SAIC-MPT-2002

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

REFERENCE DOCUMENTS: SAEP-1142, Qualification of Non-Saudi Aramco NDT Personnel, 29 February, 2004
Contractor / Third-Party
Construction Representative*
A7
A8
SAEP-1142 Para. 7.3.2
REMARKS: Note: 1. Saudi Aramco has the right to request submission of, or granted access to, any and all training, experience, qualification and certification records pertaining to NDT personnel (SAEP-1142, Para 5.4). Copies of each dossier shall be available in Project Records for Personnel performing or expected to perform NDE. Coordinate & maintain an NDT Personnel Roster (Certs copy) on all Projects. Note: 2. This checklist may be used to evaluate each one or a batch of personnel qualifications submitted in one transmittal.
saudiaramcoidpidstandardscutoffjune2008rev30星期一六月08saudiaramcoinspectionchecklistsaicnumberdateapprovedqrnumberreviewqualificationsmptpersonnelsaicmpt2002ndeprojecttitlewbsjonumbercontractorsubcontractorequipmentidnumbersequipmentdescriptioneqptcodesystemid
SAUDI ARAMCO USE ONLY
WORK PERMIT REQUIRED?
ITEM No. A
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
General Requirements (For Subcontractor, Prime Contractor & NDT Service Provider Co.)
NDT Service Provider* has a written practice or procedure covering NDT (Magnetic particle Testing) personnel training, experience, qualification, and certification submitted to the Saudi Aramco Inspection Department, Dhahran and approved. For in-kingdom works, written practice shall meet the minimum requirements of ANSI/ASNT CP-189 (latest edition) plus the additions and clarifications outlined in SAEP-1142. *These are one of the SA Approved NDT Companies. Personnel performing or evaluating Magnetic Particle Testing results shall be certified in MPT method. (Personnel has submitted his certificate for verification.) Personnel responsible for interpretation of or affecting results of NDT operations shall be certified to a minimum of Level II per the certifying organization's written practice. The claimed training and/or experience of the NDT personnel from the previous employer's) has been obtained and verified by the current employer and has retained the verification on file. Note: Any claimed training or experience that cannot be verified and documented shall be considered invalid. The responsible NDT Level III has verified the documentation/certification and attested in writing to its validity. Vision examinations shall be performed annually according to Section 6 of ANSI/ASNT CP-189. Review Records Level I and II NDT personnel shall be recertified by the employer as per Section 6 of CP-189, i.e., by examination. Recertification by demonstration of experience is not allowed. Review Results. Level III personnel shall be recertified by verification of the individual's ASNT Level III certificate in each method for which re-certification is sought. A practical examination may be required for level III recertification at the discretion of the Saudi Aramco Level III.
EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER
EQPT CODE
SYSTEM ID.
PLANT NO.
EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Veห้องสมุดไป่ตู้ified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Proponent and Others
Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified
Y = YES
N = NO F = FAILED
Page 1 of 1
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008)
REV 3 SAIC NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Qualifications - MPT Personnel
A1
SAEP-1142 Para. 4.2
A2
SAEP-1142 Para. 7.2 SAEP-1142 Para. 4.4
A3
A4
SAEP-1142 Para. 5.2
A5 A6
SAEP-1142 Para. 5.3 SAEP-1142 Para. 6.3 SAEP-1142 Para. 7.3.1
PROJECT TITLE
30-Jun-08 DATE APPROVED QR NUMBER
SAIC-MPT-2002
WBS / BI / JO NUMBER
NDECONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
相关文档
最新文档