110kv变电站一次接线设计
毕业设计---110kv变电站一次、二次系统设计[管理资料]
![毕业设计---110kv变电站一次、二次系统设计[管理资料]](https://img.taocdn.com/s3/m/a586def0bed5b9f3f80f1c89.png)
毕业设计(论文)论文题目:110千伏终端变电站一次系统设计学生姓名:学号年级、专业、层次:二00六年三月目录第一章设计题目 (1)一.毕业设计课题 (1)二.毕业设计的内容要求 (1)第二章变压器容量确定 (2)一.主变容量的确定 (2)二.所用变压器容量的确定 (3)第三章电气主接线确定 (3)一.方案技术经济比较原则 (4)第四章短路电流及主要设备选择 (5)一.短路电流计算 (5)二.主设备选择 (8)三.主设备校验 (10)第五章绝缘配合及过电压保护 (16)一.绝缘配合 (16)二.过电压保护 (16)三.接地 (17)四.泄漏比距 (18)第六章电气设备布置及配电装置 (18)一.电气设备布置 (18)二.配电装置的型式 (19)第七章电容器补偿装置 (19)第八章保护配置及交直流部分 (19)一.110千伏线路保护配置 (19)二.变压器保护配置 (19)三.35千伏线路保护配置 (20)四.10千伏线路保护配置 (20)五.10千伏电容器组保护配置 (20)六.逻辑闭锁 (21)七.交流系统 (21)八.直流系统 (21)第九章监控系统功能配置 ..................................................... 错误!未定义书签。
一.系统结构 ..................................................................... 错误!未定义书签。
二.硬件设备配置............................................................ 错误!未定义书签。
三.软件系统 ..................................................................... 错误!未定义书签。
四.系统功能 ..................................................................... 错误!未定义书签。
110KV变电站一次设计(1)讲解

❖ 110KV侧采用内桥接线的连接方式
内桥:变压器的切除、投入或故障时,操作较复杂,需动作两台断路器( QF1、QF2断开,断开变压器侧隔离开关,变压器退出运行,再合QF1、QF2,恢 复线路供电),影响一回线路暂时停运;桥联断路器检修时,两个回路须解裂运 行;出线断路器检修时,线路需长时期停运,为避免此缺点,可加装正常断开运 行的跨条(如图中QS2、QS3),为了轮流停电检修任何一组隔离开关,在跨条上 需加装两组隔离开关,桥联断路器检修时,也可利用此跨条。
1)1=27.8MVA
主变压器的选择
主变压器台数的确定 ❖ 为了保证供电可靠性,变电所一般装设2台主变压
器;枢纽变电所装设2~4台。 ❖ 对地区性孤立的一次变电所或大型工业专用变电所,
设变压器为宜。
主变容量的确定
❖ 主变压器容量一般按变电所、建成后5~10年的规划负荷选择,并应按 照其中一台停用时其余变压器能满足变电所最大负荷的60% ~ 70% (35~110kV变电所为60%,220~550kV变电所为70%)或全部重要 负荷(到Ⅰ、Ⅱ类负荷超过上述比例时)选择,即其额定容量可按下 式确定变压器的额定容量:
内桥接法适用于变压器不需要经常切换、输电线路较长(检修和故障机率较 高,故障断开机会较多)及穿越功率不大的小容量配电装置中,
内桥接线
110kV进线1
1#主变
110kV进线2
2#主变
10kV出线1 10kV出线2 10kV出线3 10kV出线4 10kV出线5 10kV出线6
无功补偿的选择
❖ 无功补偿装置的意义 1、提高设备的利用率 2、降低系统能耗 3、改善电压质量
4.2、本次主接线的选择
本次设计110KV侧采用内桥接线的连接方式, 10KV侧采用 双母分段连接。接线方式如下:
110kV变电所电气一次设计

第 1 章原始资料分析1.变电站的地址和地理位置选择:建设一个变电站要考虑到地理环境、气象条件等因素,包括:⑴年最高温度、最低温度。
⑵冬季、夏季的风向以及最大风速。
⑶该地区的污染情况。
2.确定变电站的建设规模设计⑴电压等级有两个:110kV 10kV。
⑵主变压器用两台。
⑶进出线情况:110kV有两回进线,10kV有18回出线。
3.设计110kV和10kV侧的电气主接线:通过比较各种接线方式的优缺点、适用范围,确定出最佳的接线方案。
⑴110kV侧有两回进线,为电源进线,此时宜采用桥形接线,根据桥断路器的安装位置,可分为内桥和外桥接线两种,比较这两种接线的特点,适用范围,确定110k V侧的接线方式为内桥接线。
⑵10kV侧有18回出线,可供选择的接线方式有:①单母线分段接线。
②双母线以及双母线分段。
③带旁路母线的单母线和双母线接线。
比较这几种接线方式的优缺点,适用范围,确定出10K V侧的接线方式为单母线分段接线。
4.计算短路电流及主要设备选型。
⑴主变压器的型号、容量、电压等级、冷却方式、结构、容量比和中性点接地方式的选择等。
①主变的容量:主变容量的确定应根据电力系统5-10 年发展规划进行。
当变电所装设两台及以上主变时,每台容量的选择应按照其中任一台停运时,其余容量至少能保证所供一级负荷或为变电所全部负荷的60-80%。
②接线方式:我国110kV及以上电压,变压器三相绕组都采用“YN'联接;35kV采用“Y” 联接,其中性点多通过消弧线圈接地。
因此,普通双绕组一般选用YN,d11 接线;三绕组变压器一般接成YN,y,d11 或YN,yn,d11 等形式。
5.绘制电气主接线图;总平面布置图;110kV和10kV的进出线间隔断面图等有关图纸。
