Power transformers are essential components of
electrical power systems, enabling the transmission and distribution of electricity over long distances. They are responsible for converting electricity from one voltage level to another, allowing for efficient power transmission and distribution. The proper operation of power transformers is critical for maintaining a stable and reliable power supply.
One crucial aspect of power transformer maintenance is ensuring the accuracy and reliability of current transformers (CTs). CTs are essential for measuring the current flowing through a power transformer, providing data that is used for protection, control, and monitoring purposes. Inaccurate CT measurements can lead to incorrect operation of protective devices, potentially resulting in equipment damage or outages.
To ensure the accuracy and reliability of CTs, it is important to regularly test and calibrate them. This involves injecting a known current into the CT and measuring the output voltage. The ratio of the output voltage to the input current should be within the specified accuracy limits.
In addition to regular testing and calibration, it is also important to inspect CTs for any signs of damage or degradation. This includes checking for loose connections, corrosion, or insulation damage. Any abnormalities should be addressed promptly to prevent potential failures.
By following these guidelines for CT maintenance, power utilities can ensure the accuracy and reliability of their power transformers, helping to maintain a stable and reliable power supply for their customers.
中文回答:
电力变压器是电力系统中必不可少的组成部分,使电力能够远
距离传输和分配。

它们负责将电力从一个电压等级转换为另一个电
压等级,从而实现高效的电力传输和分配。

电力变压器的正常运行
对于维持一个稳定可靠的电源供应至关重要。

电力变压器维护的一个关键方面是确保电流互感器(CT)的准
确性和可靠性。

CT对于测量流过电力变压器的电流至关重要,它提
供的数据用于保护、控制和监测。

CT测量不准确会导致保护装置操
作不正确,可能导致设备损坏或停电。

为确保CT的准确性和可靠性,定期对它们进行测试和校准非常
重要。

这包括向CT注入已知电流并测量输出电压。

输出电压与输入
电流之比应在规定的精度范围内。

除了定期测试和校准外,检查CT是否有任何损坏或降解迹象也
很重要。

这包括检查松动连接、腐蚀或绝缘损坏。

任何异常情况都
应及时解决,以防止潜在故障。

通过遵循这些CT维护指南,电力公司可以确保其电力变压器的
准确性和可靠性,从而帮助为其客户维持一个稳定可靠的电源供应。