工程量计算书(2)
工程量计算书模板
工程量计算书模板第二部分工程量计算书第1章土建工程量工程名称:分部(项)名称计算公式工程量单位一层:S=[124.68+0.24-(5+6)*2-0.1*2]*(9+0.24)=949.133 1建筑面积S=(6+0.24)*0.23*4=5.741 2S=[3.14(4.3+0.24)*(4.3+0.24)*120度/360度+(5+0.12-1.277+5+0.12)*(6-1.6-0.332)3/2+(5+0.12-1.277+7+0.24)*(2.5+0.332)/2+(1.6+0.12)*(5+0.24)+(7+0.24)*(2.5+0.12)]*2=116.96S= S+ S +S=949.133+5.741+116.96=1121.834 一层总1233339.662 ? S= S+ S +S=949.133+5.741+116.96=1121.834 一层总123 二层:S=[124.68+0.24-(5+6)*2-0.1*2]*(9+0.24)=949.133 1S=(6+0.24)*0.23*4=5.741 2S=[3.14(4.3+0.24)*(4.3+0.24)*120度/360度+(5+0.12-1.277+5+0.12)*(6-1.6-0.332)3/2+(5+0.12-1.277+7+0.24)*(2.5+0.332)/2+(1.6+0.12)*(5+0.24)+(7+0.24)*(2.5+0.12)]*2=116.96S=(1.1-0.12)*5.3*13*1/2=33.76 阳台4S= S+ S +S S=949.133+5.741+116.96+33.76=1155.594 二层总阳台123+4三层:S=[124.68+0.24-(5+6)*2-0.1*2]*(9+0.24)=949.133 1S=(6+0.24)*0.23*4=5.741 2S=[3.14(4.3+0.24)*(4.3+0.24)*120度/360度+(5+0.12-1.277+5+0.12)*(6-1.6-0.332)3/2+(5+0.12-1.277+7+0.24)*(2.5+0.332)/2+(1.6+0.12)*(5+0.24)+(7+0.24)*(2.5+0.12)]*2=1 16.96S= S+ S +S=949.133+5.741+116.96=1121.834 三层总123工程名称:桩基工程分部(项)名称计算公式工程量单位预应力混凝土管桩(162V=14*53+18*109=2704 32704 m 根)工程名称:土方工程分部(项)名称计算公式工程量单位S=(124.68+0.24+2+2)*(9+0.24+2+2)=1706.90 机械平整场地 731.56 ?地坑1-1V(1个)=(1+2*0.3+0.5*1.3)*(1+2*0.3+0.5*1.3)*1.3+0.5*0.5*1.3*1.3*1.3/3=6.764 750.326 地坑2-2V (29个)=(2.2+2*0.3+0.5*1.3)*(1+2*0.3+0.5*1.3)*1.3+0.5*0.5*1.3*1.3*1.3/3*29=297.946 3 m地坑3-3(33个):S底=(2.2+2*0.3)*(0.607+0.3)+(2.2+2*0.3+0.662+2*0.3)*(1.432+0.3)/2=6.057S面=(2.2+2*0.3+1.3)*(0.607+0.3+0.65)+(2.2+2*0.3+1.3+0.662+2*0.3+1.3)*(1.432+0.3+0.65)人工挖土方 /2=14.318S 中=(2.2+2*0.3+0.65)*(0.607+0.3+0.325)+(2.2+2*0.3+0.65+0.662+2*0.3+0.65)*(1.432+0.3+0.325)/2=9.765V=(S底+4S 中+S面)/6*1.3*33=(6.057+4*9.765+14.318)/6*1.3*33=429.96地坑4-4V(1个)V=(2.2+0.6+0.5*1.3)*(2.2+0.6+0.5*1.3)*1.3+0.5*0.5*1.3*1.3*1.3/3=15.656地梁1土方:V=0.5*0.65*(2*3.14*4.39*90度/360度-0.6-0.65)*2=3.667 DL1 地梁2土方:V=0.5*0.75*[124.68*3(-5+6)*2-33*(2.2+0.6+0.65)-29*(1+0.6+0.65)-1*(1+0.6+0.65)DL2-1*(2.2+0.6+0.65)]=62.715地梁3土方:V=0.5*0.6*(2*3.14*4.39*30度/360度+2.51-0.6-0.65)*2=1.466 DL3地梁4土方:V=0.8*0.7*[9-(1.839+0.6+0.65)*2]*2=3.161 DL4地梁5土方:V=0.5*0.85*(2+3-1-0.6-0.65)*2=2.338 3DL573.347 mV=750.36+73.347-19.764-6.541-110.708-86.70-33.884=566.11 回填土 3 566.11 m工程名称:混凝土工程分部(项)名称计算公式工程量单位承台1垫层:V1-1(1个)=(0.1+0.4+0.4+0.1)*0.1*1=0.1承台2垫层:V2-2(29个)=(0.4+0.4+0.2)*(0.4+0.4+1.2+0.2)*0.1*29=6.38承台3垫层:V3-3(33个)=[(2+0.2)*(0.507+0.1)+(0.462+2+0.2+0.2)*(1.332+0.1)/2]*0.1*33=12.80 承台4垫层:V4-4(1个)=(0.4+1.2+0.4+0.2)*(0.4+1.2+0.4+0.2)*0.1*1=0.48419.764垫层地梁1垫层:V=0.3*0.55*(2*3.14*4.39*90度/360度-1)*2*0.1=0.194 地梁2垫层:0.3*0.65*[124.68*3-(5+6)*2-29*1-33*2+(9-2.2*2)*20]*0.1=5.192地梁3垫层:V=0.3*0.4*(2*3.14*4.39*30度/360度+2.5-0.4)*0.1=0.053 地梁4垫层:0.6*0.6*(9-0.4*3)*2*0.1=0.562地梁5垫层:V=0.3*0.75*(2.5+3-0.4)*0.1=0.5406.541 CT-1(1个):V=(4+0.4)*(4+0.4)*0.8*1=0.3283钢筋混凝土承台 mCT-2(29个):V=(0.4+0.4+1.2)*0.8*29=37.12 110.708 CT-3(33个):V=[(0.4+0.4+1.2)*0.507+(0.462+2)*1.332/2]*0.8*33=70.06CT-4(1个):V=(0.4+0.4+1.2)*(0.4+0.4+1.2)*0.8*1=3.2DL-1: V=0.3*0.55*(2*3.14*4.39*90度/360度-0.4*1)*2=2.142DL-2: V=0.3*0.65*[124.68*3-(5+6)*2-60*0.4+(9-3*0.4)*20]=96.728DL-3: V=0.3*0.4*(2*3.14*4.39*30度/360度+2.5-0.4)=0.528 3地梁 m 86.70 DL-4: V=0.6*0.6*(9-0.4*3)*2=5.616DL-5: V=0.3*0.75*(2.5+3-0.4)=1.148工程名称:砌筑工程分部(项)名称计算公式工程量单位 V=0.24*0.4*[124.68*2-(5+6)*2-0.4*50+(5+1.6+2)*2+(5-0.8)*2+(6-0.8)*20+(9-1-0.4)3基础砖砌体m*2+2*3.14*4.3*120度/360度*2]=33.884 33.884外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-2.7*2+0.32/0.24*0.5*8-50+0.4=247.918外墙面积S=247.918*3.9-0.9*1.8*42-4.6*3*12-5.5*11.6*4-8.9*3*2-2.3*6.3*1=410.15外墙体积V=410.15*0.24=98.436 302.755 3一层砌体 m 内墙:(厚为240):L 中=(7-0.24)*2+(9-0.24)*19-20*0.4=171.96(厚为120):L中=[(1.26-0.12)*2+3]*18+(1.26-0.12)*2+2.5=99.82内墙体积V=171.96*0.24*3.9+(99.82*3.9-0.7*2.1*19)*0.12=204.319外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-+0.32/0.24*0.5*8-50+0.4=253.318外墙面积S=253.318*3.3-0.9*1.8*42-4.2*1.8*13-8.9*6.3*2=557.488 外墙体积V=538.558*0.24=133.797 二层砌体 L中=(7-0.24)*2+(9-0.24)*18-20*0.4=163.2 内墙:263.051 内墙面积V=163.2*3.3=538.558内墙体积V=538.558*0.24=129.254 3 m 外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-+0.32/0.24*0.5*8-50+0.4=253.318外墙面积S=253.318*3-0.9*1.5*42-4.2*1.5*13=621.354外墙体积V=621.354*0.24=149.125 3三层砌体 m284.345 内墙:(厚为240):L 中=(7-0.24)*2+(9-0.24)*19-20*0.4=163.2(厚为120):L中=(2.3-0.12+1.32-0.12)*19=58.52内墙体积V=163.2*0.24*3+(58.52*3-0.7*2.1*19)*0.12=135.22工程名称:现浇混凝土梁分部(项)名称计算公式工程量单位 2KL1(1):V=0.24*0.5*(5-0.4*2+0.24)*2=1.0662KL2(2):V=0.24*0.7*(5+2+1-0.24)*2=2.607 二层现浇梁2KL3(2):V=0.24*0.5*(9-0.4*3+0.24)*2=1.932KL4(2):V=0.24*0.5*(9-0.4*3+0.24)*4=3.862KL5(2):V=0.24*0.7*(9-0.4*3+0.24+0.5)*4=5.7392KL6(2A):V=0.24*0.7*(9-0.4*3+0.24+0.5)*8=11.4783 m107.343 2KL7(5):V=0.24*0.85*(6*5-6*0.4+0.24)*2=11.1632KL8(7):V=0.24*0.85*(6*7-6*0.4+0.24)=8.0292KL9(2):V=0.24*0.85*(2*4.42*3.14*120度/360度-0.4*2)=1.724 2KL10(2):V=0.24*0.85*(2*4.42*3.14*120度/360度-0.4*2)=1.724 2KL11(1A):V=0. 3*0.85*(3+5-0.4*2+0.12)=1.8672KL12(1A):V=0. 3*0.85*(3+5-0.4*2+0.12)=1.8672KL13(7):V=0.24*0.5*(6*6+5-7*0.4+0.24-0.24)=4.5842KL14(7):V =0.24*0.5(6*7-8*0.4+0.24)=4.6852KL15(7) :V=0.24*0.5*(6*6+5-7*0.4+0.24-0.24)=4.5842L1(1):0.24*0.3*(2.3-0.24)*36=5.402L1a(1):0.24*0.4*(5-0.24)=0.4572L1b(1):0.24*0.4*(9-0.24-1.44)=0.7032L2(1):0.24*0.4*(6-1.44-0.24*2)=0.3922L2b(1):0.24*0.4*(6-0.24-0.24*2)=0.50107.3432L4(7):0.24*0.4*(6*6+5-7*0.24)*2+0.24*0.4*(6+6+5-7*0.24)=11.42 3KL1(1):0.24*0.5*(5-0.4*2-0.24)*2=1.0673KL2(2):0.24*0.7*(5+2+1-0.4+0.12)*2=2.5943KL3(2):0.24*0.5*(9-0.4*3+0.24)*2=1.93 3KL4(2):0.24*0.5*(9-0.4*3+0.24)*2=1.933KL5(2):0.24*0.5*(9-0.4*3+0.24)*2=1.93 三层现浇梁3KL6(2):0.24*0.5*(9-0.4*3+0.24)*4=3.863KL7(2A):[0.24*0.5*(9-0.4*3+0.24)+0.37*0.5*0.5]*4=4.2293KL8(2A):[0.24*0.5*(9-0.4*3+0.24)+0.37*0.5*0.5]*4=4.2293KL9(7):0.24*0.55*(6*7-8*0.4+0.24)=5.1533KL10(2):0.3*0.85*(3+5-2*0.4+0.12)=1.8673 m125.305 