工厂常用英文

合集下载

工厂常用英文缩写

工厂常用英文缩写

工廠常用英文縮寫PE:Products Engineer;生产工程Process engineer 制程工程TE:Test Engineer 测试工程ME:Manufacturing Engineer;制造工程;Mechanical Engineer 机械工程IE:Industrial Engineer 工业工程DCC:Document Control Center 文管中心BOM:Bill OF Material 材料清单ECN:Engineering Change Notice 工程变动公告TECN:Temporary Engineering Change Notice 工程临时变动公告ATY:Assembly Test Yield Total Yield 直通率TPM:Total Productivity MaintenancePM:Product Manager; Project Manager ECR:Engineering Change Request 工程变更申请ECO:Engineering Change Order 工程变更指令EN:Engineering Notice 工程通报WPS:Work Procedure Sheet 工作说明书ICT:In Circuit Test 电路测试P/R:pilot run;C/R control run T/R trial run 试做EVT:Engineer Verification Test 工程验证测试DVT:Design Verification Test 设计验证测试MVT:Mass Verification Test 多项验证测试ORT:On Going Reliability Test 出货信赖性测试S/W:software 软件H/W:hardware 硬件DCN:Design Change Notice 设计变更通知PVT:Production Verification Test 生产验证测试MTF:Modulation Transfer Function 调整转换功能CAT:Carriage Alignment Tool 载器调整具ID:Industrial Design 工业设计(外观设计) PCBA:Printed Circuit Board Assembly 电路板组装F/T:Function Test 功能测试CCD:Charge Coupled Device 扫描仪之读器ERS:External Reference Spec 外部规格PMP:Production Management Plan 工程管理计划SOP:Standar Operation Procedure 作业标准书QRA:Quality reliability Assurance 品保部ESD:Electrical Static Discharge 静电释放或静电防护OAY:Output Accept Yeild 直通率VMI:Visual mechanical inspection 外观检查PK:Packing 包装FQA:Final quality assurance 质量追踪CE:Component engineer 材料工程师EE:Electronic engineer 电子工程师EVT:Engineer verification test 工程验证测试WIP:Working in process inventory 在制品QA Quality Assurance 质量保证QRA :Quality & Reliability Assurance质量与可靠性保证MQA :Manufacturing Quality Assurance 制造质量保证DQA:Design Quality Assurance 设计质量保证QC:Quality Control 质量控制IQC:VQC:Vendor Quality Control 售货质量控制IPQC:In Process Quality Control 制程质量控制OQA:Out going Quality Control 出货质量控制QE:Quality Engineer 质量工程AQL:Acceptable Quality Level 可接受的质量水平DPPM:Defective Pieces Per Million units 百万件中有损件数PPM:Pieces Per Million 百万分之一CS:Custom Service 顾客服务MRB:Marerial Review Board 材料审核委员会DMR Defective Material Report 材料缺陷报告RMA:Return Marerial Administration 材料回收处理Life Test 寿命测试T/C:Temperature Cycle 温度循环H/T:High Temperature Test 高温测试L/T:Low Temperature Test 低温测试ISO:International Standard Organization 国际标准化组织SPC:Statistic process control 统计过程控制5S:Seiri Seito Seiso Seiketsu Shitsuke整理.整顿.清理.清扫.素养VMI:Visual Mechanical Inspection 外观机构检验MIL-STD:Military Standard 美军标准SPEC:Specification 规格AVL:Approval Vendor List 合格厂商QVL:Qualified Vendor List 合格厂商FQC:Final Quality Control 最终质量控制Open Box Audit 成品检验EAR:Engineering Analysis Request 工程分析需求FAI:First Article Inspection 首件检验VQM:Vendor Quality Management 厂商质量管理CAR:Corrective Action Request 改进对策要求4M:Man; Machine; Material; Method人,机,材,方法5M:Man; Machine; Material; Method; Measurement人,机,材,方法,测量MTBF:Mean Time Between Failure 平均寿命TTL:TotalFIN Finance&Accounting 财务与账目P&L:Profit & LosePerformance Variance 现象差异3 Element of Cost = M,L,OM:Material 材料L:Labor 人力O:Overhead 管理费用Fix OH Fix Overhead 固定管理费用Var OH Variable Overhead 不定管理费用COGS Cost Of Goods Sold 工厂制造成本AR:Account Receivable 应收AP:Account Payable 应支MIS Management Information System 资迅管理系统IS:Information System 资迅系统IT:Information Technology 系统技术Material Requisition Plan 材料需求计划I2:Information Integration System 资迅整合系统SAP:System Application Programming 系统申请项目ERP:Enterprise Resource Programming 企业资源项目HR Human Resource 人力资源PR:Public relation 公共关系T/O:Turn Over Rate=Monthly T/O Total People*12 GR:General Affair 总务Organization 组织HQ Head Quarter 总公司Chairmen 主席President 总裁Executive Vice President 常务副总裁Vice President 副总裁HR Human Resource 人力资源部FIN Finance 财务Sales 销售R&D:Research & Developing 研发部QA:质量保证QA DQA CSMIS:Management Information System 资迅管理系统PUR 采购PurchasingIMD:Image Management Division 影像管理事业部ITS:Information Technology System 计算机部QRA:Quality Reliability Assurance 品保部MFG:Manufacturing 制造部PMC:Production & Material Control 生(产)物(料)管(理) Materials 材料PC:Production Control 生产控制MPS:Mass Production Schedule 量产计划FGI:Finished goods Inventory 成品存货UTS:Units To Stock 存货单元WIP:Working In Process Inventory 在制品C/T:Cycle Time 循环时间,瓶颈WD:Working Days 工作天MTD:Month To Days 月初到今日(例如总表整理) YTD:Year To Days年初到今日SO:Sales Order 销售清单MO:Manufacture Order 制造清单BTO:Build To Order 订单生产P/N:Part Number 料号MC:Material Control 材料控制MRP:Material Requisition Plan 材料需求计划INV:Inventory 存货清单Inv Turn Over Days=INVS/NSB X WD 库存周转天数PSI:Production Shipping Inventory 预备待出货JIT:Just In Time 实时Safety Inventory 安全存量CKD:Completed Kits Delivery 全件组装出货SKD:Semi Kits Delivery 半件(小件)组装出货W/H:Warehouse 仓库Rec:Receiving Center 接收中心Raw MTL 原物料F/G:finish goods 成品Import/Export 进出口SI:Shipping Instruction 发货指令PL:Packing List 包装清单Inv:Shipping Invoice 出货发票ETA:Estimate Arrive 预估到达时间ETD:Estimate departure 预估离开时间BL:Bill of Landing 提货单(海运) AWB:Air Way Bill 提货单(空运)MAWB:Master Air Way Bill 主提货单HAWB:House Air Way Bill 副提货单TEU:Twenty foot Equipment Unit(Contain)二十英尺货柜FEU:Forty foot Equipment Unit(Contain)四十英尺货柜CY:Container Yard 货柜场THC:Terminal Handing Charge 码头费ORC:Original Receiving Charge 码头费PUR:Purchasing 采购FOB:Free on Board 货运至甲板(离岸价)CIF:Cost Insurance Freight 成本+运费+保险OA:Open Account 开户TT:Telegram Transfer 电汇COD:Cash On DeliveryCRP:Cost Reduction Program 降低成本方案PR:Purchasing Requisition 采购申请PO:Purchasing Order 采购单MFG Manufacturing Production 制造生产DL:Director Labor 直接人工IDL:Indirect Labor 间接人工DLH:Direct Labor Hours 直接工时Productivity=UTS/DLHPPH:Pieces Per Hour 每小时件数Efficiency=Actual/Target(%)DT:Machine Down Time 停机时间AI:Auto Insertion 自动插入MI:Manual Insertion 人工插入SMD:Surface Mount Device 表面粘着零件SMT:Surface mount technology 表面粘着技术B/I:Burn In(for how many hours at how many degree)烧机WI:Work Instruction 工作说明SOP:Standard Operation Procedure 作业指导书R/I:Run In 运转机器ESD:Electrical Static Discharge 静电释放MP:Mass Production 量产。

