合同清单报价费用增加申请函
合同费用增加申请书
合同费用增加申请书英文回答:Application for an Increase in Contract Fees.I am writing to request an increase in contract feesfor the project that I am currently working on. The initial contract was signed six months ago, and since then, there have been several unforeseen circumstances that have significantly impacted the scope and complexity of the project. As a result, I believe it is necessary to adjust the contract fees to adequately compensate for the additional work and expenses incurred.Firstly, there have been numerous changes in theproject requirements and specifications. The clientinitially provided a detailed project brief, but as the project progressed, they requested several modifications, which required additional time and resources to implement. These changes were beyond the scope of the originalcontract and have caused delays and increased workload.Secondly, there have been unexpected challenges and obstacles that have arisen during the course of the project. For example, we encountered technical difficulties while integrating a new software system, which required the involvement of specialized consultants and additional expenses. These unforeseen circumstances have placed a significant strain on our resources and have impacted the project timeline.Furthermore, the project has also experienced delaysdue to external factors beyond our control. For instance, there were delays in receiving necessary approvals from regulatory authorities, which resulted in a longer project duration and increased costs. These external factors were not accounted for in the original contract and have added significant financial burden to our organization.In light of these circumstances, I kindly request an increase in the contract fees to reflect the additional work, resources, and expenses that have been incurred. Ibelieve that it is fair and reasonable to adjust the contract fees to ensure that our organization is adequately compensated for the extra efforts and costs associated with this project.Thank you for considering my request. I look forward to discussing this matter further and reaching a mutually beneficial agreement.中文回答:合同费用增加申请书。
合同加价申请书
尊敬的甲方:您好!我司与贵司于[日期]签订的《[合同名称]》合同编号为[合同编号],合同标的为[合同标的],合同总价为[合同总价]。
根据合同约定,合同履行期间如遇政策性调整、市场价格波动等因素导致成本上升,双方应协商解决合同价格调整问题。
现因以下原因,我司特向贵司申请合同加价,具体如下:一、政策性调整因素1. 依据[政策名称]规定,自[政策实施时间]起,我司生产[合同标的]所需原材料价格上调[上调幅度]%。
2. 依据[政策名称]规定,自[政策实施时间]起,我司生产[合同标的]所需能源费用上调[上调幅度]%。
二、市场价格波动因素1. 自合同签订以来,我司生产[合同标的]所需原材料市场价格持续上涨,涨幅达到[涨幅]%。
2. 自合同签订以来,我司生产[合同标的]所需能源费用市场价格持续上涨,涨幅达到[涨幅]%。
三、其他因素1. 由于[其他因素],导致我司生产[合同标的]的成本上升。