3KL11(2):0.24*0.85*(3+5-2*0.4+0.12)1.724125.3053KL12(2):0.3*0.85*(3+5-2*0.4+0.12)=1.8673KL13(6):0.24*0.5*(6*5-6*0.4+0.24)=3.3413KL14(7):0.24*0.5*(6*7-8*0.4+0.24)=4.6853KL15(2):0.24*0.85*(3+5-2*0.4+0.12)1.7243KL16(6):0.24*0.5*(6*5-6*0.4+0.24)=3.3413KL17(7):0.24*0.55*(6*6+5-8*0.4+0.24)=5.0213KL18(7):0.24*0.55*(6*7-8*0.4+0.24)=5.1533KL19(7):0.24*0.55*(6*6+5-8*0.4+0.24)=5.0213KL20(5):0.24*0.55*(6*5-6*0.4+0.24)=3.6753L1(1):0.24*0.4*(5-0.24)*2=0.9143L2(1A):0.24*0.4*(5+2-1.44-0.24-0.24)*2=1.0213L3(2A):0.24*0.4*(9-1.44-0.24-0.24)*16=10.8753L4(2):0.24*0.4*(9-0.24-0.24)*16=13.0873L4a(2):0.24*0.4*(9-0.24-0.24+9-1.44-0.24-0.24)=1.4783L5(7):0.24*0.45*(6*6+5-0.24-0.24*18)=3.9363L6(6):0.24*0.45*(6*6-0.24-0.24*17)=3.4213L7(1):0.24*0.4*(2.26+2.3-0.24-0.24)*2=0.7833L8(1):0.24*0.4*(2.26+2.3-0.24)=0.4573L9(4):0.24*0.4*(6+6-1.44*2-0.24-0.24*3)*6=18.5243L10(7):0.24*0.45*(6+6+5-0.24-0.24*18)=3.9363L11(2):0.24*0.4*(2.26+2.3+5-0.24-0.24*2)=0.8493L11a(3):0.24*0.4*(6-1.44+6-0.24-0.24*4)=0.8993L12(3):0.24*0.4*(2.26+2.3+5-0.24-0.24*2)=0.8493L13(2):0.24*0.4*(4.56-0.24-0.24)=0.392WKL1(1):0.24*0.5*(5-0.4*2)*2=1.008WKL2(2):0.24*0.7*(9-1-0.4*3)=2.285WKL3(2):0.24*0.5*(9-3*0.4)*8=7.488WKL4(2):0.24*0.5*(9-3*0.4)*4=3.744WKL5(4):0.24*0.5*(9-3*0.4)*8=7.488WKL6(7):0.24*0.6*(6*7-0.4*8)*2=11.17491.793屋面梁 mWKL7(5):0.24*0.6*(6*5-0.4*6)*2=7.95 91.79 WKL8(2):0.24*0.85*(2*3.14*4.42*120度/360度)=1.888 WKL9(7):0.24*0.4*(6*6+5-3-0.4*2-0.24*7)=3.41WKL10(7):0.24*0.4*(6*6+5-3-0.4*2-0.24*7)=3.41WKL11(6):0.24*0.5*(6*6+5-7*0.4)=4.584WKL12(7):0.24*0.5*(6*7-0.4*8)=4.656WKL13(2):0.24*0.85*(2*3.14*4.42*120度/360度)=1.888 WKL14(6):0.24*0.5*(6*6+5-7*0.4)=4.584WKL15(7):0.24*0.6*(6*6+5-8*0.4)=5.443WKL16(7):0.24*0.6*(6*6+5-8*0.4)=5.443WKL17(1):0.24*0.4*(2-0.12-0.2)=0.161WKLa(2):0.3*0.85*(3+5-0.24*2)=3.835WL2(7):0.24*0.4*(6*6+5-0.24*8)=3.752WL3(7):0.24*0.4*(6*7-0.24*8+6*6+5-0.24*8)=7.599工程名称:现浇混凝土板分部(项)名称计算公式工程量单位二层现浇板(厚度均为S={(6-0.24)*(9-0.24)-0.24*[(6-0.24)*2+(2.3-0.24)*2] }*16=747.274 板1120,故将板按面积不同分成三部分算,分别S=[3.14*4.3*4.3*120度/360度+(5-1.277-0.12+7-0.24)*(2.5+0.332)/2+(2.5-10.12)*(7-0.24)板23 m设轴3~15和16~22为1116.689+(5-1.277-0.12+5-0.12)*(6-1.6-0.332)/2+(1.6-0.12)*(5-0.24)]*2-0.24*[(5+6-0.24)*2+(9-1-0.24*3)板1,轴1~3和轴22~24+(2.3-0.24)*2]*2=139.609 为板2,轴15~16为板3): S=(6-0.24)*(9-0.24)-0.24*[9-0.24+5-0.24+(6-0.24*3)*2+6-1.44-0.24*2]=43.7 板3V= (S + S + S)*1.2=(747.274+139.609+43.7)*1.2=1116.689 板总板板板123 S={(6-0.24)*(9-0.24)-0.24*[(9-1.44-0.24+9-0.24)+(6-0.24*3)*2+(6-1.44-0.24)] }*16=688.435 板1三层现浇板(厚度均为120,故将板按面积不S=[3.14*4.3*4.3*120度/360度+(5-1.277-0.12+7-0.24)*(2.5+0.332)/2+(2.5-10.12)*(7-0.24)板2同分成三部分算,分别+(5-1.277-0.12+5-0.12)*(6-1.6-0.332)/2+(1.6-0.12)*(5-0.24)]*2-0.24*[(5+6-0.24)*2+(4.56-0.24)3 m设轴3~15和16~22为835.86 +(5-0.24)+(3+2.5)+(5-0.24*3)+(5+2-1.44-0.24*3)+(9-1-0.24*5)]*2=123.87 板1,轴1~3和轴22~24为板2,轴15~16为板S=(6-0.24)*(9-0.24)-0.24*[(9-0.24+9-1.44-0.24)+(6-0.24*3)*2+(1.44-0.24)]=43.565 板33):V= (S + S + S)*1.0 (747.274+139.609+43.7)*1.0=835.86 板总板板板二123 S=[(6-0.24)*(9-0.24)-0.24*(6-0.24)*3] *16=740.973 板1屋顶现浇板(厚度均为120,故将板按面积不S=[3.14*4.3*4.3*120度/360度+(5-1.277-0.12+7-0.24)*(2.5+0.332)/2+(2.5-10.12)*(7-0.24)板2同分成三部分算,分别+(5-1.277-0.12+5-0.12)*(6-1.6-0.332)/2+(1.6-0.12)*(5-0.24)]*2-0.24*[(5+6-0.24)*2+(9-1)3 m设轴3~15和16~22为919.045+(3+2)]*2=131.761 板1,轴1~3和轴22~24为板2,轴15~16为板S=(6-0.24)*(9-0.24)-0.24*(6-0.24)*3=46.311 板33):V= (S + S + S)*1.0 (740.973+131.761+46.311)*1.0=919.045 板总板板板二123工程名称:混凝土柱分部(项)名称计算公式工程量单位混凝土柱70根(此建筑物V=0.4*0.4*(10.2+0.7)*70=122.08 KZ1122.08 的柱子全部为KZ1) 3 m工程名称:屋面工程分部(项)名称计算公式工程量单位2顶层屋面 m*0.6*[124.68*2-(5+6)*2+(5+1.6+2)*2=2*3.14*4.3*120度/360度*2]=157.917 157.917工程名称:女儿墙分部(项)名称计算公式工程量单位女儿墙 V=0.12*0.6*[124.68*2-(5+6)*2+(5+1.6+2)*2=2*3.14*4.3*120度/360度*2]=18.905 3 m18.905工程名称:楼梯分部(项)名称计算公式工程量单位S=1.2*(5-1.34+3.12+0.3)*18+1.2*(5-0.3+2.12+0.3)*1=161.472 2二层楼梯m161.4722三层楼梯 mS=1.2*(5-2.12-+6-2.3-1.28+0.3)*18+1.32*(3.12+0.3)*1=125.474 125.474工程名称:脚手架工程分部(项)名称计算公式工程量单位23339.662 3339.662 m 综合脚手架2一层: 1121.834 1121.834 m 一层满堂脚手架2二层:1155.594 1155.594 m 二层满堂脚手架2三层:1109.75 1109.75 m 三层满堂脚手架工程名称:内墙抹灰分部(项)名称计算公式工程量单位S=[(7-0.24)*2+(9-0.24)*19-20*0.4+[(1.26-0.12)*2+3]*18+(1.26-0.12)*2+2.5]*3.9=1059.942 2m 一层内墙抹灰 1059.942S=[(7-0.24)*2+(9-0.24)*18-20*0.4]*3.3=538.56 538.56 2m 二层内墙抹灰:L中=(7-0.24)*2+(9-0.24)*19-20*0.4=163.2 (厚为240)(厚为120):L中=(2.3-0.12+1.32-0.12)*19=58.52 637.23 2m 三层内墙抹灰S=163.2*3+(58.52*3-0.7*2.1*19)=637.23工程名称:外墙抹灰分部(项)名称计算公式工程量单位外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-2.7*2+0.32/0.24*0.5*8-50+0.4=247.918 410.15 2m 一层外墙抹灰 S=247.918*3.9-0.9*1.8*42-4.6*3*12-5.5*11.6*4-8.9*3*2-2.3*6.3*1=410.15 外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-+0.32/0.24*0.5*8-50+0.4=253.318 2m 二层外墙抹灰 557.488 面积S=253.318*3.3-0.9*1.8*42-4.2*1.8*13-8.9*6.3*2=557.488外墙:L中=124.68*2-(5+6)+(1.6+5+2.5+2+2*3.14*4.42*120度/360度)*2-0.12*4-+0.32/0.24*0.5*8-50+0.4=253.318 2m 三层外墙抹灰 621.354 面积S=253.318*3-0.9*1.5*42-4.2*1.5*13=621.3542 m工程名称:女儿墙抹灰分部(项)名称计算公式工程量单位2m 女儿墙抹灰 S=0.6*[124.68*2-(5+6)*2+(5+1.6+2)*2=2*3.14*4.3*120度/360度*2]=157.542 157.5422 m工程名称:顶棚抹灰分部(项)名称计算公式工程量单位2m 一层顶棚抹灰 S=(747.274+139.609+43.7)=930.574 930.5742m 二层顶棚抹灰 S=(747.274+139.609+43.7)=835.86 835.862m 三层顶棚抹灰 S= (740.973+131.761+46.311)=919.045 919.045 工程名称:水泥砂浆楼地面(楼梯)分部(项)名称计算公式工程量单位2m 一层砂浆地面 S=(747.274+139.609+43.7)=930.574 930.5742m 二层砂浆楼面 S=(747.274+139.609+43.7)=835.86 835.862m 三层砂浆楼面 S= (740.973+131.761+46.311)=919.045 919.045 模板工程名称计算公式工程量单位桩承台模板 S=110.708*1.99=220.309 220.30923m/m 基础梁模板 S=(2.142+0.528+5.616)*10.6+(96.728+1.148)*8.10=880.627 880.628 23m/m 柱模板 S=122.08*14.73=1798.238 1798.238 23m/m 现浇板模板(1116.689+919.045)*8.04+835.86*12.06=26447.773 26447.7723m/m 3 工程名称:门窗工程分部(项)名称计算公式工程量单位LTC0915(42个):S=0.9*1.8*52=68.04ML1(12个):S=4.6*3 *12=165.6ML2(4个):S=5.5*11.6*4=255.22 584.66 m 一层门窗ML3(2个):S=8.9*3*2=53.4ML4(1个):S=2.3*6.3=14.49M1(19个):S=0.7*2.1*19=27.93 LTC0915(42个):S=0.9*1.8*52=68.042LTC0915(13个): S=4.2*1.8*13=98.28 278.46 m 二层门窗LTC0915(2个): S=8.9*6.3*2=112.14LTC0915(42个): S=0.9*1.5*42=56.7LTC0915(13个): S=4.2*1.5*13=81.9 2166.53 m 三层门窗M1(19个):S=0.7*2.1*19=27.93模板工程量第2章钢筋工程量楼层名称:基础层(绘图输入) 钢筋总重:27423.974Kg级别直筋号计算公式根数总根数单长m 总长m 总重kg 径构件名称:构件数量:10 本构件钢筋重:107.016Kg KZ-1[2589]构件位置:<1+80,B-80>;<3+80,B>;<4,B>;<5,B>;<12,B>;<13,B>;<20,B>;<21,B>;<22,B>;<24-80,B>B20 4850/3+800-40+max(6*d,150) B边插6 60 2.527 151.62 373.919 筋.1 B20 4850/3+800-40+max(6*d,150) H边插6 60 2.527 151.62 373.919 筋.1 B22 4850/3+800-40+max(6*d,150) 角筋插4 40 2.527 101.08 301.628 筋.1 B10 2*((400-2*30)+(400-2*30))+2*(11.9*d)+(8*d)箍筋.1 2 20 1.678 33.56 20.691 构件名称:构件数量:48 本构件钢筋重:102.157Kg