工厂常用英文字汇

工厂常用英文字汇

Page:1 of 8常用英文對照表生產規格specification or spec光藕合二極體photo couple生產注意事項S/N突破吸收器varistor料表BOM(bill of material)場效電晶體pet電氣規格ES接地星形墊片lock washer電路圖PK橋片整流bridge diode外觀尺寸圖PD可變電阻VR(variable)零件符號圖PM晶片電阻chip resistor連片圖H-PCB陶瓷電容ceramic capacitance 銅箔面布線圖PI保險絲座Fuse holder調整regulation熱敏電阻NTC機種model積體電路IC版本revision彈簧墊片spring washer發行日期issue date星形墊片star washer品名料號p/n二極體diode(dio)說明description電晶體transistor草擬reported by小基板control board審核checked by穩壓器regulator核準approved by電路板PCB生產通知FN(factory notice)濾波器filter工程變更通知ECN(engineering change連接器connector立即變更immediately change輸出線output cable自然切換running change散熱片heat sink舊版本old rev絕緣片insulator新版本new rev電阻resistor(res)圖號drawing no電容capacitor客戶customer線圈choke倉庫warehouse電感inductor人力資源HR human resources齊納zener資料中心document control風扇fan追求卓越excellence外殼case品質至上quality開關switch信賴第一reliability插座socketPage:2 of 8零件component螺帽nut電氣electrical墊片washer制程process罩框housing線軸bobbin端子terminal束帶cable卯釘rivet螺絲screw套管tube塑膠柱space supportlr標簽label顏色color樹脂epoxy黑色black跳線jumper wire藍色blue錫棒solder bar棕色brown膠glue金色gold加工成型pre-forming灰色gray助焊劑flux綠色green插件insertion橙色orange錫燼solder machine紅色red比重gravity銀色silver溫度temperature紫色violet補焊touch-up白色white崩應burn-in黃色yellow組立assemby粉紅色pink包裝packing樣品sample測試test目標target調整adjust踫觸touch報表report方法method接地grounding處置disposition記錄record追蹤follow up產品product分析analysis變更change檢驗inspection修訂revise規格specification or spec重工rework缺點defect儲存storage修復repair更新update篩選sorting增加ADD備注remark刪除cancel正確地correct問題problem進料檢驗IQC治具fixture成品檢驗FQC安全safety流程圖flow chare計劃plan過電壓保護over voltage protection日期date過電流保護over current protection位置location過功率保護over power protection頻率frequencyPage:3 of 8輸出output負載load漣波ripple滿載fun load雜訊noise損壞damage異音noise buzz示波器oscillograph保護protection高壓測試hi-pot test燒機broken品質手冊quality manual電壓voltage品質政策quality policy電流current工作指導書operation instructor注意專心attention允收accept風扇不轉fan no turn功能function研究中under study材料materionalarm參考refer to報警器警戒使警覺請求request退貨reject不同different變更依據alteration ref錯誤過失error作業程序procedure百萬分之一 1 ppm極性反polarity reversed最大負載max load漏件missing part電腦computer錯件wrong part控制control壞件component標志marking無線尾no lead protruded制程品質保證PQA裝插不良improper insertion漏電流leakage currem零件偏移component shifted錫solder絕緣不良insulation damaged範圍range成型不良poor preforming棧板pallet錫洞solder void開關電源供應器switch power supply錫多excessive solder高壓hi-pot近似短路near short作業員operator錫裂solder crack主要magor錫渣solder spatter檢查check錫橋solder bridge批lot冷焊cold solder加嚴tightened錫尖solder icicle安全安規safety短路solder short額定的reted錫少solder in sufficient電壓下降drop漏焊missing solder正常標準的normal翹皮peeling off顯示器display漏標示missing marking碟裝tray線腳長lead protrusion out of spec 蓋子lid漏點膠missing glue塑膠袋pi bat防焊漆膠落solder mask peeling off紙板pad污損contamination干燥劑dryer當機shut down保護膜pi film誤判NDTPage:4 of 8隔板partition重調re-adjust單箱carton測試板test board海棉pu foam外殼下蓋lower case保力龍EPS外殼上蓋upper case遙控的remote保險絲fuse判斷不公(錯誤)misjudge選擇開關select switch主席chairman核對checkancectorgedentout of spec ling off。

工厂常用英文2

工厂常用英文2

Rev: 011.生產規格(Specification or Spec).1.1 BOM: Bill of material 料表 1.2 S/N: Spec notice 生產注意事項 1.3: ES : Electrical Spec 電氣規格 1.4: PK: Schematic 電路圖 1.5: PD: Physical dimension 外觀尺寸圖ES:Input characterstics 輸入特性 1.1 Input voltage range 輸入電壓範圍 1.2 Input frequency range 輸入頻率範圍 1.3 Max .input AC current 最大輸入交流電流 1.4 Inrush current(cold start)突增電流(冷開機) 1.5 Efficency:60% Min.At nomall line 效率:60%,一般電壓(指115/230V,除非另有說明)Noise test 雜訊測試 Static output characteristics 靜態輸出特性 Dynamic output characteristics 動態輸出特性 Rise time DC 輸出電壓上升時間 Hold up time DC 輸出電壓持續時間Protection:保護 OVP(over voltage protection)過電壓保護 OPP(over power protection)過功率保護 OCP(over current protection)過電流保護 OTP(over temp protection)過溫度保護 Short circuit protection 短路保護Hi-pot(dielectric withstand voltage)耐電壓測試 1.1 Primary to secondary 初級對次級 AC TO DC 1.2 Primary to safety ground 初級對地 AC TO FG 1.3 Secondary to protection)次級對地 DC TO FG 1.4 Insulation resistance 絕緣阻抗 1.5 Leakage current 漏電流Electrical 常用單詞regulation 調整voltage / current 電壓/電流ripple / noise / buzz 漣波/雜訊/異音frequency / load 頻率/負載no power (NOP ) 無輸出full load / low load 重載/輕載工廠常用英語詞彙一覽表按類別查詢簡表broken / blow out (BRO 燒機damage / adjust 損壞/調整open / short 開路/短路oscilloscope 示波器SPEC(規格)常用單詞model: 機種revision: 版本issued date發行P/N: 品名,料號discrption: 說明remark: 備注reported by: 草擬cheched by: 審核approved by: 核 2.FN(factory notice):工廠變更通知 / ECN(cngineering change notice 2.1 FN實施方式: Immediated change 立即變更 Running change 舊料用完用新料2.2 ECN: old rev.