2. 由于[其他因素],导致我司生产[合同标的]的效率降低,进而导致成本上升。
鉴于以上原因,我司认为合同价格已无法覆盖实际成本,为维护双方合法权益,现申请对合同价格进行如下调整:1. 原合同总价为[合同总价],现申请调整为[调整后总价]。
2. 调整后的合同总价中,包含政策性调整因素、市场价格波动因素及其他因素导致的成本上升。
为确保双方权益,我司建议如下:1. 双方就合同价格调整事宜进行友好协商,达成一致意见。
2. 如协商不成,双方可依法向相关仲裁机构申请仲裁。
3. 在合同价格调整期间,双方应继续履行合同约定的各项义务。
我司承诺,在合同价格调整期间,将严格按照合同约定,确保[合同标的]的质量和交货时间。
敬请贵司予以考虑,并给予回复。
如需进一步沟通,我司随时愿意配合。
感谢贵司对我司的信任与支持,期待双方在本次合同加价事宜上达成共识,共同维护双方合法权益。
此致敬礼!申请人:[申请人名称]法定代表人:[法定代表人姓名]联系电话:[联系电话]电子邮箱:[电子邮箱]申请日期:[申请日期]。
费用增加申请书格式
尊敬的[部门负责人姓名]:申请部门:[部门名称]申请人:[申请人姓名]申请日期:[年月日]一、申请背景随着公司业务的发展和市场环境的不断变化,我部门在[具体项目/业务]方面的运营成本有所增加。
为了确保项目的顺利进行和业务的持续发展,特向贵部门申请增加相应费用。
现将具体情况说明如下:二、费用增加原因1. 市场价格波动:近期,原材料价格、运输费用等市场因素发生波动,导致我部门在[具体项目/业务]方面的直接成本上升。
2. 技术升级:为提高产品品质和降低生产成本,我部门计划对现有设备进行技术升级,预计将产生一笔较大的投资。
3. 人力资源需求:随着业务量的增加,我部门需要招聘更多专业人才,以满足项目需求,从而产生人力成本增加。
4. 安全保障投入:为保障员工生命财产安全,我部门计划增加安全设施投入,以降低潜在风险。
三、费用增加预算根据以上原因,我部门对费用增加进行如下预算:1. 原材料及运输费用增加:预计增加[金额]元。
2. 设备技术升级投资:预计增加[金额]元。
3. 人力资源成本增加:预计增加[金额]元。
4. 安全保障投入:预计增加[金额]元。
总计:预计增加[金额]元。
四、费用使用计划1. 原材料及运输费用:用于购买优质原材料和优化运输方式,降低生产成本。
2. 设备技术升级投资:用于购买先进设备,提高生产效率,降低能耗。
3. 人力资源成本:用于招聘专业人才,提高团队整体实力。
4. 安全保障投入:用于购买安全设施,保障员工生命财产安全。
五、预期效益通过本次费用增加,我部门将实现以下预期效益:1. 降低生产成本,提高产品竞争力。
2. 提高生产效率,缩短交货周期。
3. 增强团队实力,提升客户满意度。
4. 保障员工生命财产安全,树立良好的企业形象。
综上所述,为确保我部门在[具体项目/业务]方面的持续发展,特向贵部门申请增加相应费用。
恳请领导审批,给予支持。
此致敬礼!申请人:[申请人姓名]联系电话:[联系电话]电子邮箱:[电子邮箱]附件:费用增加预算明细表。
工程追加合同价款申请书
工程追加合同价款申请书尊敬的[业主公司名称]:兹因我司与贵司签订的《[项目名称]建设工程施工合同》(以下简称“原合同”),在执行过程中发生了如下变化,导致原合同约定的工程价款无法满足实际施工需求,特向贵司提出工程追加合同价款的申请。
一、变更原因说明[详细阐述导致合同价款需要追加的具体原因,例如设计变更、市场价格波动、政策调整、自然灾害等,以及这些变化是如何影响工程成本的。
]二、变更内容及影响1. 设计变更:[具体描述设计变更的内容及其对工程造价的影响,包括增加的工程量、材料、人工等。
]2. 材料价格波动:[列出主要材料的价格变动情况及其对总造价的影响。
]3. 工程量增减:[详细说明工程量的增减情况及对应的成本变化。
]4. 其他因素:[如果有其他影响造价的因素,也应在此部分进行说明。
]三、追加合同价款计算根据上述变更内容,我司已按照合同约定和相关法规标准,对追加的工程价款进行了详细计算。
具体如下:1. 设计变更增加费用:[金额]元;2. 材料价格波动增加费用:[金额]元;3. 工程量增减调整费用:[金额]元;4. 其他因素增加费用:[金额]元;合计追加合同价款:[总金额]元。
四、附件材料为支持本次追加合同价款申请,我司附上了以下相关证明材料:1. 工程设计变更通知单及相关图纸;2. 材料价格变动证明文件;3. 工程量增减记录表;4. 相关法律法规和标准依据文件;5. 其他支撑材料。
五、申请意见基于以上情况和计算,我司恳请贵司审查并批准本次追加的合同价款。
我们期待与贵司进一步沟通,以确保项目顺利进行。
此致敬礼![施工公司名称][负责人签字][日期]。
2024年合同费用增加申请书
合同费用增加申请书合同编号:__________第一章:合同双方1.1合同双方基本信息1.2甲方基本信息甲方名称:__________甲方地址:__________甲方联系方式:__________1.3乙方基本信息乙方名称:__________乙方地址:__________乙方联系方式:__________第二章:合同内容2.1合同目的本合同旨在明确甲乙双方关于__________(合同标的)的权利义务,确保项目顺利进行。
2.2合同范围本合同的范围包括__________(合同范围)。
除双方另有约定外,乙方应按照本合同约定完成合同范围内的各项工作。
2.3合同期限本合同自双方签字(或盖章)之日起生效,至__________(合同期限)终止。
第三章:合同价款3.1合同价款双方确认,本合同的总价款为人民币(大写):__________元整(小写):__________元。
3.2价款支付(1)预付款:合同签订后__________个工作日内,甲方支付乙方合同价款的__________%作为预付款。
(2)进度款:乙方按照合同约定完成相应工作量后,甲方支付乙方已完成工作量的__________%。