KZ-1[2590]构件位置:<1+80,A+80>;<2,A+80>;<3+80,2/B-80>;<3,A+80>;<4,2/B-80>;<4,A+80>;<5,2/B-80>;<5,A+80>;<6,2/B-80>;<6,A+80>;<7,2/B-80>;<7,A+80>;<8-80,2/B-80>;<8-80,A+80>;<10,2/B-80>;<10,A+80>;<11,2/B-80>;<11,A+80>;<12,2/B-80>;<12,A+80>;<13,2/B-80>;<13,A+80>;<14,2/B-80>;<14,A+80>;<15,2/B-80>;<15,A+80>;<16-80,2/B-80>;<16-80,A+80>;<18,2/B-80>;<18,A+80>;<19,2/B-80>;<19,A+80>;<20,2/B-80>;<20,A+80>;<21,2/B-80>;<21,A+80>;<22,2/B-80>;<22,A+80>;<23,A+80>;<24-80,A+80>;<2+2500,1/B>;<22+2500,1/B>;<9+80,2/B-80>;<9+80,A+79>;<17+80,2/B-80>;<17+80,A+80>;<2-3161,1/B>;<24-2900,1/B>B20 4500/3+800-40+max(6*d,150) B边插6 288 2.41 694.08 1711.712 筋.1 B20 4500/3+800-40+max(6*d,150) H边插6 288 2.41 694.08 1711.712 筋.1 B22 4500/3+800-40+max(6*d,150) 角筋插4 192 2.41 462.72 1380.781 筋.1 A10 2*((400-2*30)+(400-2*30))+2*(11.9*d)+(8*d)箍筋.1 2 96 1.678 161.088 99.317 构件名称:构件数量:12 本构件钢筋重:104.233Kg KZ-1[2602]构件位置:<6,B>;<7,B>;<8-80,B>;<10,B>;<11,B>;<14,B>;<15,B>;<16-80,B>;<18,B>;<19,B>;<9+80,B>;<17+80,B>B20 4650/3+800-40+max(6*d,150) B边插6 72 2.46 177.12 436.806 筋.1 B20 4650/3+800-40+max(6*d,150) H边插6 72 2.46 177.12 436.806 筋.1 B22 4650/3+800-40+max(6*d,150) 角筋插4 48 2.46 118.08 352.357 筋.1 A10 2*((400-2*30)+(400-2*30))+2*(11.9*d)+(8*d)箍筋.1 2 24 1.678 40.272 24.829构件名称:构件数量:1 本构件钢筋重:139.344Kg JZL-1[2659]构件位置:<22+2500,1/B><24-2836,1/B>B20 522-40+470/2+5595+500-40+470/2 1跨.下3 3 7.007 21.021 51.841 通长筋11跨.侧B12 15*d+5595+15*d面构造筋2 2 5.955 11.91 10.5741B20 522-40+470/2+5595+500-40+470/2 1跨.上3 3 7.007 21.021 51.841 部钢筋1A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.634 4.902 1.934 筋1A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.634 4.902 1.934 筋2A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍29 29 1.634 47.386 18.698 筋3A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉15 15 0.426 6.39 2.521 筋1 构件名称:构件数量:1 本构件钢筋重:140.664Kg JZL-1[2660]构件位置:<2-3161,1/B><2+2500,1/B>B20 522-40+470/2+5655+522-40+470/2 1跨.下3 3 7.089 21.267 52.448 通长筋11跨.侧B12 15*d+5655+15*d面构造筋2 2 6.015 12.03 10.681B20 522-40+470/2+5655+522-40+470/2 1跨.上3 3 7.089 21.267 52.448 部钢筋1A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.634 4.902 1.934 筋1A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.634 4.902 1.934 筋2A8 2*((300-2*40)+(550-2*40))+2*(11.9*d)+(8*d) 1跨.箍29 29 1.634 47.386 18.698 筋3A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉15 15 0.426 6.39 2.521 筋1 构件名称:构件数量:1 本构件钢筋重:2375.511Kg JZL-2[2661]构件位置:<3,2/B><22,2/B>B20 400-40+570/2+102200+400-40+570/2 1跨.下3 3 103.49 310.47765.669 通长筋11跨.侧B12 15*d+102200+15*d+1800面构造通4 4 104.36 417.44 370.611长筋1B20 400-40+570/2+102200+400-40+570/2 1跨.上3 3 103.49 310.47765.669 通长筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.834 5.502 2.171 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 2跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 3跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 4跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 5跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍31 31 1.834 56.854 22.434 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 6跨.拉32 32 0.426 13.632 5.379 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 7跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 8跨.拉30 30 0.426 12.78 5.043 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 9跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 10跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 11跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 11跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 11跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 12跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 12跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 12跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 13跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 13跨.箍31 31 1.834 56.854 22.434 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 13跨.拉32 32 0.426 13.632 5.379 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 14跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 14跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 14跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 15跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 15跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 15跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 16跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 16跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 16跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 17跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 17跨.箍3 3 1.8345.502 2.171 筋2A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 17跨.箍29 29 1.834 53.186 20.986 筋3A8 (300-2*40)+2*(11.9*d)+(2*d) 17跨.拉30 30 0.426 12.78 5.043 筋1 构件名称:构件数量:1 本构件钢筋重:2880.308Kg JZL-2[2662]构件位置:<1,A><24,A>B20 400-40+570/2+124120+400-40+570/2 1跨.下3 3 125.41 376.23927.843 通长筋11跨.侧A12 15*d+124120+15*d+2160 面构造通 4 4 126.64 506.56 449.733 长筋1B20 400-40+570/2+124120+400-40+570/2 1跨.上3 3 125.41 376.23927.843 通长筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.834 5.502 2.171 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍24 24 1.834 44.016 17.368 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 2跨.拉26 26 0.426 11.076 4.37 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 3跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 4跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 5跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 6跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 7跨.拉30 30 0.426 12.78 5.043 筋1 AA8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍31 31 1.834 56.854 22.434 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 8跨.拉32 32 0.426 13.632 5.379 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 9跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 10跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 11跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 11跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 11跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 12跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 12跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 12跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 13跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 13跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 13跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 14跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 14跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 14跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 15跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 15跨.