(舊版本)new rev.(新版本) drawing no / customer / alteration ref (圖號 / 客戶 / 變更依據)3.Department 部門3.1 MFG:manufacturing制造3.1.1 AI: auto insertion自動插件3.1.2 preforming加工3.1.3 SMD自動粘著3.2 QA: quality assurance品保3.2.1 VQA進料品質保證3.2.2 PQC ,FQC製程品管3.2.3 Calibration , safety儀校,安規3.3 PE:production engineering制造工程3.3.1 TE:test engineering測試工程3.3.2 ME:mechanical engineering機械工程3.3.3 IE: industrial engineering工業工程3.4 HR:human resources人力資源3.5 Material物料3.5.1 PC:production control生管3.5.2 purchasing采購3.5.3 warehouse倉庫3.6 ENG:engineering工程3.6.1 document center資料中心4. Safety4.1 UL(Underwriters Laboratories)美國保險協會實驗室4.2 CSA(Canadian Standards Association)加拿大標準協會4.3 TUV德國技術監護協會4.4 VDE德國電氣標準4.5 NEMKO挪威電氣標準4.6 DEMKO丹麥電氣標準4.7 CCEE(China Commission for Conformity 中國電工產品認證委員會Certification of Electronial Equipment)4.8 CCIB(China Commodity Inspection Bureau)中國商品檢驗局5. Other 其他 FAX(傳真): date,to,fm,subject,dear,TKS,best regards,FAR: issue,description,corrective action,preventive action, analysis,defect,failure,s ISO:Internation Organization for Standardization 國際標準化組織Quality Manual:品質手冊Procedure: 作業程序Quality policy: Quality Reliability Excellence品質至上信賴第一追求卓越6.Contraction(縮寫)AQL: accept quality lecer 允收水準ATS: auto test system自動測試系統CR: critical嚴重ESD: electrostatic discharge靜電放電FET: field effective transistor場效電晶體ICT: in-circuil test線路測試MA: major主要MI:minor次要MRB: material reciew board不良材料審核組NTC: negative temperatire characteristic熱敏電阻O/I: operation instruction工作指導書PWM: pulse width modification脈波寬調整S/N: series number序號SMD: surface mounting device表面沾著WIP:work in progress半成品(工作進行中)JIT: just in timeIR: infra-red 紅外線的PDPC: process,decision,program,chartQCCA: quality control circle activities品管圈活動CWQC: company-wide quality control全面品管QCCA: quality control circle activities品管圈活動CWQC: company-wide quality control全面品管ponent(零件)bobbin線軸shieldbridge diode橋式整流triodecable tie束帶tapecapactitor(cap)電容screw tappingcase外殼screw machine ceramic capacitor陶瓷電容terminalchip capacitor晶片電容transformer(X'FMR) chip resistor晶片電阻transistorchoke線圈tubeconnector連接器varistorcontrol board基板VR(variable resistance) diode二極體washerepoxy樹脂zenerfan風扇photo coupleFET場效電晶體regulatorfilter濾波器resistorfuse保險絲ricerfuse clip保險絲底座screwfuse holder保險絲底座socketglue膠solder barheatsink散熱片sping washerIC集成電路stand-offinductor電感star washerinsulator絕緣片switchjumper wire跳線output cablelabel標簽output wirelock washer接地唾形墊片PCBNTC熱敏電阻LEDnut螺絲帽tubber footTEFLON8.Time(時間)Jan.(Janury)一月month月份Feb.(February)二月period期間Mar.(March)三月quarter季Apr.(April)四月since從…..May五月week周Jun.(June)六月after 在……之後Jul.(July)七月before在……之前Aug.(August)八月date日期Sept.(September)九月Mon=Monday 星期一Oct.(October)十月Tue=Tuesday 星期二Nov.(November)十一月Wed=Wednesday 星期三Dec.(December)十二月Thu=Thuresday 星期四Fri=Friday 星期五Sat=Saturday 星期六Sun=Sunday 星期日9.Ver(動詞)change改變paycheck檢查producecome來providedamage損傷receivefind發現replacefix修理sendgo去takehappen發生touchimprove改善windinsert插入issue發行make 做,使10.Non(名詞)action動作,措施analysis分析condition條件data資料defect缺點disposition處置engineer工程師failure失敗file文件夾inspector檢驗員11.Process(製程)assembly組立methodburn-in(B/I)崩應modelcomponent零件noiseflux助焊劑palletfunction test功能測試papergravity比重planHi-pot test耐高壓測試positioninsertion插件problemORT可靠度測試procedurepacking包裝productsolder machine錫爐productionstation站別recordsupplier/vendor廠商remarktemperature溫度reporthumidity濕度requirementtorque扭距sampletouch-up(T/U)補焊(二次作業)targetlayout設計圖tracelocation位置waybillmanager經理operator作業員technician技術員12.Color(顏色)black黑色blue藍色brown棕色gold金色gray灰色green綠色orange橙色red紅色silver銀色violet(purple)紫色white白色yellow黃色13.Number(數字)one 一twenty 二十two 二twenty-one 二十一three 三thirty 三十four 四forty 四十five 五fifty 五十six 六sixty 六十seven 七seventy 七十eight 八seventy-three 七十三nine 九eighty 八十ten 十ninety 九十eleven 十一hundred 百twelve 十二thousand 千thirteen 十三million 萬fourteen 十四fifteen 十五sixteen 十六seventeen 十七eighteen 十八nineteen 十九14.基本單位換算長度:1m=10dm=10*10cm=10*10*10mm1inch=25.4mm面積:1立方米=10*10平方分米=104平方釐米=106=1.5-e3体積:1立方米=10+e3=10+e6=10+e9=10+e3=10+e6=264.2重量:1公斤=1千克=103克(g)1磅=453.59克(g)電氣:電感(L) 1亨(H)=103毫亨=106微亨電阻(R) 1千歐=103歐=106毫歐電容(C) 1法=106微法=1012皮法電壓(V) 1千伏=103伏=106毫伏電流(A) 1安=103毫安=106微安頻率(f) 1(MHz)=103千赫(KHz)=106赫茲(Hz) 電壓/電流頻率/負載重載/輕載損壞/調整示波器date: 發行日期: 備注ed by: 核 準g change notice)工程變更通知舊料用完用新料/ alteration ref員會lure,supplier/vendor背板三極管膠布自攻螺絲機械螺絲端子變壓器電晶體套管突波吸收器可變電阻墊片齊納光藕合二極體穩壓器電阻鉚釘螺絲插座錫棒彈簧墊片支柱星形墊片開關輸出線輸出線電路板發光二極體腳墊鐵弗龍套管……之後……之前星期一星期二星期三星期四星期六星期日付給產生提供收到代替發出拿,采取踫觸纏(盤,卷)繞,扭曲方法機種噪音棧板紙張設劃位置問題程序產品生產記錄備注報告要求樣品目標(基板)線路運貨單二十二十一。

