某市给水水厂初步设计

某市给水水厂初步设计

某市给水水厂初步设计学院:水电学院专业:水务工程姓名目录摘要 (1)Abstract (2)第1章给水厂处理设计任务书 (3)第2章水厂设计水量的确定 (6)第3章给水处理工艺流程的确定和给水处理构筑物的选择 (8)第4章絮凝池设计 (23)第5章沉淀池设计 (27)第6章普通快滤池设计 (30)第7章消毒工艺设计 (32)第8章清水池设计 (33)谢辞 (34)参考文献 (35)摘要学习了《水处理工程技术》这门课程,我们开始了我们的课程设计,本次设计的题目是“某市给水水厂初步设计”,其中包括给水处理工艺流程的确定和给水处理构筑物的设计等。

城市给水排水是城市建设的重要组成部分之一。

水是人们日常生活和一切生产活动不可缺少的物质。

城市给水工程的目的和任务,就是为了经济合理和安全可靠的供应人们生活和生产活动中所需要的水以及保障人民生命财产安全,并满足他们对水量水质和水压的要求。

水处理工程便是通过物理的、化学的手段,去除水中一些对生产、生活不需要的物质所做的一个项目。

是为了适用于特定的用途而对水进行的沉降、过滤、混凝、絮凝,以及缓蚀、阻垢等水质调理的一个项目。

由于社会生产、生活与水密切相关,因此,水处理工程领域涉及的应用范围十分广泛,构成了一个庞大的产业应用项目。

因此完善的给水工程对促进城市工农业生产、保障人民身体健康以及保护环境免遭污染等都具有重大作用。

关键词:水处理, 工艺流程,构筑物设计AbstractLearning the Water treatment Engineering Course, we began our course design. This design is the subject of preliminary design of a city water supply and water, which includes the determination of the water treatment process and water treatment structures designed to and so on.Urban water supply and drainage is an important part of urban construction.Water is the people's daily life, and all production activities indispensable material. Urban water supply project purpose and mission, is to economically rational and safe and reliable water supply and production activities in people's lives and the need to protect people's lives and property safety, and to meet their water quality and pressure requirements.Water treatment works is through physical, chemical means to remove some of the water of a project on the production and living unwanted substances do. The settlement in order for a particular purpose and on the water, a project filtration, coagulation, flocculation, and corrosion, scale and other water conditioning.Because of social production, is closely related to living with water, therefore, the scope of application of water treatment projects involving a wide range of areas, constitute a huge industrial application projects.So perfect for urban water supply projects for industrial and agricultural production, protect people's health and the protection of the environment from pollution and so has a major role.Keywords: The water treatment,Treatment process,The structure Design第1章给水厂处理设计任务书1.1设计题目某市给水水厂初步设计1.2主要设计内容及基本要求具体内容包括以下几个方面:(1)基本资料的分析整理。

给水处理厂初步设计

给水处理厂初步设计
由于药液一般都具有腐蚀性,所以盛放药液的池子和管道及配件都应采取防腐措施。溶解池一般采用钢筋混凝土池体,若其容量较小,可用耐酸陶土缸作溶解池。
投药设备采用计量泵投加的方式。采用计量泵(柱塞泵或隔膜泵),不必另备计量设备,泵上有计量标志,可通过改变计量泵行程或变频调速改变药液投量,最适合用于混凝剂自动控制系统。
Preface
Water quality engineering is very important in our professional discipline, mainly in water treatment process, various treatment structure calculation design and their characteristics. Its highly professional, practicality is very strong. This week for water treatment engineering design, the design of the city water consumption is 118000m3/d. Design is a major aspect of all kinds of structures for the calculation, plant layout, elevation layout.
混凝剂消毒剂
原水网格絮凝池平流沉淀池滤池清水池 二级泵房
用户
污泥浓缩池脱水机房污泥处理
图2-1水处理工艺流程
2.2
2.2.1
设计药剂溶解池时,为便于投置药剂,溶解池的设计高度一般以在地平面以下或半地下为宜,池顶宜高出地面0.20m左右,以减轻劳动强度,改善操作条件。溶解池的底坡不小于0.02,池底应有直径不小于100mm的排渣管,池壁需设超高,防止搅拌溶液时溢出。

(完整版)自来水厂设计

(完整版)自来水厂设计

给水处理课程设计说明书姓名:班级:学号:序号:xxx大学城建学院给水排水系2015年9月目录第一章工程概况及设计任务 (2)1.1 工程概况 (2)1.2 设计资料 (2)1.3 设计任务书 (3)第二章水厂工艺方案确定及技术比较 (4)2.1 给水处理厂工艺流程方案的选择及确定 (4)2.2 拟设计方案流程图 (6)第三章混凝工艺计算 (11)3.1 水厂规模及水量确定 (11)3.2 混凝剂投配设备的设计 (14)3.3 混合设备的设计 (14)3.4 往复式隔板絮凝反应池设计 (14)第四章沉淀工艺计算 (15)4.1 设计参数 (16)4.2 平面计算 (17)4.3 进出水系统 (18)第五章普通快滤池设计计算 (20)5.1 设计参数 (21)5.2 设计计算 (21)第六章消毒和清水池设计 (22)6.1 加氯消毒 (22)6.2 清水池计算 (22)第七章二级泵站的设计 (23)7.1 设计参数 (23)7.2 设计计算 (24)第八章水厂总平面布置 (25)第一章工程概况及设计任务1.1 工程概况本设计主要是给水处理厂的设计,随着国民经济快速发展、城市化进程加快,人民生活水平迅速提高,人们对水质和水量的要求越来越高。