箍31 31 1.834 56.854 22.434 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 15跨.拉32 32 0.426 13.632 5.379 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 16跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 16跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 16跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 17跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 17跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 17跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 18跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 18跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 18跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 19跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 19跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 19跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 20跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 20跨.箍24 24 1.834 44.016 17.368 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 20跨.拉26 26 0.426 11.076 4.37 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 21跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 21跨.箍3 3 1.8345.502 2.171 筋2A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 21跨.箍29 29 1.834 53.186 20.986 筋3A8 (300-2*40)+2*(11.9*d)+(2*d) 21跨.拉30 30 0.426 12.78 5.043 筋1 构件名称:构件数量:2 本构件钢筋重:172.986Kg JZL-2[2663]构件位置:<2,A><2,1/B>;<23,A><23,1/B>B20 400-40+570/2+6570+300-40+570/2 1跨.下3 6 7.76 46.56 114.824 通长筋11跨.侧B12 15*d+6570+15*d 面构造筋 4 8 6.93 55.44 49.2211B20 400-40+570/2+6570+300-40+570/2 1跨.上3 6 7.76 46.56 114.824 通长筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 6 1.83411.004 4.342 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍24 48 1.834 88.032 34.736 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉26 52 0.426 22.152 8.741 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍2 4 1.834 7.336 2.895 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍9 18 1.83433.012 13.026 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 2跨.拉10 20 0.426 8.52 3.362 筋1 构件名称:构件数量:1 本构件钢筋重:2878.137Kg JZL-2[2665]构件位置:<1,B><24,B>B20 400-40+570/2+124120+400-40+570/2 1跨.下3 3 125.41 376.23927.843 通长筋11跨.侧B12 15*d+124120+15*d+2160 面构造通 4 4 126.64 506.56 449.733 长筋1B20 400-40+570/2+124120+400-40+570/2 1跨.上3 3 125.41 376.23927.843 通长筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍3 3 1.834 5.502 2.171 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 1跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 1跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 2跨.箍25 25 1.834 45.85 18.092 筋1A8 (300-2*40)+2*(11.9*d)+(2*d) 2跨.拉26 26 0.426 11.076 4.37 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 3跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 3跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 4跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 4跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 5跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 5跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 6跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 6跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 7跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 7跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 8跨.箍31 31 1.834 56.854 22.434 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 8跨.拉32 32 0.426 13.632 5.379 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍2 2 1.834 3.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 9跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 9跨.拉30 30 0.426 12.78 5.043 筋1 A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍2 2 1.8343.668 1.447 筋1A8 2*((300-2*40)+(650-2*40))+2*(11.9*d)+(8*d) 10跨.箍29 29 1.834 53.186 20.986 筋2A8 (300-2*40)+2*(11.9*d)+(2*d) 10跨.拉30 30 0.426 12.78 5.043 筋1。
工程量计算书
工程量计算书某砖混二层办公楼建筑面积:①一层:S1=12.24×8.24=100.858m2②二层:S2=12.24×8.24=100.858m2③一层底檐廊:S1=12.24×1.2/2=7.344m2(走廊、檐廊)④二层走廊:S2=12.24×1.2/2=7.344m2(挑廊、走廊)[注:P59页第4.2.11条:有永久性顶盖无围护结构的应按其结构底板水平面积的1/2计算。
仅指顶盖〈挑檐〉]⑤室外楼梯:S=0〈无永久性顶盖的室外楼梯不计算建筑面积。
〉∴∑S总建筑面积=100.858×2+7.344×2=216.40m2工程量清单编制A.1 土方工程项目编码 项目名称 项目特征 计量单位 工程量 010********* 平整场地m 2 108.20 (A 1-26)010*********挖沟槽V=L ·B ·H=[(12+8)×2+(8-1.2)×2]=53.6×1.2×1.7=109.344 m 3 010********* 土方回填 m 3 95.33 (A1-29)分析:⑪室内回填:100mm 厚C10砼垫层,20mm 1:2水泥砂浆抹面h 回填高度=0.3-(0.1+0.02)=0.18mV=S 净×h 净=(12-0.24×3)×(8-0.24)×0.18=15.756 m 3⑫台阶回填 V=12.24×(1.2-0.3)×(0.3-0.1-0.02)=1.983m 3100mm 厚C10砼现浇台阶,20mm1:2水泥砂浆抹面⑬基础土方回填:V 回填=V 挖-V 室外地面0.3以下的建筑物=109.344-(6.432+25.32)=77.592 m 395.330 m3V C10垫层=1.2×0.1×[(12+8)×2+(8-1.2)×2=6.432m3V砖基础-0.3~-1.9m=[(0.12×0.06+0.06×0.12+0.18×0.12)×2放脚面积+(2.0-0.1-0.3)×0.24基础墙面积]×[(12+8)×2+(8-0.24)×2]长度=0.456×55.52=25.32 m3A.3 砌筑工程010********* 砖基础m326.09分析:V JQL=0.24×0.24×[(12+8)×2+(8-0.24)×2-0.24×8]=3.09m3备注:0.24*8=梁长算至柱侧面,扣除柱长度砖基础:S1-1断面=(0.12×0.06+0.06×0.12+0.18×0.12)×2+0.24×(2.0-0.1-0.24)净高=标高-减垫层和JQL高度= 0.4704 m2∴V=0.4704×[(12+8)×2+(8-0.24)×2]=26.12 m3另扣GZ在砖基础里所占的体积h=0.3-0.24=0.06mV GZ(从JQL上表面至±0.00)=0.24×0.24×0.06×8个=0.03m3∴V净砖基础=26.12-0.03=26.09m3S墙基防潮层=[(12+8)×2+(8-0.24)×2]×0.24长*宽=13.325 m2010********* 实心砖墙m348.59(A3-9)240外墙:S =(12+8)××2)×(0.9-0.06)=244.522 m2另扣外墙门、窗、洞、QL、GL、GZ①:S外门窗洞:M10.9×2.4×6=12.96 m2 M1:900×2400共6樘C1 1.5×1.5×2=4.5 m2C1:1500×1500共2樘C2 1.2×1.2×6=8.64 m2C2:1200×1200共6樘无空洞026.1 m2②:QL、TL1、TL4 (240×240)两处高度240已扣过(6-0.24×2)③:GL 分析看其高度是否顶在上一个楼层下的梁底。
工程量计算书
监理审核
业主审核
备注
m2 (1)+(2) m2 S1+S2+S3+S4+60.88*2 m2 (290-47.02)*(19-0.3*2) m2 (1)+(2) m2 S1+S2+S3+S4 m2 (290-47.02)*(19-0.3*2) m2 同SUP-20 m2 同SUP-20 m2 同SUP-20 m2 60.88*2 m2 (1)+(2)+(3) m2 2*(S1+S2+S3+S4) m2 2*(290-47.02)*(19+0.345*2) m2 2*(14*2.5+17.5*2.54*2.5*3.14*0.25)
m2 72*1.2*1.2 m2 (1)+(2)-(3)-(4) [65.95/180*3.14*(20-1.25) +(180-65.95)/180*3.14* m2 (12-1.25)+2*(47.0212.74)]*2.5 监理:
(1) K0+12.74-K0+47.02交叉口
278.80
计算:
详见计算表: GC-003 详见计算表: GC-004 详见计算表: GC-005 详见计算表: GC-006
监理审核
业主审核
备注
15 040201001002 16 040205006001 17 040501002001 18 040501002002 19 040501006001 20 040501006002 21 040501006003 22 040501006004 23 040103001001
工程量计算书
监理工程师:
日期:
现场跟审:
日期:
现场负责人:
日期:
工程计量单
编号:002
