of pipeline to the bottom of the tank replacement cycle; And then the valve position to rotate lofting lofting, can get the export of lofting valve in the tank is a position of the sample. Repeat the above。

中英文合同样本(标准版)

中英文合同样本(标准版)

中英文合同样本(标准版)(sample letter of intent form)依据《中华人民共和国合同法》及相关法规、规章的规定,承租人与房地产经纪机构在平等、自愿的基础上,就房屋承租居间的有关事宜达成协议如下:letter of intent for possiblecontract for sale of assetspossible seller: _____________________________承担承租地域内所发生的事故责任(包括安全生产、用电、防火防盗等),对事故造成的相邻各方及甲方的损失负赔偿责任。

possible buyer: _____________________________入场停放并使用车衣的任何机动车辆,应按停车卡或车管员指定之区域停放,不得异区、异位停放,否则本停车场有权将不按指定位置停放的车辆拖至适当地点,并由其车主承担一切费用。

business: _____________________________date: ______________, 20_____在建设期内,乙方除应向甲方提交工程施工组织计划和施工进度计划表外,还须于每月5日前向甲方提交上月施工进度表,供甲方备查和督促之用。

this is a non-binding letter of intent that contains provisions that are being discussed for a possible sale of the business named above from the possible seller named above to the possible buyer named above. this is not a contract. this is not a legally binding agreement. this is merely an outline of possible contract terms for discussion purposes only. this is being signed in order to enable the possible buyer to apply for financing of the purchase price. this letter of intent is confidential and shall not be disclosed to anyone other than the parties and their employees, attorneys and accountants and the possible lenders of the possible buyer. the terms of the transaction being discussed are attached hereto, but the terms (and the possible sale itself) are not binding unless and until they are set forth in a writtencontract signed by possible seller and possible buyer. the word "shall" is used in the attached terms only as an example of how a contract might read, and it does not mean that the attached terms are or ever will be legally binding.为了保证工程的正常进行,乙方必须至少提前____天书面向甲方提出下一工序需要的甲方提供材料清单,并注明该所需材料的数量。

英文版销售合同样本(分享)5篇

英文版销售合同样本(分享)5篇

英文版销售合同样本(分享)5篇篇1SALES CONTRACTThis Sales Contract (hereinafter referred to as the "Contract") is made and executed on [Date] by and between [Seller's Name] (hereinafter referred to as "Seller"), and [Buyer's Name] (hereinafter referred to as "Buyer").1. PartiesThe Seller and Buyer, through their authorized representatives, agree to the terms and conditions stated in this Contract.2. Product Description2.1 The Product to be sold is described in detail in the Annexure A, including its specifications, quality, quantity, and other related information.3. Price and Payment3.1 The Price of the Product shall be as stated in Annexure B. The total contract value is USD [Amount].3.2 Payment shall be made in full through [specified payment method] within [specified period] after the Contract is signed.4. Delivery and Shipping4.1 The Product shall be delivered to the Buyer at the shipping address specified in Annexure C.4.2 The Product shall be shipped within [shipment period] after receiving the payment in full.4.3 Shipping risks shall be borne by the Seller until the Product is delivered to the carrier.5. Quality Assurance5.1 The Seller guarantees that the Product is of the agreed quality and specifications stated in Annexure A.5.2 If the Product is found to be defective or non-compliant during inspection by the Buyer, the Seller shall replace or refund as per the agreed terms.6. Contract Modifications and Cancellation6.1 Any modification to this Contract must be mutually agreed in writing by both parties.6.2 Cancellation of this Contract can only be done with mutual consent and subject to any outstanding obligations and liabilities.7. Force MajeureIn case of force majeure events, both parties shall strive to mitigate their impact and work together to find solutions.8. DisputesAny dispute arising from or in connection with this Contract shall be settled through friendly negotiation. If no settlement can be reached, either party may submit the dispute to [specified court/arbitration body] for resolution.9. Law and JurisdictionThis Contract shall be governed by and construed in accordance with the laws of [specified country/jurisdiction].10. Miscellaneous10.1 This Contract constitutes the entire agreement between the Seller and Buyer on the sale of the Product, and nomodifications shall be made except in writing and signed by both parties.10.2 This Contract is written in English, and any translation provided for reference only. The English version shall prevail in case of discrepancies between different language versions.In witness whereof, the parties have executed this Contract in duplicate originals, each party retaining one original for their records.Seller: [Seller's Name]Authorized Representative:Date:Buyer: [Buyer's Name]Authorized Representative:Date:ANNEXURE A - PRODUCT DESCRIPTIONANNEXURE B - PRICE AND PAYMENTANNEXURE C - DELIVERY AND SHIPPING ADDRESS(Please note that these annexures are integral parts of this Contract and should be filled out with necessary details.)_________________________________________________________篇2Sales ContractThis Sales Contract (hereinafter referred to as the "Contract") is made and executed on [Date] by and between [Company Name], with its principal place of business located at [Address] (hereinafter referred to as the "Seller"), and [Buyer's Name], with its principal place of business located at [Buyer's Address] (hereinafter referred to as the "Buyer").Preamble:The Seller agrees to sell, and the Buyer agrees to purchase, the products specified in this Contract, on the terms and conditions stipulated below.Article 1: Product DescriptionThe Seller shall sell and the Buyer shall purchase the products listed in Annex A, which forms an integral part of this Contract.Article 2: Price and Payment2.1 The Price for the products shall be as specified in AnnexA. The Price shall be paid in [Currency] and shall be due and payable upon delivery of the products.2.2 The payment shall be made through a bank transfer to the Seller's account or by other means agreed upon by both parties.Article 3: Delivery and Performance3.1 The Seller shall deliver the products to the Buyer in accordance with the agreed schedule provided in Annex A.3.2 Any delay in delivery or performance caused by circumstances beyond the Seller's reasonable control shall be promptly notified to the Buyer.Article 4: Quality Assurance4.1 The Seller guarantees that the products shall be new, of good quality, and comply with all applicable specifications and standards mentioned in Annex A.4.2 In case of any defect in quality or non-compliance with specifications, the Buyer shall have the right to return the products and claim compensation.Article 5: Ownership and Risk Transfer5.1 Ownership of the products shall pass to the Buyer upon full payment of the Price. Risk of loss or damage to the products shall pass to the Buyer upon delivery.Article 6: ConfidentialityBoth parties shall keep confidential all information related to this Contract that is not intended for public disclosure.Article 7: Force MajeureNeither party shall be liable for failure to perform its obligations due to events of force majeure, such as natural disasters, war, riots, or other similar events beyond its reasonable control.Article 8: Warranty and After-Sales ServiceThe Seller shall provide a warranty period of [specify period] for the products, during which any defects in material or workmanship shall be rectified by the Seller without additional cost to the Buyer. After-sales service terms are specified in Annex B.Article 9: TerminationThis Contract may be terminated by either party giving written notice to the other, in case of fundamental breach by either party.Article 10: DisputesAny dispute arising from or in connection with this Contract shall be settled through friendly consultation between both parties. If no settlement can be reached, the dispute shall be submitted to [specified court/arbitration body] for resolution.Article 11: MiscellaneaThis Contract constitutes the entire agreement between the parties and no modification shall be made unless agreed upon by both parties in writing. This Contract is made in duplicate, with each party holding one original.In witness whereof, the parties have executed this Contract in [Place] on the date specified above.For the Seller:[Company Name](Seal)(Signature of Authorized Representative)Date: ________________For the Buyer:[Buyer's Name](Seal)(Signature of Authorized Representative)Date: ________________ 附加文件:[Annex A(产品列表及规格), Annex B(售后服务条款)等]。

英文版委托书(12篇)

英文版委托书(12篇)