湖北某县城原有水厂水厂能力已不能满足水质水量的要求。

为解决城市越来越严重的缺水问题,当地市政府部门研究决定新建一座自来水厂,以补充城市供水能力。

本设计主要是给水处理厂的设计,规划处理水量为10万立方米/天,近期设计规模为5万立方米/天。

该厂的水源为湖北某县城水域,水源水质符合生活饮用水水源二级水质标准,原水水质其中的一些常规的检测项目符合《生活饮用水水质卫生规范(2001)》的要求,需要处理的为水源的浊度、残渣及细菌的灭活。

由于水源水质良好无需预处理及深度处理,所以该水厂的处理工艺流程为常规处理工艺。

即:原水→混凝→沉淀→过滤→消毒→用户。

主要构筑物为:絮凝池、沉淀池、滤池和清水池。

洛阳市伊滨区给水厂净水工艺设计

洛阳市伊滨区给水厂净水工艺设计

洛阳市伊滨区给水厂净水工艺设计摘要根据《洛阳市城市总体规划(2008—2020)》和《洛阳新区建设总体方案》,伊滨区是“以伊洛河水系为纽带,以产业集中集聚集合发展为支撑,以产促城、产城融合、生态环保、健康文明的新城区”为发展定位,是未来10年洛阳城市发展的主要方向。

根据该区人们生活的需要,需要在地势较为平坦的地块新建一座给水厂,给水厂水源取自附近的一个大型水库,供水量约为2万m3/d,满足每人每天综合生活用水,采用常规净水工艺,原水→混凝→沉淀→过滤→消毒→城市管网,给水厂出水水质达到国家生活饮用水水源水质一级标准。

关键词:给水厂,设计工艺,混凝沉淀,过滤,消毒Design of water purification the offshore area water supply plant inLuoyang CityABSTRACTAccording to the "Luoyang city master plan (2008 - 2020)" and "Luoyang New District Construction Plan", the offshore area is "to the Yiluohe River as the link, with the industry gathering collection development as the support, to promote city, production integration, ecological environmental protection, healthy and civilized city" as the development orientation Luoyang City, is the main direction of development in the next 10 years. According to the needs of the people's lives, need in flat land a new waterworks, waterworks water from a large near the reservoir, water supply of about 20000 m3/d per person per day, to meet the comprehensive living water, using conventional water purification process, the raw water, coagulation, sedimentation, filtration, disinfection, city pipe network water quality, to meet the drinking water quality standards at the national level.Keywords: waterworks; design process; coagulation; filtration; sterilization目录第一章概述 (5)1.1 设计依据 (5)1.2 设计规范 (5)1.3 设计原则 (6)1.4 水量水质资料 (7)1.5 地质资料 (8)1.6 用地资料 (8)1.7 毕业设计的要求 (9)第二章工艺流程的选择与确定 (10)2.1 工艺流程选择的原则 (10)2.2 厂址选择 (10)2.3 工艺方案的对比 (10)2.4 净水工艺的确定 (15)2.5 工艺说明 (16)第三章单体构筑物计算 (17)3.1 混合反应 (17)3.2 网格絮凝池 (19)3.3 斜管沉淀池 (23)3.4 普通快滤池 (26)3.5 消毒 (28)3.6 清水池 (30)3.7 配水池计算 (32)3.8 二级泵房 (32)第四章附属设备的选择 (33)4.1 起重设备 (33)4.2 排水设备 (33)4.3 通风设备 (33)4.4 引水设备 (33)4.5 计量设备 (34)第五章给水处理厂的总体布置 (35)5.1平面布置 (35)5.2 高程布置 (37)第六章劳动定员 (40)6.1 定员原则 (40)6.2 污水厂人数定员 (40)第七章附属构筑物尺寸 (41)结论 (42)谢辞 (43)参考文献 (44)第一章概述水是生命之源,是人们生活、工农业生产以及社会经济发展的重要资源,科学用水和排水是人类社会发展史上最重要的社会活动和生产活动内容之一。

某城市10万方给水厂初步设计

某城市10万方给水厂初步设计

目录目录 (1)第一章设计任务及设计资料............................................... 错误!未定义书签。

1.设计题目 (5)2.设计内容 (5)3.设计资料 (5)3.1基本资料 (5)3.2地质资料 (7)3.3水文资料 .................................................................. 错误!未定义书签。

3.4气象资料 .................................................................. 错误!未定义书签。

3.5其它资料 .................................................................. 错误!未定义书签。

3.6主要参考资料及编制依据 (8)第二章设计说明书 (10)1.设计水量 (10)1.1设计水量 (10)2.给水处理厂工艺设计 (11)2.1 给水处理厂规模及流程 (11)2.1.1 给水处理厂的设计规模 (11)2.1.2 处理工艺流程的选择 (11)2.1.3 水处理工艺的确定 (11)2.2 药剂选择及投加方式 (12)2.2.1 混凝剂 (12)2.2.2 消毒剂 (13)2.3 水处理构筑物的选择 (15)2.3.1 混合设施 (15)2.3.2 絮凝 (16)2.3.3 沉淀 (16)2.3.4 过滤 (17)第三章给水厂净水构筑物的设计计算 (19)11. 混凝设施 ................................................................................... 错误!未定义书签。

1.1 药剂溶解及溶液配制 ............................................. 错误!未定义书签。

某城市净水处理厂初步设计

某城市净水处理厂初步设计

摘要:给水系统是保证城市、工矿企业等用水的各项构筑物和输配水管网组成的系统,当然,水在日常和生产生活中占有极其重要的地位,在现代化工业企业中,为了生产上的需要以及改善劳动条件,水更是必不可少,缺水将会直接影响工业产值和国民经济发展的速度,因此,给水工程成为城市和工况企业的一个重要基础设施,必须保证足够的水量、合格的水质、充裕的水压供应生活用水、生产用水和其他用水,还要兼顾今后的发展。

