定语从句小练(优秀经典练习)

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

定语从句小练 2 考点针对练

一、单句语法填空

1.(2019·浙江宁波模拟)My parents are the most important for me, without ________ support, I wouldn't have reached that far.

2.(2019·四川雅安中学月考)—When did you see the sponsor, Madam? —It was on the weekend ________ I was doing some shopping with my husband.

3.(2019·江苏如东中学期中) Mensa is a society for bright people, and it aims to create a platform _______ many think can provide the chance to share their thoughts and ideas.

4.(2019·安徽合肥质检)The movie Pompeii came out this February,________ many people think brings a touching love story to the audience.

5.(2019·南京、盐城模拟)As the dark horse, China's football team swept into the quarter­finals ________ it lost to host country Australia.

6.(2019·江苏南通二模)My grandpa, ________ is often the case with old people, is fond of talking about the good old days.

7.(2019·河北石家庄模拟)It was in the small house ________ was built with stones ________ he spent his childhood.

8.(2019·天津和平区月考)Lucy invited many friends to dinner, some of ________ her parents had never met before.

二、语法填空

(2019·山东潍坊3月一模)The Hong Kong­Zhuhai­Macau Bridge(HZMB),a 55­kilometre bridge­tunnel system,1.________(consist) of a series of three cable­stayed bridges,an undersea tunnel,and four artificial islands.It is both the longest sea crossing and the longest fixed link on earth,another 2.________ (significance) project.The HZMB,3.________ connects Hong Kong,Macau,and Zhuhai—three major cities on the Pearl River Delta,crosses the Lingding and Jiuzhou channel.

The HZMB desinged 4.________(last) for 120 years was built with

a cost of 126.9 billion yuan(US $18.77 billion).The cost of

5.________(construct) the Main Bridge was estimated

6.________ 51.1

billion yuan(US $7.56 billion) shared among the governments of mainland China,Hong Kong and Macau.

7.________(initial) set to be opened to traffic in late 2016,the structure was finally completed on 6 February 2018 and 8.________(journalist) were subsequently given rides over the bridge.On 24 October 2018,the HZMB was opened to 9.________ public after its opening ceremony a day 10.________(early).

相关文档
最新文档