工厂相关英语

工厂相关英语

部分工厂常用英文,供大家参考部分工厂常用英文,供大家参考.Education and Training教育训练proposal improvement/creative suggestion提案改善BS Brain Storming 脑力激荡QCC Quality Control Circle 品质圈PDCA Plan Do Check Action 计划执行检查总结DCC delivery control center 交货管制中心3CComputer 计算机类产品Consumer electronics 消费性电子产品Communication 通讯类产品7SClassification整理(sorting, organization)-seiriRegulation整顿(arrangement, tidiness)-seiton Cleanliness清扫(sweeping, purity)-seisoConservation清洁(cleaning, cleanliness)-seiktsuCulture教养(discipline)-shitsukeSave 节约Safety安全质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水平S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheetPDCS Process defect correcting sheetGRN Goods receiving noteA/R Accounting receivableA/P Accounting payable三:专业词汇通用类president董事长operator作业员position职务general manager总经理special assistant 特助deputy manager |'depjuti| =vice manager副理deputy supervisor =vice supervisor副课长group leader组长line leader线长supervisor 课长responsible department负责单位Human Resources Department人力资源部Head count 人头数production department生产部门QC Section品管课administration/general affairs dept./总务部production unit生产单位meeting minutes会议记录distribution department分发单位subject主题conclusion结论decision items决议事项pre-fixed finishing date预定完成日Color management 颜色管理Visual management 目视管理production capacity生产力first count初盘first check初盘复棹second count 复盘second check复盘复核quantity of physical inventory second count 复盘点数量physical inventory盘点数量physical count quantity账面数量difference quantity差异量spare parts physical inventory list备品盘点清单cause analysis原因分析waste materials废料description品名specification 规格model机种work order工令revision版次remark备注registration登记registration card登记卡to control管制application form for purchase请购单consume, consumption消耗to notify通知to fill in填写to collect, to gather收集statistics统计cosmetic inspection standard 外观检验规范computer case 计算机外壳(组件)personal computer enclosure 计算机机箱产品front plate前板rear plate后板chassis |'∫æsi| 基座bezel panel面板Hood 上盖base pan 基座bezel 面板flat cable 排线resin film 树脂膜raw materials原料materials物料steel plate钢板roll/coil material卷料spare parts =buffer备品plastic parts塑料件sheet metal parts/stamping parts 冲件material check list物料检查表finished product成品semi-finished product半成品good product/accepted goods/ accepted parts/good parts良品defective product/non-good parts不良品disposed goods处理品warehouse/hub仓库packing material包材basket蝴蝶竺plastic basket胶筐flow chart流程窗体production tempo生产进度现状lots of production生产批量manufacture procedure制程to revise, modify修订to switch over to, switch—to, switching over切换engineering bottleneck, project difficulty工程瓶颈glove(s)手套glove(s) with exposed fingers割手套Band-Aid创可贴Industrial alcohol工业酒精broom扫把mop拖把vacuum cleaner吸尘器rag 抹布garbage container灰箕garbage can垃圾箱garbage bag垃圾袋liaison联络单rags抹布lamp holder灯架to mop the floor拖地to clean a table擦桌子air pipe 气管delivery deadline交货期die worker模工production, to produce生产equipment设备resistance电阻beacon警示灯coolant冷却液crusher破碎机plate电镀power button电源按键reset button重置键forklift叉车Workshop traveler 天车trailer =long vehicle拖板车Hydraulic trolley手压车hydraulic hand jack油压板车casing = containerization装箱velocity速度patent专利coordinate坐标supply and demand供求career card履历卡barricade隔板carton box纸箱to pull and stretch拉深work cell/work shop工作间sub-line支线bottleneck 瓶颈packaging tool打包机packaging打包品质类qualified products, up-to-grade products良品defective products, not up-to-grade products不良品defective product box不良品箱poor processing 制程不良poor incoming part来件不良exposed metal/bare metal金属裸露excessive defect过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格cosmetic defect外观不良lack of painting烤漆不到位slipped screw head/slippery slipped thread滑丝missing part漏件wrong part错件oxidation氧化defective threading抽芽不良poor staking铆合不良deficient purchase来料不良deficient manufacturing procedure制程不良cosmetic inspection外观检查inner parts inspection内部检查blister 气泡angular offset 角度偏差dent 压痕scratch 刮伤deformation 变形filings 铁削defective label 不良标签abrasion 磨损Breaking. (be)broken,(be)cracked 断裂short射料不足nick缺口speck瑕疪shine亮班splay 银纹gas mark焦痕delaminating起鳞speckle斑点mildewed =moldy = mouldy发霉deformation变形burr(金属)flash(塑件)毛边poor staking铆合不良excessive gap间隙过大grease/oil stains油污inclusion杂质shrinking/shrinkage缩水mixed color杂色fold of packaging belt打包带折皱painting make-up补漆discoloration羿色water spots水渍impurity 杂质Mismatch 错位failure, trouble 故障deformation 变形rust 生锈peel 脱漆Shrink 缩水Contamination 脏污water spots 水渍Gap 间隙label error 标签错误Missing label 漏贴rejection criteria 拒收标准Suspected rejects 可疑庇abrasion 损伤、磨损Texture surface 印花纹表面Streak 条纹stains 污点Blotch 斑点discoloration 脱色Inclusion 杂质slug mark 压痕dirt grime 灰尘blush 毛边薄膜sink 下凹Hickey 漏漆labels and logos 贴纸与商标Configuration labels 组合贴纸corrugated container 瓦摆纸箱Delaminating 脱层splattering 散点Gouge 锉孔puckering 折痕烤漆类phosphate皮膜化成viscosity涂料粘度alkalidipping脱脂main manifold主集流脉organic solvent有机溶剂demagnetization去磁;消磁high-speed transmission高速传递heat dissipation热传rack上料volatile挥发性degrease脱脂rinse水洗alkaline etch龄咬desmot剥黑膜D.I. rinse纯水次Chromate铬酸处理Anodize阳性处理seal封孔scraped products报放品disposed products处理品dismantle the die折模auxiliary function辅助功能heater band 加热片thermocouple热电偶derusting machine除锈机degate打浇口dryer烘干机induction感应induction light感应光response =reaction =interaction感应ram连杆edge finder巡边器concave凸convex凹cold slug冷块blush 导色gouge沟槽;凿槽satin texture段面咬花witness line证示线grit沙砾granule =pellet =grain细粒sand blasting喷沙grit maker抽粒机cushion缓冲fillet镶;嵌边roller pin formality滚针形式cam driver铡楔shank摸柄crank shaft曲柄轴组装类Assembly line组装线Layout布置图Conveyer流水线运输带Rivet machine拉钉机Rivet gun拉钉枪Screw driver起子Electric screw driver电动起子Hydraulic machine 液压机Pneumatic screw driver气动起子automation自动化to stake, staking, riveting铆合add lubricant oil加润滑油argon welding氩焊cylinder油缸robot机械手conveying belt输送带transmission rack输送架to draw holes抽孔bolt螺栓nut 螺母screw 螺丝identification tag标示单screwdriver plug起子插座automatic screwdriver电动启子to move, to carry, to handle搬运be put in storage入库packing包装staker = riveting machine铆合机fit together组装在一起fasten锁紧(螺丝)fixture 夹具(治具)pallet/skid栈板barcode条形码barcode scanner条形码扫描仪fuse together熔合fuse machine/heat stake热熔机processing, to process加工delivery, to deliver 交货to return delivery to. to send delivery back to return of goods退货easily damaged parts易损件standard parts标准件to lubricate润滑spring 弹簧spare tools location/buffer手工备品仓spare molds location模具备品仓tox machine自铆机waste废料board广告牌sliding rack滑料架to impose lines压线to compress, compressing压缩character die字模to feed, feeding送料material change, stock change材料变更feature change 特性变更prepare for, make preparations for 准备rotating speed, revolution转速abnormal handling异常处理工厂常用缩略语5S:5S管理ABC:作业制成本制度(Activity-Based Costing)ABB:实施作业制预算制度(Activity-Based Budgeting)ABM:作业制成本管理(Activity-Base Management)APS:先进规画与排程系统(Advanced Planning and Scheduling) ASP:应用程序服务供货商(Application Service Provider)ATP:可承诺量(Available To Promise)BOM:物料清单(Bill Of Material)BPR:企业流程再造(Business Process Reengineering)BSC:平衡记分卡(Balanced ScoreCard)BTF:计划生产(Build To Forecast)BTO:订单生产(Build To Order)CPM:要径法(Critical Path Method)CRM:客户关系管理(Customer Relationship Management)CRP:产能需求规划(Capacity Requirements Planning)CTO:客制化生产(Configuration To Order)DBR:限制驱导式排程法(Drum-Buffer-Rope)DRP:运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC:设计变更/工程变更(Engineer Change)EC:电子商务(Electronic Commerce)EDI:电子资料交换(Electronic Data Interchange)EIS:主管决策系统(Excutive Information System)EOQ:基本经济订购量(Economic Order Quantity)ERP:企业资源规划(Enterprise Resource Planning)FMS:弹性制造系统(Flexible Manufacture System)FQC:成品品质管制(Finish or Final Quality Control)IPQC:制程品质管制(In-Process Quality Control)IQC:进料品质管制(Incoming Quality Control)JIT:实时管理(Just In Time)KM:知识管理(Knowledge Management)L4L:逐批订购法(Lot-for-Lot)LTC:最小总成本法(Least Total Cost)LUC:最小单位成本(Least Unit Cost)MES:制造执行系统(Manufacturing Execution System)MPS:主生产排程(Master Production Schedule)MRP:物料需求规划(Material Requirement Planning)MRPⅡ:制造资源计划(Manufacturing Resource Planning)OEM:委托代工(Original Equipment Manufacture)ODM:委托设计与制造(Original Design & Manufacture)OLAP:线上分析处理(On-Line Analytical Processing)OLTP:线上交易处理(On-Line Transaction Processing)OPT:最佳生产技术(Optimized Production Technology)OQC:出货品质管制(Out-going Quality Control)PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)PERT:计画评核术(Program Evaluation and Review Technique)POH:预估在手量(Project on Hand)QCC:品管圈(Quality Control Circle)RCCP:粗略产能规划(Rough Cut Capacity Planning)ROP:再订购点(Re-Order Point)SCM:供应链管理(Supply Chain Management)SFC:现场控制(Shop Floor Control)SIS:策略信息系统(Strategic Information System)SPC:统计制程管制(Statistic Process Control)TOC:限制理论(Theory of Constraints)TQC:全面品质管制(Total Quality Control)TQM:全面品质管理(Total Quality Management)WIP:在制品(Work In Process)>>> 5S:5S管理5S是由JP企业研究出来的一种环境塑造方案,其目的在藉由整理(SEIRI)、整顿(SEITON)、清扫(SEISO)、清洁(SEIKETSU)及身美(SHITSUKE)五种行为来创造清洁、明朗、活泼化之环境,以提高效率、品质及顾客满意度。