给水工程的任务是向城镇居民、工矿企业、公共设施等提供用水,且保证水质、水量、水压要求。

本次设计的题目为东北地区某市给水厂初步设计,选择设计水量为70000m3/d,给水厂处理工艺采用常规处理工艺:原水—→混凝—→沉淀(澄清或气浮)—→过滤—→消毒—→饮用水。

混合是在扩散混合器中投加碱式氯化铝,选用机械搅拌澄清池进行沉淀絮凝,过滤设备采用具有广阔发展前景的V 型滤池,最后投加液氯进行消毒。

经过给水厂中各处理构筑物处理后,出厂水能够达到饮用水要求。

关键词:给水工程往复式隔板絮凝池普通快滤池目录1设计任务及设计资料 (1)1.1课程设计任务与要求 (1)1.1.1课程设计任务 (1)1.1.2设计要求 (1)1.2课程设计原始资料 (1)1.2.1气候资料 (1)1.2.2原水水质 (2)1.2.3城市规划资料 (2)1.3课程设计结果 (2)1.3.1设计计算的主要内容 (2)1.3.2课程设计成果 (2)2某城市净水处理厂初步设计计算说明书 (4)2.1给水厂的设计规模 (4)2.2给水厂的工艺流程选择 (4)2.3配水井的设计计算 (4)2.3.1设计参数 (4)2.3.2设计计算 (4)2.4混凝剂的配置和投加 (5)2.5隔板絮凝池设计计算 (6)2.5.1设计参数 (6)2.5.2设计计算 (6)2.6斜管沉淀池 (9)2.7普通快滤池设计计算 (12)2.8消毒 (16)2.9清水池设计 (17)3 净水厂平面与高程布置 (19)3.1净水厂的平面布置 (19)3.2水厂管线设计 (19)3.3水厂高程布置 (21)3.4水厂绿化及道路 (21)4 结论 (22)参考文献 (23)1 设计任务及设计资料1.1课程设计任务与要求1.1.1课程设计任务此次设计题目为:《某城市净水处理厂初步设计》,其内容包括:1).设计计算(1)计算城镇最高用水日与最高用水时水量。

某镇自来水厂工程(供水水厂部分)初步设计报告

某镇自来水厂工程(供水水厂部分)初步设计报告

**市**区**镇自来水厂工程(供水水厂部分)初步设计报告广东揭阳市市政综合设计院目录第一章设计说明书 (4)1.1概述 (4)1.1.1主要设计资料 (4)1.1.2主要设计资料 (7)1.1.3城市概况 (7)1.1.4现有供水设施概况 (10)1.1.5城市供水规划 (11)1.2设计内容 (11)1.2.1总体设计 (11)1.2.2净水厂设计 (21)1.2.3配水管网 (27)1.2.4建筑设计 (27)1.2.5结构设计 (29)1.2.6采暖通风与空气调节 (29)1.2.7供电设计 (30)1.2.8 自动控制、仪表及通讯设计 (32)1.2.9机械设计 (33)1.2.10环境保护 (35)1.3劳动保护与安全 (37)1.3.1设计依据 (37)1.3.2建设场地自然条件存在的危害因素 (37)1.3.3建设场地自然条件危害因素的对策 (37)1.3.4运行阶段中的职业危险、危害因素分析 (37)1.3.5各危险因素的相关防范措施: (38)1.3.6劳动安全卫生机构 (39)1.3.7主要防范措施安全评价 (39)1.4消防 (40)1.4.1工程概况及其特征 (40)1.4.2消防设计依据及设计原则 (40)1.4.3消防设计 (40)1.5节能 (41)1.5.1节电 (41)1.5.2节水 (42)1.5.3节药 (42)1.5.4建筑物隔热措施 (42)1.6人员编制及经营管理 (42)1.6.1管理机构及人员编制 (42)1.6.2经营成本及单位制水成本 (44)1.6.3单位水量的投资指标 (44)1.6.4关于分期投资的确定 (44)1.7下阶段的设计要求 (44)1.7.1审批时需要确定的主要问题 (44)1.7.2施工图设计需要的资料及勘测要求 (44)1.8附录 (45)第一章设计说明书1.1概述1.1.1主要设计资料1.设计委托书依据黄石市东阳镇政府签定的设计委托合同。

给水厂工艺设计

给水厂工艺设计

水质工程学(Ⅰ)课程设计任务书2015 - 2016学年第Ⅰ学期1 设计题目某给水厂工艺设计2 设计时间自12.07 至12.20 ,共2 周3 设计任务根据指定的水源、厂址、处理流程和有关设计资料,设计主要处理设备及构筑物,使出水水质达到生活饮用水标准,并满足最高日供水量m3/d。

4 课程设计内容4.1画处理流程示意图。

4.2计算各构筑物的设计流量。

4.3选用混凝剂、助凝剂,决定其投量;设计药库面积;设计药剂配制设备,药剂的剂量与投配方式,并设计加药间的平面布置。

4.4设计混合、絮凝池及沉淀池。

4.5设计滤池4.6氯化消毒、氯库及加氯间的设计。

4.7清水池的容积、尺寸。

4.8各构筑物之间的连接管道。

4.9各辅助建筑面积、主要尺寸(查手册)。

4.10全厂总平面布置及工艺高程设计,包括道路及主要工艺管线。

(总平面图用A2纸)表1 原水水质分析资料表2 气象水文及其它基础资料水质工程学(1)课程设计指导书1.目的和要求1.1 学生应通过本设计掌握给水设计工作的一般步骤、内容、方法,并提高设计、计算及制图的能力,培养自己分析问题和解决问题的能力,做到理论和实际相结合。

1.2 通过本设计对给水净化所学内容进行更进一步的系统总结和复习,加深对教学内容的理解、巩固所学内容,并举一反三,由此旁通给水处理的其它内容。

1.3 通过本设计熟悉一些资料的引用,如设计规范,设计手册,标准设计、工程图和参考资料等,并学习如何参考,运用这些资料解决实际问题(注意新设计手册有些数据与新规范不符,以规范为标准)。