6.简要设计主变压器继电保护的配置、整定计算选择几个特殊的短路点:如110k V侧、10kV母线上。
根据系统的短路容量进行整定计算。
7.防雷接地设计防雷设计要考虑到年雷暴日,保护范围等因素。
110KV变电站电气主接线设计(课程设计)

110KV变电站电气主接线设计摘要本次设计为110kV变电站电气主接线的初步设计,并绘制电气主接线图。
该变电站设有两台主变压器,站内主接线分为110kV、35kV和10kV三个电压等级。
110KV电压等级采用双母线接线,35KV和10KV电压等级都采用单母线分段接线。
本次设计中进行了电气主接线的设计、短路电流计算、主要电气设备选择及校验(包括断路器、隔离开关、电流互感器、电压互感器、熔断器等)、各电压等级配电装置设计以及防雷保护的配置。
关键词:降压变电站;电气主接线;变压器;设备选型;无功补偿Abstract目录1.电气主接线设计1.1 110KV变电站的技术背景 (3)1.2 主接线的设计原则 (3)1.3主接线设计的基本要求 (3)1.4高压配电装置的接线方式 (4)1.5主接线的选择与设计 (8)1.6主变压器型式的选择 (9)2.短路电流计算2.1 短路电流计算的概述 (11)2.2短路计算的一般规定…………………………………………………………………………112.3短路计算的方法………………………………………………………………………………122.4短路电流计算…………………………………………………………………………………123.电气设备选择与校验3.1电气设备选择的一般条件……………………………………………………………………153.2高压断路器的选型……………………………………………………………………………163.3高压隔离开关的选型…………………………………………………………………………173.4互感器的选择…………………………………………………………………………………173.5短路稳定校验…………………………………………………………………………………183.6高压熔断器的选择……………………………………………………………………………184.屋内外配电装置设计4.1设计原则………………………………………………………………………………………194.2设计的基本要求………………………………………………………………………………204.3布置及安装设计的具体要求…………………………………………………………………204.4配电装置选择…………………………………………………………………………………215.变电站防雷与接地设计5.1雷电过电压的形成与危害……………………………………………………………………225.2电气设备的防雷保护…………………………………………………………………………225.3避雷针的配置原则……………………………………………………………………………235.4避雷器的配置原则……………………………………………………………………………235.5避雷针、避雷线保护范围计算 (23)5.6变电所接地装置………………………………………………………………………………246.无功补偿设计6.1无功补偿的概念及重要性……………………………………………………………………246.2无功补偿的原则与基本要求…………………………………………………………………247.变电所总体布置7.1总体规划………………………………………………………………………………………267.2总平面布置……………………………………………………………………………………26结束语 (27)参考文献 (27)1.电气主接线设计1.1 110KV变电站的技术背景近年来,我国的电力工业在持续迅速的发展,而电力工业是我国国民经济的一个重要组成部分,其使命包括发电、输电及向用户的配电的全部过程。
110KV变电站电气主接线设计【文献综述】

毕业设计开题报告电气工程及其自动化110KV变电站电气主接线设计一、前言电气主接线也称电气主系统或电气一次接线,它是有电气一次设备按电力生产的顺序和功能要求连接而成的接受和分配的电路,是发电厂、变电站电气部分的主体,也是电力系统网络的重要组成部分。
110kV变电站电气主接线的设计,包括系统方案选择、负荷计算、一次设备选择、短路电流计算、防雷与接地等。
1、电气主接线设计的基本要求变电站的电气主接线应该根据变电站在电力系统中的地位、变电站的规划容量、负荷性质、线路、变压器连接元件总数、设备特点等条件确定,并应综合考虑供电可靠性、运行灵活性、检修操作方便、节约投资、便于过渡和扩展等要求。
(1)供电可靠性。
供电可靠性是电力生产和分配的首要要求,主接线能可靠地工作,以保证对用户不间断供电。
评价电气主接线可靠性的标志是:断路器检修时,不宜影响对系统的供电;线路或母线发生故障时应尽量减少线路的停运回路数和主变的停运台数,尽量保证对重要用户的供电;尽量避免变电站全部停运的可能性。
(2)运行检修的灵活性。
主接线应满足在调度、检修的灵活性,调度运行中应可以灵活地投入和切除变压器和线路,满足系统在事故、检修以及特殊运行方式下的系统调度运行要求,实现变电站的无人值班。
检修时,可以方便地停运断路器、母线和继电保护设备,进行安全检修,而不致影响电力网的运行和对用户的供电。
(3)适应性和可扩展性。
能适应一定时期内没有预计到的负荷水平的变化,满足供电需求,扩建时,可以适应从初期接线过渡到最终接线,在影响连续供电或停电时间最短的情况下,投入变压器或线路而不互相干扰,并且使一次、二次部分的改建工作量最少。
(4)经济合理。
主接线在满足可靠性、灵活性要求的前提下,要求做到经济合理。
①投资省,即变电站的建筑工程费、设备购置费、安装工程费和其他费用应节省,采用不同的接线方式,其投资具有明显的不同;②占地面积小,主接线设计要为配电装置创造条件,采用不同的接线方式,配电装置占地面积有很大的区别;③能量损失小。
110kv变电站一次接线设计讲述