最全工厂英文对照

最全工厂英文对照

最全工厂英文对照一、工厂基本设施及部门名称对照1. 工厂:Factory2. 车间:Workshop3. 办公室:Office4. 生产线:Production Line5. 库房:Warehouse6. 物料部:Material Department7. 质量部:Quality Department8. 生产部:Production Department9. 技术部:Technical Department10. 人力资源部:Human Resources Department二、工厂常用设备名称对照1. 冲压机:Stamping Machine2. 注塑机:Injection Molding Machine3. 车床:Lathe4. 铣床:Milling Machine5. 磨床:Grinding Machine6. 钻床:Drilling Machine7. 线切割机:Wire Cutting Machine8. 激光切割机:Laser Cutting Machine9. 折弯机:Bending Machine10. 剪板机:Shearing Machine三、工厂常用原材料名称对照1. 钢铁:Steel2. 铝:Aluminum3. 铜:Copper4. 塑料:Plastic5. 橡胶:Rubber6. 纸张:Paper7. 玻璃:Glass8. 木材:Wood9. 纱线:Yarn10. 纤维:Fiber四、工厂生产流程及工艺名称对照1. 设计:Design2. 打样:Sampling3. 下料:Cutting4. 成型:Shaping5. 焊接:Welding6. 抛光:Polishing7. 喷涂:Spraying8. 组装:Assembly9. 调试:Testing10. 包装:Packing五、工厂质量管理术语对照1. 质量控制:Quality Control2. 抽样检验:Sample Inspection3. 全检:Full Inspection4. 不良品:Defective Product5. 合格率:Pass Rate6. 质量改进:Quality Improvement7. 质量管理体系:Quality Management System8. 认证:Certification9. 检测报告:Test Report10. 客户满意度:Customer Satisfaction六、工厂安全与环保术语对照1. 安全生产:Safe Production2. 安全培训:Safety Training3. 安全检查:Safety Inspection4. 防护用品:Protective Equipment5. 环境保护:Environmental Protection6. 废气处理:Exhaust Gas Treatment7. 废水处理:Wastewater Treatment8. 噪音治理:Noise Control9. 危险品:Hazardous Materials10. 应急预案:Emergency Plan七、工厂人力资源管理术语对照1. 招聘:Recruitment2. 面试:Interview3. 培训:Training4. 考核:Assessment5. 薪酬:Salary6. 福利:Benefits7. 劳动合同:Labor Contract8. 休假:Leave9. 晋升:Promotion10. 离职:Resignation八、工厂物流与供应链管理术语对照1. 供应链:Supply Chain2. 供应商:Supplier3. 采购:Procurement4. 库存管理:Inventory Management5. 物流配送:Logistics Distribution6. 运输:Transportation7. 仓储:Warehousing8. 订单处理:Order Processing9. 货物跟踪:Cargo Tracking10. 供应链优化:Supply Chain Optimization九、工厂市场营销与客户服务术语对照1. 市场调研:Market Research2. 产品定位:Product Positioning3. 营销策略:Marketing Strategy4. 广告宣传:Advertising5. 展会推广:Exhibition Promotion6. 客户关系管理:Customer Relationship Management7. 客户满意度调查:Customer Satisfaction Survey8. 售后服务:Aftersales Service9. 客户投诉:Customer Complaint10. 持续改进:Continuous Improvement十、工厂财务管理术语对照1. 财务报表:Financial Statements2. 成本核算:Cost Accounting3. 预算管理:Budget Management4. 税务筹划:Tax Planning5. 应收账款:Accounts Receivable6. 应付账款:Accounts Payable7. 资金周转:Capital Turnover8. 投资分析:Investment Analysis9. 融资:Financing10. 内部审计:Internal Audit十一、工厂信息技术与数据分析术语对照1. 企业资源规划(ERP):Enterprise Resource Planning2. 制造执行系统(MES):Manufacturing Execution System3. 计算机辅助设计(CAD):ComputerAided Design4. 计算机辅助制造(CAM):ComputerAided Manufacturing5. 数据分析:Data Analysis6. 大数据:Big Data7. 互联网物联网(IoT):Internet of Things8. 云计算:Cloud Computing9. 信息技术支持:IT Support10. 网络安全:Cybersecurity十二、工厂项目管理术语对照1. 项目启动:Project Initiation2. 项目规划:Project Planning3. 项目执行:Project Execution4. 项目监控:Project Monitoring5. 项目收尾:Project Closure6. 项目团队:Project Team7. 项目风险管理:Project Risk Management8. 项目进度:Project Schedule9. 项目预算:Project Budget10. 项目目标:Project Objectives十三、工厂技术创新与研发术语对照1. 研发(R&D):Research and Development2. 技术创新:Technological Innovation3. 新产品开发:New Product Development4. 专利:Patent5. 技术转移:Technology Transfer6. 知识产权:Intellectual Property7. 样品:Prototype8. 实验室:Laboratory9. 技术标准:Technical Standard10. 创新能力:Innovation Capability十四、工厂国际化与外贸术语对照1. 进口:Import2. 出口:Export3. 贸易壁垒:Trade Barrier4. 国际市场:International Market5. 外贸合同:Foreign Trade Contract6. 海关申报:Customs Declaration7. 贸易术语(如FOB、CIF):Trade Terms8. 国际支付:International Payment9. 跨国公司:Multinational Corporation10. 全球供应链:Global Supply Chain通过这份最全工厂英文对照文档,我们希望能够为您的日常工作提供便利,帮助您在国际化的大背景下,更好地融入全球工业体系,提升个人和企业的竞争力。

工厂常用英语简写及职责(初版)

工厂常用英语简写及职责(初版)

- Internal Use Only -
工厂常用英语简写 CS工程师
英文全称:Customer satisfaction Engineer, 中文意思是客服工程师
7
主要职能
1、应对Customer Quality Issue 2、通过Customer requirement feedback 增大顾客满意度。 3、通过顾客满意度调查评价顾客的满意度并改善。 4、对顾客不良品进行Failure Analysis 5、顾客返品维修 及换货。 5、顾客返品维修及换货
- Internal Use Only -
工厂常用英语简写 QE
英文全称: Quality Engineer, 中文意思是质量工程师
10
主要职能
1.参与新产品的开发和试制,及产品品质计划的制定。 2.参与解决制程中出现的质量问题,并根据工程检验标准追踪 确认,实行标准化 3.组织对现有产品的品质评审,评诂产品品质与工程规格,检 验标准和客户要求的符合性。 4.督促生产过程和检验过程严格按规程操作。 5.负责与客户联络检测标准和测量方法及时对应客户抱怨等事宜 6.参与产品品质先期策划,实施并跟踪产品品质。 7.负责品质管理成本分析 8.参与公与5S检查工作。
FQC Final Quality Control (最终品质管制)
OQC (Outgoing Quality Control) (出货品质管制)
- Internal Use Only -
工厂常用英语简写 QA工程师
英文全称: Quality Assurance Engineer, 中文意思是品质保证工程师
6、接受顾客审核
7、组织召开定期品质会议(with Customer) 8、组织进行顾客量产品的ECN ★

100个工厂常用英文缩写

100个工厂常用英文缩写

1AQL Acceptable Quality Level可允收质量水平2ASS'Y Assembly组装3AVL Approved Vendor List合格供应商名录4BOM Bill of Materials材料清单5BTN Button按钮6CA Corrective Action矫正措施7BU Business Unit事业处8CCC China Compulsory Certification中国强制认证9CPK Capability process index制程能力参数10DCC Document Control Center文件管制中心11DFX Design for X 面向产品生命周期各/某环节的设计。

DFP:Design for Procurement 可采购设计DFM:Design for Manufacture 可生产设计DFT:Design for Test 可测试设计DFD:Design for Diagnosibility 可诊断分析设计DFA:Design for Assembly 可组装设计DFE:Design for Environment 可环保设计DFF:Design for Fabrication of the PCB 为PC 制造而设计DFS:Design for Serviceability 可服务设计DFR:Design for Reliability 为可靠性而设计DFC:Design for Cost 为成本而设计12DOE Design of experiments实验设计法13DPPM Defect part per million每百万的缺陷数14DVB-C Digital Video Broadcasting-Cable欧规数字电视有线广播标准15DVB-H Digital Video Broadcasting forhandheld欧规手持装置数字地面广播标准16DVB-S Digital Video Broadcasting-Satellite欧规数字电视卫星广播标准17DVB-T Digital Video Broadcasting-Terrestrial欧规数字电视地面广播标准18DVT Design Verification Testing设计验证19ECN Engineering Change Notice工程变更通知20ECO Engineering Change Order工程变更指令21ECR Engineering Change Request工程变更需求22EE Electronic Engineering电子工程23EMC Electromagnetic Compatibility电磁共容24EMI Electromagnetic Interference电磁干扰25EOL End of Life产品生命结束100句工廠常用單詞26ERP Enterprise Resources planing企业资源规划系统27ESD Electro-Static Discharge静电释放(放电)28EU Europe欧洲29FA Failure Analysis失效分析30FAI First Article Inspection首件样品检查31FMEA Failure model effectivenessanalysis失效模式分析32FPC Flexible Printed Circuit可绕性印刷电路板33FQC Finish Quality Control成品质量管理34FR Failure Rate不良率35F/T Function Test功能测试36FYI For Your Information提供您参阅(对平级和下级用)37FYR For Your Reference提供您参考(对平级和上级用)38GND Ground地面39ID Industry Design工业设计40IPQC In-process Quality Control制程质量控制41IQC Incoming Quality Control进料质量控制42ISDB-T Integrated Services DigitalBroadcasting-Terrestrial日规数字电视地面广播标准43ISO International StandardOrganization国际标准化组织44KPI Key Performance Indicator关键绩效指标45KR Korea韩国46MAJ Major主要的47MBO Management by Objective目标管理48MCN Manufacturing Change Notice制造变更通知49MCR Manufacturing ChangeRequest 制程变更需求50ME Mechanical Engineering机构工程51MES Manufacturing ExecutionSystem制造执行系统52MFG Manufacturing制造53MIN Minor轻微的54MIS Management InformationSystem管理信息系统55MO Manufacturing Order工单56MP Mass Production量产57MRB Material Review Board材料审核会议58MRP Material Requirement Plan物料需求计划59NA Not Available无效/不适用60NG No Good不良61NPI New Product Introduction新机种导入62ODM Original Design Manufacturer代设计制造者63OEM Original EquipmentManufacture委托代工64OP Operator作业员65OQA Outgoing Quality Assurance出货品质确认66OQC Outgoing Quality Control成品出货质量管理67ORT On-going Reliability Test持续性可靠度测试68OS Operation System操作系统69PCB Printed CircuitBoard印刷电路板70PCBA Printed CircuitBoard assembly电路板组装71PDCA Plan-Do-Check-Action PDCA管理循环72PE Process Engineering制程工程师73PKG Packing包装74PM Project Management项目管理75PN(P/N)Part Number料号76PO Purchase order订购单77PP Production Plan生产计划78PPM Percent Per Million百万分之一79P/R Pilot Run试产80PV Proces Verification制程验证81QA Quality Assurance质量保证82QC Quality Control质量控制83QE Quality Engineering质量工程84QM Quality Management质量管理85QS Quality System质量系统86RD Research&Development研发87RMA Return Materials Approval退货验收88SFC Shop Floor Control现场控制89SFIS Shop Floor Integrated System 现场信息整合系统90SIP Standard Inspection Procedure标准检验程序91SMD Surface Mount Device表面粘着组件92SMT Surface Mount Technology表面粘着技术93SN Serial Number序号94SOP Standard Operation Procedure标准作业指导95SPC Statistical Process Control统计制程管制96SPK Speaker喇叭/扬声器97SQE Supplier Quality Engineer供应商质量管理98TBD To Be Determined待决定99TE Test Engineering测试工程100WIP Working In Process在制半成品。