1.4 通过设计培养自己刻苦钻研,严格细致,克服困难,努力完成任务的作风,提高自己独立工作能力。

2 设计前的准备工作在正式动手作设计之前,首先应明确设计任务,基础资料,认真阅读《设计任务书》和本指导书,根据任务书要求及学校规定安排好的设计时间及进度,准备好书籍、规范、手册、参考文献、计算及绘图工具等。

3 设计工作程序及设计安排3.1 第一阶段3.1.1布置设计任务及讲解设计指导书3.1.2设计计算方法步骤3.2 第二阶段设计课一次,其内容为:3.2.1水厂布置及绘图3.2.2工程设计的一般知识3.3 第三阶段绘图3.4 整理抄写说明书,完成图纸4 设计内容、步骤和方法4.1 处理流程的确定根据原水水质,处理后的水质要求和技术经济条件选择处理工艺流程,并以方框图表示。

推荐-工业园区基础设施工程给水工程初步设计 精品 精品

推荐-工业园区基础设施工程给水工程初步设计 精品 精品

1.概述1.1工程概况1、工程名称:XX县XX(XX)工业园区给水工程-初步设计2、项目建设管理单位:XX县招商局3、设计单位:XX第二公路勘察设计研究院有限公司4、工程规模:设计年限:20年设计规模:5100立方米/日;5、工程设计内容新建给水管线:PE DN300管长度为1520米;PE DN250管长度为27676米;1.2项目建议书根据上级主管部门“关于可行性研究报告批复”,经有关领导对本供水工程进行反复研究和论证,确定实施本供水工程。

进行本项目的初步设计。

1.3设计依据文件:1、XX县XX(XX)工业园区基础设施工程给水工程规划图;2、工程合同;3、XX县地形图;4、XX县XX(XX)工业园区工程地质勘察报告;5、XX县XX(XX)工业园区给水工程环境影响评价报告。

有关资料文件:(1)《室外给水设计规范》(GB50013-20XX);(2)《城市工程管线综合规划规范》(GB50289-98);(3)《给水工程管道结构设计规范》(GB50332-20XX);(4)《给水工程构筑物结构设计规范》(GB50069-20XX);(5)《给水管道工程施工及验收规范》(GB50268-20XX);(6)《给水标准图集》;(7)《新疆XX县城市总体规划修编(20XX-2030)》(XX省城乡规划设计研究院);(8)《新疆XX县XX综合经济技术开发区控制性详细规划》(XX 省城乡规划设计研究院有限公司,20XX.5)1.4资金来源由地方政府筹集资金。

1.5工程规模受XX县招商局委托,我公司承担了《XX县XX(XX)工业园区基础设施工程》的设计,编制本项目的初步设计报告。

设计供水里程:29.196Km。

该工程主要为输水工程部分。

该项目实施后可解决该地区工业用水和居民生活用水。

目的:是解决XX县工业园区工业及居民生活供水问题,对水质要严格求,进一步促进当地经济可持续发展。

本初步设计报告将通过对供水工程的输水工程环节进行初步设计。

给水厂毕业设计--给水厂工艺的初步设计

给水厂毕业设计--给水厂工艺的初步设计

非洲安哥拉罗安达市给水厂工艺的初步设计摘要水是生命的源泉,没有水人类就不能生存。

正常的供水系统是一个现代化城市不可或缺的基础设施,是城市生命线工程的重要组成部分。

本文通过对安哥拉罗安达市目前的饮用水系统的现状及存在的问题进行分析,指出了建设给水厂的必要性与迫切性。

在本文中,首先分析了国内外饮用水水源现状,介绍了给水处理工艺的发展;在水源地现状调查的基础上,对罗安达市水源水质进行了分析,采用Bengo 河作为原水水源,水厂规模为60,000m3/d。

其次,经过比较,提出了给水厂工艺流程推荐方案混凝—沉淀—过滤—消毒,混凝采用静态管道混合器和折板絮凝反应池,沉淀采用斜管沉淀池,过滤采用V型滤池,消毒采用氯气消毒,并对各个反应池进行了设计计算。