毕业设计指导老师:王必生老师学校:湘西职业技术学院专业:电力系统自动化技术班级:11-3电力一班姓名:110kv变电站一次接线设计摘要本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。
从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV,35kV,10kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,从而完成了110kV电气一次部分的设计。
2、变电站负荷情况及所址概况本变电站的电压等级为110/35/10。
变电站由两个系统供电,系统S1为600MVA,容抗为0.38, 系统S2为800MVA,容抗为0.45.线路1为30KM, 线路2为20KM, 线路3为25KM。
该地区自然条件:年最高气温 40摄氏度,年最底气温- 5摄氏度,年平均气温 18摄氏度。
出线方向110kV向北,35kV向西,10kV向东。
所址概括,黄土高原,面积为100×100平方米,本地区无污秽,土壤电阻率7000Ω.cm。
本论文主要通过分析上述负荷资料,以及通过负荷计算,最大持续工作电流及短路计算,对变电站进行了设备选型和主接线选择,进而完成了变电站一次部分设计。
二.设计步骤:第一章变压器选择 (6)1 主变台数、容量和型式的确定 (7)2 站用变台数、容量和型式的确定 (9)第二章电气主接线 (10)1110kv电气主接线 (11)235kv电气主接线 (12)310kv电气主接线 (14)4站用变接线 (16)第三章最大持续工作电流及短路电流的计算 (17)1 各回路最大持续工作电流 (17)2 短路电流计算点的确定和短路电流计算结果 (18)第四章主要电气设备选择 (19)1 高压断路器的选择 (21)2 隔离开关的选择 (22)3 母线的选择 (23)4 绝缘子和穿墙套管的选择 (24)5 电流互感器的选择 (24)6电压互感器的选择 (26)7各主要电气设备选择结果一览表 (29)附录I设计计算书 (30)附录II电气主接线图 (37)10kv配电装置配电图 (39)1.负荷计算及变压器选择1.负荷计算要选择主变压器和站用变压器的容量,确定变压器各出线侧的最大持续工作电流。
110kV降压变电所电气一次部分的设计毕业设计

摘要本毕业设计通过对110KV变电站一次部分的设计,完成了对负荷的分析、主变压器的选择、无功补偿装置的选择、电气主接线的选择、各电压等级负荷的计算、最大持续工作电流及短路电流的计算、变压器、高压断路器、隔离开关、母线、绝缘子和穿墙套管、电流互感器、电压互感器、接地刀闸、避雷器的配置、选择、校验工作。
关键词:电气一次部分设计计算短路电流变电站110kV降压变电所电气一次部分的设计第一章:设计概况一.设计题目110kV降压变电所电气一次部分的设计二.所址概况1.所址地理位置及地理条件变电所位于某中型城市边缘,所区西为城区,南为工业区,所址地势平坦,交通便利,进出线方便,空气污染轻微,不考虑对变电所的影响。
2.所区平均海拔200米,最高气温40℃,最低气温-18℃,年平均气温14℃,最热月平均最高气温30℃,土壤温度25℃。
三.系统情况如下图:四.负荷情况:五.设计任务1.负荷分析及主变压器的选择。
2.电气主接线的设计。
3.变压器的运行方式以及中性点的接地方式。
4.无功补偿装置的形式及容量确定。
5.短路电流计算(包括三相、两相、单相短路)6.各级电压配电装置设计。
7.各种电气设备选择。
8.继电保护规划。
9.主变压器的继电保护整定计算。
六.设计目的总体目标:培养学生综合运用所学各科知识,独立分析和解决实际工程问题的能力。
第二章:负荷分析及主变选择一.负荷分析:1.负荷分类及定义1)一级负荷:中断供电将造成人身伤亡或重大设备损坏,切难以修复,带来极大的政治、经济损失者,属于一级负荷。
一级负荷要求有两个独立电源供电。
2)二级负荷:中断供电将造成设备局部破坏或生产流程紊乱,且较长时间才能修复或大量产品报废,重要产品大量减产,属于二级负荷。
二级负荷应由两回线供电。
但当两回线路有困难时(如边远地区),允许有一回专用架空线路供电。
3)三级负荷:不属于一级和二级的一般电力负荷。
三级负荷对供电无特殊要求,允许较长时间停电,可用单回线路供电。
110kV中间变电站一次设计

110kV中间变电站一次设计本文旨在介绍110kV中间变电站一次设计的背景信息。
该项目的目的在于建设一座高压中间变电站,以实现电力输送和供电需求。
中间变电站是电力系统中的重要组成部分,能够协调不同电压等级之间的电力传输,保障电力的稳定供应。
该中间变电站将运用110kV电压等级,可以连接其他变电站及配电网,为周边地区的大型工业和居民用电提供稳定和可靠的电力供应。
通过该项目的建设,可以满足当地用电需求的增长,并促进区域经济的发展。
中间变电站的一次设计需要充分考虑项目所处的环境和现有条件。
这包括选址要求、土地利用情况、地形地貌特征等因素。
同时,还需要考虑当地气候状况、地震等自然灾害风险,以及社会环境、交通条件等因素。
通过仔细研究和设计,我们将确保中间变电站的一次设计充分满足项目的要求,并在建设过程中考虑到现有条件和环境保护等因素。
本文档旨在列出110kV中间变电站一次设计的主要要求。
以下是各方面的要求:容量需求:中间变电站需要满足指定的容量要求,以确保电力系统的正常运行。
电力系统架构:中间变电站的一次设计应基于适当的电力系统架构,确保系统的可靠性和灵活性。
电力设备选择和配置:选择和配置适当的电力设备,包括变压器、断路器、开关设备等,以满足变电站的要求。
安全要求:中间变电站应考虑安全因素,包括防火、防爆等措施,以确保工作人员和设备的安全。
维护要求:一次设计应考虑设备的维护和检修要求,以便确保设备的可持续运行和性能。
以上是110kV中间变电站一次设计的主要要求,这些要求将指导设计过程,确保中间变电站的正常运行和可靠性。
本部分将详细描述关于110kV中间变电站一次设计的具体方案。
