机泵检修作业流程
英文版:
Pump Maintenance Operation Process
1. Preparation
Before starting the pump maintenance operation, proper preparation must be made. This includes collecting relevant technical information about the pump, preparing the necessary tools, spare parts, and safety protective equipment, and ensuring the cleanliness and safety of the workplace.
2. Pump Disassembly
The pump is carefully dismantled according to the prescribed disassembly sequence. Care should be taken not to damage the pump and related components during disassembly, and marked and recorded accordingly.
3. Cleaning & Inspection
The dismantled pump components are cleaned to remove surface dirt and oil stains. A detailed inspection is then carried out to check for wear, cracks, or other damage, and the inspection results are recorded.
4. Part Replacement
Based on the inspection results, the components that require replacement are identified, and the replacement is carried out according to prescribed procedures. The quality and specifications of the new components must meet the requirements, and installation should be done strictly following the specified method.
5. Assembly & Debugging
The pump with replaced components is reassembled, and initial debugging is performed. During debugging, the pump's smooth operation and the absence of
abnormal sounds are ensured, and the debugging results are recorded.
6. Test Run
After completion of assembly and debugging, a test run of the pump is conducted. During the test run, the pump's operating state is closely observed to ensure no abnormalities, and test run data is recorded.
7. Quality Check
After the successful test run, a quality check of the pump is performed. The check covers the pump's appearance, performance, safety, and other aspects to ensure it meets the standard requirements.
8. Job Completion
Upon confirmation of the completion of all pump maintenance tasks, the work area is cleaned, tools and spare parts are organized, and relevant records are made. The pump is ensured to operate normally and is ready for delivery and use.
中文版:
1. 作业准备
在开始机泵检修作业前,首先需做好充分的准备工作。

包括收集相关机泵的技术资料,准备所需的工具、备件、安全防护用品等,并确保工作场所的整洁和安全。

2. 拆卸机泵
按照规定的拆卸顺序,小心地将机泵拆卸下来。

确保在拆卸过程中不损坏机泵和相关部件,并做好拆卸部件的标记和记录。

3. 清洗检查
将拆卸下来的机泵部件进行清洗,去除表面的污垢和油渍。

然后对部件进行详细检查,查看是否有磨损、裂纹等损伤,并记录检查结果。

4. 更换部件
根据检查结果,确定需要更换的部件,并按照规定的步骤进行更换。

确保新部件的质量和规格符合要求,安装时也要严格按照规定的方法进行。

5. 组装调试
将更换好部件的机泵进行组装,并进行初步调试。

调试过程中要确保机泵运转平稳、无异常声响,并记录调试结果。

6. 试运行
在完成组装调试后,进行机泵的试运行。

试运行期间要密切观察机泵的运行状态,确保无异常现象,并记录试运行数据。

7. 质量检查
在试运行合格后,进行机泵的质量检查。

检查内容包括机泵的外观、性能、安全等方面,确保机泵的质量符合标准要求。

8. 作业结束
在确认机泵检修作业全部完成后,清理工作现场,整理好工具和备件,并做好相关记录。

确保机泵能够正常运行,并交付使用。