(3)尾款:项目验收合格后__________个工作日内,甲方支付乙方剩余的合同价款。
第四章:合同变更与解除4.1合同变更双方同意,在合同履行过程中,如遇特殊情况需要变更合同条款,应书面签署变更协议,并作为本合同的附件。
4.2合同解除(1)双方协商一致解除合同;(2)因不可抗力导致合同无法履行;(3)一方严重违约,导致合同无法继续履行。
第五章:违约责任5.1甲方违约责任甲方违反本合同约定的,应向乙方支付违约金,并赔偿因此给乙方造成的损失。
5.2乙方违约责任乙方违反本合同约定的,应向甲方支付违约金,并赔偿因此给甲方造成的损失。
5.3免责条款在合同履行过程中,如因不可抗力导致一方无法履行合同,受影响的一方不承担违约责任。
工程增加合同金额申请函
工程增加合同金额申请函您好!我方对贵公司一直以来的信任与支持表示衷心的感谢。
根据双方签订的工程合同(合同编号:[合同编号]),自[合同签订日期]起,我方开始承担[工程名称]的实施工作。
在项目实施过程中,我们始终坚持高标准、严要求,确保工程质量和进度满足合同要求。
在项目执行过程中,由于市场环境的变化以及原材料价格的上涨,原定的合同金额已无法完全覆盖当前的工程成本。
经过详细核算和慎重考虑,我们发现存在一些不可预见的费用增加,这些增加的费用是为了保证工程质量和项目顺利进行所必需的。
因此,我们提出增加合同金额的申请,并在此详细说明增加金额的原因和具体数额。
一、原因说明:1. 原材料价格上涨:自合同签订以来,部分关键原材料的市场价格已经出现了显著上涨,导致原预算无法覆盖实际采购成本。
2. 人工成本调整:随着劳动市场的变动,人工成本亦有所上调,为了保证工程团队的稳定性和施工质量,需要对人工费用进行调整。
3. 设计变更:在施工过程中,根据实际情况和甲方需求,部分设计方案进行了调整,增加了施工难度和材料用量。
4. 其他不可预见费用:包括因应环保政策调整所需的设备升级、安全生产措施加强等。
二、增加金额明细:根据上述原因,我们提出增加合同金额共计[增加金额]元。
具体明细如下:1. 原材料费用增加:[具体金额]元2. 人工成本增加:[具体金额]元3. 设计变更费用:[具体金额]元4. 其他不可预见费用:[具体金额]元三、后续工作承诺:我们承诺,增加的合同金额将严格用于上述所述的用途,并且不会影响工程的整体质量和进度。
我们将继续遵守合同约定,保证工程顺利完成。
鉴于以上情况,我们恳请贵公司能够理解并支持我们的申请。
我们期待与贵公司进一步沟通,以便达成共识,确保工程顺利进行。
如果贵公司有任何疑问或需要进一步的信息,请随时与我们联系。
再次感谢贵公司的理解与支持,我们期待继续与贵公司保持良好的合作关系。
此致敬礼![乙方公司名称][署名][日期]结束。
增加合同费用的函
增加合同费用的函尊敬的_____:您好!首先,非常感谢贵方一直以来对我们合作的支持与信任。
我们在过往的合作中携手共进,共同应对了各种挑战,也取得了一定的成果。
然而,随着合作的深入开展以及市场环境的变化,目前的合同费用已经无法满足我们继续为贵方提供高质量服务和保障项目顺利推进的需求。
在此,我们郑重地向贵方提出增加合同费用的请求。
我们希望贵方能够理解,导致需要增加合同费用的原因是多方面的。
其一,原材料价格的持续上涨给我们的生产带来了巨大的压力。
近期,各类原材料的价格不断攀升,且涨幅超出了我们的预期。
为了保证产品的质量和性能,我们不得不采购价格更高的原材料,这直接导致了生产成本的大幅增加。
其二,劳动力成本的上升也是一个不可忽视的因素。
随着社会经济的发展,劳动力市场的薪酬水平普遍提高。
为了吸引和留住优秀的员工,我们不得不相应地提高员工的工资待遇和福利,以维持团队的稳定和高效运作。
其三,技术研发和创新的投入不断加大。
在当今竞争激烈的市场环境下,为了满足贵方对于产品和服务不断提升的要求,我们需要持续投入大量的资金进行技术研发和创新,以提升产品的品质和性能,优化服务流程,为贵方提供更具竞争力和价值的解决方案。
其四,市场环境的变化也对我们的运营产生了影响。
行业标准和规范的日益严格,使得我们在生产过程中需要增加更多的检测环节和质量控制措施,以确保产品符合相关标准和法规。
同时,环保要求的提高也导致了我们在环保设备和处理措施方面的投入增加。
为了能够继续为贵方提供优质、稳定的服务,确保项目的顺利进行和高质量交付,我们经过慎重的考虑和核算,建议将合同费用在原有的基础上增加_____%。
增加合同费用后,我们将能够进一步优化资源配置,提升服务水平和效率,为贵方带来更多的价值和收益。
具体而言,我们将能够:1、采购更优质的原材料,从而提高产品的质量和可靠性,延长产品的使用寿命,降低贵方的维护成本和风险。
2、吸引和留住更多优秀的专业人才,组建更强大的技术和服务团队,为贵方提供更专业、更高效、更贴心的服务支持。
合同价格上浮申请模板
合同价格上浮申请模板
甲方:(甲方名称)
乙方:(乙方名称)
甲乙双方于(具体时间)签订了《(合同名称)》,根据合同约定,甲方承诺向乙方支付一定金额作为服务费。
鉴于市场经济行情波动,导致相关成本逐渐上涨,为了保证双方合作的顺利开展,甲方在完全尊重合同约定的基础上,提出以下价格上浮申请:
一、价格上浮理由:
(一)人工成本上涨
根据最新统计数据显示,人工成本在过去一年内上涨了10%,员工薪酬、社保缴费等支出都有所增加。
(二)原材料价格上涨
受国际市场供求关系等多方面影响,相关原材料价格逐渐上涨,直接影响到产品成本。
(三)市场价格波动
行业市场行情波动频繁,需灵活调整价格以适应市场变化,确保产品竞争力。
(四)相关政策影响
政府相关政策的调整对企业经营产生重大影响,导致成本费用的增加。
二、价格上浮范围及幅度:
甲方提出的价格上浮幅度为合同总金额的10%,具体金额为(具体金额)元人民币。
三、价格上浮实施方案:
(一)双方同意根据以上理由,同意甲方提出的价格上浮申请,并在合同金额中增加相应金额。
(二)价格上浮自(具体时间)生效,至(具体时间)结束,届时价格将重新纳入协商。
(三)价格上浮后,双方应继续履行合同其他相关约定,确保合作畅通。
四、其他约定:
本次价格上浮申请双方一致同意,属于市场因素引起的正常调整,不会影响双方良好合作关系。
甲方(盖章)
乙方(盖章)
日期:日期:。
合同清单报价费用增加申请函
申请函
——关于xxxxxxxx项目请建设单位审核合同清单综合报价的报告xxxxxxxxxxxx开发有公司:
xxxxxx项目一期工程是由贵公司开发,由我公司于2000年7月12日中标承建的一项项重要工程,但由于原住户的拆迁事宜迟迟未能解决,直至今年7月,经过贵我双方的不懈努力,拆迁事宜才得以解决,使工程具备并工条件,但由于以下原因我公的特提出申请:
1、依据合同计划开工时同2012年7月20,由于拆迁事宜本工程未能按时开工,至使开工时间滞后2年;
2、因国家环保大整治等不可控因素以及长治市作为京津冀“2+26”污染联防联控城市,自2011年起秋冬采暖季环保节能实行错峰限产,使得工程施工时间大幅缩减,导数的材料价格、施工机械价格及工人劳务价格非理性大幅上流,旋工成本大幅增加;
3、根据建筑业“营改增”《山西省建设工程计价依据》的调整及2011年1月1日起执行的社保、税制的变动;
4、根据《建投工程工程量清单计价规范》(GB50600-2013)中9.7.3条规定及中标合同12条约定综合单价的风险范国:材料费3%,机城费10%内:风险范围以外合同价格的调整方法:按实调整,我公司申请对该工程材料单价及综合单价按现行市场价格于以调整。
(后附具体材料单价、施工机械台班价格变动清单及对应的综合单价分析表)
我公司充分理解合约的严性,但请贵公司充分考虑国家环保大整
治这一不可控因素及工程开工时间顺延导致的材料市场、机械价格及劳务价格变动,从实事求是的角度出发,酌情考虑,合理调整该工程的价格。
我公司将一如既往地加强项目管理,精心组织,科学施工,保安全,保质量,保工期,以实现合作共赢的发展目标。
特此中请!望贵公司尽快予以回复确认,
xxxxx有限公司
2002年9月10日。
合同追加费用的请示
合同追加费用的请示
尊敬的XXX(收件人姓名):
我写信是为了向您请示追加费用的事宜。
根据我们之前所签订的合同((合同编号/日期),我们在执行项目过程中遇到了一些额外的费用和成本,超出了原定的合同金额。
经过仔细分析和评估,我们发现这些额外费用是由于以下原因引起的:(简要描述额外费用产生的原因)
为了确保项目能够按时、按质量要求完成,我们认为必须解决这些额外费用,并进行必要的追加支付。
在此,我们盼望得到您的理解和支持,并请求审慎考虑并批准我们的追加费用申请。
附上了详细说明了每个额外费用的成本和相关原因的清单,请您详细查阅。
我们愿意随时与您沟通并提供进一步的信息,以确保您对追加费用的处理有透彻的了解。
同时,我们也非常愿意就此事项进行面谈,以商讨可能的解决方案。
衷心感谢您对这一事项的关注与合作。
最诚挚的问候,
XXX(您的姓名)
职务或职位
联系方式。
申请合同价格调整的函模板
申请合同价格调整的函模板亲爱的[对方称呼]:您好呀!我想跟您说一件很重要的事呢。
就像我们之前做了一个小约定,写在合同里的那种。
可是现在有些情况变啦,就像我们玩游戏的时候,突然游戏规则有点不一样了。
我给您讲个小故事吧。
我之前和小伙伴一起做小手工去卖。
我们定好了每个小手工卖多少钱,这就像合同里的价格一样。
我们开始做的时候,发现原材料突然变得特别贵。
就像我们本来打算用很便宜的彩纸,可是那种彩纸突然没有了,只能买贵好多的那种。
这样一来,我们要是还按照原来定的价格卖小手工,我们就会亏好多钱呢。
我们之间的合同也是这样的情况。
比如说,我们之前定好的价格是因为当时的一些东西很便宜。
就像我做小手工的时候,那时候胶水很便宜,所以我们算成本的时候是按照便宜胶水的价格来的。
可是现在胶水的价格涨了好多,就像坐火箭一样往上升。
还有那些小珠子、小贴纸,以前一块钱能买好多,现在只能买一点点了。
这让我们做东西的成本变得好高好高,如果还是按照合同里的价格,我们就像小蚂蚁一样,要背着很重很重的东西,却没有足够的力气,真的会很辛苦很辛苦的。
所以呀,我们希望您能考虑一下调整合同里的价格呢。
我们也不是随便就想改价格的。
就像我和小伙伴商量小手工价格的时候,我们算了好久好久,把每一个多出来的成本都算得清清楚楚。
我们也把现在的情况都列出来了,像新的原材料价格,还有我们花费的更多的时间和精力。
要是您能同意调整价格,就像给我们在黑暗里点亮了一盏小灯一样。
我们会特别特别感激您的。
我们也会更加努力地做好我们该做的事情。
就像我和小伙伴会更加用心地做小手工,让买的人都觉得物超所值。
我们真的希望您能理解我们的处境,就像我们也会理解您如果有什么难处一样。
希望您能给我们一个好消息呀。
祝您每天都开开心心的![你的名字][日期]。
续签合同价格上涨申请说明模板
续签合同价格上涨申请说明模板英文回答:Contract Renewal Price Increase Request Justification.Introduction.The purpose of this document is to provide a detailed justification for the requested price increase in the renewal of our contract. We have carefully considered all relevant factors and believe that the proposed increase is both reasonable and necessary to ensure the continued success of our partnership.Value Delivered.Over the past [number] years of our partnership, wehave consistently exceeded expectations in delivering value to your organization. Our team has played a