英文版委托书(12篇)英文委托书篇一致任何有关人员:本人(身份证号码:id, 护照号码:passport) 自愿同意我的孩子(身份证号码:id, 护照号码:passport) 自20xx 年09 月至20xx 年08 月在中国广西玉林学习。

为保证我女儿在中国期间的合法权益不受侵害,本人特此授权中国公民先生(身份证号码:,护照号码:)为我女儿的临时法定监护人。

在临时监护期间,未经临时监护人同意,任何人不得以任何理由将我的`女儿带离临时监护人的监护范围,同时我女儿的护照交由临时监护人保管。

特此声明。

委托人签名:年月日英文委托书篇二This is to authorize ____________to be the attorney of me (“__________”)toexecute any and all instruments for the purpose to complete the necessary registration for the establishment and operation of ______________________ in New and Hi-Tech Industrial Development Zone of Kunshan City. This power of Attorney shall come into effect from the date of execution and remain effective until the date when the business license of ________________is issued. I recognize the documents executed by theAttorney on behalf of me within the scope of authorization.Company: __________Signed by: ________________Date:____________________英文委托书篇三xxx center:Comrade I unit [XXXXX] because [XXXXX] x mission, will be in (XXXXX) in x x month x country (region),stay outside xx days, pay cost of xx. Because of the comrade of the personnel archives check your center, entrust the relevant foreign affairs formalities.(name of the entity and affix one's seal)In x x month x day英文委托书篇四兹全权委托xxx先生(女士)和xxx先生(女士)代表本公司与贵公司签署货物买卖合同事宜,其代表本公司签署的'合同、订单以及其他文件,本公司确认其法律效力。

工作汇报+英文模板(共5篇)

工作汇报+英文模板(共5篇)

工作汇报+英文模板(共5篇)第1篇:英文的工作证明模板dear sirs,mr./ ms.xxxx(申请人姓名)works in our company.he/she will be on travelling purposes visiting your country and some other schengen countries from xx.xx.xxxx to xx.xx.xxxx(出国具体日期某年某月某日).all the expenses include air tickets, transportation, accommodation and health insurance will be covered by himself/herself/xxxx(出资方的公司名称或个人名字).he/she will be back on time as per his/her schedule planned and shall continue to work in our company after his/her visit to schengen date of birth paport-no.position annual incomexxxx xxxxxx gxxxxxx xxxx xxxxyour kind approval of this application will be highly appreciated.best regards,name of the leader(领导人姓名)position of the leader(领导人职位)signature(领导的签名)company’s stamp(公司盖章)tel: xxx-xxxxxxadd: xxxxxxcompany name: xxxxxx注:1.如果出资方非您本人,还需提供出资方的出资证明及出资方所在公司的营业执照副本的清晰复印件(所在公司为企业单位)或组织机构代码证的清晰复印件(所在公司为事业单位)2.在职证明需打印成英文,请删掉参考样本中所有中文的提示语,保持在职证明为全英文格式3.凡样本中xx的地方,均需相应填写您的相关信息,不要保留xx 在完成后的在职证明中4.()括号中为我们为您更加清晰在职证明的内容而标注的解释,不要保留在完成后的在职证明中5.请不要将“附件1:在职证明参考样本”字样保留在完成的在职证明中第2篇:英文求职自我介绍模板导语:在求职时,优秀的英文自我介绍可以为自己加分哦。

外贸合同样本英文版

外贸合同样本英文版

****************** PURCHASE AND SALECONTRACTContract No.: **************This PURCHASE AND SALE CONTRACT made on May 15, 2009 in Beijing cityBETWEENBUYER:********Add.: *******Tel: ******Fax: ******ANDSELLER:*************Add.: *************Tel: *****Fax: *******The BUYER is desirous of buying all such molybdenum concentrate from the SELLER. The BUYER confirmed the purchase of the contracted amount from the SELLER in this contract. And where as the BUYER, is desirous of purchasing all such molybdenum concentrate offered by the SELLER.The SELLER is willing to give all his productions and sales in this contract to the BUYER.----------THE SELLER AND THE BUYER HEREBY AGREE AS FOLLOWS-----------1.DEFINITIONSUnless specifically stated the following terms in this contract shall refer to and willhave the following meaning:Goods shall mean molybdenum concentrate;DMT shall mean dry metric ton;MMT shall mean metal metric ton;MTU shall mean metric ton unit;"Metric Ton" shall mean a ton of 1,000 kilograms or 2,204.62 pounds avoirdupois wetor dry basis as stated;PPM shall mean part per million or 1 gram per Metric Ton.Inspectorate shall mean independent inspectorate as CGL (Central Geological Laboratory, Mongolia) and/or its correspondenc; CIQ (China Entry-Exit Inspectionand Quarantine Association) and/or its correspondence, CCIC[China Certification &Inspection (Group)Co., LTD] and/or its correspondence, or any independent inspectorate accepted by both parties;T/T shall mean Telegraphic Transfer;$ or dollar or cent shall mean dollars and cents of the United States of America official currency ;DAF shall mean delivered at frontier as per Incoterms 2000.2.GOODS1) Name of goods******2) Specification*******Goods should not contain radioactive element and other harmful impurities.3) Weight*******4) Price (packing charges included)USD*****0/DMT(U.S.DOLLARS SEVEN THOUSAND FIVE HUNDRED) per DMT DAF Erlianhot on basis of 50% Mo with premium/penalty USD 150 per DMTfor 1% increase/decrease in Mo above/below 50% Mo, scale fraction pro-rata.5) Renegotiationa. If the Mo content is below 48% or the goods is over the impurity, the BUYER hasthe right to reject accepting the goods or the price will be renegotiated by the twoparties.b. If the BUYER rejects the goods according to the reasons mentioned above, then allcharges will be to SELLER’s account.3.TOTAL VALUEUSD******* (U.S.Dollars seven hundred and fifty thousand).The exact total value should pay the SELLER will be determined by the Mo content according to the certificate from CIQ/CCIC (China).4.INSURANCEInsurance up to the point of delivery shall be the responsibility of the SELLER.Insurance after the point of delivery shall be the responsibility of the BUYER.5.PLACE OF SHIPMENT*********6.PLACE OF DELIVERY*************7.SHIPMENTThe shipment will be effected before *******8.PACKAGING1MT net bags sealed in containerThe goods should be packed suitable for long distance land transportation and for change of climate, well protected against moisture and shocks.9.SHIPPING MARKSN/M10.QUALITY AND WEIGHT INSPECTIONAt the place of shipment (Mongolia), weighing, sampling and analysis shall be carried out by CGL in accordance with standard international practice. Inspection fee shall be for the SELLER’s account. The BUYER has the right to be present or represented at these operations at it's own expense.At the discharging place (China), weighting, sampling analysis shall be carried out by CIQ/CCIC at BUYER's account in accordance with international practices.Inspection fee shall be for the BUYER’s account. The SELLER has the right to be present or represented at these operations at it's own expense.The certificate issued by CIQ/CCIC shall be the final results for negotiation of payment.11.TERM OF PAYMENT*************12.REQUIRED DOCUMENTS FOR CUSTOMS CLEARANCE1) Signed Provisional Commercial Invoice in four originals and one copy, whichindicating Contract No.****************13.CLAIMSIn the event that SELLER is liable for the discrepancies and the BUYER lodges aclaim within Ninety (90) days after discharge of the goods at the destination, suchclaim must be accompanied by an inspection certificate issued by CCIC/CIQ. All expenses (including inspection fees) and losses arising from the return of goods or claims should be borne by the SELLER.14.ARBITRATION***************15.DELAY/NON-DELIVERYIn the event of delay/non-delivery of contractual quantity the SELLER shall bear following duties. In case of delayed delivery, the SELLERS shall pay to the BUYERS for every week of delay a penalty amounting to 0.5% of the total value of the goods whose delivery has been delayed. Any fractional part of a week is to beconsidered as a full week. The total amount of penalty shall not, however, exceed1% of the total value of the goods involved in late delivery and is to be deductedfrom the amount due to the SELLERS by the paying bank at the time of negotiation,or by the BUYERS direct at the time of payment. In case the period of delay exceeds60 days after the stipulated delivery date the BUYERS have the right to terminatethis contract but the SELLERS shall not hereof be exempted from the payment of thepenalty16.LICENSE, TARIFFS, TAXES AND DUTIESAll license, tariffs, taxes and duties whether existing or new on the merchandise andits contents or commercial documents relating thereto shall be borne by BUYER inthe event of their existence in China. Any export relate license, taxes or dutieswhether existing or new levied in the country of origin shall be borne by BILUUTMINING CO., LTD17.FORCE MAJEUREThe SELLER shall not be held responsible for late delivery or non-delivery of thegoods owing to generally recognized "Force Majeure" causes. In such cases, however, the SELLER shall immediately inform the BUYER the accident and air mail to the BUYER within 15 days after the accident, a certificate of the accidentissued by the competent government authorities or the chamber of commerce located at the place where the accident occurs as evidence thereof.18.VALIDATIONThe contract shall become valid as and when signed by duly authorizedrepresentative of both the SELLER and the BUYER.Contract is made by:BUYER:*****************_________________________________SELLER:******_________________________________。