包括主要设备的选择和布置,安全和可靠性考虑,系统的互连和监控等方面的设计。
主要设备选择和布置在110kV中间变电站的一次设计中,需仔细选择和布置主要设备。
关键设备包括变压器、电缆、断路器、隔离开关等。
在选择主要设备时,应考虑其技术性能、可靠性和适用性,以满足变电站的需求。
110kV变电站一次系统设计

110kV变电站一次系统设计一、本文概述随着社会的快速发展和电力需求的日益增长,110kV变电站作为电力系统中不可或缺的重要环节,其设计与建设的合理性和高效性显得尤为重要。
本文旨在探讨110kV变电站一次系统的设计,通过对变电站的主要设备、电气接线、短路电流计算、设备选择及布置等方面的详细论述,以期为变电站的设计、建设和运行提供理论支持和实践指导。
本文首先介绍了110kV变电站一次系统的基本组成和功能,包括变压器、断路器、隔离开关、互感器、避雷器等关键设备的作用和选型原则。
随后,详细阐述了电气接线的设计原则,包括接线方式的选择、接线方案的优化以及运行灵活性和可靠性的保证。
在此基础上,本文还深入探讨了短路电流的计算方法,以确保设备在短路故障时能够安全、可靠地运行。
本文还重点介绍了设备选择及布置的内容,包括设备的选型依据、技术参数要求以及布置方案的优化等。
通过对设备选型和布置的综合分析,旨在提高变电站的运行效率,降低故障率,确保电力系统的安全稳定运行。
本文总结了110kV变电站一次系统设计的关键要点和注意事项,为变电站的设计、建设和运行提供了有益的参考和借鉴。
也指出了当前设计中存在的问题和不足,为进一步的研究和改进提供了方向。
二、110kV变电站一次系统设计基础110kV变电站的一次系统设计是整个变电站设计的核心部分,它涉及到电力系统的安全、稳定运行以及电力供应的可靠性。
在进行110kV变电站一次系统设计时,需要遵循一定的设计基础和原则,确保设计的合理性、经济性和先进性。
设计基础包括电气主接线的设计。
电气主接线是变电站内部电气设备的连接方式,它决定了电力系统的运行方式。
在设计中,应充分考虑系统的可靠性、灵活性和经济性,合理确定电气主接线的形式和设备配置。
电气设备的选择也是设计的基础之一。
电气设备包括变压器、断路器、隔离开关、互感器、避雷器等,它们的选择直接影响到变电站的运行性能和安全性。
在选择电气设备时,应根据变电站的容量、电压等级、运行方式等因素,选择符合国家标准和行业规范的设备,并充分考虑设备的可靠性、维护性和经济性。
110kV变电站电气一次系统主接线设计

110kV变电站电气一次系统主接线设计摘要:电力系统的安全性、灵活性、稳定性、经济运行以及电气设备的选择都是受到变电站主接线型式的影响。
本文对110kV变电站电气一次系统主接线设计进行分析,包括高压侧接线型式、低压侧接线型式、电气设备选择等,使电气一次系统操作简便,运行灵活和经济合理。
关键词:110kV变电站;电气一次;主接线0 前言当前我国110kV变电站电气系统设备更新换代,日益完善,建设规模不断扩大,有效缓解了供电压力。
但是为了保证电力的持续、稳定输出,变电站建设必须具有兼容性、超前性和科学性。
因此,电气一次设计需注重安全性和经济性。
从宏观角度来说,良好的设计是解决生产与建设矛盾的有效途径,设计过程中应充分利用新型设备技术满足电气一次现代化设计要求。
对于110kV变电站电气一次系统设计来说,设计方案的选择需兼顾电气设备布置、选型、主接线选择等多个方面,只有兼顾了创新性、科学性、实用性等多项要求,方可确保变电站的正常运行,这也是电力企业在面对竞争激烈的市场环境背景下,要想提高自身的核心竞争力、抢占市场份额的重要举措。
1、110kV变电站电气一次系统主接线设计的关键点1.1电气主接线电气主接线是发电厂、变电站电气设计的首要部分。
主接线与电力系统整体及发电厂、变电站本身运行的可靠性、灵活性和经济性密切相关,并对电气设备选择、配电装置布置等有较大影响。
1.2变电站电气设备的选择在未来的发展中,变电站会以智能为主进行发展,所以在选择电气设备的时候应该考虑电气设备的先进程度和可靠性,同时还需要有采集和保护测控的功能。
除此之外,变电站的设备还应具有降低生命周期成本的功能,减少后期的维修以及维修的成本。
1.3计算短路电流电网系统日趋完善,相应的技术水平也有所提高。
设计阶段中,需准确记录短路电流,并作为设计的参考数据。
可通过短路电流计算选择导体和设备、确定中性点接地方式、计算软导线的短路摇摆、确定分裂导线间隔棒的间距等。
110KV变电站电气一次部分设计

摘要随着国民经济的突飞猛进,电能已成为社会生产中必不可少的一种能源,为国民经济各部门和人民生活提供充足,可靠,优质,廉价的电能,是电力工业的基本任务。
变电站作为电力系统中的重要组成部分,直接影响整个电力系统的安全与经济运行。
这次设计首先根据任务书上所给原始资料及所有负荷的参数,分析负荷发展趋势。
从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV,35kV,10kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,从而完成了110kV电气一次部分的设计。
该变电站的建成,不仅增强了当地电网的网络结构,而且为当地的工农业生产提供了足够的电能,从而达到使本地区电网安全、可靠、经济地运行的目的。