工程名称
南京市第十三中学校园路面铺装工程
建设单位
南京市第十三中学
监理单位
江苏建咨工程咨询有限公司
日期
年 月 日
施工单位
江苏煊炜铭建设工程有限公司
工程量价及相关情形描述:
1、拆除现场混凝土路面(100厚):934.78m2(体育馆处)+35.4*3停车场+5.3*3.3+5.6*3.3公厕处=1076.95m2
2、修补地面基层(200厚C20混凝土,下铺C12@200单层双向钢筋):860.48m2
3、体育馆压模地坪下整体增加下铺C12@200单层双向钢筋:10.2*10.15+18.9*6+7.7*15.8+23.55*6.8+(7.9+9.2)/2*51=934.78m2
4、新增雨水管HDPE波纹管@200-S8:17.5+17.5+14.8+3.6+4.2*3=66m
11、更换原圆形@700检查井井盖:36套
12、更换原600*600检查井井盖:43套
13、新建管道拆除原混凝土基层(200厚):66*0.9+36.3*1.1+(31+30+9+6*2+6.8+19.5)*0.6=164.31m2
14、新建管道沟槽土方开挖:66*0.9*0.7+36.6*1.1*0.9+(31+30+9+6*2+6.8+19.5)*0.6*0.4=103.8m3
工程量计算书
工程量计算书11374(总12页)--本页仅作为文档封面,使用时请直接删除即可----内页可以根据需求调整合适字体及大小--目录第一章:编制说明及施工图说明1.编制总说明2.施工图说明第二章:工程量计算表一:建筑面积计算表表二:门窗统计表表三:基数计算表表四:楼面预制构件统计表表五:工程量计算表表六:钢筋工程量计算表表七:钢筋工程量汇总表第三章:工料分析表表八:人工工日、机械台班、材料消耗分析表表九:人工、机械台班、材料消耗量汇总表第四章:工程造价计算分析表十:未计价材料费计算表表十一:主要材料价差调整表表十二:直接费计算表表十三:间接费计算表表十四:其他项目计算表表十五:定额直接工程费计算、调整表表十六:未计价材料费计算表表十七:主要材料价差调整表表十八:利税、税金调整表表十九:工程造价计算汇总表(土建)第一章编制说明及施工图说明一、编制总说明:1、工程概况:本工程为某公司四层砖混结构办公楼,建筑总面积。
具体做法可参见建筑设计说明。
2、投标报价范围包括:本司办公楼工程施工图范围内的建筑工程和装饰装修工程。
3、编制依据包括:(1) 本工程施工组织设计及所制定施工方案。
(2) 本工程现有建筑、结构施工图、图纸会审纪要、设计变更文件。
(3)《贵州省建筑装饰工程计价定额(2004)版》(4)人工费调整:2011年9月1日后执行黔建施通[2011]564号,黔建施通[2008]297号文安装专业人工费调增54%,其他专业调整57%,单独承包土石方工程调整%机械费调整:2011年9月1日后执行黔建施通[2011]564号。
(5)贵阳市2011年12月主要建筑材料市场指导价。
(6)关于印发《建筑安装工程费用项目组成的通知》[2003]206号。
(7)本工程施工合同,工程变更合同未计入。
(8)国家建筑相关法律、法规、及行政规章。
(9)图纸以外的相关措施费用及今后增加的工程数量按实签证,不包含在此次预算包干中。
安装工程量计算书(3篇)
第1篇一、工程概况本项目为XX大厦安装工程,位于XX市XX区,总建筑面积为100,000平方米。
大厦共地上30层,地下3层,主要功能为办公、商业及酒店。
本次安装工程包括强电、弱电、消防、空调、给排水、通风等系统。
二、计算依据1. 国家及地方相关法律法规、标准规范;2. 设计图纸;3. 施工组织设计;4. 材料设备清单;5. 工程量计算规则。
三、计算方法1. 按照设计图纸、施工组织设计、材料设备清单,对工程量进行分类、统计;2. 根据国家及地方相关法律法规、标准规范,确定工程量计算规则;3. 对各类工程量进行计算,汇总形成安装工程量计算书。
四、计算内容1. 强电系统(1)低压配电箱:30台,每台安装工程量为5平方米;(2)电缆桥架:300米,每米安装工程量为10平方米;(3)电缆:5000米,每米安装工程量为5平方米;(4)插座:2000个,每个安装工程量为0.5平方米;(5)开关:1000个,每个安装工程量为0.3平方米。
2. 弱电系统(1)电话线:1000米,每米安装工程量为1平方米;(2)网络线:1000米,每米安装工程量为1平方米;(3)监控摄像头:100个,每个安装工程量为1平方米;(4)门禁系统:100个,每个安装工程量为1平方米;(5)背景音乐:100个,每个安装工程量为1平方米。
3. 消防系统(1)消防报警主机:1台,安装工程量为10平方米;(2)消防探测器:1000个,每个安装工程量为0.5平方米;(3)消防喷淋头:1000个,每个安装工程量为0.5平方米;(4)消防泵:1台,安装工程量为10平方米;(5)消防水池:1座,安装工程量为100平方米。
4. 空调系统(1)空调机组:30台,每台安装工程量为50平方米;(2)风管:5000米,每米安装工程量为10平方米;(3)新风机组:10台,每台安装工程量为20平方米;(4)排风机:10台,每台安装工程量为10平方米;(5)空调水管:1000米,每米安装工程量为5平方米。
工程量计算书
工程量计算书一、土石方工程1.平整场地清单量S=49.2*(16.2-1.8-1.8+0.2)+(3.7+0.2)*0.8*2+(3.8*2+0.2)*0.8*2+(3.1+2.6+3.1+0.2)*1*3+(2.6+0.2)*0.8*3=682.2m²计价量S′=682.2+(49.2+2*2)*2+(16.2-1.8-1+0.2+2)*2*2+3.7*2*2+3.1*2*6+2.6*2*3+(1.2*2+1.6*2+2)*3=963.8m²2.挖一般土方:挖土深度6.6-0.7=5.9mV=[(49+1.4*2)*(16.2-1-1.8+0.5*2)+(3.1*2+2.6+1.7+1)*(0.5+1.25)*2+(3.1*2+2.6+1.1*2)*(0.5+1.25)]*5.9+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.2=5526.453m³计价量:考虑工作面,地下室做防水,基础外边外扩1m,放坡系数:机械开挖,坑内作业,选择0.33V′=(A+2C+KH)*(B+2C+KH)*H+1/3*K²H³=(49+1.4*2+2*0.7+0.33*5.53)*(15.2+0.5+0.45+2*0.7+0.33*5.53)*5.53+1/3*0.33²*5.53³=5901.68m³3.挖基坑土方V=(2.2+0.7*2)*(2.6+0.7*2)*3*(8.18-5.53-0.7)=84.24m³4.土方回填V(垫层)=[(49+1.4*2+0.1*2)*(13.4+0.5*2+0.1*2)+(1+1.25-0.5)*(1.2+3.1*2+ 2.6+0.5+1+0.1*2)*2+(1.25+1+0.5)*(10+1.1*+0.1*2)]*0.1=84.89m³V(防水找平层)=848.9*0.07=59.423m³V(褥垫层)=850.75*0.2=170.15m³V(满堂基础)=[(49+1.4*2)*(13.4+1)+11.5*1.75*2+12.2*1.75]*0.7+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.9+43.2*1.95=736.095m³V(地下室)=[49.2*13.6+(3.1*2+2.6+0.2)*1.2*3]*(5.53-0.7)=3388.35m³V(回填)=5526.45+84.24-84.89-59.423-170.15-736.095-3388.35=1171.78m³5.余方弃置V=5526.45+84.24-1171.78=4438.91m³二、砌筑工程:标准层第四层1.砌体墙 200厚外墙1轴:V=[5.6(长度)*2.9(墙高)*0.2(墙厚)-0.72(扣窗)-0.532(扣梁)]*2(根数)=3.992m³V=(3.8*2.9*0.2-0.3-0.366)*2=2.076m³J轴:V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³V=(2.4*2.9*0.2-0.285-0.24)*3=2.601m³V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³H轴:V=(3*2.9*0.2-0.54-0.3)*2=1.8m³V=(2.1*2.9*0.2-0.45-0.21)*4=2.232m³V=(3.4*2.9*0.2-0.27-0.258)*4=5.776m³V=(1.4*2.9*0.2-0.126)*2=1.372m³F轴:V=(2*2.9*0.2-0.21-0.16)*4=3.16m³A轴:V=(8.8*2.9*0.2-2.312-0.688)*3=6.312m³V=(0.9*2.9*0.2-0.238-0.072)*6=1.272m³B轴:V=(2.2*2.9*0.2-0.68-0.22)*2=0.752m³V=(6.1*2.9*0.2-1.36-0.61)*2=3.136m³2.砌体墙 200厚内墙G轴:V=[6.6(长度)*2.9(墙高)*0.2(墙厚)-0.756(扣门)-0.462(扣梁)]*2=5.22m ³V=(5.7*2.9*0.2-0.756-0.387)*4=8.652m³F轴:V=(2*2.9*0.2-0.484-0.16)*3=1.548m³V=0.9*2.9*0.2*4=2.088m³E轴:V=(3.2*2.9*0.2-0.212)*4=6.576m³C轴:V=(7.4*2.9*0.2-2.76-0.868)*3=9.444m³3轴:V=(6.6*2.9*0.2-0.588(扣洞)-0.504-0.632)*6=12.624m³V=(4.2*2.9*0.2-0.378(扣门)-0.406(扣梁))*6=9.912m³4轴:V=(3.05*2.9*0.2-0.216(扣门)-0.291(扣梁))*6=7.572m³V=(1.4*2.9*0.2-0.42(扣门))*6=2.352m³V=0.7*2.9*0.2*6=2.436m³5轴:V=(6.8*2.9*0.2-0.51(扣梁))*3=10.302m³V=(1*2.9*0.2-0.08)*3=1.5m³10轴:V=(5.8*2.9*0.2-0,566)*2=5.596m³3.砌体墙 100厚内墙F轴:V=(3.5*2.9*0.1-0.1225(扣梁))*2=0.785m³2轴:V=(2.1*2.9*0.1-0.168(扣门)-0.06(扣梁))*6=2.286m³4轴:V=1.2*2.9*0.1*6=2,088m³V=(1.75*2.9*0.1-0.147(扣门)-0.0525(扣梁))6=1.848m³D轴:V=(2.45*2.9*0.0.0813(扣梁))*6=3.7752m³三、混凝土及钢筋混凝土工程:标准层第四层1.矩形梁:L8:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L4:V=0.2*0.35*3.9=0.273m³模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L10:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L1:V=0.2*0.3*2.2*2=0.264m³模板:S=(0.2*2.2+0.3*2.2*2)*2=3.52㎡XL2:V=0.2*0.4*0.9*6=0.432m³模板:S=(0.2*0.9+0.4*0.9*2)*6=5.4㎡L3:V=0.2*0.4*8.8*3=2.112m³模板:S=(0.2*8.8+0.4*8.8*2)*3=26.4㎡L2:V=0.2*0.5*7.2*3=2.16m³模板:S=(0.2*7.2+0.5*7.2*2)*3=25.92㎡L5:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡XL4:V=0.2*0.45*1.6*2=0.288m³模板:S=(0.2*1.6+0.45*1.6*2)*2=3.52㎡L9:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L12:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L7:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L6:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡L13:V=0.2*0.3*1.9*4=0.456m³模板:S=(0.2*1.9+0.3*1.9*2)*4=6.08㎡L11:V=0.2*0.35*14.6=1.022m³模板:S=0.2*14.6+0.35*14.6*2=13.14㎡KL1:V=0.2*0.3*2.2*4=0.528m³模板:S=(0.2*2.2+0.3*2.2*2)*4=7.04㎡KL2:V=0.2*0.3*1.8*2=0.216m³模板:S=(0.2*1.8+0.3*1.8*2)*2=2.88㎡LLK26:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK2:V=0.2*0.5*5.6*2=1.12m³模板:S=(0.2*5.6+0.5*5.6*2)*2=13.44㎡LLK3:V=0.2*0.5*11*2=2.2m³模板:S=(0.2*11+0.5*11*2)*2=26.4㎡LLK1:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK12:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK19:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK4:V=0.2*0.5*4.5*2=0.9m³模板:S=(0.2*4.5+0.5*4.5*2)*2=10.8㎡LLK24:V=0.2*0.4*2*3=0.48m³模板:S=(0.2*2+0.4*2*2)*3=6㎡