英文担保书模板(共4篇)

英文担保书模板(共4篇)

篇一:父母担保书--中文英文模版父母担保函样本letter of supporting **/**/**** (年月日)to: french embassydear sir or madam,we are the applicant ********s parents and guarantors for his study in france, *****(父亲/母亲名). for better development in the future, my son, ******** decided to go to france for further study. i am willing to provide my savings rmb **0, 000 to support my son. all the money will be transferred to his account in france when he arrived at rennes. we guarantee that our son ****** will have no economic difficulties in france and obey the laws and regulations. i am willing to bear all the responsibility if any problems happen.please give kind consideration to my son *****s visa application. thanks a lot!i hereby to guarantee.***** (申请人父亲/母亲)signature:担保信致:法国大使馆:尊敬的签证官先生/女士:我是申请人***的父亲/母亲兼其在法国留学的担保人。

为了将来更好的发展,我儿子决定去法国进一步深造留学。

产品说明书样本(英文版)

产品说明书样本(英文版)

The first summarizeToday,internal sample of liquid dielectric in the oiltank is performed by ISO3170(GB/T4756-1998)《Petrol liquid product handicraft sample law》.It is impossibly to control accurately sample ually the sample will not be exact.Performing personnels will feel tired as usual because of hardwork.When rain or snow,climb oiltank that is a very dangerous job.When getting a sample at top of oiltank,easily volatile and noxious dielectric will injure someones,at one time,it will not be in favour of environment and the medium of oiltank will be polluted by other things from environment.For solving these problem, we have developed ” The auto control getting sample from oiltank” that according to 《ISO3170(GB/T4756-1998 criterion》,it has achieved that liquid sample at different level of oiltank will be sampled. The machine operation is very simply、very accurate、excellently repeated,it’s structure is simple and it will be install very easily. It will not pollute the environment too. The sample machine has been awarded nationalpatent and the second prize of the sino petrol & chemical industry automation vocation 2010 year. The auto co ntrol getting sample from oiltank , it’s structure is sample, it will be install very easily、it’soperation is very simply、very accurate and it will not pollute the environment. At present, it’s technology has been take the lead in the like product.We have gotten by the auto control getting sample from oiltank the patents and the credits that are:( 1 ) The liquid sample devicment from oiltank, the number of parent is ZL 02208233.6.( 2 ) The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is ZL 200820029965.3( 3 )The sample devicment of Multi-dimensional sampling valve, the number of parent is ZL 200620079363.X( 4 )The multichannel two globe valves, the number of parent is ZL 200720032338.0( 5 ) The nationalpatent and the second prize of the sino petrol & chemical industry automation vocation 2010 yearPatentee’s declaration:About the patents of oil tank sampler:( 1 ) The liquid sample devicment from oiltank, the number of parent is ZL 02208233.6.( 2 ) The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is ZL 200820029965.3( 3 )The sample devicment of Multi-dimensional sampling valve, the number of parent is ZL 200620079363.X( 4 )The multichannel two globe valves, the number of parentis ZL 200720032338.0The 4 items’s using right has been awarded to Lan zhou GuKe chemical plant & apparatus Co.,Ltd by patentee for manufacture and sale. If others will manufacture and sell them ,they will break the law, the patentee will inquire their responsibilityof law and call for economics compensation.The patentee’s signature:The designsketch in fact:The second sampler technology parameter:item parameterCarried standard ISO3170 GB/T 4756-1998《The petroleum liquid handicraft sample method》The third type of sampleThe fourth applicable rangeThe self-tuning oil tank sampler is applicable to liquid medium of oiltank in the petroleum and chemical industry and so on.(for example:gas、kerosene、diesel、white oil、naphtha、crude oil、all kinds of residuum、slops、asphalt、petroleum aromatics、various solvent、thick vitriol、organic acid、lye、beer and so on)’s upper sample、middles ample、lower sample、upper middles lowe’s 1:1:1 uniform combination sample and bottoms ample、exits samples、upper sample and so on.Setting sample at the especial location by users’s require.Can setting 9 point for maxize.The fiveth The self-tuning oil tank sampler’s characteristic and virtue1.Accurate sample locationThe sampler uses the patent technology” The liquid sample from oiltank Multilayer frame means expansion of type of zero gravity, the number of parent is ZL 200820029965.3”.We establish the database of multilayer frame means expansion manufacture parameter by more and more test. We can assure that our multilayer frame means expansion can conquerconnatural weak pointthat can not go up anddown in ratio ofequality by others.Assure every sample connection that been set in multilayer frame means expansion can automatically go up and down in ratio of equality with liquid level, to let it to truely get upper sample、middles ample、lower sample、upper middles lowe’s 1:1:1 uniform combination sample. If multilayer frame means expansion can go up and down in ratio of equality that will decide every connection’s definition of sample.For the drawing-1:the drawing-12. Independence of sample mediumThe sampler uses the patent technology” The sample devicment of Multi-dimensional sampling valve, the numberof parent is ZL 200620079363.X” that is independent shunting plant of multilayer sample in the valve. It can take sample of every location independently shunt to lofting valve and can mix upper sample、middles ample、lower sample by the rate of 1:1:1 and take it to lofting valve, sample personnel can get every independent sample and 1:1:1 uniform combination sample from lofting valve exit.3、Security and reliabilityA) The self-tuning oil tank sampler uses the patent technology” The multichannel two globe valves, the number of parent is ZL 200720032338.0”that can fast cut off the communication of guitar pipe and pipe of outside, make sure that mediu m of oiltank will not leak out.The globe valves’s button run reliably and accurately, it’s operation is simple and convenientB) The sampler only need be operated on the ground, and operationer need not climb to the top of oiltank to sample. Eliminate the danger of climbing in the rain or snow. Eliminate the danger when getting a sample at top of oiltank,easily volatile and noxious dielectric will injure someones. Take humanized and reliable environmental sample come true.4.Reasonable structure and simple operationThe sampler uses the patent technology” The sample devicment of Multi-dimensional sampling valve, the number of parent is ZL 200620079363.X”that take multilayer sample oil pipes scientifically and possibly combine into one of circular operation hand-actuated wheel. Operate the rated hand-actuated wheel to choice sample point. Take complex operation process to simple action.For drawing-2Drawing-25.Hes-cling structure and little leaking pointScience and reasonable The self-tuning oil tank sampler structure, Can the DuoGe sampling output line and a circulation return pipe road high oil chips in cluster. Make DuoGe independent sample line compact from a took over, the output to tank through within the operation of the DuoWei sampling valve ,This compact structure tell the DuoGe lofting, thus greatly reducing valve sealing the number of points. In normal conditions using zero leakage .For drawing-3For drawing-36.Sample pipe road has reverse wash function:The self-tuning oil tank sampler take SKC-HF structure circulating pump But through the cycle of the pump valve or reverse rotation oil change realize tank Sample pipe road, reverse through media Thus will CaiYangGuan way or tank sampling injector mesh on the plugging of dirt reverse wash to tanks, at any time to sampling the pipeline the cleaning 7.Replacement old way of the operation is simple:The self-tuning oil tank sampler used specially developed for sampling convenient and special two tee lofting valve, Made with a conversion between lofting cycle is very simple, just press the valve for the arrows spin an Angle start after circulating pump can.8.Convenient installation:The sampler can be set up special steam heating device, oil tank external sampler components have straight heat conduction heat tracing of. For drawing-4 Use electric heating, in the valve body sampler exclusively electric tracing band through the heating channel, the heating effect ideal. A heating device can be used for the sampler asphalt, and so easy as the medium tank.For drawing-49. Meet of the medium to samplingThe sampler can be set up special steam heating device, oil tank external sampler omponents have straight heat conduction heat tracing of. Use electric heating, in the valve body sampler exclusively electric tracing band through the heating channel, the heating effect ideal. A heating device can be used for the sampler asphalt, and so easy as the medium tank.The sixth. T he self-tuning the composition of the oil tank sampler The self-tuning oil tank sampler The composition of the oil tank sampler as shown in figure 5 shows1, extendable frame; 2, float group; 3, circulating pump 【 manual pump, pneumatic pump 】; 4, sampling combination tube; 5, sampling distribution device; 6, the integrated oil, a choice of the directional control valve, valve, sample combination distribution on a stop valve, no drop leak lofting valve combination together; 7, operation box; 8, adjustable bearing; under the plane 9,small tube resistance metal hoseFor drawing-5The seventh. working principleThe self-tuning oil tank sampler is through the float group in the expansion set drive tank with oil level within the truss and sample, the upper or lower, middle kind, samples and top samples (optional) sampling mouth all fixed in telescopic rack, telescopic frame in liquid is according to the proportion of sampling, ensure that came out of the position accuracy. The sampling location is determined according to the ISO3170 (GB/T4755 1998) "oil liquid product manual sampling method" regulation of sampling location of the design. For drawing-6 showsFor drawing-6Different sample position of the pipeline is independent sample through sampling combination tube transfer to oil chips, again through the DuoWei reversing valve handwheel control of their respective independent leads to the valve, again by lofting lofting valve control lofting or cycle will turn to cycle the valve, start lofting circulation pump can turn number after the part of the old way of pipeline to the bottom of the tank replacement cycle; And then the valve position to rotate lofting lofting, can get the export of lofting valve in the tank is a positionof the sample. Repeat the above。