关键词:电气主接线; 短路电流计算; 电气设备选择; 设计图纸AbstractAlong with the rapid development of national economy, the power has become necessary in social production of a kind of energy, for national economic sectors and people's life quality, reliable, and provide enough power, cheap, is the basic task of the electric power industry. Substation as an important part of power system, directly affects the whole power system safety and economical operation. The first task according to the design of this book to the original material and all the parameters, the analysis of load load development trend. From the load increasing illustrates the necessity of the establishment of construction, and then through the generalization of substation and outlet to consider, and through the analysis of the data of load, safety, economy and reliability into consideration, determine the 110 kv and consumers 10kV power station, as well as 35kV main connection, and then through the load calculation and power supply range determines the main transformer capacity and models, and also identified with the capacity of transformer station, finally, according to the model and maximum sustained working current and short circuit calculation results of high-pressure fuse, isolating switch, bus, insulator and wear casing wall,voltage transformer, current transformer, the selection of 110 kv electrical once finished parts design. The substation built, not only enhances the local power grid, the network structure and the local industrial and agricultural production provides sufficient electricity, so as to achieve the network safe, reliable, economic operation. Keywords: the main electrical wiring, Short-circuit current calculation, Electrical equipment selection, Drawings目录摘要 (I)1 概述 (1)2 电气主接线 (2)2.1 电气主接线概述 (2)2.2 选择电气主接线时的设计依据 (3)2.3 变电站主接线设计的基本要求: (3)2.4 110kv侧主接线方案 (4)2.5 35kv侧主接线方案 (5)2.6 10kv侧主接线方案 (7)2.7 站用电接线 (8)3 负荷计算及变压器选择 (10)3.1 负荷分类及定义 (10)3.2 110kv 35KV及10KV各侧负荷的大小 (11)3.3 主变压器台数的确定 (12)3.4 主变压器容量的确定 (13)3.5 变电站主变压器型式的选择 (13)3.6 无功补偿和电容器的选取 (17)4 最大持续工作电流及短路计算 (20)4.1 各回路最大持续工作电流 (20)4.2 短路计算的目的及假设 (20)4.3 短路电流计算 (22)5 主要电气设备选择 (24)5.1 电气设备的选择原则 (24)5.2 高压断路器的选择 (26)5.3 隔离开关的选择 (33)5.4 电流互感器的选择 (36)5.5 电压互感器的选择 (40)5.6 母线导体的选择 (43)5.7 避雷器的选择 (48)5.8 接地刀闸的选择 (49)6 配电装置设计 (50)6.1 设计原则与要求 (50)结论 (53)致谢 (54)1 概述群英110kv变电站处于焦作市山阳区,地平,交通便利,进出线方便,空气污染微轻;待建变电站所选在黄沙土地上,突然电阻率p=500欧每米。
110kV变电站的一次设计

110kV变电站的一次设计摘要:变电站是电力系统的一个重要组成部分,而变电站变压器的选择至关重要.在电力系统中,电压的转换与分配都需要借助变电站完成,变电站就是将不同的电网连接在一起,并对电能进行控制与分流.而变电站一次设计直接影响整个电网的运行效率,因此对110kv的变电站一次设计提出了更高的要求,本文主要针对110kv的变电站进行一次设计,并分析变压器以及线路的保护措施。
关键词:110kV变电站;电气;一次设计1、110kV变电站一次系统设计原则(1)严格执行国家制定的政策、法规,保证整个电力行业运行稳定,满足国家用电要求。
同时,在操作过程中,要保证人员的安全和电源的稳定,在实际设计工作中,应尽可能引进先进的设备和技术,以保证电力系统的整体水平。
(2)随着现代信息技术的发展,积极运用自动化技术,保证110kV变电站自动化水平的提高。
(3)110kV变电站的建设需要利用相应的土地资源,对周围环境和电力系统使用人员有一定的影响。
因此,根据施工现场的实际情况,要求设计人员保证参数符合标准要求,从而完成设计工作。