LLK5:V=0.2*0.5*4.5*4=1.8m³模板:S=(0.2*4.5+0.5*4.5*2)*4=21.6㎡LLK7:V=0.2*0.5*4.4*4=1.76m³模板:S=(0.2*4.4+0.5*4.4*2)*4=21.12㎡LLK20:V=0.2*0.5*2.1*4=0.84m³模板:S=(0.2*2.1+0.5*2.1*2)*4=10.08㎡LL1:V=0.2*0.5*1.9*4=0.76m³模板:S=(0.2*1.9+0.5*1.9*2)*4=9.12㎡LLK31:V=0.2*0.5*2.4*3=0.72m³模板:S=(0.2*2.4+0.5*2.4*2)*3=8.64㎡LLK25:V=0.2*0.4*4.2*2=0.84m³模板:S=(0.2*4.2+0.4*4.2*2)*2=8.4㎡LLK8:V=0.2*0.4*3.5*4=1.12m³模板:S=(0.2*3.5+0.4*3.5*2)*4=14㎡LL2:V=0.2*0.5*1*3=0.3m³模板:S=(0.2+0.5*2)*3=3.6㎡LLK16:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡LLK21:V=0.2*0.35*6.5*2=0.91m³模板:S=(0.2*6.5+0.35*6.5*2)*2=11.7㎡LLK6:V=0.2*0.5*5.7*4=2.28m³模板:S=(0.2*5.7+0.5*5.7*2)*4=27.36㎡LLK13:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK9:V=0.2*0.5*5.9*2=1.18m³模板:S=(0.2*5.9+0.5*5.9*2)*2=14.16㎡LLK22:V=0.2*0.4*6.5*2=1.04m³模板:S=(0.2*6.5+0.4*6.5*2)*2=13㎡LL3:V=0.2*0.5*1.9*2=0.38m³模板:S=(0.2*1.9+0.5*1.9*2)*2=4.56㎡LLK29:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK23:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK11:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK15:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK14:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK17:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡2.直形墙Q-1 V1=1.7(长度)*2.9(墙高)*0.2(墙厚)*16(个数)=15.776m³模板:V=1.7*(2.9-0.1)*2*16=152.32㎡V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.12)*2*16=53.376㎡ V3=3.8*2.9*0.2*2=4.408m³模板:S=3.8*(2.9-0.1)*2*2=42.56㎡ V4=0.5*2.9*0.2*2=0.58m³模板:S=0.5*(2.9-0.1)*2*2=5.6㎡V5=0.3*2.9*0.2*6=1.044m³模板:S=0.3*(2.9-0.12)*2*6=10.01㎡ V6=2.2*2.9*0.2*8=10.208m³模板:S=2.2*(2.9-0.12)*2*8=97.856㎡ V7=0.8*2.9*0.2*4=1.856m³模板:S=0.8*(2.9-0.1)*2*4=17.92㎡ V8=1*2.9*0.2*2=1.16m³模板:S=1*(2.9-0.1)*2*2=11.2㎡Q-2 V1=1.7*2.9*0.2*16=15.776m³模板:S=1.7*(2.9-0.1)2*16=152.32㎡ V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.1)*2*16=53.76㎡4.板现浇板 100厚V1=3.5*2.8*0.1*2=1.96m³模板:S=(3.5-0.2)*(2.8-0.2)*2=17.16㎡V2=2.3*2*0.1*2=0.92m³模板:S=(2.3-0.2)*(2-0.2)*2=7.56㎡V3=3.5*2*0.1*2=1.4m³模板:S=(3.5-0.2)*(2-0.2)*2=11.88㎡V4=2.3*1.6*0.1*2=0.736m³模板:S=(2.3-0.2)*(1.6-0.2)*2=5.88㎡V5=3.5*4*0.1*2=2.8m³模板:S=(3.5-0.2)*(4-0.2)*2=25.08㎡V6=1*2*0.1*6=1.2m³模板:S=(1-0.2)*(2-0.2)*2=2.88㎡V7=1*1.6*0.1*6=0.96m³模板:S=(1-0.2)*(1.6-0.2)*6=6.72㎡V8=2.9*3.8*0.1*6=6.612m³模板:S=(2.9-0.2)*(3.8-0.2)*6=58.32㎡V9=4.2*1.6*0.1*6=4.032m³模板:S=(4.2-0.2)*(1.6-0.2)*6=33.6㎡V10=2.4*2*0.1*3=1.44m³模板:S=(2.4-0.2)*(2-0.2)*3=11.88㎡V11=2.6*2.8*0.1*4=2.912m³模板:S=(2.6-0.2)*(2.8-0.2)*4=24.96㎡V12=1.4*2*0.1*4=1.12m³模板:S=(1.4-0.2)*(2-0.2)*4=8.64㎡V13=3.6*2*0.1*4=2.88m³模板:S=(3.6-0.2)*(2-0.2)*4=24.48㎡V14=2.4*1.6*0.1*4=1.536m³模板:S=(2.4-0.2)*(1.6-0.2)*4=12.32㎡V15=3.6*4*0.1*4=5.76m³模板:S=(3.6-0.2)*(4-0.2)*4=51.68㎡现浇板 120厚V1=(2.9*2.2+3.1*2)*0.12*6=9.058m³模板:S=[(2.9-0.2)*(2.2-0.2)+(3.1-0.2)*(2-0.2)]*6=63.72㎡V2=4.2*5*0.12*6=15.12m³模板:S=(4.2-0.2)*(5-0.2)*6=115.2㎡钢筋工程量:剪力墙:1.Q-1 ①水平筋 L=1800-2*15+10d*2=1930mm=1.93mN=[(2900-50)/200+1]*2=16*2=32根(向上取整+1)质量=0.00617*8*8*1.93*32=24.39kg②纵筋L=2900+1.2Lae=2900+1.2*35*10=3320mm=3.32mN=[(900-200*2+15*2+6*2)/200+1]*2=8根(向上取整+1)质量=0.00617*10*10*3.32*8=16.39kg③拉筋L=200-2*15+2*(5d+1,9d)=253mm质量=0.00617*6*6*0.253*18=1.02kgGBZ-1 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*7*2=43.4kg②箍筋L=(700+200)*2-8*20+11.9d*2=1830.4mm=1.83mN=2900/200+1=16根质量=0.00617*8*8*1.83*16=11.56kgL=(500+200)*2-8*20+11.9d*2=1382.8mm=1.38m质量=0.00617*6*6*1.38*16=4.9kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m质量=0.00617*6*6*0.333*32=2.42kgGBZ-3 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*6=18.6kg②箍筋L=(400+200)*2-8*20+11.9d*2=1182.8mm=1.183mN=2900/200+1=16根质量=0.00617*8*8*1.183*16=4.2kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m 质量=0.00617*6*6*0.333*16=1.21kgD=6 理论质量小计 (1.02+4.9+2.42+4.2+1.21)*10=137.5kgD=8 理论质量小计 (11.56+24.39)*10=359.5kgD=10 理论质量小计 16.39*10=163.9kgD=12 理论质量小计 (43.4+18.6)*10=620kg。
工程量计算书
工程量计算书一、拦河坝工程1.1.1 土方开挖(如下图)拦河坝下游坝坡(桩号0+000-0+193.5)长为193.5米,开挖深度为1米。
开挖宽度为:(97.5-83.3)×2.3+1=33.66m开挖工程量为:0+010~0+05033.66×40×0.5×1.2=807.8 m3(193.5-50)×1.2×33.66=5796.3m3合计:807.8+5796.3=6604.1 m31.1.2拦河坝上游旧石拆除翻修(厚30cm)、反滤料找平补齐(厚25cm)及旧干砌石铺筑(厚30cm)(如以下简图)1、0+030-0+172.6 (长142.6m、宽10.6 m) (如下图)干砌石拆除工程量:142.6×10.6×0.3=453.5m3旧干砌石砌筑工程量:142.6×10.6×0.3=453.5m3反滤料找平补齐工程量:142.6×10.6×0.25=377.9 m32、0+016-0+028.4 (长12.4m、宽10.6 m) (如下图)干砌石拆除工程量:12.4×10.6×0.3=39.4m3干砌石砌筑工程量:12.4×10.6×0.3=39.4m3反滤料找平补齐工程量:12.4×10.6×0.25=32.9 m33、上游马道平台工程量0+030-140.2(长110.2m、宽2m)(如下图)。
干砌石拆除工程量:2×74.2×0.3+36×2×0.3×0.5= 55.3m3干砌石砌筑工程量:2×74.2×0.3+36×2×0.3×0.5= 55.3m3反滤料找平补齐工程量:2×74.2×0.25+36×2×0.25×0.5=46.1m34、上游马道平台以上(0+020-0+229.6)工程量为(如下图):干砌石拆除工程量:(12.1×36+10.5×32.4+12.1×122.6+12.4×18.6)×0.3= 746.97m3干砌石工程量:(12.1×36+10.5×32.4+12.1×122.6+12.4×18.6)×0.3= 746.97m3反滤料找平补齐工程量:(12.1×36+10.5×32.4+12.1×122.6+12.4×18.6)×0.25= 622.5m35、新建连接坡道与坝顶三角形夹角处(0+153.9-0+193.5)长39.6米(如下图)。
工程量计算书_secret (2)
18 19 20 21
1:3 水泥砂浆找平 1.5 厚三元乙丙防水卷 材 C25 钢筋砼剪力墙 C25 钢筋砼独立柱 +0.000m 以下
工程名称 :**别墅 C 户型 Z2:0.25×0.50×5.62=0.70 KZ1:3.14×0.175^2×3.90×2=0.75 KZ1a:3.14×0.175^2×3.9=0.38 KZ2: (0.25×0.50+0.25×0.25)×2.25×2=0.84Байду номын сангаас
4
C25 砼灌桩
WKZJ1: (3.14× 0.4^2+3.14× 0.47^2) /2× 4.65+(3.14× 0.45^2+3.14 × 0.55^2)/2×1.6=4.05×2=8.10 WKZJ2: ( 3.14 × 0.4^2+3.14 × 0.47^2 ) /2 × 4.65+3.14 × 0.45^2 × 1.60=3.80×19=72.16 合计:80.26m³
续表 5.1
KZ3: (0.25×0.5+0.25×0.25)×3.90×5.0=3.66 KZ4:0.25×0.25×2.25×2.0=0.28 KZ5:0.3×0.4×(2.25+3.9×2)=1.21 KZ6、KZ7:0.3×0.4×3.9×2=0.94 KZ8、KZ8a:0.35×0.35×3.9×2=0.96 KZ9、KZ10: (0.25×0.50+0.25×0.25)×3.90×2=1.46 KZ11: (0.25×0.50+0.25×0.25)×(2.25×2+3.9)=1.57 KZ12: (0.25×0.50+0.25×0.25)×(3.9×3+2.25×3)=3.45 3.300m 以下 KZ1a:3.14×0.175^2×3.30=0.32 KZ3: (0.25×0.5+0.25×0.25)×3.30×5.0=3.09 KZ5:0.3×0.4×3.30×3=1.19 KZ6、KZ7:0.3×0.4×3.3=0.40 KZ8、KZ8a:0.35×0.35×3.3×2=0.81 KZ9、KZ10: (0.25×0.50+0.25×0.25)×3.30×2=1.24 KZ11、KZ12: (0.25×0.50+0.25×0.25)×(3.30×3+3.30×6)=5.56 3.300m 以上 H=3.80m H=3.73m H=5.13m H=5.50m H=4.57m H=4.99m H=6.03m H=5.63m 3.14×0.175^2×3.80×2=0.73 3.14×0.175^2×3.73×(1+3+1+3+6)=5.04 (0.25×0.50+0.25×0.25)×5.13×2=1.92 0.25×0.25×5.50×2=-0.69 0.3×0.4×4.57×1.0=0.55 0.3×0.4×4.99×1.0=0.60 0.38×0.35×6.03×1.0=0.74 (0.25×0.50+0.25×0.25)×6.03×1.0=1.13 0.35×0.35×5.63×1.0=0.69 合计:矩形柱 1.2m 内:1.07 m³ 1.8m 内:10.54 m³ 异形柱: 30.92 m³ 圆形柱: 2.54 m³ 22 C25 钢筋砼梁 二层: 2 轴: 3 轴: 4 轴: 5 轴: 6 轴: 7 轴: 6.95×0.25×0.97-0.13×2=1.42 6.05×0.25×0.40=0.61 5.30×0.25×0.40=0.71 6.45×0.25×0.50=0.81 1.6×0.25×0.45=0.18 10.95×0.25×0.40=1.46 1.6×0.25×0.80=0.32 4.55×0.25×0.60=0.68