最后,运用AutoCAD软件,绘制主体构筑物图,设计深度为初步设计。

关键词:供水系统处理技术初步设计The Preliminary Design of the Waterworks Process of Angola, Luanda, AfricaABSTRACTWater is the source of life, and humanbeings without water cannot exist. The normal water supply system is one of the indispensable infrastructures and an important component for modern urban. Based on the analysis of Luanda city's water supply status, the necessity and urgency of building the waterworks are indicated.In this paper, the current domestic of drinking water sources was analyzed and the development of water treatment technology was presented. On the basis of water sources investigation, we analyzed the resourceof the waterworks ofLuanda and chose Bengo reservoir as the resource to build a waterworks with the scale of 60,000 m3/d. Secondly, by comparison,coagulation—sedimentation—filtration—disinfection was recommended as the technical procedure of the waterworks, the static channel mixer board and baffled plate flocculation tank was chosen as coagulation technology, the slanted tube sedimentation tank was used as sedimentation,filtration was the V filter pond, disinfection was used with chlorine , then each reaction pool was calculated and designed. Finally, with the help of AutoCAD software, the main structures were rendered and design depth for the preliminary design.Key Words:Water Supply System Treating Techniques Preliminary Design目录第一章总论 (1)1.1罗安达市概况及供水现状 (1)1.1.1罗安达市概况 (1)1.1.2罗安达市供水现状 (1)1.2项目建设的必要性 (2)1.3项目的主要研究内容及设计原则 (2)1.3.1工程设计内容 (2)1.3.2设计原则 (2)第二章给水厂发展状况 (3)2.1水源水质现状分析 (3)2.2 给水厂工艺发展 (3)第三章给水厂总体设计 (5)3.1设计规模 (5)3.2取水水源及水质分析 (5)3.2.1供水水质分析 (5)3.2.2水处理目标及出水水质 (7)3.3给水处理工艺的确定 (10)第四章给水厂设计说明 (12)4.1混合方式 (12)4.2絮凝方式 (12)4.3沉淀形式 (13)4.4过滤形式 (13)4.5消毒 (13)第五章给水厂设计计算 (14)5.1混合反应 (14)5.1.1混凝剂的选择 (14)5.1.2投药系统计算 (14)5.1.3加药间及药库 (15)5.1.4混合设施 (15)5.2波折板反应池 (16)5.2.1设计参数 (16)5.2.2平面计算 (16)5.2.3水头损失计算 (18)5.2.4 G、GT值 (21)5.3斜管沉淀池 (21)5.3.1设计参数 (21)5.3.2平面计算 (22)5.3.3进出水系统 (23)5.4 V型滤池 (24)5.4.1设计参数 (24)5.4.2平面尺寸计算 (25)5.4.3进水系统 (26)5.4.4反冲洗系统 (28)5.4.5过滤系统 (29)5.4.6排水系统 (30)5.4.7滤池总高度 (30)5.5消毒 (31)5.5.1设计参数 (31)5.5.2加氯量及氯瓶的确定 (31)5.5.3加氯机及漏氯处理 (32)5.5.4加氯间及氯库设计计算 (32)5.6清水池 (32)5.6.1清水池设计作用及特点 (32)5.6.2设计参数 (33)5.6.3清水池有容积 (33)5.6.4清水池的平面尺寸 (33)第六章水厂平面及高程布置 (35)6.1水厂的平面布置 (35)6.1.1选址原则 (35)6.1.2厂址位置 (35)6.2水厂高程布置 (35)第七章设计总结 (37)参考文献 (38)致谢 (39)第一章总论1.1罗安达市概况及供水现状1.1.1罗安达市概况罗安达位于非洲大陆西海岸,是安哥拉共和国的首都。

自来水厂工程初步设计报告(修订稿)_secret

自来水厂工程初步设计报告(修订稿)_secret

1 概述某省某市某镇水厂位于某市某镇场镇,供水对象主要为某镇场镇居民生活用水及部分企业用水。

受业主委托某市某水利电力勘测设计研究院承担了某市某镇水厂的初步设计设计工作。

我公司组织设计人员在熟悉工程基本情况下,深入工程区现场收集了自然环境、社会经济,详细调查了工程区的地形地貌后,对工程合理性分析,作出了初步设计方案。

某镇水厂设计规模840m3/d,属Ⅳ型工程,工程主要工程量:土石方开挖12586m3、砂砾石填筑10441m3、砼、钢筋砼及砌砖680m3、管理房建设84m2。

工程静态总投资172.71万元,其中建筑工程费108.22万元,临时工程6.55万元元,其它费用30.48万元。

本项目经济内部收益率为14.13%,经济净现值为122.22万元,经济效益费用比为1.01,结果表明该项目在经济上是合理的。

在本《报告书》编制过程中,得到了某镇水厂、某镇政府等有关单位大力支持和协助,在此一并表示感谢!2 项目区概况2.1项目区概况2.1.1 地理位置、地形地貌某镇地处某东郊,是一个以传统的农业大田生产为主的坝区镇乡,是某市主要的粮油产区;属平坝区,地形平坦开阔,地貌属成都平原绵远河流域一级阶地。

2.1.2 气象项目区属亚热带温润气候区,气候温和,降水充沛,四季分明。

春季冷空气活动频繁,气候回升不稳定,寒潮次数多,降雨较少,常有春旱发生;夏季暴雨较多,但也伴随有伏旱,每年几乎均有洪涝;秋季气温下降快,常有连绵秋雨;冬季较长而温暖,少雨多阴天。

多年平均气温15.7℃,年降雨量1067mm,年最大降雨量为1421.4mm,多集中在6~9月,年蒸发量800~950mm,平均湿度70~80%,多年平均最大风速17.3m/s。

2.1.3 社会经济情况2005年5月25日原五福镇归并到某后,全镇幅员面积45.2km2,人口35419人,辖20个行政村,2个居民社区。

“十一五”期间,在镇党委政府和全镇人民的共同努力下,某镇经济和社会各项事业都取得了长足发展,截至2005年末,国内生产总产值27563万元,工业增加值8324万元,农民人均纯收入3766元。

供水工程初步设计说明 精品

供水工程初步设计说明 精品

XX县XXXX供水工程初步设计说明1 综合说明XX县XXXX供水工程位于XX县城西北25公里处,该项目涉及XX 乡的XX村、景村、洛城村、关村、豆村、西沟村、程家塬村、后沟塬村8个行政村,现状人口7740人,饮水不安全人口6148人,设计供水人口8136人。

我院受XX县水利局委托,按照《陕西省村镇供水工程初步设计要点》,编制了XX县XXXX供水工程初步设计。

XXXX供水工程由水库取水工程、原水输水管道工程、水厂工程、配水干管、配水支管网及进户工程五部分组成。

供水水源为地表水,由原XX水库供水。

其中,修建取水构筑物1处,埋设原水输水管道4公里,新建水厂1处,埋设φ160U-PVC给水管道942米,埋设φ125U-PVC给水管2000米,埋设φ110钢管2100米,埋设φ110U-PVC给水管道605米,埋设φ90U-PVC给水管道1784米,埋设φ75U-PVC给水管2685米,埋设φ63U-PVC给水管道8002米,埋设φ50U-PVC给水管道26082米。

设计供水规模600m3/d,工程概算总投资526.25万元,综合水价2.50元/m3。

该项目实施后,将彻底解决XX乡8个行政村的供水紧张局面,极大改善XX乡特别是XX5个行政村的居民生活和XX乡的基础设施条件,将对XX乡新农村建设起到很大的促进作用。