crucial role in:[Quantifiable results and accomplishments][Case studies or examples of success]We are confident that we can continue to provide this exceptional level of service in the future.Market Conditions.The market conditions for our industry have changed significantly over the past year. Costs have risen across the board, including:[List of specific cost increases, such as labor, materials, etc.]These increases have made it impossible for us to maintain our current pricing model while continuing to provide the same level of quality.Competitor Analysis.We have conducted a thorough analysis of ourcompetitors' pricing and have found that our proposed increase is in line with the market. We believe that our value proposition and track record of success make us a competitive choice in the market.Proposed Price Increase.We are requesting a price increase of [percentage]% for the renewal of our contract. This increase will allow us to:[List the specific benefits and improvements that will be made possible by the price increase, such as additional resources, enhanced services, etc.]Conclusion.We believe that our requested price increase is both reasonable and necessary. It will enable us to continue providing the same high level of service that you have come to expect while also allowing us to invest in our businessto ensure our continued success.We value our partnership with your organization and are confident that we can continue to deliver exceptional results in the years to come.中文回答:合同续约价格上涨申请说明。
增补合同费用的申请
增补合同费用的申请
尊敬的XXX部门领导:
我在此申请增补我负责的合同费用。
根据我对项目进展的分析和评估,原先申请的合同费用无法覆盖当前所需的工作量和成本。
以下是我申请增补合同费用的理由和细节:
1. 工作量增加:在合同开始执行后,我们发现项目所需的工作量比最初预期的要大。
原先的费用无法满足在项目中增加的工作量,导致工作进度受到影响。
2. 面临的困难:由于工程设计的要求变更,我们需要额外的人力资源和材料来满足新的要求。
这些额外的需求加大了项目的复杂性和风险,因此需要增补费用以应对这些困难。
3. 成本上升:在项目执行过程中,我们遇到了一些不可预见的成本上升因素,如原材料价格的上涨、运输费用的增加等。
考虑到这些额外成本的发生,我们需要额外的费用以保证项目的顺利进行。
4. 满足质量要求:为了确保项目的质量和客户满意度,我们需要额外的费用用于提升工作质量和采购更好的材料。
这些额外的投入将有助于确保项目达到预期的目标。
基于以上原因,我认为增补合同费用是必要的。
我已经对项目进行了详细的成本分析和预算计划,并将费用增补的具体数字列入附件。
我希望您能审慎考虑我的申请,并在合适的时候与
我讨论和确认增补费用的事宜。
谢谢您的支持与配合!
此致
敬礼
XXX。
产品合同涨价申请
尊敬的销售部门/供应商:
我方作为乙方,根据我们之间签订的产品合同(合同编号:_________),在此向您提出产品涨价申请。
由于以下原因,我们希望对所购买的产品的价格进行调整:
1. 原材料成本上升:近期原材料市场价格出现了明显上涨的趋势,对我们生产过程中所使用的原材料造成了不小的压力。
2. 劳动力成本增加:根据市场情况和劳动力市场紧缺情况,我们不得不加大对员工的薪酬投入,以保证员工能够持续稳定地工作,这进一步增加了我们的运营成本。
3. 运输费用增加:最近物流行业的费用普遍上涨,包括货运、运输工具维护等各个环节,导致我们的产品运输成本明显增加。
考虑到以上因素,我方不可避免地需要对产品价格进行适当调整,以保证我们能够维持正常的业务运营并确保产品质量。
我们建议通过以下方式进行涨价调整:
产品名称:_________
原合同价格:_________
申请涨价后价格:_________
我们希望双方能够理解并协商,以达成共识。
我们相信通过合作和沟通,我们能够找到一个互利共赢的解决方案。
请您尽快回复,如果您有任何进一步的疑问或需要额外的信息,请随时与我们联系。
期待您的回复!