2、110kV变电站的主接线设计对于变电站来说,主接线的设计极其繁琐,其接线方式非常复杂,如果接线方式不对,则很容易引发故障,一旦发生故障,不仅检测非常困难,而且修复也非常困难,所以在确保供电良好的前提下,还要不断简化变电站主接线的设计。
首先清楚变压器的最大承载情况,然后依据电气的实际情况设计好变电站的主接线方式,一般常见的主接线方式为单母线分段接线或双母线接线。
通常110kV的变电站会采用直接接入对侧变电站间隔的进线方式,采用此种接线方式主要是由于供电更可靠,便于运行管理。
3、110kV变电站主变压器的设计通常主变压器在安装以前,必须先严格的察看整个变电站的运行情况,然后根据具体情况选取适当的变压器,其数量需要依据空间面积和规模结构进行选择,一般都以总容量和占地面积作为参考标准。
对于110kV的变电站来说,大多数都需要安装一台以上的变压器,这主要是为了确保变压器能够稳定高效的运行,当一台变压器出现异常情况时,另一台变压器就可自动承载一部分负荷,这样既能确保变电站的安全,又能保障变电站的运行效率。
110kV变电站主接线设计

110kV变电站主接线设计D目录第一章引言 (5)第二章主变压器的确定 (6)第三章电气主接线设计 (9)第四章主接线方案的确定 (13)第五章短路电流计算 (17)第六章设备的选择与校验 (22)第一节设备选择的原则和规定 (22)第二节导线的选择和检验 (24)第三节断路器的选择和校验 (31)第四节隔离开关的选择和校验 (36)第五节互感器的选择及校验 (38)第六节避雷器的选择及校验 (41)第七章防雷及接地系统设计 (43)第一节防雷系统 (43)第二节变电所接地装置 (45)毕业设计总结和致谢 (42)第一章引言一、设计任务:本次设计任务为新建一所110KV降压变电站。
二、设计依据:1.电压等级:110/35/10KV2.出线回路数:110KV侧2回(架空线)LGJ-300/35km35KV侧6回(架空线)10KV侧12回(其中电缆4回)3.负荷情况35KV侧:最大40MW,最小25MW,Tmax=6000h,cosφ=0.8510KV侧:最大25MW,最小18MW,Tmax=6000h,cosφ=0.85负荷性质:工农业生产及城乡生活用电4、系统情况:(1)系统经双回路给变电站供电。
(2)系统110KV母线短路容量为3000NV A。
(2)系统110KV母线电压满足常调压要求。
5、环境条件:年最高温度:32℃年最低温度:-25℃海拔高度:1000m雷暴日数:40日/年参考文献:1、电力系统课程设计参考资料华北电力大学2、发电厂电气部分天津大学3、电力工程手册(1、2、3、4分册)西北、东北电力设计院第二章主变压器的确定一、主变压器台数的确定为了保证供电的可靠性,变电所一般装设两台主变压器。
二、调压方式的确定:据设计任务书中:系统110KV母线电压满足常调压要求,且为了保证供电质量,电压必须维持在允许范围内,保持电压的稳定,所以应选择有载调压变压器。
三、主变压器容量的确定主变压器容量一般按变电所建成后5~10年的规划负荷选择,亦要根据变电所所带负荷的性质和电网结构来确定主变压器的容量。
110kV变电站一次设计

110kV变电站一次设计110KV变电所电气一次初步设计目录前言 (5)第一部分毕业设计说明书 (7)第1章总则 (7)第2章原始资料 (8)第3章接入导线及配电导线设计 (11)第4章电气主接线设计 (12)第5章短路电流计算 (16)第6章变压器选择 (17)第7章站用变选择 (21)第8章主要电气设备选择 (22)第9章过电压保护与接地 (24)第10章继电保护配置 (25)第二部分毕业设计计算书 (28)第1章接入导线及配电导线计算 (28)第2章主变压器调压分接头计算 (39)第3章短路电流计算 (44)第4章主要电气设备选择计算 (54)第5章防雷保护计算 (63)总结 (64)谢辞 (65)参考文献 (66)前言变电站是电力系统的重要组成部分,是联系发电厂和用户的中间环节,起着变换和分配电能的作用,直接影响整个电力系统的安全与经济运行。
电气主接线是变电站设计的首要任务,也是构成电力系统的重要环节。
电气主接线的拟订直接关系着全站电气设备的选择、配电装置的布置、继电保护和自动装置的确定,是变电站电气部分投资大小的决定性因素。
本次设计为110kV 变电站电气一次部分初步设计,分为设计说明书、设计计算书、设计图纸等三部分。
所设计的容力求概念清楚,层次分明。
本文是在电力高等专科学校电力工程系启军教授的精心指导下完成的。
老师治学严谨、知识广博、善于捕捉新事物、新的研究方向。
在毕业设计期间老师在设计的选题和设计思路上给了我很多的指导和帮助。
老师循循善诱的教学方法、热情待人的处事方式、一丝不苟的治学态度、对学生严格要求的敬业精神给我留下了很深的印象。
在此,我对恩师表示最崇高的敬意和最诚挚的感谢!本文从接入导线和配电导线的设计选择,主接线、短路电流计算、主要电气设备选择等几方面对变电站设计进行了阐述,并绘制了电气主接线图、电气总平面布置图、站用电系统图、防雷保护配置图、各级电压配电装置断面图、直流系统图等相关设计图纸。
110kV变电站的电气一次设计分析金黄炜

110kV变电站的电气一次设计分析金黄炜发布时间:2021-10-22T06:18:13.365Z 来源:《中国电业》(发电)》2021年第12期作者:金黄炜[导读] 电气一次设计是变电站设计的重要内容,其直接关系变电站的职能发挥效果,对于变电站的安全与稳定应用具有深刻影响。
本文在阐述110kV变电站的电气一次设计要求的基础上,就其主接线设计与电气一次设计的技术要点展开分析,期望能进一步提升电气一次设计的整体水平,促进电力工程的持续、稳定发展。
关键词:电金黄炜浙江中新电力工程建设有限公司浙江杭州 310000摘要:电气一次设计是变电站设计的重要内容,其直接关系变电站的职能发挥效果,对于变电站的安全与稳定应用具有深刻影响。