2 工程概况2.1自然概况XX县XX乡位于XX县城西北边陲,距县城25km,西面、北面环山,地势西北高、东南低,全乡总人口约7740人,辖8个行政村,总面积70.49平方公里。

项目区内有小(二)型水库1座,位于北申家河流域上游,属千河一级支流,渭河二级支流。

XX水库总库容56.5万m3,均质土坝,有效库容45万m3,淤积高程1139.0米,正常蓄水位1161.5米,坝顶长105米,坝高30米,坝顶高程1165.0米,放水工程为卧管,右岸开敞式溢洪道,属Ⅴ等小⑵型工程。

2.2 项目区社会经济情况项目区总面积70.49平方公里,辖XX村、景村、洛城村、关村、豆村、西沟村、程家塬村、后沟塬8个行政村,常住人口7740人,项目区主要以小麦、玉米种植为主,2008年农民人均纯收入3000元。

甘肃某县给水厂初步设计

甘肃某县给水厂初步设计

甘肃某县给水厂初步设计摘要:给水系统是城市和工况企业的一项重要的基础设施,本文以实际工程设计为基点结合当地条件进行了净水工艺的选取,并对之进行了总结。

关键词:给水厂净水工艺处理构筑物一、工程概况该县城区供水始建于1975年,主要利用地下水作为城市的供水水源,随着城市经济发展,城镇化建设进程加快,目前供水已不能满足城市居民的生活用水需要。

根据该县供水规划,城市供水水源逐步由地下水改为地表水。

该县自来水厂,以环江地表水最为水源。

环江是该县境内的主干系,自北而南流经县城东部,马坊川、城西川均为其支流。

环江发源于宁夏盐池县、流经本县、庆阳县、汇入马莲河。

县城以上流域面积6667平方千米,多年平均径流量 2.13m3/s,枯水期1.73,洪峰流量达1740m3/s,据环江洪德水文站资料,多年平均径流量0.74*10 m3/s,平均流量2.34m3/s。

据水质分析结果,环江水质除细菌总数和总大肠菌群数超标外,其余均符合《生活饮用水卫生标准》(GB5749-2006),拟采用常规水处理工艺流程,即原水—混凝—沉淀—过滤—消毒的水处理工艺。

工艺流程:原水→管式静态混合器→折板絮凝池→斜管沉淀池→V型滤池→清水池→二级泵房→用户。

二、设计用水量的确定通常将设计用水量作为设计水量。

设计用水量是根据设计年限内用水单位数,用水定额和用水变化情况所预测的用户用水总量。

包括下列用水:1.综合生活用水量:该县属中小城市,设计人口为十万人,取最高日综合生活用水定额q=200L/(人/d),Q1=q×N×f=2万m3 /d。

2.工业企业生产用水量:与综合生活用水量之比为1:1,Q2=2万m3 /d。

3.浇洒道路和绿地用水量:由于绿化面积不易确定,可以取前两项水量的5%-10%作为此项用水量,本设计取8%,Q3=8%×(Q1+Q2)=3200m3 /d。

4.漏损及未预见水量:城镇配水管网的漏损水量及未预见水量宜按前三项水量之和的20%-25%计算,本设计取21%,Q4=10%×(Q1+Q2+Q3)=9072m3 /d。

给水工程初步设计

给水工程初步设计

摘要给水工程系统由相互联系的一系列构筑物和输配水管网组成。

它的任务是从水源取水,按照用户对水质的要求进行处理,然后将水输送到用水区,并向用户配水。

本设计为广西某县城的给水初步设计,设计包括管网设计、取水构筑物设计、水处理构筑物设计等。

力求在设计规划年限内,满足人们对水质的要求,并保证水量足够,保证供水及管网的安全,满足人们的日常生活需要。

通过对方案的选取,本设计采用了当前较为先进和成熟的工艺进行水质的净化。

通过各构筑物的有机结合,构成了整个给水工程的初步设计,完成了设计任务,并对设计管网和水厂进行了概预算,为其他工程相似提供了参考价值。

关键词:给水工程;取水构筑物;水处理构筑物;工程概预算AbstractWater supply system consists of a series of interconnected pipes of structures and composition. Its mission is from the water source, water quality in accordance with the requirements of the user are processed and then transported to the water area of water, water distribution to users. The design is a county's water supply preliminary design in Guangxi, including pipe network design, water structure design, water structure design and so on. Number of years in the design plan seeks to meet the people on the water quality requirements, And to ensure adequate water, To ensure the security of water supply pipe network, To meet the daily needs of people.By selecting the program, This design uses the current more advanced and mature technology of water purification. Through the combination of structures, Constitute the preliminary design of the entire water supply project, Completed the design task, And design of pipe network and water plant for the General Budget, It provides a reference value to Similar projects.Key words: Water Supply Project; Water structures; Water Treatment structures project budget目录摘要 (1)Abstract (1)前言 (1)1 概述 (1)1.1 城市总体规划概况 (1)1.2 水文资料 (1)1.3 气象资料 (2)1.4 地质资料 (2)1.5 用水量预测基本参数 (2)1.6 设计任务 (2)2 给水管网定线布置 (2)2.1管布置形网式 (2)2.2 管道布置原则和要求 (3)2.2.1管道布置原则 (3)2.2.2管道布置要求 (3)2.3 阀门、消火栓的布置原则 (4)2.3.1阀门布置原则 (4)2.3.2 消火栓布置原则 (5)2.4 管网定线 (5)3 水厂选址及工艺方案比选 (6)3.1 水厂选址 (6)3.2 水厂工艺方案选址 (7)3.3 水厂平面布置 (9)3.3.1布置要求 (9)3.3.2布置形式 (10)3.3.3水厂道路布置 (10)致谢 (11)参考文献 (12)前言水在人们生活和生产活动中占有重要的地位。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