工程量计算书
V=外墙外边线长度*外地坪到外墙顶板高度
V=(*2+*2)*100
16
基础模板
A-21-3
独立基础模板
100m2
S=接触面积
V=[(**4)*2+(**4)*5+**4]/100
17
基础模板
A21-12
基础垫层模板
100m2
S=接触面积
V=[**4)*2+**4)*5+2**4]/100
18
V=**8/10
10
基础梁
梁截面:300*600
混凝土强度等级:30
A4-8
基础梁
10m3
V=梁断面面积×梁长
V=*(*2+++*2+*3+*2)/10
11
矩形梁
梁截面:200*400
混凝土强度等级:30
A4-9
单梁、连续
梁、异形梁浇
筑
10m3
V=梁断面面积×梁长
V=*(*2+++*2+*3+*2+*2)/10
V1=[(++*2)*(++*2)*2+1/(3***8)]*2+[++*2)*++*2)*2+1/(3***8)]*5+++*2)*++*2)*2+1/(3***8)
V2=+2*+***
3
回填方
A1-144
松填土方
m3
V=挖土体积-室外地坪下埋设的基础体积
V=[**+**+**]*2-[**+**+**]*5-(2*2*+**+****
工程量计算书
土(石)方回填1、土质要求:符合相关规定 2、密实度要求:按设计要求 3、夯填(碾压):夯填 4、运输距离:1KM 5、回填土方由挖掘机挖,自卸汽车运回 6、部位:基础回填
挖掘机挖土斗容1m3内反铲装车
V回填土量=挖基础土方量-垫层-独立基础量-砖基础量-基础圈梁量
(3.3+0.1*2+0.5*2) * (5.8+0.1*2+0.5*2)*(3.1-0.03)
(5.6+0.1*2+0.5*2) * (3.2+0.1*2+0.5*2)*(3.1-0.03)
单位 相同数量 合计
m2
1125.750
10m2
112.575 1.00 1125.750 1.00
m3
1955.310
单位
相同数量
1.00 1.00 1.00 1.00 1.00
合计
26.004 7.644
13.876 31.110
7.092
m3
72.020
m3
72.023
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
21.798 4.158 0.720
m3
3.9*(8.4*4+7.5*9+3.6*8.1*6+7.2*2+8.1+7.2+9.3*3+2.4)*0.24
3.6*(7.5*9+8.4*4+3.6+8.1*6+7.2*3+2.4+3.6+9.3*5+8.4*4+3.6)*0.24
合同内容工程量计算书
合同内容工程量计算书一、工程概况1.1 工程名称:XXXX工程项目1.2 工程地点:XXXX地区1.3 工程规模:XXXX平方米1.4 工程性质:住宅小区1.5 工程预算:人民币XXXX万元二、合同双方2.1 甲方(委托方):XXXX房地产开发有限公司2.2 乙方(承包方):XXXX建筑安装工程有限公司三、工程量计算依据3.1 《建筑工程施工图纸》及相关设计文件3.2 《建筑工程预算定额》3.3 《建筑工程施工及验收规范》四、工程量计算内容4.1 土建工程4.1.1 基础工程根据《建筑工程施工图纸》及相关设计文件,基础工程的工程量为XXXX立方米。
4.1.2 主体结构工程根据《建筑工程施工图纸》及相关设计文件,主体结构工程的工程量为XXXX立方米。
4.1.3 建筑幕墙工程根据《建筑工程施工图纸》及相关设计文件,建筑幕墙工程的工程量为XXXX平方米。
4.2 安装工程4.2.1 给排水工程根据《建筑工程施工图纸》及相关设计文件,给排水工程的工程量为XXXX米。
4.2.2 电气工程根据《建筑工程施工图纸》及相关设计文件,电气工程的工程量为XXXX米。
4.2.3 暖通工程根据《建筑工程施工图纸》及相关设计文件,暖通工程的工程量为XXXX立方米。
4.3 装饰装修工程4.3.1 室内装饰工程根据《建筑工程施工图纸》及相关设计文件,室内装饰工程的工程量为XXXX平方米。
4.3.2 外墙装饰工程根据《建筑工程施工图纸》及相关设计文件,外墙装饰工程的工程量为XXXX平方米。
五、工程量计算结果5.1 土建工程5.1.1 基础工程:XXXX立方米5.1.2 主体结构工程:XXXX立方米5.1.3 建筑幕墙工程:XXXX平方米5.2 安装工程5.2.1 给排水工程:XXXX米5.2.2 电气工程:XXXX米5.2.3 暖通工程:XXXX立方米5.3 装饰装修工程5.3.1 室内装饰工程:XXXX平方米5.3.2 外墙装饰工程:XXXX平方米六、合同价款及支付方式6.1 合同价款:人民币XXXX万元6.2 支付方式:(1)合同签订后,甲方支付乙方工程总价款的30%;(2)工程进度达到50%时,甲方支付乙方工程总价款的30%;(3)工程验收合格后,甲方支付乙方工程总价款的20%;(4)剩余的10%作为质保金,质保期结束后支付。
工程量计算书 (2)
南分干渠任光屯西生产桥工程量计算书1.普通模板=2.23*13*2+0.25*4=58.98m2S防撞墙S=台(6.34*7.1+1.82*2)*2+(0.25*0.92*4+0.25*0.25*2)*2+(2.18*4+0.25*0.65*2)*2=117.49m2=(16.46-5.3)*1.4+6.78*2=29.18m2S梁=0.4*6.5*2+0.4*13*2=15.6m2S桥板=58.98+117.49+29.18+15.6=221.25m2S总2.曲面模板S=2*3.14*0.5*1.05*2=6.6m23.C25砼防撞墙V=0.25*13*2=6.5m34.C30砼台帽、梁=1.8*7.1*2+0.25*0.25*0.92*4+2.18*0.25*4=27.97m3V台V=6.78*1.4=9.49m3梁=27.97+9.49=37.46m3V总5.C40砼现浇桥板V=6.5*13*0.4=33.8m36.C40砼桥面铺装V=1.05*13=13.65m37.钢筋制安桥板:1.92t*2=3.84t桥面铺装:0.97t桥台盖梁:1.31t*2=2.62t桥墩盖梁:1.38t耳、背墙:0.5t*2=1t防撞墙:0.71t合计:10.52t8.橡胶支座:7*4=28个9.TST伸缩缝:6.5*2=13m10.橡胶片:3.14*0.2*0.2*28=3.52m211.抗震锚栓:6*2*4=48个12.抗震钢套管:6*4=24个13.双排脚手架:13*2.5*2=65m2南分干渠任光屯东生产桥上部结构工程量计算书1.普通模板=2.23*13*2+0.25*4=58.98m2S防撞墙S=台(6.34*7.1+1.82*2)*2+(0.25*0.92*4+0.25*0.25*2)*2+(2.18*4+0.25*0.65*2)*2=117.49m2=(16.46-5.3)*1.4+6.78*2=29.18m2S梁=0.4*6.5*2+0.4*13*2=15.6m2S桥板=58.98+117.49+29.18+15.6=221.25m2S总2.曲面模板S=2*3.14*0.5*1.05*2=6.6m23.C25砼防撞墙V=0.25*13*2=6.5m34.C30砼台帽、梁=1.8*7.1*2+0.25*0.25*0.92*4+2.18*0.25*4=27.97m3V台V=6.78*1.4=9.49m3梁=27.97+9.49=37.46m3V总5.C40砼现浇桥板V=6.5*13*0.4=33.8m36.C40砼桥面铺装V=1.05*13=13.65m37.钢筋制安桥板:1.92t*2=3.84t桥面铺装:0.97t桥台盖梁:1.31t*2=2.62t桥墩盖梁:1.38t耳、背墙:0.5t*2=1t防撞墙:0.71t合计:10.52t8.橡胶支座:7*4=28个9.TST伸缩缝:6.5*2=13m10.橡胶片:3.14*0.2*0.2*28=3.52m211.抗震锚栓:6*2*4=48个12.抗震钢套管:6*4=24个13.双排脚手架:13*2.5*2=65m2南分干渠张河东生产桥拆除工程量计算书1.钢筋砼拆除桥墩桩:=3.14*0.32*0.32*5*4=6.43m3;V1张河东老生产桥桥台墩:=3.14*0.32*0.32*5*4=6.43m3;V2张河东老生产桥桥墩盖梁:=5.4*0.7*0.7*2=5.3m3;V3张河东老生产桥桥台:V=(0.4*0.3+0.75*0.7)*5.4*2=6.97m3;4张河东老生产桥桥板:V=5.4*18.8*0.3=30.46m3;5合计:V=55.59m32.浆砌砖拆除张河东老生产桥防撞墙:=0.24*0.52*18.8*2=4.69m3(防撞墙高0.72m,上部0.24*0.52为浆砌砖,下部V10.44*0.2为钢筋砼)钢筋砼V=0.44*0.2*18.8*2=3.31 m3合计: V=4.69m3,钢筋砼V=3.31 m3=55.59+3.31=58.9m3总计:V钢筋砼=4.69m3V浆砌砖南分干渠张河东生产桥工程量计算书1.普通模板=2.23*13*2+0.25*4=58.98m2S防撞墙=S台(6.34*7.1+1.82*2)*2+(0.25*0.92*4+0.25*0.25*2)*2+(2.18*4+0.25*0.65*2)*2=117.49m2=(16.46-5.3)*1.4+6.78*2=29.18m2S梁=0.4*6.5*2+0.4*13*2=15.6m2S桥板S=58.98+117.49+29.18+15.6=221.25m2总2.曲面模板S=2*3.14*0.5*1.05*2=6.6m23.C25砼防撞墙V=0.25*13*2=6.5m34.C30砼台帽、梁V=1.8*7.1*2+0.25*0.25*0.92*4+2.18*0.25*4=27.97m3台=6.78*1.4=9.49m3V梁V=27.97+9.49=37.46m3总5.C40砼现浇桥板V=6.5*13*0.4=33.8m36.C40砼桥面铺装V=1.05*13=13.65m37.灌注砼桩造孔L=10*4+15*2=70m8.C25砼灌注桩V=70*3.14*0.5*0.5=54.95m39.C25钢筋砼柱V=1.05*3.14*0.5*0.5*2=1.65m310.钢筋制安桥板:1.92t*2=3.84t桥面铺装:0.97t桥台盖梁:1.31t*2=2.62t桥墩盖梁:1.38t耳、背墙:0.5t*2=1t防撞墙:0.71t合计:10.52t11.灌注桩钢筋:2.59+2.02=4.61t12.橡胶支座:7*4=28个13.TST伸缩缝:6.5*2=13m14.橡胶片:3.14*0.2*0.2*28=3.52m215.抗震锚栓:6*2*4=48个16.超声波检测钢管 1.14t17.抗震钢套管:6*4=24个18.双排脚手架:13*2.5*2=65m2南分干渠小韩庄南生产桥拆除工程量计算书1.钢筋砼拆除桥墩桩:=3.14*0.32*0.32*5*4=6.43m3;V1小韩庄南老生产桥桥台墩:=3.14*0.32*0.32*5*4=6.43m3;V2小韩庄南老生产桥桥墩盖梁:=5.4*0.7*0.7*2=5.3m3;V3小韩庄南老生产桥桥台:V=(0.4*0.3+0.75*0.7)*5.4*2=6.97m3;4小韩庄南老生产桥桥板:V=5.4*18.8*0.3=30.46m3;5合计:V=55.59m32.浆砌砖拆除小韩庄南老生产桥防撞墙:=0.24*0.52*18.8*2=4.69m3(防撞墙高0.72m,上部0.24*0.52为浆砌砖,下部V10.44*0.2为钢筋砼)钢筋砼V=0.44*0.2*18.8*2=3.31 m3合计: V=4.69m3,钢筋砼V=3.31 m3=55.59+3.31=58.9m3总计:V钢筋砼=4.69m3V浆砌砖南分干渠小韩庄南生产桥工程量计算书1.普通模板=2.23*13*2+0.25*4=58.98m2S防撞墙=S台(6.34*7.1+1.82*2)*2+(0.25*0.92*4+0.25*0.25*2)*2+(2.18*4+0.25*0.65*2)*2=117.49m2=(16.46-5.3)*1.4+6.78*2=29.18m2S梁=0.4*6.5*2+0.4*13*2=15.6m2S桥板S=58.98+117.49+29.18+15.6=221.25m2总2.曲面模板S=2*3.14*0.5*1.05*2=6.6m23.C25砼防撞墙V=0.25*13*2=6.5m34.C30砼台帽、梁V=1.8*7.1*2+0.25*0.25*0.92*4+2.18*0.25*4=27.97m3台=6.78*1.4=9.49m3V梁V=27.97+9.49=37.46m3总5.C40砼现浇桥板V=6.5*13*0.4=33.8m36.C40砼桥面铺装V=1.05*13=13.65m37.灌注砼桩造孔L=10*4+15*2=70m8.C25砼灌注桩V=70*3.14*0.5*0.5=54.95m39.C25钢筋砼柱V=1.05*3.14*0.5*0.5*2=1.65m310.钢筋制安桥板:1.92t*2=3.84t桥面铺装:0.97t桥台盖梁:1.31t*2=2.62t桥墩盖梁:1.38t耳、背墙:0.5t*2=1t防撞墙:0.71t合计:10.52t11.灌注桩钢筋:2.59+2.02=4.61t12.橡胶支座:7*4=28个13.TST伸缩缝:6.5*2=13m14.橡胶片:3.14*0.2*0.2*28=3.52m215.抗震锚栓:6*2*4=48个16.超声波检测钢管 1.14t17.抗震钢套管:6*4=24个18.双排脚手架:13*2.5*2=65m2南分干渠大韩庄南生产桥拆除工程量计算书1.钢筋砼拆除桥墩桩:=3.14*0.32*0.32*5*4=6.43m3;V1大韩庄南老生产桥桥台墩:=3.14*0.32*0.32*5*4=6.43m3;V2大韩庄南老生产桥桥墩盖梁:=5.4*0.7*0.7*2=5.3m3;V3大韩庄南老生产桥桥台:V=(0.4*0.3+0.75*0.7)*5.4*2=6.97m3;4大韩庄南老生产桥桥板:V=5.4*18.8*0.3=30.46m3;5合计:V=55.59m32.