制造业工厂常用的英语

制造业工厂常用的英语

制造业工厂常用的英语以下是一些制造业工厂常用的英语词汇和表达:1.工厂:factory,制造厂:manufacturing plant2.生产线:production line,流水线:assembly line3.原材料:raw material,半成品:semi-finished product4.成品:finished product,产品:product5.加工:processing,制造:manufacturing6.装配:assembly,包装:packaging7.质检:quality inspection,质量:quality8.仓库:warehouse,库存:inventory9.物流:logistics,运输:transportation10.供应商:supplier,订单:order11.采购:purchasing,销售:sales12.管理:management,财务:finance13.电脑控制台:control console,操作系统:operating system14.设备:equipment,维护:maintenance15.安全:safety,事故:accident16.保险:insurance,赔偿:compensation17.工具:oolt,手套:gloves18.工厂管理培训计划:factory management training program,工程学培训课程:engineering training course19.操作指南:instruction manual,使用说明:directions for use20.工作许可证:work permit,安全许可证:safety permit21.招聘启事:job opening,职位申请表:job application form22.劳动力成本:labor cost,生产成本:production cost23.设备投资:equipment investment,利润:profit24.工艺流程图:process flowchart,流程图解:flowchart legend25.标准操作程序:standard operating procedure,安全操作规程:safety operating procedure。