非洲某给水厂工艺的初步设计目录第一章总论 (1)1.1罗安达市概况及供水现状 (1)1.1.1罗安达市概况 (1)1.1.2罗安达市供水现状 (1)1.2项目建设的必要性 (2)1.3项目的主要研究内容及设计原则 (2)1.3.1工程设计内容 (2)1.3.2设计原则 (2)第二章给水厂发展状况 (3)2.1水源水质现状分析 (3)2.2 给水厂工艺发展 (3)第三章给水厂总体设计 (5)3.1设计规模 (5)3.2取水水源及水质分析 (5)3.2.1供水水质分析 (5)3.2.2水处理目标及出水水质 (7)3.3给水处理工艺的确定 (10)第四章给水厂设计说明 (12)4.1混合方式 (12)4.2絮凝方式 (12)4.3沉淀形式 (13)4.4过滤形式 (13)4.5消毒 (13)第五章给水厂设计计算 (14)5.1混合反应 (14)5.1.1混凝剂的选择 (14)5.1.2投药系统计算 (14)5.1.3加药间及药库 (15)5.1.4混合设施 (15)5.2波折板反应池 (16)5.2.1设计参数 (16)5.2.2平面计算 (16)5.2.3水头损失计算 (18)5.2.4 G、GT值 (21)5.3斜管沉淀池 (21)5.3.1设计参数 (21)5.3.2平面计算 (22)5.3.3进出水系统 (23)5.4 V型滤池 (24)5.4.1设计参数 (24)5.4.2平面尺寸计算 (25)5.4.3进水系统 (26)5.4.4反冲洗系统 (28)5.4.5过滤系统 (29)5.4.6排水系统 (30)5.4.7滤池总高度 (30)5.5消毒 (31)5.5.1设计参数 (31)5.5.2加氯量及氯瓶的确定 (31)5.5.3加氯机及漏氯处理 (32)5.5.4加氯间及氯库设计计算 (32)5.6清水池 (32)5.6.1清水池设计作用及特点 (32)5.6.2设计参数 (33)5.6.3清水池有容积 (33)5.6.4清水池的平面尺寸 (33)第六章水厂平面及高程布置 (35)6.1水厂的平面布置 (35)6.1.1选址原则 (35)6.1.2厂址位置 (35)6.2水厂高程布置 (35)第七章设计总结 (37)参考文献.................................................... 错误!未定义书签。

致谢.................................................... 错误!未定义书签。

第一章总论1.1罗安达市概况及供水现状1.1.1罗安达市概况罗安达位于非洲大陆西海岸,是安哥拉共和国的首都。

面积5696平方公里,东经13°30′,南纬8°50′,西临大西洋本戈湾,南依安哥拉国内最大的宽扎河河口,人口400多万,是撒哈拉以南欧洲殖民者兴建的最古老的城市之一。

罗安达平均海拔不到200米,地形较为平坦,平原上间有低丘。

市内的地形标高在70~80米左右,沿海区域较低,市区外的地形较高,基本在100~130米之间。

本项目设计的给水厂所在位置为Candelabro高地,其最高处标高为107.7米。

罗安达地处热带地区,但由于地势较高,依山傍水,加之受本格拉寒流的影响,气候温和并不炎热,年平均气温24℃,素有“热带春城”的美称。

罗安达从12月中旬至一月底,通常会有一个雨量较少的约3周的时间。

空气的湿度全天都很大,年平均在79%左右。

罗安达市的主要水源地为Bengo河和Kuanza河。

Bengo河位于罗安达市北部,源于Kuanza Norte省的Quiculungo附近,向西经罗安达入海,流域面积10016平方公里,多年平均流量37.82m3/s。

Kuanza河位于罗安达市南部,由东向西流入大西洋,是安哥拉主要的河道之一。

Kuanza河长960公里,流域面积15.6万平方公里,多年平均流量836m3/s。

罗安达新建给水厂最大勘察深度为12.00米,场地地表普遍分布有一层坡积土,厚约1.00米左右。

坡积土以下以粘土为主,并含有泥灰岩夹层。

在勘察深度范围内揭示有两层泥灰岩地层,第一层普遍揭示,厚度在50~60厘米左右;第二层局部缺失,厚度在20~50厘米左右;该两层泥灰岩地层埋深深浅不一,大体上与山坡坡面呈同一倾向;坚硬,致密,含矿物结晶,岩芯呈柱状,平均抗压强度在18.7MPa左右。

1.1.2罗安达市供水现状罗安达目前共有三个给水系统,它们分别是1号系统——Marcal给水厂、2号系统——Kifangondo给水厂、3号系统——Kikuxi给水厂。

1号和2号系统均以Bengo河为水源,负责城市北部地区的供水;3号系统以Kuanza河为水源,担负城市南部地区的供水。

罗安达市供水设施除Kifangondo(2号系统)给水厂等少数构筑物外,大多建于葡萄牙殖民地时期的1950年前后,现已运行50多年,很多供水管道、构筑物出现不同程度的老化、损坏,管道经常爆管,供水能力严重不足。

罗安达市现有净水厂三座,总设计规模约35万吨/日,但由于管道、供水构筑物的老化、损坏,实际供水量已不足20万吨/日,致使城区用水量严重不足,居民用水大多靠供水车、供水管道集中取水。