本文在阐述110kV变电站的电气一次设计要求的基础上,就其主接线设计与电气一次设计的技术要点展开分析,期望能进一步提升电气一次设计的整体水平,促进电力工程的持续、稳定发展。
关键词:电力工程;110kV变电站;电气一次设计变电站在电压变化、接受和分配中起到至关重要的作用,其能在变压器的作用下,实现各级电压电网的有效连接。
新时期,人们对于电力资源的需求持续增强,并且对于电力系统使用的安全性要求不断提高,在110kV变电站设计中,应基于现有设计原则,规范化地开展电气一次设计,以此来保证电力系统电气设备使用的安全性。
一、基于110kV变电站的电气一次设计要求110kV变电站设计本身具有较强的专业性、综合性和复杂性,在110kV变电站设计中,电气一次系统的设计至关重要,其直接关系着变电站使用的完全性和稳定性。
故而在110kV变电站电气一次设计中,应注意遵守以下要求:其一,在电气一次设备选择中,需充分考虑变电站的实际需求,并对所有的设备进行检验和试验,确保设备性能良好,且满足变电站正常检修、维护、过电压以及断路保护工作需要。
其二,环境因素对于一次设备的使用具有较大应影响,基于此,在110kV变电站设计中,应重视电气一次设备与环境适应性的检测分析,确保在特定环境下,电气一次设备能可靠运行,保证整个变电站及电力系统应用的稳定性、安全性。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
110kv变电站一次接线设计毕业设计指导老师:王必生老师学校:湘西职业技术学院专业:电力系统自动化技术班级:11-3电力一班姓名:摘要首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。
从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV,35kV,10kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,从而完成了110kV电气一次部分的设计。
一.待设计变电所地位及作用按照先行的原则,依据远期负荷发展,决定在本区兴建1中型110kV变电所。
该变电所建成后,主要对本区用户供电为主,尤其对本地区大用户进行供电。
改善提高供电水平。
同时和其他地区变电所联成环网,提高了本地供电质量和可靠性。
北待设计变电站~110kV出线4回,2回备用 35kV 出线8回,2回备用 10kV线路12回,另有2回备用~2、变电站负荷情况及所址概况本变电站的电压等级为110/35/10。
变电站两个系统供电,系统S1为600MVA,容抗为, 系统S2为800MVA,容抗为线路1为30KM, 线路2为20KM, 线路3为25KM。
该地区自然条件:年最高气温 40摄氏度,年最底气温- 5摄氏度,年平均气温 18摄氏度。
出线方向110kV向北,35kV向西,10kV向东。
所址概括,黄土高原,面积为100×100平方米,本地区无污秽,土壤电阻率7000Ω.cm。
本论文主要通过分析上述负荷资料,以及通过负荷计算,最大持续工作电流及短路计算,对变电站进行了设备选型和主接线选择,进而完成了变电站一次部分设计。
二.设计步骤:第一章变压器选择…………………………………………… 1 主变台数、容量和型式的确定…………………………… 2 站用变台数、容量和型式的确定…………………………第二章电气主接线………………………………………………1 110kv电气主接线………………………………………2 35kv电气主接线………………………………………3 10kv电气主接线………………………………………4 站用变接线……………………………………………第三章最大持续工作电流及短路电流的计算………………… 1 各回路最大持续工作电流………………………………2 短路电流计算点的确定和短路电流计算结果............第四章主要电气设备选择............................................. 1 高压断路器的选择............................................. 2 隔离开关的选择................................................... 3 母线的选择......................................................... 4 绝缘子和穿墙套管的选择 (5)电流互感器的选择................................................6电压互感器的选择 (7)各主要电气设备选择结果一览表…………………………附录I设计计算书………………………………………………………附录II电气主接线图…………………………………………………… 10kv配电装置配电图…………………………………………1. 负荷计算及变压器选择1.负荷计算要选择主变压器和站用变压器的容量,确定变压器各出线侧的最大持续工作电流。
首先必须要计算各侧的负荷,包括站用电负荷、10kVφ负荷、35kV负荷和110kV侧负荷。
p1% SKt公式ci1cosn式中 sC ——某电压等级的计算负荷kt——同时系数а%——该电压等级电网的线损率,一般取5%P、cos——各用户的负荷和功率因数1.站用负荷计算S站=×(/)×(1+5%)= ≈负荷计算S10KV=[(4+3+++++)×+3/9×4] ×(1+5%) = 负荷计算S35KV=×[(6+6+5+3)/+(+)/]×(1+5%) =负荷计算S110KV=×(20/+/+/+12/) ×(1+5%)+ S站=+ =2主变台数、容量和型式的确定1.变电所主变压器台数的确定主变台数确定的要求:1.对大城市郊区的一次变电站,在中、低压侧已构成环网的情况下,变电站以装设两台主变压器为宜。
2.对地区性孤立的一次变电站或大型专用变电站,在设计时应考虑装设三台主变压器的可能性。