工厂常用英语词汇一览表

工厂常用英语词汇一览表

工廠常用英語詞彙一覽表;按字母查詢簡表1Rev:01;英文簡稱英文全名中文解釋;========================;5S5S整理,整頓,清掃,清潔,教養;66Sig ma六標準差;A/IAutoInsertion自動插件;AQLAcceptQualityLevel允收水;B /IBurn-In高溫熱機(老化)過程;BOMBillOfMaterial6 6 Sigma 六標準差A/I Auto Insertion 自動插件AQL Accept Quality Level 允收水準B/I Burn-In 高溫熱機(老化)過程BOM Bill Of Material 材料明細表BTO Build To Order 接單生產CAD/CAM Computer Aided Design/Manufacturing 電腦輔助設計/製造CAL Calibration 儀器校驗 (儀校)CAR Corrective Action Response 改善對策報告CCR Customer Complain Requirement 客戶抱怨/要求Charge Charge 索取費用CND Cannot Duplicate 無法複製,異常現象消失CR Critical 嚴重(CR>MA>MI)CS Customer Service 客戶服務CTO Configure To Order 接單組裝Debit Note Debit Note (會計) 帳目通知DELL's Survey Form DELL's Survey Form DELL公司稽核供應商的文件ECN Engineering Change Notice 工程變更通知ECR Engineering Change Request 工程變更要求EMI Electro Magnetic Interference 電磁干擾ENG Engineering 工程(部)ESD Electrostatic Discharge 靜電放電FAE Field Application Engineering 客訴前置處理單位FAI First Article Inspection 首件檢查FN Factory Notice 工廠通知FRR Field Return Rate 市場退修率FRU Field Replacement Unit 市場不良回修更換套件Hi-Pot Hi-Pot 耐電壓測試Hold Hold (shipping, production…) 停止 (出貨,生產…)ICT In-Circuit Test (PC板)電路測試IE Industrial Engineering 工業工程IPQC In-Process Quality Control 製程品質管制IQC Incoming Quality Control 進料品質管制ISO International Organization for Standardization 國際標准組織JIT Just In Time 即時 (行動,入料…)MA Major 主要ME Mechanical Engineering 機械工程MFG Manufacturing 製造部(業)MI Minor 次要MIS Management Information System 資訊管理系統MP Mass Production 量產 (亦指製造部)MRB Material Review Board VQA材料異常會閱MTBF Mean Time Between Failure 平均失效時間ODM Original Developing Manufacturer 原始設計生產OEM Original Equipment Manufacturer 原始配備生產O/I Operational Instruction 作業指導書ORT On-going Reliablity Test 在製品可靠度測試PDCA Plan Do Check Action 戴明循環PE Production Engineering 製造工程(部)P/N Part Number 品名P/R Pilot-Run 試作驗證Preforming Preforming 預加工P/O Purchase Order 採購下訂單(P/O->S/O->W/O)PPM Part Per Million 百萬分之一 (品質計算單位)QA Quality Assurance 品質保証QCQuality Control 品質管制QCCA Quality Control Circle Activities 品管圈活動QIS Quality Information System 品質資訊系統REV Revision 版本R/I Run-In 常溫熱機(老化)過程RMA Return Merchandise Approval(or Authorization) 退貨品認可RTV Return To Vendor 退回廠商Safety Safety 安全規格 (安規)SMT Surface Mounting Technology 表面黏著技術S/N Serial Number 序號S/O Sales Order 業務下訂單SPC Statistics Process Control 統計製程管制SPEC Specification 規格SWOT Strength Weaknesses Opportunities Threats 強勢弱勢潛在機會威脅TE Test Engineering 測試工程TPM Total Productive Maintenance 全面性生產維護TQM Total Quality Management 全面品質管理TUV TUV 德國萊茵技術監護顧問公司 (安規單位)UL Underwriters Laboratories 美國保險協會實驗室 (安規單位)VQA Vender Quality Approval 供應商品質保證 (雷同進料檢驗)WIP Work In Process 尚未完成的在製品W/O Work Order 生產工單電腦公司專有名詞縮寫釋義小集一. 企劃,產銷,采購,進出口專有名詞P/N ------ Part Number 料號P/R ------ Purchase Request (物控release給采購的)請購單P/O ------ Purchase Order (采購release給廠商的)訂單PMC ------ Production & Material Control 生管&物控管理PM ------ Production Management 整個生產管理(包括生管,物控,產銷) MC ------ Material Control (企劃)物控PC ,------ Production Control (企劃)生管PL,,------ Project Leader ,專案管理(針對大客戶大訂單的專門全面管理, 主要是Pilot Run 階段及其前期工作), OM ------ Order Management ,訂單管理(量產之後的訂單答交﹑生產進度跟蹤﹑工令管理﹑ECN變更﹑出貨排程等),PMP ------ Project Management Plan 專案(訂單)管理計劃書,PIC ------ Person In Charge (專案)負責人,COPP ------,ORT ------ Ongoing Reliability Test生產過程中的可靠度測試,UCL ------ Up Control Line 上管制線,LCL ------ Low Control Line 下管制線FAI ------PVT ------ Process Verification Test ,,Pilot Run試生產第一階段,先作PVT,再作MVB.MVB ------ Mass Verification Board ,Pilot Run試生產之第二階段M/P ------ Mass Production ,量產/大批量生產BTF ------ Build To Forecast ,依據銷售預測進行生產BTO ------ Build To Order , ,,依據訂單生產CTO ------ Configuration To Order 客製化生產PTD ------ Production To Departure,,,CRM ------ Customer Relationship Management 客戶關係管理,,,CRP ------ Capacity Requirements Planning 產能需求規劃, ERP ------ Enterprise Resource Planning 企業資源規劃,FMS ------ Flexible Manufacture System , 彈性製造系統BOM ------ Bill Of Material 物料清單MPS ------ Master Production Scheduling ,主生產排程,指根據業務接單或銷售預測所排定一段期間之產品生產計劃,須指定何種產,品應於何時製造完成多少數量.MRP ------ Material Requirement Planning 物料需求規劃,MRP之計算依照MPS之產品獨立需求,透過BOM展開之零組件相依需求,,配合當時存貨狀況,以求得某段期間內應投入生產或執行採購之計劃方針.,WIP ------ Work In Process 在製品,FG ------ Finished Goods ,制成品/產成品,E&O ------ Excess & Order/Backlog ,呆滯在途(訂單),EOL ------ End Of Line 產品壽命中止(停止生產),MES------Manufacturing Execution System製造執行系統輔助生管人員收集現場資料及控制現場製造流程,提供企業改善製程、提高生產效益的工具.大部分的MES系統模組皆會包括訂單管理系統(Customer Order Management, C OM)﹑物料管理系統(Material Management System, MMS)﹑製程式控制管系統(Work In Process Tracking, WIP)﹑生產排程系統(Production Scheduling S ystem, PSS)﹑品質控管系統(Statistical Process Control , SPC)﹑設備控管系統(Equipment Management System, EMS)及對外部系統的PDM整合介面(PD M Integration Interface)與ERP整合介面(ERP Integration Interface)等模組.,OEM ------ Original Equipment Manufacture 委託代工,,ODM ------ Original Design & Manufacture ,委託設計與製造AVL ------ Approved Vendor List 具備資格/被認可的廠商名冊SCM ------ Supply Chain Management 供應鏈管理SLM ------ Supply Line Management 供應鏈管理產品由起始原料轉換成完成品至最終到達顧客手上之流動過程中,影響其執行績效的個體組合而成之網路稱為供應鏈,供應鏈的組成個體可能包括:供應商→製造→工廠→配銷點→零售商→最終顧客;而供應鏈管理之定義,簡單而言,就是需求與供應適當的結合,以達到資源﹝人﹑設備﹑物﹑資金﹞運用與分配之有效性與及時性.,EC ------ Engineer Change 設計變更/工程變更,EC ------ Electronic Commerce 電子商務,ECN ------ Engineer Change Notice 工程變更通知書,S/O ------ Shipping Order 裝貨通知單S/A ------ Shipping Advice 出貨通知,比“SI”先行S/I ,------ Shipping Invoice 正式的出貨文件/發貨單P/L ------ Packing List , , (出貨)裝箱單B/L ------ Bill of Leading 提貨單/提單N/W ------ Net Weight 淨重ETD/E.T.D/e.t.d ------ Expected Time ,of Departure (貨船)預定開航時間,ETA/E.T.A/e.t.a ------ Expected Time, of Auuival 預定到達時間,CAT ------ Component Approval Team 零件承認組,KPI ------ Key Part Index 關鍵指標二.財務,會計專有名詞A/R ------ Account Receivable 應收帳款A/P ------ Account Payment 應付帳款Deduct AP ------ 扣除應付帳款/不良扣款T/T ------ Telegraph Transfer 匯轉帳(付款)OA 30天 ------ 貨到30天後付款(如11/5到貨,則12/5付款)月結30天 ------ 貨送到後下月底付款(如11/5到貨,則12/30付款) ID ------ Input Duty 關稅VAT ------ Value Add Tax 增值稅三. 品管專有名詞IQC ------ Incoming Quality Control ,, 進料品質控制IPQC------ In-Process Quality Control ,製程品質管制:產品未完成前,尚在製程中的品管工作FQC ------ Finish or Final Quality Control , 成品品質管制:成品未裝箱前的品管工作.QE ------ Quality Engineering , 品質工程FAE ------ Final Application Engineer 終端應用工程部門(屬R&D范疇)又稱為 AED --- Application Engineer Department.FAE ------ Finished Application Engineer 成品應用工程CPSR ------ Customer Product Standard Request 客戶產品規格標准要求QA ------ Quality Assure 品質保証OQA ------ Out-going Quality Assure , 出貨品質保証對廠內生產線的產品進行檢驗及測試, 范圍包括: 產品外觀,ECN是否最新版,產品結搆是否符合ECN,附屬配件是否齊全(CD-PRO,MENU),包裝方法是否符合客戶要求,產品性能檢驗測試(能否正常運行,與其他產品的相容性等).DIST機種用3種固定規格的CPU,HDD進行測試,專案機種按客戶提供的固定程式測試,項目相對較少,時間較短.OQA 0.0 ------ 出貨failure rate(不良率)為0.0%之品質保証OOB ------ Out Of Box 開箱檢查,包括產品功能及相容性測試除需進行與OQA相同的檢驗及測試之外,還要設法取得客戶資訊,模擬客戶端系統使用狀況進行產品相容性測試,對客戶可能采用的各種規格型號之HDD,CPU,FLOPPY等均需進行測試,,測試項目較多,,時間較長,所需的測試程式和測試治具比OQA要多,OQC ------ Out-going Quality Control 出貨品質管。