(全面版)操作说明样本英文版

(全面版)操作说明样本英文版

(全面版)操作说明样本英文版Comprehensive Operating Instructions Sample1. IntroductionThis document serves as a comprehensive guide on how to operate a specific system. It includes detailed steps and instructions to ensure smooth functioning.2. Starting the SystemTo start the system, press the power button located on the front panel. Wait for the system to boot up completely before proceeding to the next step.3. Logging InEnter your username and password in the designated fields. Make sure to use the correct credentials to access the system successfully.4. Main MenuOnce logged in, you will be directed to the main menu. Here, you can navigate through different options using the arrow keys and enter key on the keyboard.5. Selecting an OptionTo select a specific option, highlight it using the arrow keys and press the enter key. This will take you to the corresponding submenu or action.6. Performing ActionsFollow the on-screen instructions to perform various actions within the system. Use the designated keys or buttons to input data or make selections.7. Saving ChangesAfter making any changes or updates, remember to save your work. Look for the save option in the menu and confirm your decision to save the changes.8. Exiting the SystemWhen you are done using the system, navigate to the exit option in the menu. Confirm your decision to exit and log out of the system to ensure security.9. TroubleshootingIf you encounter any issues while operating the system, refer to the troubleshooting section in the user manual. Follow the recommended steps to resolve common problems.10. Additional FeaturesExplore the system to discover additional features and functionalities that can enhance your user experience. Experiment with different options to maximize the system's capabilities.11. ConclusionThis operating instructions sample provides a comprehensive overview of how to operate the system effectively. Refer to this document whenever you need guidance on using the system.。

(完整版)申请表样本中英文对照1

(完整版)申请表样本中英文对照1

(完整版)申请表样本中英文对照1申请表样本中英文对照1申请表样本 - Application Form Sample申请人信息 - Applicant Information:- 姓名(中文):__________________- 姓名(英文):__________________- 性别:__________________- 出生日期:__________________- 国籍:__________________- 住址:__________________- 联系__________________- 电子邮件:__________________教育背景 - Educational Background:- 学位:__________________- 学校:__________________- 专业:__________________- 就读时间:__________________工作经历 - Work Experience:- 公司:__________________- 职位:__________________- 工作时间:__________________ 语言能力 - Language Proficiency:- 中文水平:__________________ - 英语水平:__________________技能 - Skills:- 技能1:__________________- 技能2:__________________- 技能3:__________________奖项与荣誉 - Awards and Honors:- 奖项1:__________________- 奖项2:__________________- 奖项3:__________________推荐人信息 - Referee Information:- 姓名:__________________- 职务:__________________- 单位:__________________- 联系__________________声明 - Declaration:我确认以上提供的信息真实有效,并同意遵守申请相关规定。

英文请假邮件

英文请假邮件
篇三:英语请假条的书写格式及范文
请假条是请求领导或老师或其它,准假不参加某项工作、学习、活动的文书。
鉴于许多同学和工作的朋友对请假条的写法及格式比较模糊,本站精选4篇关于请假条格式请假条范文/范本,供参考:
通用请假条格式
请假条一般应包括以下几个部分:正文的第一行最中间应写上“请假条”字样。
I am feeling very bad.I can't study freely in class .I went to see a doctorin the hospital.He gave me some medicine and asked me to stay in bed for two days .So I'm sorry to ask you two days leave. I hope you can ratify my ask. Thank you very much.
I''''m sorry I can''''t go to school today. I helped the farmers pick apples with my classmates on the farm yesterday. Unluckily, I fell off the ladder and hurt my leg, but I wasn''''t badly hurt. The doctor asked me to stay in bed and have a good rest. So I ask for leave for two days. Wang Li

英文2024年标准化保密合同样本NDA模板版

英文2024年标准化保密合同样本NDA模板版

20XX 专业合同封面COUNTRACT COVER甲方:XXX乙方:XXX英文2024年标准化保密合同样本NDA模板版本合同目录一览1. 定义与解释1.1 定义1.1.1 保密信息1.1.2 受让人1.1.3 披露方1.1.4 商业秘密1.2 解释2. 保密信息的披露2.1 披露方的义务2.2 受让人的义务2.3 保密信息的接收与保管3. 保密期限3.1 保密期限的定义3.2 披露方的保密期限3.3 受让人的保密期限4. 保密信息的范围4.1 技术信息4.2 商业信息4.3 财务信息4.4 其他保密信息5. 保密信息的例外5.1 公开信息5.2 获取信息的方式5.3 法律义务6. 违约责任6.1 违约的定义6.2 违约的后果6.3 赔偿责任7. 法律适用与争议解决7.1 法律适用7.2 争议解决方式8. 合同的生效、修改与终止8.1 合同的生效条件8.2 合同的修改8.3 合同的终止9. 合同的转让9.1 转让的条件9.2 转让的通知10. 合同的附件10.1 附件的定义10.2 附件的效力11. 合同的完整性11.1 合同的组成部分11.2 合同的补充12. 合同的违约12.1 违约的定义12.2 违约的处理13. 合同的解除13.1 解除的条件13.2 解除的后果14. 合同的终止14.1 终止的条件14.2 终止的后果第一部分:合同如下:第一条定义与解释1.1 定义1.1.1 保密信息保密信息是指在合同期间披露方披露给受让人的,且未公开的、具有商业价值的信息,包括但不限于技术信息、商业信息、财务信息等。