考虑到该变电站为一重要中间变电站,与系统联系紧密,且在一次主接线中已考虑采用旁路呆主变的方式。
故选用两台主变压器,并列运行且容量相等.2.变电所主变压器容量的确定主变压器容量确定的要求:1.主变压器容量一般按变电站建成后5~10年的规划负荷选择,并适当考虑到远期10~20年的负荷发展。
2.根据变电站所带负荷的性质和电网结构来确定主变压器的容量。
对于有重要负荷的变电站,应考虑当一台主变压器停运时,其余变压器容量在设计及过负荷能力后的允许时间内,应保证用户的一级和二级负荷:对一般性变电站停运时,其余变压器容量就能保证全部负荷的60~70%。
S总=于上述条件所限制。
所以,两台主变压器应各自承担。
当一台停运时,另一台则承担70%为。
故选两台50MVA的主变压器就可满足负荷需求。
3.变电站主变压器型式的选择具有三种电压等级的变电站中,如通过主变压器各侧绕组的功率均达到该变压器容量的15%以上或低压侧虽无负荷,但在变电站内需装设无功补偿设备时,主变压器采用三饶组。
而有载调压较容易稳定电压,减少电压波动所以选择有载调压方式,且规程上规定对电力系统一般要求10KV及以下变电站采用一级有载调压变压器。
故本站主变压器选用有载三圈变压器。
我国110kV及以上电压变压器绕组都采用Y0连接;35kV采用Y连接,其中性点多通过消弧线圈接地。
35kV以下电压变压器绕组都采用连接。
故主变参数如下:电压组合及分接范围型号高压中压低压高-中SFSZ9-50000/110 110±8×1。
25% 阻抗电压高-低中-低 38.5±5% 10.5 11 17.5 YN,1.3 yn0,d11 空载电流连接组 3.站用变台数、容量和型式的确定1.站用变台数的确定对大中型变电站,通常装设两台站用变压器。
因站用负荷较重要,考虑到该变电站具有两台主变压器和两段10kV 母线,为提高站用电的可靠性和灵活性。
所以装设两台站用变压器,并采用暗备用的方式。
2.站用变容量的确定站用变压器容量选择的要求:站用变压器的容量应满足经常的负荷需要和留有10%左右的裕度,以备加接临时负荷之用。
考虑到两台站用变压器为采用暗备用方式,正常情况下为单台变压器运行。
每台工作变压器在不满载状态下运行,当任意一台变压器因故障被断开后,其站用负荷则完好的站用变压器承担。
S站=/(1-10%) =106KVA3.站用变型式的选择考虑到目前我国配电变压器生产厂家的情况和实现电力设备逐步向无油化过渡的目标,可选用干式变压器。
故站用变参数如下:电压组合型号高压 10;;6 高压分接范围±5% 连接组低压标号 Y,yn0 空载损耗负载损耗空载阻抗压4 电流电S9-200/10 因本站有许多无功负荷,且离发电厂较近,为了防止无功倒送也为了保证用户的电压,以及提高系统运行的稳定性、安全性和经济性,应进行合理的无功补偿。
根据设计规范第条自然功率应未达到规定标准的变电所,应安装并联电容补偿装置,电容器装置应设置在主变压器的低压侧或主要负荷侧,电容器装置宜用中性点不接地的星型接线。
《电力工程电力设计手册》规定“对于35-110KV变电所,可按主变压器额定容量的10-30%作为所有需要补偿的最大容量性无功量,地区无功或距离电源点接近的变电所,取较低者。
地区无功缺额较多或距离电源点较远的变电所,取较低者,地区无功缺额较多或距离电源点较远的变电所取较高者。
2.电气主接线电气主接线主要是指在发电厂、变电所、电力系统中,为满足预定的功率传送和运行等要求而设计的、表明高压电气设备之间相互连接关系的传送电能的电路。
现代电力系统是一个巨大的、严密的整体。
各类发电厂、变电站分工完成整个电力系统的发电、变电和配电的任务。
其主接线的好坏不仅影响到发电厂、变电站和电力系统本身,同时也影响到工农业生产和人民日常生活。
因此,发电厂、变电站主接线必须满足以下基本要求:1 运行的可靠断路器检修时是否影响供电;设备和线路故障检修时,停电数目的多少和停电时间的长短,以及能否保证对重要用户的供电。
2 具有一定的灵活性主接线正常运行时可以根据调度的要求灵活的改变运行方式,达到调度的目的,而且在各种事故或设备检修时,能尽快地退出设备。
切除故障停电时间最短、影响范围最小,并且再检修在检修时可以保证检修人员的安全。
3 操作应尽可能简单、方便主接线应简单清晰、操作方便,尽可能使操作步骤简单,便于运行人员掌握。
复杂的接线不仅不便于操作,还往往会造成运行人员的误操作而发生事故。
但接线过于简单,可能又不能满足运行方式的需要,而且也会给运行造成不便或造成不必要的停电。
4 经济上合理主接线在保证安全可靠、操作灵活方便的基础上,还应使投资和年运行费用小,占地面积最少,使其尽地发挥经济效益。
5应具有扩建的可能性于我国工农业的高速发展,电力负荷增加很快。
因此,在选择主接线时还要考虑到具有扩建的可能性。
变电站电气主接线的选择,主要决定于变电站在电力系统中的地位、环境、负荷的性质、出线数目的多少、电网的结构等。
电气主接线于此变电站是为了某地区电力系统的发展和负荷增长而拟建的。
那么其负荷为地区性负荷。
变电站110kV侧和10kV 侧,均为单母线分段接线。
110kV~220kV出线数目为5回及以上或者在系统中居重要地位,出线数目为4回及以上的配电装置。
在采用单母线、分段单母线或双母线的35kV~110kV 系统中,当不允许停电检修断路器时,可设置旁路母线。
根据以上分析、组合,保留下面两种可能接线方案,如图及图所示。
图单母线分段带旁母接线图双母线带旁路母线接线对图及图所示方案Ⅰ、Ⅱ综合比较,见表1-1。
表1-1 主接线方案比较表项方案技术目方案Ⅰ方案Ⅱ①简单清晰、操作方便、易①运行可靠、运行方式灵活、便于于发展②可靠性、灵活性差③旁路断路器还可以代替出修出线断路器,保证重要用户供电事故处理、易扩建②母联断路器可代替需检修的出线断路器工作线断路器,进行不停电检③倒闸操作复杂,容易误操作经济①设备少、投资小路断路器节省投资①占地大、设备多、投资大投资②用母线分段断路器兼作旁②母联断路器兼作旁路断路器节省在技术上第Ⅱ种方案明显合理,在经济上则方案Ⅰ占优势。