谢谢!
乙方代表签字:_________
日期:_________。
合同费用增加的申请报告
报告编号:[报告编号]报告日期:[报告日期]致:[相关单位或部门名称]报告单位:[报告单位名称]报告人:[报告人姓名]报告职务:[报告人职务]一、报告背景尊敬的[相关单位或部门名称]领导:我单位[报告单位名称]于[合同签订日期]与贵单位签订了[合同名称]合同,合同编号为[合同编号]。
根据合同约定,我单位负责[合同具体内容概述]。
合同总价为人民币[合同总价]元,合同期限为[合同期限]。
在合同履行过程中,由于[具体原因],导致合同实施过程中产生了额外的费用。
为确保项目顺利进行,特向贵单位申请增加合同费用,具体原因及申请金额如下:二、费用增加原因1. 自然灾害影响在项目实施过程中,遭遇了[具体自然灾害名称],造成了施工现场的严重破坏。
根据《中华人民共和国合同法》及《建设工程施工合同管理办法》等相关法律法规,自然灾害属于不可抗力因素,合同双方均无责任。
但由于灾害导致施工现场停工、修复及重新施工,产生了额外的费用。
2. 设计变更在项目实施过程中,由于[具体原因],需要对原设计方案进行变更。
设计变更导致施工难度加大,材料消耗增加,人工成本上升,从而产生额外费用。
3. 机械设备租赁原合同中约定的部分机械设备无法满足施工需求,需租赁新的机械设备。
由于市场价格上涨,租赁费用超出原合同约定,导致额外费用产生。
4. 人工成本上升近年来,我国人工成本逐年上升,尤其是施工现场的劳动力成本。
在合同履行过程中,由于劳动力市场供需变化,人工成本较原合同约定有所增加。
5. 材料价格上涨受市场环境影响,部分施工材料价格较原合同约定有所上涨,导致材料费用增加。
三、费用增加金额及构成根据以上原因,经核算,我单位申请增加合同费用共计人民币[增加费用总额]元。
具体构成如下:1. 自然灾害影响费用:人民币[具体金额]元;2. 设计变更费用:人民币[具体金额]元;3. 机械设备租赁费用:人民币[具体金额]元;4. 人工成本上升费用:人民币[具体金额]元;5. 材料价格上涨费用:人民币[具体金额]元。
合同涨价申请书
合同涨价申请书尊敬的[合作方称呼]:朋友!今天写这个申请书呀,心里还挺复杂的呢。
咱们合作也有一段时间啦,一直以来相处得都特别愉快,就像老朋友一样。
咱们当初签订合同的时候呢,那是基于当时的各种情况,像原材料价格、人工成本之类的。
可现在呀,情况发生了不小的变化。
你知道吗?就拿原材料来说吧,之前的价格还比较稳定,可最近那是蹭蹭往上涨啊。
就像坐火箭似的,根本停不下来。
以前能买到的量,现在花同样的钱只能买到一小部分了。
这就好比我们原本计划做一个大大的蛋糕,材料都备好了,可突然发现面粉和糖都不够了,还得花大价钱去买。
再说说人工成本吧。
现在大家生活的成本都变高了,为了让工人们也能过上好日子,工资自然就得往上提一提啦。
这也是没办法的事儿呀,大家都不容易。
我们要是不提高工资,就很难留住那些熟练的工人,没有他们,咱们的合作项目也没法顺利进行呀。
所以呢,基于这些原因,我们这边的成本真的是大大增加了。
如果还按照原来合同的价格,我们真的是有点吃不消了。
这就像一个人背着很重的包袱,已经快走不动路了。
我们也想了很多办法去节省成本,比如说优化生产流程之类的,可这也只是杯水车薪呀。
我们希望能够对合同的价格进行一定幅度的上调。
我们不是想占您什么便宜,真的只是想让我们的合作能够继续健康地发展下去。
我们也知道这对您来说可能会有点突然,但是我们真的是没有别的办法了。
我们保证,如果价格上调了,我们会更加努力地提高产品或者服务的质量。
就像我们得到了您的一份信任和支持,一定会加倍地回报您。
我们会在每一个细节上都做到更好,让您觉得这个价格涨得是值得的。
我们很珍惜咱们之间的合作关系,从一开始就希望能够一直走下去。
这次合同涨价真的不是我们单方面的任性或者贪心,而是现实情况所迫。
希望您能够理解我们的难处,咱们一起商量一个合适的解决方案。
我们相信,只要咱们双方能够坦诚地交流,互相理解,一定能够找到一个对大家都好的办法。
不管结果如何,我们都希望咱们之间的友谊和合作关系不会受到影响。
增加合同费用申请
增加合同费用申请
增加合同费用申请书
申请人(甲方):_________
受托人(乙方):_________
文书编号:_________
1.甲方与乙方签署的《委托合同》中约定甲方应向乙方支
付的合同费用总额为_______元。