1.1.2 受让人受让人是指接受披露方保密信息的一方,其在合同中承诺对保密信息进行保密。

1.1.3 披露方披露方是指向受让人披露保密信息的一方,其在合同中承诺对受让人的保密义务。

1.1.4 商业秘密商业秘密是指不为公众所知悉、能为披露方带来经济利益、具有实用性并经披露方采取保密措施的技术信息和经营信息。

信用证样本(中英文对照)

信用证样本(中英文对照)

信用证样本(中英文对照.信用证样本.以下信用证内容源自华利陶瓷厂与一塞浦路斯客户所开立并顺利支付的信用. TO:BAN.O.CYPRU.LT.LETTER.O.CREDI.DEPARTMEN.MERCIA.OPERATION.CENTE.INTERNATIONA.DIVISIO.*****.*****.TEL:*****.FAX:*****.TELEX:245..493.KYPRI.C.SWIFT:BCYPCY2.DATE:2.MARC.200.APPLICATIO.FO.TH.ISSUANC.O..LETTE.O.CREDI.SWIF.MT70.SEN.TO:MT700转送.STANDAR.CHARTER.BAN.UNI.1-.52/.SHU.NIN.SQUAR.MERCIA.CENTRE,SHE.NA.ROA.EAST,SHENZHE.51800..CHIN.渣打银行深圳分.深南东路5002.信兴广场地王商业大厦52楼1-8单.电话.8246168.:27.SEQUENC.O.TOTAL序列.1/.指只有一张电.:40A.FOR.O.DOCUMENTAR.CREDIT跟单信用证形.IRREVOCABL.不可撤消的信用.:20OCUMENTAR.CREDI.NUMBER信用证号.00143-01-005355.:31C.DAT.O.ISSUE开证.如果这项没有填, 则开证日期为电文的发送日期.:31DAT.AN.PLAC.O.EXPIRY信用证有效.05062.I.CHIN.050622在中国到.:50.APPLICAN.信用证开证审请.******.NICOSI.较对应同发票上是一致.:59.BENEFICIAR.受益.CHAOZHO.HUAL.CERAMIC.FACTOR.FENGY.INDUSTRIA.DISTRICT.GUXIAN.TOWN.CHAOZHO.CITY,GUANGDON.PROVINCE,CHINA.潮州华利陶瓷洁具.:32B.CURRENC.CODE,AMOUN.信用证项下的金.USD***7841,8.:41D:AVAILABL.WITH....BY....议付适用银.STANDAR.CHARTERE.BAN.CHIN.AND/O.A.BELO.渣打银行或以下.B.NEGOTIATIO.任何议付.:42CRAFT.A.开汇.SIGH.即.:42A.RAWE.付款.BCYPCY2NO1.BAN.O.CYPRU.LT.塞浦路斯的银行.:43PARTIA.SHIPMENT.是否允许分批装.NO.ALLOWE.不可.:43T:TRANSHIPMENT转.ALLOWED允.:44AOADIN.O.BOARD/DISPATCH/TAKIN.I.CHARG.AT/FROM...装船港.SHENZHE.PORT深.:44B:FO.TRANSPORTATIO.T.目的.LIMASSO.PORT发票中无提.:TES.DAT.O.SHIPMENT最后装船.05060.:045.ESCRIPTIO.O.GOOD.AND/O.SERVICE.货物/服务描.SANITAR.WAR.陶瓷洁....SHENZHE.PORT,INCOTERM.200.fob深圳港, INCOMTERM.200.:046.OCUMENT.REQUIRE.须提供的单据文.*FUL.SE.(A.LEAS.THREE.ORIGINA.CLEA.SHIPPE.O.BOAR.BILL.PAN.LTD,CYPRUS,NOTIF.PARTIE.APPLICAN.AN.OURSELVES,SHOWIN.全套清洁已装船提单原件(至少三份), 作成以“塞浦路斯股份有限公司”为抬头.通知开证人和我们自己, 注.*FREIGH.PAYABL.A.DESTINATIO.AN.BEARIN.TH.NUMBE.O.THI.CREDIT.运费在目的港付注明该信用证号.*PACKIN.LIS.I..COPIES.装箱单一式三.*PANY/CARRIE.O.THEI.AGEN.STATIN.TH.B/.NO(S.AN.TH.VESSEL(S.NAM.CERTIFYIN.THA.TH.CARRYIN.VESSEL(S.IS/ARE.A.HOLDIN..VALI.SAFET.MANAGEMEN.SYSTE.CERTIFICAT.A.PE.TERM.O.INTERNATIONA.SAFET.MANAGEMEN.COD.AN.B.CLASSIFIE.A.PE.INSTITUT.CLASSIFICATIO.CLAUS.01/01/200.B.A.APPROPRIAT.CLASSIFICATIO.SOCIET.由船公司或代理出有注明B/L号和船名的证明书证明他们的船是.A)持有根据国际安全管理条款编码的有效安全管理系统证书..B)由相关分级协会根据2001年1月1日颁布的ICC条款分类的.*D11,202,7.I..COPIE.DUL.SIGNE.B.TH.BENEFICIARY/IES.STATIN.THA.TH.GOOD.SHIPPED.A)AR.O.CHINES.ORIGIN.B)AR.I.ACCORDANC.WIT.BENEFICIARIE.PROFORM.INVOIC.NO.HL05030.DATE.07/03/05.由受益人签署的商业发票总额USD11,202,70一式四份,声明货物运输.A)原产地为中.B)同号码为HL05030.开立日.07/03/05的商业发票内容一.:047A.ADDITIONA.CONDITIONS附加条..TH.NUMBE.AN.DAT.O.TH.CREDI.AN.TH.NAM.O.OU.BAN.MUS.B.QUOTE.O.AL.DRAFT.(I.REQUIRED).信用证号码及日期和我们的银行名必须体现在所有单据上(如果有要求.*TRANSPOR.DOCUMENT.T.B.CLAUSED.’VESSE.I.NO.SCHEDULE.T.CAL.O.IT.CURPEN.VOYAG.A.FAMAGUSTA,KYRENT.O.KARAVOSTASSI.CYPRUS.运输单据注明.船在其航行途中不得到塞***的Famagusta.Kyrent.o.Karavostassi这些地. *INSURANC.WIL.B.COVERE.B.TH.APPLICANTS.保险由申请人支.*NGUAGE.所有单据由英文缮.*NEGOTIATION/PAYMENT:UNDE.RESERVE/GUARANTE.STRICTL.保结押汇或是银行保. PROHIBITED.禁.*D80.FO.EAC.SE.O.DISCREPAN.DOCUMENT.PRESENTE.UNDE.THI.CREDIT,WHETHE.ACCEPTE.O.NOT,PLU.OU.CHARGE.FO.EAC.MESSAG.CONCERNIN.REJECTIO.AND/O.ACCEPTANC.MUS.B.BORN.B.BENEFICIARIE.THEMSELVE.AN.DEDUCTE.FRO.TH.AMOUN.PAYABL.T.THEM.修改每个单据不符点费用将扣除80美元(最多40.*I.TH.EVEN.O.DISCREPAN.DOCUMENT.AR.PRESENTE.T.U.AN.REJECTED,W.MA.RELEAS.TH.DOCUMENT.AN.EFFEC.SETTLEMEN.UPO.APPLICANT’.WAIVE.O.SUC.DISCREPANCIES,NOTWITHSTANDIN.AN.COMMUNICATIO.WIT.TH.PRESENTE.THA.W.AR.HOLDIN.DOCUMENT.A.IT.DISPOSAL,UNLES.AN.PRIO.INSTRUCTION.T.TH.CONTRAR.AR.RECEIVED.如果不符点是由我方提出并被拒绝,我们将视为受益人放弃修改这个不符点的权利.是说你如果提交了有不符点的单据并且被银行拒付的话,如果客人接受这些不符点.银行在没有收到你们的指示之前有权把单据REALSE给客.*TRANSPOR.DOCUMENT.BEARIN..DAT.PRIO.T.TH.L/.DAT.AR.NO.ACCEPTABLE.早于开证前的运输文件不接.*D3363.81(T.E.3.PERCEN.O.INVOIC.VALUE.BETWEE.L/.AMOUN.AN.INVOICE.AMOUN.REPRESENT.AMOUN.PAI.B.APPLICANT.DIREC.T.BENEFICIARIE.OUTSID.TH.L/.TERM.WITHOU.AN.RESPONSIBILIT.O.OURSELVE.AN.T.B.SHOW.O.INVOICE.A.SUCH.L/C跟发票上USD3363.81的差额(30%发票额)由申请人直接用L/C以.的方式直接给予受益.:71B.CHARGE.BAN.CHARGE.OUTSID.CYPRU.INCLUDIN.THOS.O.TH.REIMBURSIN.BAN.AR.FO.BEN.A/C.在塞浦路斯以外银行产生的费用包括支付行的费用由信用证收益人负担.:48.PERIO.FO.PRESENTATIO.单据提交期.DOCUMENT.MUS.B.PRESENTE.WITHI.2.DAY.AFTE.B/LADIN.DATE,BU.WITHI.TH.VALIDIT.O.TH.CREDIT.在信用证有效期内,最迟装运期后21天内,向银行提交单. :49:CONFIRMATIO.INSTRUCTIONS保兑指.WITHOU.不保.:53A.REIMBURSIN.BANK偿付.BCYPGB2.BAN.O.CYPRU.U.INTERNATIONA.DEPARTMENT.87/9.CHAS.SIDE,SOUTHGAT.N1.5B.LONDO..UNITE.KINGDOM.:78.INSTRUCTION.T.TH.PAY/ACCEP/NE.BAN.议付.NEG.O.DOC.THR.BAN.O.CHIN.LIMITE.CHIN.I.ALLOWED.PLEAS.可通过中国银行议付,.D15,0.(是15还是1500,请指明. 于受益人的帐户中扣去USD15,0.REPRESENTIN.RECORDIN.FEES.NEGOTIATIO.BAN.T.OBTAI.作为记录费.REIMBURSEMEN.FRO.OU.ACCOUN.WIT.REIMBURSIN.BAN..BUSINES.DAY.FOLLOWIN.THEI.AUTHENTICATE.TELEX/.STATIN.A.OU.CREDI.NUMBER.B)AMOUN.CLAIMED.C.VALU.O.DOCUMENT.D)SHIPMENT/DISPATC.DAT.AN.E)THA.DOC.AR.I.STRIC.,BAN.O.APN.LTD,MERCIA.OPER.CENTE.INTERN.DIV..1.KYRIACO.MATS.AV.108.AY.OMOLOYITES,NIGOSIA.CYPRUS,AL.DOC.I.ON.LO.B.COURIE.SERVIC.A.BENEFICIARIE.EXPENSE.所有单据应由偿付行于三个工作日内通过快件形式发给我们,费用由受益人承担. :RMATIO.附.CREDI.I.SUBJEC.T.U.C.P.199.本信用证根据跟单信用证统一惯例UCP500(199.年版)开.I.C..PUBL.NO.500.SUBJEC.T.UR.IC.525.COLLEC.YOU.CHARGE.FRO.BENE.PLEAS.ACKN.RECEIPT.CUMSTOMER’.APPROVAL.Welcome To Download欢迎您的下载, 资料仅供参考!。