罗安达市1号系统设计规模为60000吨/日,从Bengo河取水,取水口位于Kifangondo净水厂内。

1号系统现取水口处泥砂淤积严重,构筑物严重损坏、老化,输水量严重不足。

本项目主要是对准备新建的6万吨Marcal给水厂进行初步设计。

1.2项目建设的必要性水是生命的源泉,没有水人类就不能生存。

正常的供水系统是一个现代化城市不可或缺的基础设施,是城市生命线工程的重要组成部分,没有完善的供水系统的城市根本就谈不上发展,更不用说现代化了。

给水厂是供水系统的核心部分,它是控制水质净化水质的主要环节[1-2]。

因此对于一个城市的建设和发展来说,给水厂的设计和研究显得尤为重要。

罗安达市是安哥拉的首都,是政治、经济和文化中心。

罗安达所需水量总设计规模约为35万吨/日,但实际供水量已不足20万吨/日。

城区用水量严重不足,居民用水大多靠供水车、供水管道集中取水。

另外,罗安达市尚有一些地方为供水空白区,近80%用户没有实现供水到户,而采用小区域集中取水的方式。

可以看出,罗安达市目前的饮用水系统根本满足不了该城市居民生活的需要,更满足不了该市发展对水资源的需要。

罗安达市要持续稳定发展,对其给水厂进行全面改造新建势在必行。

1.3项目的主要研究内容及设计原则1.3.1工程设计内容本项目主要是对准备新建的6万吨Marcal给水厂进行初步设计。

Marcal给水厂的初步设计共包括如下内容:1.确定给水处理工艺流程;2.确定处理构筑物(或设备)的类型和数量;3.进行各构筑物单体的设计计算;4.进行主体构筑物的设计,绘制主体构筑物的平面图、剖面图等。

1.3.2设计原则1.本项目的设计均采用我国现行的国家标准及规范。

2.本项目的设计在考虑当地地质特点,在保证安全可靠的基础上,进行优化设计,尽量降低工程投资。

3.贯彻节约能源的方针,力求取得较好的经济效益和社会效益。

4.积极稳妥地引进、采用先进节能的新工艺、新技术;工艺流程先进、简洁、可靠,便于操作管理。

第二章给水厂发展状况2.1水源水质现状分析饮用水水源共分两类:地表水与地下水。

地表水又分为江河水与水库水。

另有些海岛等利用海水做饮用水,但需经过淡化处理。

地下水水质清澈,水质、水温较稳定。

但由于地下水流经岩层时会溶解各种矿物质,故地下水常铁锰超标;同时由于渗透量有限,往往径流量较小,取水量受限[5]。

江河水受上游排放影响,易受污染,常使细菌、有机物增加。

在汛期时,水量增大,浊度变差。

水库水水质与江河水类似,但由于水库存水量大,水流动性小,经过一段时间沉淀后,往往浊度较低。

当暴雨季节时,由于库底沉渣泛起,会引起水质突变。

2.2 给水厂工艺发展供水工程是国家基础设施之一,近年来得到很大发展。

随着经济发展和人民生活水平的提高,对供水需求逐年大幅增长,作为供水工程核心——水厂能否保证安全供水、供优质水,设计、施工和管理都对其有重要的影响[3-4]。

给水厂的设计包括水厂的总体布局及位置选择,水处理工艺,构建物及冲洗等,其中合理选择水处理工艺是首要问题,合理的净水工艺是保证供水水质的关键。

给水处理的方法应根据水源水质和用水对象对水质的要求而确定。

二十世纪初,饮用水净化技术已基本形成现在被人们普遍称之为常规处理工艺的处理方法,即混凝、沉淀或澄清、过滤和消毒[6]。

这种常规处理工艺至今仍被世界上大多数国家所采用,成为目前饮用水处理的主要工艺。

在常规处理工艺之前通常还进行预处理,针对水源水的污染特性,增设必要的预处理设施。

预处理技术包括投加化学氧化剂,如臭氧、高锰酸钾;投加吸附剂,包括粉末活性炭和活化粘土;以及生物氧化技术等。

饮用水常规工艺的主要目的是去除水源水中的悬浮物、胶体杂质和细菌。

混凝是向原水中投加混凝剂,使水中难以自然沉淀分离的悬浮物和胶体颗粒互相聚合,形成大颗粒的絮体。

沉淀是将混凝后形成的大颗粒絮体通过重力分离。

过滤则是利用颗粒状滤料(石英砂等)截留经沉淀后出水中残留的颗粒物,进一步去除水中杂质,降低水中的混浊度。

过滤之后采用消毒方法来灭活水中致病微生物,从而保证饮用水的卫生安全性。

二十世纪七十至八十年代,给水工程技术人员面临的主要问题是工程的投资效益,即如何以最低的工程总投资来完成简单的处理目标[7]。

在这段时期里,研究出了许多比较经济的净水技术和工艺,这些研究包括改进沉淀池设计,出现了斜管沉淀池、斜板沉淀池和气浮池等快速澄清工艺,还有快速过滤工艺和将絮凝、沉淀和过滤工艺组合在一起的专用集成设备。

二十世纪八十至九十年代,新的问题出现了,即饮用水中存在的微量有机物对人体健康具有长期潜在的危害[8]。

因此仅对水源水以传统水处理工艺进行处理难以满足要求,必需对其进行深度处理。

深度处理技术能较好地去除水中溶解性有机物,特别是对致癌、致畸、致突变等物质的去除,满足了人们对生活用水水质的要求[9]。

各种深度处理方法的基本作用原理,一般认为是吸附、氧化、生物降解和膜滤等,即利用吸附剂的吸附能力可去除水中溶解性有机物;利用氧化剂的强氧化能力可分解水中有机物;利用生物氧化法降解水中有机物;利用滤膜的筛分作用滤除有机物。

有时两种作用又能同时发挥,共同去除有机物,臭氧活性炭联用技术发挥了氧化和吸附两种作用[10]。

深度处理技术能在很大程度上提高水质,各地水厂可以根据自身的水源特点,合理选择深度处理工艺。

进入二十一世纪,水处理工艺采用自动控制技术监控生产过程已成为一种趋势,当前发达国家给水程序中的自动监控技术已经发展到较高水平。