浆砌砖拆除大韩庄南老生产桥防撞墙:=0.24*0.52*18.8*2=4.69m3(防撞墙高0.72m,上部0.24*0.52为浆砌砖,下部V10.44*0.2为钢筋砼)钢筋砼V=0.44*0.2*18.8*2=3.31 m3合计: V=4.69m3,钢筋砼V=3.31 m3=55.59+3.31=58.9m3总计:V钢筋砼=4.69m3V浆砌砖南分干渠大韩庄南生产桥工程量计算书1.普通模板=2.23*13.46*2+0.25*4=61.03m2S防撞墙=S台(6.34*7.35+1.82*2)*2+(0.25*0.92*4+0.25*0.25*2)*2+(2.18*4+0.25*0.65*2)*2=120.66m2=(16.96-5.55)*1.4+7.03*2=30.03m2S梁=0.4*6.5*2+0.4*13.46*2=15.97m2S桥板S=61.03+120.66+30.03+15.97=227.69m2总2.曲面模板S=2*3.14*0.5*1.05*2=6.6m23.C25砼防撞墙V=0.25*13.46*2=6.73m34.C30砼台帽、梁V=1.8*7.35*2+0.25*0.25*0.92*4+2.18*0.25*4=28.87m3台=7.03*1.4=9.84m3V梁V=28.87+9.84=38.71m3总5.C40砼现浇桥板V=6.5*13.46*0.4=35m36.C40砼桥面铺装V=1.05*13.46=14.13m37.灌注砼桩造孔L=10*4+15*2=70m8.C25砼灌注桩V=70*3.14*0.5*0.5=54.95m39.C25钢筋砼柱V=1.05*3.14*0.5*0.5*2=1.65m310.钢筋制安桥板:1.97t*2=3.94t桥面铺装:0.99t桥台盖梁:1.26t*2=2.52t桥墩盖梁:1.33t耳、背墙:0.57t*2=1.14t防撞墙:0.71t合计:10.63t11.灌注桩钢筋:2.59+2.02=4.61t12.橡胶支座:7*4=28个13.TST伸缩缝:6.5*2=13m14.橡胶片:3.14*0.2*0.2*28=3.52m215.超声波检测钢管 1.14t16.抗震锚栓:6*2*4=48个17.抗震钢套管:6*4=24个18.双排脚手架:13*2.5*2=65m21.C15砼垫层V=6.7*5*0.1=3.35m32.粗砂垫层V=6.7*5*0.1=3.35m33.C25砼梁板柱=(1.4+2)*2.5*0.15*2=2.55m3V检修平台=2.5*7.6*0.25=4.75m3V生产桥=0.3*2.5*0.6*8=3.6m3V梁V=10.9m3总4.C25砼消力池陡坡段V=1.88*5=9.4m35.C25砼消力池底板V=5.4*5=27m36.C20砼消力池挡墙V=(4.71+6.27)/2*2.8*2+6.27*8*2=131.06m37.钢筋制安1.56+2.13=3.69t8.普通模板=1.4*2.5*2+2*2.5*2=17m2S检修平台S=2.5*3.3*2+3.3*0.25*4+2.5*0.25*2=21.05m2生产桥=2.5*0.6*2*8+0.3*0.6*2*8+0.3*2.5*8=32.88m2S梁=1.88*2+1.5*5=11.26m2S陡坡段S=5.4*2+0.7*5+2.2*5=25.3m2消力池S挡墙=[0.6+0.5+(2.8+3.58)/2+0.5+(3.7+3)/2+0.5+0.6]*2.8*2+(0.6+0.5+3.58+0.5+3. 7+0.5+0.6)*8*2=211.42m2=318.91m2S总9.聚乙烯低发泡沫板S=0.8*7.6+0.4*7.6+1.5*5+0.8*3*4=26.22m210.651橡胶止水带L=6.4m11.PVC排水管L=(5+4+5)*0.5+10*2.1*2=49m12.土工反滤布S=6.7*5=33.5m21.土方开挖V=26.11*5.6*1.2=175.46m32.土方回填V=26.11*4.2*1.2=131.59m33.C15砼垫层V=3.9*3*0.1=1.17m34.粗砂垫层V=3.9*5*0.1=1.17m35.C25砼梁板柱V=(1.4+2)*3*0.15=1.53m3检修平台=2.54*3*0.25=1.91m3V生产桥=0.3*3*0.6*4=2.16m3V梁=5.6m3V总6.C25砼消力池陡坡段V=2.06*3=6.18m37.C25砼消力池底板V=2.82*3=8.46m38.C20砼消力池挡墙V=5.82*9.11*2=106.04m39.钢筋制安0.93+0.86+0.46=2.25t10.普通模板S=1.4*3+2*3=10.2m2检修平台=2.54*3+3*0.25*2+2.54*0.25*2=10.39m2S生产桥S=3*0.6*2*4+0.3*0.6*2*4+0.3*3*4=19.44m2梁S=2.06*2+1*3=7.12m2陡坡段=2.82*2+0.5*3+1.5*3=11.64m2S消力池=(0.6+0.5+3.41+0.3+3.35+0.5+0.6)*9.11*2=168.72m2 S挡墙=227.51m2S总11.聚乙烯低发泡沫板S=0.8*4.6+0.4*4.6+1*3+0.8*3*4=18.12m212.651橡胶止水带L=3.4+3.25*2=9.9m13.PVC排水管L=(3+2+3)*0.4=3.2m14.土工反滤布S=3.9*3=11.7m2。
【精品】最新工程量计算书
第 2 页,共 2 页
工程量清单计算书
工程名称:福建省大田供电生产综合楼 序号 分项工程名称 单位 木龙骨细木工板基层防火涂 16 刷,成品花梨木实木斜拼板饰 m2 面 细木工板基层艺术画框线100 17 m 宽 细木工板基层艺术画框线150 18 m 宽 细木工板基层,电力县级专用 2 19 会议背景,(12mm烤漆玻璃) m 20 细木工板基层,铝塑板饰面 m2 细木工板基层,5mm米黄色、 21 m2 黑色玻璃胶勾缝饰面 细木工板基层玫瑰金不锈钢50 22 m 宽 夹板基层,100高不锈钢踢脚 23 m 线 成品实木斜拼板白色人造石台 24 m 面矮柜 25 成品实木踢脚线 m 26 闪电米黄大理石窗台200宽 m 27 800*100玻化砖踢脚线 m 28 隐形装饰门 樘 29 卫生间实木门 樘 30 浴巾杆(架) 套 31 毛巾杆(架) 套 32 卫生间墙面300*600瓷砖(若贝尔) m2 数量 计算式
25.43 2.5*3.2+2.5+2.5*0.12+0.8*2.5+2*2.5+0.5*2.5+2.55*2.5 21.93 2.7*2+5.5+2.7*2+5.625 9.4 4.4+2.5*2 10.26 2.23*4.6 2.052 0.38*5.4 12.03 2.227*5.4 17.50 2.5*7 9.87 2.75+10.8-0.9*2 3.20 27.69 4.1+5.32+0.78+3.4+2.3+1.7+9.29+0.4*2 2.076 99.97 26.9+25.57+26.3+21.2 1 1 1 1 23.76 2*2.4*2+3.3*2.4*2-0.8*2.1
工程量计算书
0.4084 0.4084 0.4084 0.4084 4.2458
输入 5 3-6 砖墙1砖(M2.5混合砌筑砂浆)女儿墙
合计
10m3 10m3
绘图 第2层 Q-1[外墙] <1,A- ((17.7<长度>*0.43<墙高>*0.24<墙厚>)-0.2229<扣构造柱>-0.0557<扣马牙槎 10m3 700><6, A-700> >) <6,A- ((5.7<长度>*0.43<墙高>*0.24<墙厚>)-0.0446<扣构造柱>-0.0112<扣马牙槎>) 10m3 700><6, B> <6,B><1 ((17.7<长度>*0.43<墙高>*0.24<墙厚>)-0.0991<扣构造柱>-0.0248<扣马牙槎 10m3 ,B> >) <1,B><1 ((5.7<长度>*0.43<墙高>*0.24<墙厚>)-0.0446<扣构造柱>-0.0112<扣马牙槎>) 10m3
<6,B><1 ((17.7<长度>*4.02<墙高>*0.24<墙厚>)-3.4992<扣窗>-1.0944<扣构造柱>- 10m3 ,B> 0.2736<扣马牙槎>-1.6272<扣圈梁>-0.6106<扣砼过梁>)
1.9808 4.2458 0.4084
0.7983
工程量计算表格
三 1.25+0.9+0.1)*3+(3.6-0.2)*3
算
线
L内II=(3.7*10+3.65+3.6*5-0.5*4-0.6*6)+(3.7*10+3.6*6-0.2)+(7-0.1)*6+(7-0.5-0.6)*6+
基
一 (6.7-0.5)*11+(1.6+2.1-0.3+7-1.2-0.2+3.7-0.2+7-0.6-2.4-0.9-0.2)*3+3.7*2*3
5*4*0.35+(2*5*4+2*0.6*0.6+0.6*5+4*0.6)*9/0.55*6
m3
206.82 DJP08
小计
m3
1492.95
JK1
(2.1+0.2+0.1*2)(2.7+0.2+0.1*2)*0.1*3 (2.1+0.2)(2.7+0.2)(1.63+0.25+0.03-0.45)
(81+3.85*2)(25.6+2.8+3)
m2
5.9*5.9*0.1*9+4.2*4.2*0.1*15+5.1*4.4*0.1*2+6.4*5.8*0.1*1+2.4 *2.4*0.1*11+2.8*2.2*0.1*1+2*2*0.1*11+2.5*2*0.1+5.1*4.1*0.1*9
m3
5.8*5.8*0.35+(2*5.8*5.8+2*0.6*0.7+0.6*5.8+5.8*0.7)*6/6*0.7
工程量 计算书 (手算)
#NAME?
#NAME?
#NAME?
2022/2/24
-2
工程名称:新湖总场养老院电气工程
工程量计算
序 号
分项(子分项)工程名称
结果小 计
辅助计算 结 果
#NAME?
工程量计算式
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
工程量计算式
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
2022/2/24
-1
工程名称:新湖总场养老院电气工程
工程量计算
序 号
分项(子分项)工程名称
结果小 计
辅助计算 结 果
2022/2/24
-49
工程名称:新湖总场养老院电气工程
备注
工程量计算
2022/2/24
-50
工程名称:新湖总场养老院电气工程
备注
工程量计算
2022/2/24
-51
工程名称:新湖总场养老院电气工程
备注
工程量计算
2022/2/24
-52
工程名称:新湖总场养老院电气工程
备注
工程量计算
2022/2/24
辅助计算 结 果
工程量计算
工程量计算式
2022/2/24
-25
工程名称:新湖总场养老院电气工程
工程量计算书
体积=[59.48*2.4<墙高>]*0.2<墙厚>=28.55m3
43.47
m3
三层
墙长=(4.84-0.6)*2+(4.24-0.4)*2+(4.24+1.5
-0.6)*2+(4.84+4.2+2.4+1-0.3-0.1-0.4*3)
26.2
m3
3
内墙:100mm
共计:
15.38
m3
一层
墙长=1.05*6+(4.2-0.1+0.05)*6
31.2
m
体积=[31.2*2.6<墙高>-8.82<门窗洞口面积>]
*0.1<墙厚>
7.23
m3
二层
墙长=1.05*6
6.3
m
体积=[6.3*2.4<墙高>]*0.1<墙厚>
1.51
m3
三层
墙长=0.55*2+0.6*2+(2-0.2)*2+(2.1-0.2)*2
617.14
m2
4
三层
(24.5+0.2)*(4.24+4.2+2.4+0.2)+[(3*2+0.2)*2+(3.3*2+0.2)]*0.6+[(2.7+0.2)*2+(2.85*2+0.2)*2]*1+4.2*2*0.5
306.01
m2
5
四层
同三层
(24.5+0.2)*(4.24+4.2+2.4+0.2)+[(3*2+0.2)*2+(3.3*2+0.2)]*0.6+[(2.7+0.2)*2+(2.85*2+0.2)*2]*1+4.2*2*0.5
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
编号
清单价 清单价
项目名称
道路清挖淤泥 块石置换土方 (1)五金仓库东面、北至南道路局部 (2)转角部份 (3)机修车间东侧道路
计算式
数量
321.984 452.400 215.6 151.808 84.988 370.569 164.505 70.668 33.936 12.72 45.54 43.2 28.800 929.048 210.106 178.734 511.686 14.003 14.520 1093.440
备注
3
Байду номын сангаас清单价
临时排水沟 (1)五金、机修东侧 (2)五金仓库东侧南局部 (3)五金仓库东侧北局部 (4)五金仓库南局部 (5)五金仓库西局部 (6)五金仓库机修车间之道路
4 5
清单价 清单价
集水坑 道路土方 (1)五金机修西至东道路 (2)钢结构南道理 (3)两车间东侧道路 (4)机修车间大门道路接口 (5)五金仓库大门道路接口
m3 m3 m3 m3 m3 m3 m3
6
清单价
钢结构厂房区域土方
造价员盖执业章: 预 算 员 签 字:
编制日期:2015年5月4日
工程量计算书
工程名称:氟材料i期工程进度结算表 序号
1 2
第1页 共1页 单位
m3 m3 43*9*0.832 215.6+151.8075+62.04+22.94775 20*7*1.54 175.5*0.865 16.5*2.35*1.6+9.3*2.35*1.05 m3 164.5046+70.668+33.936+12.72+45.54+43.2 80.6*1.3*1.57 39*1.2*1.51 28*1.2*1.01 31.8*1*0.4 27.6*1.2*1.375 15*3.2*0.9 m3 9*3.2*1 210.1056+178.7336+511.686+14.00256+14.5 46.2*7*0.62+7.74*0.62*2 46.6*6*0.62+4.34*0.62*2 80.6*7*0.9+4.34*0.9 5.1*6.6*0.416 5.5*6.6*0.4 48*17*1.34