在职证明英文填写模板_证明书_

在职证明英文填写模板_证明书_

在职证明英文填写模板在职证明是我国公民在日常生产生活经营活动中,所需要的对个在职情况及收入的一种证明,一般在办理主要是出国签证使用。

在职证明很多人都会写。

但英文版的在职证明又怎么写呢?下面小编为大家收集整理了在职证明英文填写模板,供大家参考。

篇一:在职英文版CERTIFICATEDate: month day, yearSeries (97): 001This is to certify that Name, has been a teacher of Subject at Taipei County Hai-Shan High School since Date, and is still a member of our faculty.Name:National ID No.Date of Birth:Sung-Hsi WuPrincipalTaipei County Hai-Shan High School篇二:在职证明书英文版CERTIFICATE______________:This is to certify that -x(姓名) (passport NO. ---x (护照号))is employed by our firm since --x(雇用年月). His/Her current income monthly is RMB -(月收入).We hereby confirm he/she is going to (所去国家) on travel. From XX TO XXX(旅游起始日期).We further guarantee -x (姓名)will comply with local law and regulation during her or his stay in (所去国家) and will also be back on time, meanwhile, we are willing to retain her or hisposition until she or he comes back .This certificate is issued to facilitate him/her application for a visa for such a visit .公司名称日期盖章公司地址:电话:联系人:篇三:在职证明(中英)签证用TO: VISA SECTIONDear Sirs,Mr. / Ms. XXX (申请人姓名) works in our company from XX.XX.XXXX(现单位入职时间某年某月某日).He/She will be on traveling purposes visiting your country in XX.XXXX (出国时间某年某月). All the expenses include air tickets, transportation, accommodation and health insurance will be covered by himself / herself. He/She will be back on time as per his/her schedule planned and shall continue to work in our company after his/her visit to AustraliaName Date of Birth Passport-No. Position Annual IncomeXXXX XXXXXX GXXXXXX XXXX XXXXYour kind approval of this application will be highly appreciated.Best Regards,Name of the leader(领导人姓名)Position of the leader(领导人职位)Signature (领导的签名)Company’s Stamp(公司盖章)Tel: XXX-XXXXXXAdd: XXXXXXCompany Name: XXXXXX注:1. 在职证明需打印成英文,请删掉参考样本中所有中文的提示语,保持在职证明为全英文格式2. 凡样本中XX的地方,均需相应填写您的相关信息,不要保留XX在完成后的在职证明中3.括号中为我们为您更加清晰在职证明的内容而标注的解释,不要保留在完成后的在职证明中4.请不要将“附件1:英文在职证明参考样本”字样保留在完成的在职证明中致:签证官XXX 先生/女士自X年X月X日(现单位入职时间某年某月某日)在我们公司工作。