2.经过双方协商,由于委托事项的实际情况与原定数量、
质量、时间、费用等存在差异,导致合同费用实际需要增加
_______元,甲方因此向乙方提出本《增加合同费用申请书》。
3.本申请书所增加的费用需包括客观存在的实际成本增加、及时补偿乙方承担的额外工作量及个人取得的成绩、回报、效果等事项。
4.甲方和乙方同意通过签署本申请书来达成协议,双方应
遵守且执行《委托合同》及相关法律法规,保证甲方和乙方的合法权益。
5.在双方签署本申请书后,甲方应按照增加的费用金额及
支付时间,在规定期限内向乙方支付。
6.如因甲方原因导致支付时间延迟,甲方应按月支付违约金,违约金比例为①%。
7.如乙方受理甲方变更委托事项所需的工作量和贡献导致费用不足,乙方可向甲方提出增加合同费用的请求,甲方应配合乙方完成协商,并按双方协商的费用金额和支付方式支付费用。
8.本申请书在签署后自动视为《委托合同》的修订部分,与《委托合同》具有同等法律效力。
甲方:_________ 日期:_________
乙方:_________ 日期:_________。
合同费用增加申请书
合同费用增加申请书尊敬的[相关负责人称呼]:我得跟您好好唠唠这合同费用的事儿。
我们当时预估的成本都是按照当时的市场情况、物料价格还有人力成本来的。
可是现在呢,物料的价格就像坐火箭一样蹭蹭往上涨。
比如说,我们合同里涉及到的那种特殊材料,之前的价格就像个听话的乖孩子,稳稳当当的。
可现在呢,它就像个调皮捣蛋的小鬼,价格一路狂飙。
我们采购的时候,那心都在滴血啊,原本的预算根本就不够用了。
再说说人力成本吧。
咱这活儿干起来可不容易啊,那些工作人员就像一群勤劳的小蜜蜂,每天忙得不可开交。
可是现在啊,小蜜蜂们的生活成本也高了,他们也得养家糊口啊。
为了让他们能继续好好地为这个项目干活,我们不得不给他们加点报酬。
不然的话,他们要是都飞走了,这项目可就没法顺利进行下去了。
这就像盖房子,工人都走了,那房子就只能是个烂尾楼了。
还有哦,我们在执行合同的过程中,遇到了一些之前没有预料到的情况。
就像是我们本来打算走一条平坦的大路去目的地,结果半路上突然出现了一条大河,我们就得想办法搭桥或者找船才能过去。
这额外的支出可真不是我们想看到的,但又没办法避免。
比如说,我们遇到了一些新的政策法规要求,为了符合这些要求,我们得增加一些新的设备和流程,这都是需要花钱的呀。
我们也知道,增加合同费用可能会给您那边带来一些困扰,但是我们真的是没办法了。
如果费用不增加的话,我们这个项目就会陷入困境,就像一辆车没油了,只能停在半路上,到时候谁都不好受。
我们希望您能理解我们的难处,就像朋友之间互相体谅一样。
我们也不是随随便便就提出这个申请的,我们都已经做了很详细的成本核算和分析。
我们也保证,如果费用能够增加的话,我们一定会更加努力地把这个项目做好。
就像一个得到了鼓励的孩子,会更加用心地去完成自己的任务。
我们会让每一分钱都花得物有所值,让这个项目能够顺利地进行下去,最后达到一个让大家都满意的结果。
真的希望您能好好考虑一下我们的申请,我们就像在黑暗中等待救援的人,您的同意就像是那一束照亮我们的光。
合同涨价申请书
合同涨价申请书
尊敬的[对方称呼]:
嗨,今天给您写这个申请书呀,心里还怪紧张的呢。
您知道吗,咱们之间的合同已经执行有一段时间啦,这段时间就像一场奇妙的旅程,咱们一起合作,有欢笑也有汗水。
我得跟您好好唠唠现在的情况。
您看啊,现在这物价就像坐火箭似的蹭蹭往上涨。
原材料价格那涨得可凶了,就拿我们生产用的[原材料名称]来说吧,以前买的时候价格还挺实惠的,现在呢,几乎是以前价格的[X]倍了。
这可把我们愁坏了,就像本来计划好的一顿美餐,结果食材突然变得超级贵,饭都快做不起了。
还有啊,人工成本也在增加呢。
咱都知道,现在的生活成本高,工人们也要养家糊口呀。
为了让工人们能踏踏实实地工作,我们也不得不给他们涨工资。
这一涨工资,我们的支出可就又多了一大块。
这就好比一个大家庭,每个人都要吃饱穿暖,开销自然就大了。
咱们的合同呢,当初定的价格在现在的市场环境下,真的有点让我们吃不消了。
您看,我们一直都很用心地在履行合同,每次都尽我们最大的努力把事情做到最好。
我们也不想给您添麻烦,可这现实情况摆在这儿,就像一座大山压着我们呢。
您要是能答应我们这个小小的请求,那可真是帮了我们大忙了。
我们会更加感激您,在以后的合作中也会拿出更多的诚意和努力来回报您。
