采矿工程本科毕业设计(论文)-山西潞安五阳煤矿五井初步设计

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

采矿工程本科毕业设计(论文)-山西潞安五阳煤矿五井初步设计

采矿工程本科毕业论文

题目: ___________________

专业:

班级:

学号:

姓名:

指导老师:

2010年6月X日

摘要:本设计通过详细介绍山西潞安五阳煤矿五井的井田概况和地质特征,经过一系列的方案论证比较,选择了适合本矿井的开拓方式、采煤方法和各生产系统。井田内地质构造比较简单,主要为纵贯井田东西的天仓向斜,属于低瓦斯矿井,无煤尘爆炸危险;本井田主要有三层可采煤层,按埋藏深度从浅到深分别为三号煤层、九号煤层和十一号煤层,平均厚度分别为3.75m、3.25m、3.20m,煤层倾角4o~7o,平均5o,属于近水平煤层。经过技术经济比较,煤矿设计生产能力为300万t/a,服务年限为68年,对第一水平选择了立井开拓方案,首采区的采煤方法采用倾斜长壁采煤法,综合机械化回采工艺。辅助运输系统与主运输系统相分离,其中辅助运输系统采用了国际上先进的辅助运输设备单轨吊,可满足人员、机械设备、材料和矸石的运输,无需中间转载,可从井底车场直达工作面。矿井一水平采用两翼对角式通风系统。

总之,通过技术经济等多方面的比较得出本设计的开拓方案、采煤方法等均能满足矿井的开采需求。

关键词:立井开拓;条带式;单一倾斜长壁采煤法;综合机械化采煤;两翼对角式通风

Abstract:This design introduces coalfield’s genneral situation and geologic characteristic in No.5 colliery of WUYANG in detail. Based on a series of technique and economy comparisons, the suitable mine development scheme,mining method ,mine’s (work

-ing area’s) openings and each main production system have been determined.The geologic structure in the coalield is simple,the main structure is Tiancang Syncline acrossed the field from west to east.The mine has low gas and no danger of coal-dust explosion .The main coal seams that is designed has three layers.The burying depth is 3# coal seam,9# coal seam and 11# coal seam from shallow to deep.Their average thickness is 3.75m,3.25m and 3.20m respectively.Their angle of dip is 4o~7o,the average is 5o,so they belong to flat seams.The designed capacity of the mine is 3 million t/a and the expected life of the mine is 68 years.Based on technique and economy comprisions,the plan chooses min shaft development for the first level,adopts long wall mining method along the dip and comprehensive mechanized coal mining.The auxiliary haulage system is separated from the main haulage,and the auxiliary haul system adopts the single rail hoist crane which is advanced in the international.The two-way diagonal ventilation system is used for the first level.

In a word,after a series comparisons of technique and economy and so on,the development scheme and the mining method can both be fulfilled the request of the mine production.

Keywords: shaft development; mining in strips; long wall mining method along the dip; comprehensive mechanized coal mining; two-way diagonal ventilation system.

目录

第一章井田概况及地质特征 (1)

第一节井田概况 (1)

第二节地质特征 (3)

第二章井田境界及储量 (17)

第一节井田境界 (17)

第二节埋藏储量 (18)

第三节各种煤柱的尺寸和计算方法 (21)

第三章矿井设计生产能力及服务年限 (23)

第一节工作制度 (23)

第二节矿井设计生产能力及服务年限 (23)

第四章井田开拓 (28)

第一节井田地质、老窑及水文对开采的影响28 第二节矿井开拓方式的确定 (29)

第五章矿井基本巷道 (45)

第一节井筒 (45)

第二节井底车场 (53)

第三节主要开拓巷道 (57)

第六章采煤方法和采区巷道布置 (62)

第一节煤层地质特性 (62)

第二节采煤方法和采区巷道布置 (64)

相关文档
最新文档