标准成绩单英文版样本

标准成绩单英文版样本

UNDERGRADUATE ACADEMIC RECORD OF ANHUI UNIVERSITY OF SCIENCE AND TECHNOLOGYSchool: School of Mechanical EngineeringMajor: Mechanical Design Manufacture and AutomationClass: MDMA 13-2Date of Entrance: 11/09/2013Date of Graduation: 01/07/2017Identity Card No.:XXXXXXXXPhotoCourse Credit Category Score Course Credit Category Score 1st Semester of 2013-2014Situation and Policy III 0.0 PC 85 Mental Health Education of College Students 1.0 PC 90 Problem Solving Strategies of Calculus 2.0 PO 60 College English I 4.0 PC 91 Electrical and Electronic Training 3.5 Inter 91Student ID: XXX Name: XXX Grade: 2013 Length of Schooling: 4 years Level: Undergraduate Advanced Mathematics I -1 5.5 PC 94 Metalworking Practice I 2.0 Practice 88 Introduction of Computer Technology 2.5 PC 91 Electrical Technology and Electrical Engineering 3.5 Practice 85 Military Theory 1.0 PC 92 Engineering Chemistry 2.0 MC 91 Basketball 2.0 PC 86 Theoretical Mechanics II 4.0 MC 89 Moral Education and Basics of Law 3.0 PC 79 2nd Semester of 2014-2015Situation and Policy I 0.0 PC 90 College English IV 4.0 PC 80Credits (MC) Major Compulsoiy: 34 (MO) Major Optional: 27.5 (PO) Public Optional: 27.5 (Core) Major core course: 13.5 (PC) Public Compulsory: 76.5 (Practice) Practice course: 36 (Inter) Interdisciplinary optional: 6 Outline of Modern Chinese History 2.0 PC 91 An Introduction to Socialism with Chinese Characteristics II 3.0 PC 95 Descriptive Geometry and Mechanical Graphing I 4.0 MC 92 Situation and Policy IV 0.() PC 89 2nd Semester of 2013-2014Program Design of Multimedia Interactive Art 2.0 PO 83 The C Programming Language 3.5 PC 87 The Life of Law 1.0 PO 98 Career Planning 1.0 PC 90 Auto CAD 1.5 MO 89 College Physics I 4.0 PC 82 Curriculum Design of Principle of Mechanics 2.0 Practice 92 Experiment of College Physics I 1.5 PC 80 Mechanics of Materials II 4.5 MC 83 College English II 4.0 PC 83 Principle of Mechanics 3.5 MC 94 Advanced Mathematics I -2 6.0 PC 100 Numerical Methods 2.0 MC 94 Basketball 2.0 PC 89 I s* Semester of 2015-2016Basic Principles of Marxism 3.0 PC 82 Tennis 2.0 PC 84Seal of School of MechanicalEngineering31/01/2018 Situation and Policy 11 0.0 PC 76 Situation and Policy V 0.() PC 88 Practice of Engineering Drawing 1.() Practice 94 European Integration 1.() PO 99.76 Descriptive Geometry and Mechanical Graphing II 2.5 MC 95 Appreciation and Design of Ancient Chinese Architecture 1.() PO 100 l s, Semester of 2014-2015An Introduction to Coal Mining 1.5 MO 81 College Physics II-l 3.0 PC 96 Mechanical Digital Design Technology 2.0 MO 82Seal of Office of Academic Affairs31/01/2018 Experiment of College Physics II 1.5 PC 73 Fluid Mechanics I 2.5 MO 91 College English III 4.0 PC 81 Hydraulic and Pneumatic Transmission III 2.0 MO 91 Probability and Mathematical Statistics 3.0 PC 85 Application of Creativity 1.5 MO 84 An Introduction to Socialism with Chinese Characteristics I 3.0 PC 87 Comprehensive Experiment of Mechanical Basis 1.0 Practice 80 Linear Algebra 2.0 PC 94 Curriculum Design of Mechanical Designing 3.() Practice 85UNDERGRADUATE ACADEMIC RECORD OF ANHUI UNIVERSITY OF SCIENCE AND TECHNOLOGY Date of Graduation: 01/07/2017Identity Card No.: XXXXXXXXXPhotoCourse Credit Category Score Course Credit Category Score Fundamental Theory of Material Molding 2.0 Core 78 Mining Machinery I 2.5MO 88 Engineering Materials I 2.5 MC 90 Mold Design 2.0 MO 84 Inlerchangeabilily and Technical Measurement 2.5 MC 81 Modern Integrated Manufacturing System 2.0 MO 66Student ID: XXX Name: XXX Grade: 2013 Length of Schooling: 4 years Level: Undergraduate Mechanical Designing 3.5 MC 78 Hydraulic Transmission System 2.0 MO 82 2nd Semester of 2015-2016Mechanical Designing of Professional Course 4.0 MO 86 Employment Guidance 1.0 PC 87Basketball 2.0 PC 81Situation and Policy VI 2.0 PC 87 2nd Semester of 2016-2017Contemporary Chinese Govcrnnicnt and Politics 1.() PO 99 Graduation Project 14.0 85Credits (MC) Major Compulsory: 34 (MO) Major Optional: 27.5 (PO) Public Optional: 27.5 (Core) Major core course: 13.5 (PC) Public Compulsory: 76.5 (Practice) Practice course: 36(Inter) Interdisciplinary optional: 6 Classical Tang Poems and Chinese Cultural Tradition 1.0 PO 99 Graduation Practice 2.0 90 Fine Relics and Chinese Civilization 1.0 PO 99Measurement Technology 2.5 Inter 92Introduction to Control Engineering II 2.0 MO 87Production Practice 3.0 Practice 92Technology of Mechanical Manufacture 2.5 Core 94Automation of Mechanical Manufacture Equipments 2.5 Core 83Cutting Principle and Tool Design 2.5 Core 95Numerical Control Technology II 2.0 Core 87Advanced Manufacturing Technology 2.0 Core 74Basis of Thermodynamics and Heat Transmission 2.5 MC 93Seal of School of MechanicalEngineering 31/01/2018I s* Semester of 2016-2017Logic and Critical Thinking 2.0 PO 98.6 Engineering Mathematics Software (MATLAB) 1.5 MO 91 Professional English tor Mechanical Engineering 1.5 MO 95 Precision and Special Processing 1.5 MO 86Seal of Office of Academic Affairs31/01/2018 Scientific and Technological Literature Retrieval 1.5 MO 80Title of Graduation Project (Thesis): Design of New Multifunctional Sickbed Grade of Graduation Project (Thesis): 85 Credit Requirement of the ProgramGPA: 3.74Average Score: 87.39Transfer Information:School: School of Mechanical EngineeringMajor: Mechanical Design Manufacture and Automation Class: MDMA 13-2Date of Entrance: 11 /09/2013。