要是您有什么疑虑或者想法,也可以随时跟我们说呀,咱们可以像朋友一样好好商量商量。
真的希望您能理解我们现在的处境,毕竟大家都不容易,在这个复杂多变的市场环境里,我们都想互相扶持着走下去。
谢谢您能抽出时间来看我的这份申请书,期待您的好消息哦。
追加合同金额申请书
尊敬的甲方:您好!在此,我代表乙方就本次合同项目追加金额一事,向您提出申请。
现将具体情况说明如下:一、项目背景本项目为【项目名称】,合同编号为【合同编号】,合同签订日期为【签订日期】。
根据合同约定,乙方负责项目的【具体工作内容】,合同总金额为【原合同金额】。
项目自【项目开始日期】开始实施,截至目前,已按照合同约定完成了【已完成工作内容】。
二、追加金额原因1. 工程量增加:在项目实施过程中,由于设计变更、现场实际情况等原因,导致部分工程量增加。
经双方协商,新增工程量为【新增工程量】。
2. 材料价格波动:受市场环境影响,部分材料价格出现上涨。
经市场调研,材料价格上涨幅度为【上涨幅度】。
3. 不可抗力因素:在项目实施过程中,遭遇了【不可抗力因素】,如自然灾害、政策调整等,导致项目进度延误,增加了一定的成本。
4. 合同约定以外的服务:为满足甲方需求,乙方在合同约定以外提供了【额外服务】,产生了一定的费用。
三、追加金额及明细根据以上原因,经测算,本次追加金额为【追加金额】。
具体明细如下:1. 工程量增加:增加工程量产生的费用为【工程量增加费用】。
2. 材料价格波动:材料价格上涨产生的费用为【材料价格波动费用】。
3. 不可抗力因素:因不可抗力因素产生的费用为【不可抗力因素费用】。
4. 合同约定以外的服务:提供额外服务产生的费用为【额外服务费用】。
四、追加金额使用计划为确保项目顺利实施,乙方将按照以下计划使用追加金额:1. 首先用于解决新增工程量产生的费用。
2. 其次用于解决材料价格上涨产生的费用。
3. 再次用于应对不可抗力因素产生的费用。
4. 最后用于支付合同约定以外的服务费用。
五、请求鉴于以上情况,乙方恳请甲方批准本次追加金额申请。
如有需要,乙方将积极配合甲方进行相关手续的办理。
在此,乙方承诺将严格按照合同约定,确保项目质量,按时完成各项任务。
敬请甲方审阅,并给予批准。
此致敬礼!乙方:【乙方名称】法定代表人:【法定代表人姓名】联系电话:【联系电话】电子邮箱:【电子邮箱】申请日期:【申请日期】。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
申请函
——关于xxxxxxxx项目请建设单位审核合同清单综合报价的报告xxxxxxxxxxxx开发有公司:
xxxxxx项目一期工程是由贵公司开发,由我公司于2000年7月12日中标承建的一项项重要工程,但由于原住户的拆迁事宜迟迟未能解决,直至今年7月,经过贵我双方的不懈努力,拆迁事宜才得以解决,使工程具备并工条件,但由于以下原因我公的特提出申请:
1、依据合同计划开工时同2012年7月20,由于拆迁事宜本工程未能按时开工,至使开工时间滞后2年;
2、因国家环保大整治等不可控因素以及长治市作为京津冀“2+26”污染联防联控城市,自2011年起秋冬采暖季环保节能实行错峰限产,使得工程施工时间大幅缩减,导数的材料价格、施工机械价格及工人劳务价格非理性大幅上流,旋工成本大幅增加;
3、根据建筑业“营改增”《山西省建设工程计价依据》的调整及2011年1月1日起执行的社保、税制的变动;
4、根据《建投工程工程量清单计价规范》(GB50600-2013)中9.7.3条规定及中标合同12条约定综合单价的风险范国:材料费3%,机城费10%内:风险范围以外合同价格的调整方法:按实调整,我公司申请对该工程材料单价及综合单价按现行市场价格于以调整。
(后附具体材料单价、施工机械台班价格变动清单及对应的综合单价
分析表)
我公司充分理解合约的严性,但请贵公司充分考虑国家环保大整治这一不可控因素及工程开工时间顺延导致的材料市场、机械价格及劳务价格变动,从实事求是的角度出发,酌情考虑,合理调整该工程的价格。
我公司将一如既往地加强项目管理,精心组织,科学施工,保安全,保质量,保工期,以实现合作共赢的发展目标。
特此中请!望贵公司尽快予以回复确认,
xxxxx有限公司
2002年9月10日
[温馨提醒:合同协议是经验性极强的领域,无法思考和涵盖全面,最好找专业律师起草或审核后使用。
范文供参考,期待你的好评与关注]。