英文版销售合同样本(分享)3篇

英文版销售合同样本(分享)3篇

英文版销售合同样本(分享)3篇篇1Sales ContractThis Sales Contract (“Contract”) is made and entered into as of [Date], by and between [Seller], with its principal place of business at [Address] (hereinafter referred to as “Seller”), and [Buyer], with its principal place of business at [Address](he reinafter referred to as “Buyer”).1. Agreement to Sell: Seller agrees to sell, transfer, and deliver to Buyer, and Buyer agrees to purchase the following goods (“Goods”):Description of Goods: [Description]Quantity: [Quantity]Price: [Price]Total: [Total]2. Delivery: Seller shall deliver the Goods to Buyer at [Delivery Address] on or before [Date]. Risk of loss or damage to the Goods shall pass to Buyer upon delivery.3. Payment: Buyer shall pay Seller the total amount of [Total] in the following manner:- [Payment Method 1]: [Amount] due upon signing of Contract- [Payment Method 2]: [Amount] due upon delivery of Goods4. Inspection and Acceptance: Buyer shall inspect the Goods upon delivery. Any defects or discrepancies must be reported to Seller within [Number] days of delivery.5. Warranties: Seller warrants that the Goods are free from defects in materials and workmanship. Any claims for breach of warranty must be made within [Number] days of delivery.Sell er’s liability under this warranty shall be limited to the repair or replacement of defective Goods.6. Governing Law: This Contract shall be governed by the laws of [State/Country]. Any disputes arising under this Contract shall be resolved by arbitration in [City, State/Country].IN WITNESS WHEREOF, the parties have executed this Contract as of the date first above written.[Seller]By: ___________________________Name: _________________________Title: __________________________[Buyer]By: ___________________________Name: _________________________Title: __________________________This Sales Contract is the entire agreement between the parties and supersedes all prior negotiations, representations, or agreements. This Contract may not be amended except in writing signed by both parties.篇2Sales ContractThis Sales Contract (the "Contract") is entered into on this 1st day of January, 2023, by and between XYZ Company, with its principal place of business located at 123 Main Street, City, State, Zip Code, hereinafter referred to as the "Seller," and ABC Company, with its principal place of business located at 456Market Street, City, State, Zip Code, hereinafter referred to as the "Buyer."Whereas, the Buyer wishes to purchase certain goods from the Seller, and the Seller wishes to sell such goods to the Buyer, both parties hereby agree to the following terms and conditions:1. Description of Goods: The Seller agrees to sell, and the Buyer agrees to purchase, the following goods: [insert detailed description of goods including quantity, quality, specifications, and any other relevant information].2. Price and Payment Terms: The total purchase price for the goods listed above shall be $100,000, payable in full by wire transfer within 30 days of the date of this Contract. The Buyer shall be responsible for any bank fees associated with the wire transfer.3. Delivery and Acceptance: The Seller shall deliver the goods to the Buyer within 15 days of receiving payment. The Buyer shall inspect the goods upon delivery and notify the Seller of any defects or discrepancies within 5 days.4. Risk of Loss: The risk of loss or damage to the goods shall transfer from the Seller to the Buyer upon delivery.5. Warranty: The Seller warrants that the goods shall be free from defects in materials and workmanship for a period of 6 months from the date of delivery. If any defects are discovered during this period, the Seller shall either replace the goods or provide a refund at its discretion.6. Governing Law: This Contract shall be governed by and construed in accordance with the laws of the State of [insert state].In witness whereof, the parties have executed this Contract as of the date first written above.XYZ CompanyBy: __________________________Title: _________________________ABC CompanyBy: __________________________Title: _________________________This Sales Contract is hereby accepted by both parties as of the date first written above.【Note: This is just a sample contract and should be modified as necessary to fit the specific needs and circumstances of the parties involved. It is recommended to consult with a legal professional before finalizing any sales contract.】篇3Sample Sales ContractThis Sales Contract (“Contract”) is entered into on [Date] by and between [Seller’s Name], with a place of business at [Seller’s Address], and [Buyer’s Name], with a place of business at [Buyer’s Address].1. Scope of AgreementThe Seller agrees to sell and the Buyer agrees to purchase the following goods under the terms and conditions set forth in this Contract:- [Description of Goods]- [Quantity]- [Price]2. DeliveryThe Seller shall deliver the goods to the Buyer’s address on or before [Delivery Date]. The Buyer agrees to accept delivery of the goods on the specified date.3. PaymentThe Buyer shall pay the Seller the total purchase price of [Amount] in [Currency] upon delivery of the goods. Payment shall be made by [Payment Method].4. WarrantiesThe Seller warrants that the goods will be free from defects and conform to the description provided. The Buyer has the right to inspect the goods upon delivery and notify the Seller of any defects within [Number] days.5. LiabilityThe Seller shall not be liable for any damages or claims arising from the Buyer’s use of the goods. The Buyer assumes all risks associated with the use of the goods.6. Governing LawThis Contract shall be governed by the laws of [Country]. Any disputes arising from the Contract shall be settled through arbitration in [City], [Country].7. Entire AgreementThis Contract constitutes the entire agreement between the parties with respect to the sale of the goods and supersedes any prior agreements or understandings.IN WITNESS WHEREOF, the parties hereto have executed this Contract as of the date first above written.[Seller’s Signature] [Buyer’s Signature][Print Name] [Print Name]This Sales Contract is hereby accepted and agreed to by the parties:[Seller’s Name] [Date][Buyer’s Name] [Date]This is a sample sales contract and should be reviewed by legal counsel before use.。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

3Scientific management is a necessary condition forQuality Guarantee design capacity, superior manufacturing tech-nology and perfect testing devices ensure our stable and reliable high-quality products. The IP PROTECTION grades of all our products are IP 65; also 3C, CE, TUV and CCS (China Clas-sification Society (CCS) Certificate) certifica-tions have been achieved.We have eight production lines and 40 or so professional processing and testing equipments from raw materials the analysis to product performance tests. Mak-ing use of advanced equipments to make testsSophisticated equipment is quality assurance Because of our strong R&D power and advanced moduleTAYEE wons customers’ recognition via its major advantage ofcustomized demands for usersMulti-variety High-quality Products9J D S e r i e s S i g n a l T o w e r Upholding the classical European design style,the JD series signal tower shows its ingenuity.Persistently pursuing the high standard of TAYEE, the International Protection of all its products achieves IP65. It can be used unlimitedly i n t h e a p p l i c a t i o n o f v a r i o u s i n d u s t r i e s.The outer covering of JD series signal tower is made of high-quality materials, with sound color and phonic performance. It will not fade nor beworn even after long-term utility; also, it’s pressure-proof and shock-resistant.Free combination can be adopted as the system-atized building block method of JD series signaltower. Its special vibration-proof design enhancesthe avoidance of the damage of vibration to prod-ucts and thus improves their lifespan. The lightsource can operate 100 thousand hours under ormal environments and daily maintenance is not needed. 3 types of products Single: 50mm 70mm 90mm 150mm Building block: 50mm 70mm 90mm Assembly: 36mm 50mm 4 kinds of light sources: LED, super LED, incandescentlamp and xenon lamp4 kinds of luminous modes: constant, frequentlyflash, converting flash and adjustable5 colors: red, green, yellow, white and blue12 kinds of voices 15 kinds of accessoriesMulti-variety High-quality Products TYZC series socket box10The main body of TYZC Series modular socket box adopts TYBOX sealed boxand is complemented by Germany Walter CEE socket. The socket box has theMulti-variety High-quality Products X42 Series Limit Switch13Multi-variety High-quality ProductsJ42 Series Terminal Blocks14J42 series terminal blocks can be divided into general terminals, ground terminals,test terminals, fuse terminals and blade breaking terminals.15Multi-variety High-quality ProductsLA42 Series Push Buttons16LA42 series push buttons can be divided into circular shape buttonsand square buttons. The button consists of a contact module, a baseand a button head. The three components adopt the internationally-recognized non-tightening interlock connection that results in safety,Multi-variety High-quality ProductsMulti-variety High-quality ProductsCompact in size and complete in specification, LA42(S) series Ø16 push but-tons fairly suit for the sites with the requirements of compact control panel and integrated control. Combining the attributes of quite a lot of overseas switches, this product has filled in the blank of our domestic low-pressure electric appliance switches: the long-term longing of the achieving of deli-cacy and compactness. This product is adaptable to the industries of digital control machine tool and automation.The conductivity contact bridge of this product adopts high-quality alloy material, and together with the gold-plate terminals, reliability at make-break can be ensured at low current sites and its lifespan can be enlarged at high current site. Plated with industrial gold, the oxidation of contacts can be efficiently prevented; also, the electric current can be 10 times that of normal working current. Sealing devices are added to the structure of the whole series buttons, and the protection grade of the product achieves IP65, as a result of which, sprinkle-drenched water, vapor or conductive dust at sites cannot enter into the switch and thus avoids the happening of ionization between contacts as well as electric breakdown. Therefore, safety and reli-ability can be ensured at working environments, even under harsh22excellent outcomes in numerous major and key engineering.Our Customers。

相关文档
最新文档