工厂常用英文缩写

工厂常用英文缩写

工廠常用英文縮寫PE: Products Engineer; 生产工程Process engineer 制程工程TE: Test Engineer 测试工程ME: Manufacturing Engineer; 制造工程;Mechanical Engineer 机械工程IE: Industrial Engineer 工业工程DCC: Document Control Center 文管中心BOM: Bill OF Material 材料清单ECN: Engineering Change Notice 工程变动公告TECN: Temporary Engineering Change Notice 工程临时变动公告ATY: Assembly Test Yield Total Yield 直通率TPM: Total Productivity MaintenancePM: Product Manager; Project ManagerECR: Engineering Change Request 工程变更申请ECO: Engineering Change Order 工程变更指令EN: Engineering Notice 工程通报WPS: Work Procedure Sheet 工作说明书ICT: In Circuit Test 电路测试P/R: pilot run; C/R control run T/R trial run 试做EVT: Engineer Verification Test 工程验证测试DVT: Design Verification Test 设计验证测试MVT: Mass Verification Test 多项验证测试ORT: On Going Reliability Test 出货信赖性测试S/W: software 软件H/W: hardware 硬件DCN: Design Change Notice 设计变更通知PVT: Production Verification Test 生产验证测试MTF: Modulation Transfer Function 调整转换功能CAT: Carriage Alignment Tool 载器调整具ID: Industrial Design 工业设计(外观设计)PCBA: Printed Circuit Board Assembly 电路板组装F/T: Function Test 功能测试CCD: Charge Coupled Device 扫描仪之读器ERS: External Reference Spec 外部规格PMP: Production Management Plan 工程管理计划SOP: Standar Operation Procedure 作业标准书QRA: Quality reliability Assurance 品保部ESD: Electrical Static Discharge 静电释放或静电防护OAY: Output Accept Yeild 直通率VMI: Visual mechanical inspection 外观检查PK: Packing 包装FQA: Final quality assurance 质量追踪CE: Component engineer 材料工程师EE: Electronic engineer 电子工程师EVT: Engineer verification test 工程验证测试WIP: Working in process inventory 在制品QA Quality Assurance 质量保证QRA :Quality & Reliability Assurance质量与可靠性保证MQA :Manufacturing Quality Assurance 制造质量保证DQA: Design Quality Assurance 设计质量保证QC: Quality Control 质量控制IQC: Incoming Quality Control 进货质量控制VQC: Vendor Quality Control 售货质量控制IPQC: In Process Quality Control 制程质量控制OQA: Out going Quality Control 出货质量控制QE: Quality Engineer 质量工程AQL: Acceptable Quality Level 可接受的质量水平DPPM: Defective Pieces Per Million units 百万件中有损件数PPM: Pieces Per Million 百万分之一CS: Custom Service 顾客服务MRB: Marerial Review Board 材料审核委员会DMR Defective Material Report 材料缺陷报告RMA: Return Marerial Administration 材料回收处理Life Test 寿命测试T/C: Temperature Cycle 温度循环H/T: High Temperature Test 高温测试L/T: Low Temperature Test 低温测试ISO: International Standard Organization 国际标准化组织SPC: Statistic process control 统计过程控制5S: Seiri Seito Seiso Seiketsu Shitsuke整理.整顿.清理.清扫.素养VMI: Visual Mechanical Inspection 外观机构检验MIL-STD: Military Standard 美军标准SPEC: Specification 规格AVL: Approval Vendor List 合格厂商QVL: Qualified Vendor List 合格厂商FQC: Final Quality Control 最终质量控制OBA: Open Box Audit 成品检验EAR: Engineering Analysis Request 工程分析需求FAI: First Article Inspection 首件检验VQM: Vendor Quality Management 厂商质量管理CAR: Corrective Action Request 改进对策要求4M: Man; Machine; Material; Method 人,机,材,方法5M: Man; Machine; Material; Method; Measurement 人,机,材,方法,测量MTBF: Mean Time Between Failure 平均寿命TTL: TotalFIN Finance&Accounting 财务与账目P&L: Profit & LosePV : Performance Variance 现象差异3 Element of Cost = M,L,OM: Material 材料L: Labor 人力O: Overhead 管理费用Fix OH Fix Overhead 固定管理费用Var OH Variable Overhead 不定管理费用COGS Cost Of Goods Sold 工厂制造成本AR: Account Receivable 应收AP: Account Payable 应支MIS Management Information System 资迅管理系统IS: Information System 资迅系统IT: Information Technology 系统技术MRP: Material Requisition Plan 材料需求计划I2:Information Integration System 资迅整合系统SAP: System Application Programming 系统申请项目ERP: Enterprise Resource Programming 企业资源项目HR Human Resource 人力资源PR: Public relation 公共关系T/O: Turn Over Rate=Monthly T/O Total People*12 GR: General Affair 总务Organization 组织HQ Head Quarter 总公司Chairmen 主席President 总裁Executive Vice President 常务副总裁Vice President 副总裁HR Human Resource 人力资源部FIN Finance 财务Sales 销售R&D: Research & Developing 研发部QA: 质量保证QA DQA CSMIS: Management Information System 资迅管理系统PUR 采购PurchasingIMD: Image Management Division 影像管理事业部ITS: Information Technology System 计算机部QRA: Quality Reliability Assurance 品保部MFG: Manufacturing 制造部PMC: Production & Material Control 生(产)物(料)管(理)Materials 材料PC: Production Control 生产控制MPS: Mass Production Schedule 量产计划FGI: Finished goods Inventory 成品存货UTS: Units To Stock 存货单元WIP: Working In Process Inventory 在制品C/T: Cycle Time 循环时间,瓶颈WD: Working Days 工作天MTD: Month To Days 月初到今日(例如总表整理) YTD: Year To Days年初到今日SO: Sales Order 销售清单MO: Manufacture Order 制造清单BTO: Build To Order 订单生产P/N: Part Number 料号MC: Material Control 材料控制MRP: Material Requisition Plan 材料需求计划INV: Inventory 存货清单Inv Turn Over Days=INVS/NSB X WD 库存周转天数PSI: Production Shipping Inventory 预备待出货JIT: Just In Time 实时Safety Inventory 安全存量CKD: Completed Kits Delivery 全件组装出货SKD: Semi Kits Delivery 半件(小件)组装出货W/H: Warehouse 仓库Rec: Receiving Center 接收中心Raw MTL 原物料F/G: finish goods 成品Import/Export 进出口SI: Shipping Instruction 发货指令PL: Packing List 包装清单Inv: Shipping Invoice 出货发票ETA: Estimate Arrive 预估到达时间ETD: Estimate departure 预估离开时间BL: Bill of Landing 提货单(海运)AWB: Air Way Bill 提货单(空运)MAWB: Master Air Way Bill 主提货单HAWB: House Air Way Bill 副提货单TEU: Twenty foot Equipment Unit(Contain) 二十英尺货柜FEU: Forty foot Equipment Unit(Contain) 四十英尺货柜CY: Container Yard 货柜场THC: Terminal Handing Charge 码头费ORC: Original Receiving Charge 码头费PUR: Purchasing 采购FOB: Free on Board 货运至甲板(离岸价) CIF: Cost Insurance Freight 成本+运费+保险OA: Open Account 开户TT: Telegram Transfer 电汇COD: Cash On DeliveryCRP: Cost Reduction Program 降低成本方案PR: Purchasing Requisition 采购申请PO: Purchasing Order 采购单MFG Manufacturing Production 制造生产DL: Director Labor 直接人工IDL: Indirect Labor 间接人工DLH: Direct Labor Hours 直接工时Productivity=UTS/DLHPPH: Pieces Per Hour 每小时件数Efficiency=Actual/Target(%)DT: Machine Down Time 停机时间AI: Auto Insertion 自动插入MI: Manual Insertion 人工插入SMD: Surface Mount Device 表面粘着零件SMT: Surface mount technology 表面粘着技术B/I: Burn In(for how many hours at how many degree) 烧机WI: Work Instruction 工作说明SOP: Standard Operation Procedure 作业指导书R/I: Run In 运转机器ESD: Electrical Static Discharge 静电释放MP: Mass Production 量产。

工厂常用英文翻译

工厂常用英文翻译
生管 數量 表面貼著技術 標準操作表 全員預防保全 線上半成品 逐步引入 逐步淘汰 系統程序 索引 類比信號處理
工廠常用“英文簡稱”之全譯
No. 英文簡稱 124 BOM 125 CAD 126 CAM 127 DCC 128 DSP 129 ECN 130 ECR 131 FAE 132 MRS 133 PR 134 RD 135 TSD 136 Ver 137 138 139 140 141 142 ATX 143 BAT 144 BBS 145 BIOS 146 CD-ROM 147 CPU 148 DVD 149 LPX 150 NPX 151 PC 152 USB 153 154 EDC 155 EQ 156 IQ 157 PCB 158 PM 159 SD 160 VP 161 162 163 ATP 164 DJ 規類 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 7 7 9 9 9 9 9 9 Personal Computer Universal Serial Bus Bare Bone Error Detection and Correction Emotion Quotient Intelligence Quotient Print Current Board Production Market Sale Department Vice President Postpone Work In Process Available To Promise Discrete Job Basic Input Output System Compact Disc-Read Only Memory Center processor Unit Digital Video Disc Baby AT 英 文 全 稱 Bill OF Material Computer Aided Design Computer Aided Center Data Control Center Digital Signal Processor Engineer Change Notes Engineer Change Request Field Application Engineer Marketing Require Specification Pilot Run Research & Development Test Support Department Version Release Project Plan Window Project Leader Plug And Play

工厂常用单词

工厂常用单词

工厂常用单词● Aaddress : 地址AFRICA : 非洲agriculture : 文化allow : 允许Antarctica 大洋洲ANTARCTICA: 南极洲anti-static: 防止静电any : 任何AP: Accounts payable 应付帐款April: 四月AQL: Acceptable quality level 允收水平AR: Accounts receivable 应收帐款arrow: 箭箭头计号ASIA: 亚洲ATP: Available to promise 允收量audio音频Audit: 稽核August: 八月AUSTRALIA: 澳洲澳大利亚AUSTRIA:澳地利auto: 自动Autumn: 秋季● BB/S: Balance sheet 资产负债表bad: 坏的banker: 银行业者base:基础BAT: Baby atbattery: 电池behind: 在…之后BGA:BIOS feature setup: BIOS 特性值设定BIOS: Basic input output system 基本输入输出系统black: 黑色blue: 蓝色board 板BOM: Bill of material 材料清单bracket 拖架brown: 褐色bubble 气泡Burn-run: 寿命试验● CC/I: Certificate of insurance 保险单C/N: Credit notes 贷方通知cable: 电缆. 海底电报排线cache: 静态存储器CAD: Computer aided design 计算机辅助设计CAM: Computer aided manufacturing 计算机辅助制造cap: 电容card: 卡carton:纸箱CD-ROM: compact disc read only memory 光盘机change: 改变check 核查CHINA:中国chipset feature setup: 芯片值设定Chipset芯片christ 公元clear: 清除clock: 时钟computer: 计算机计算机Conformity: 合格connector: 连接器controller:控制CPU: center processor unit 中央处理器微处理器CR: Critical defect 严重缺点cursor:光标●Ddate:日期day: 天DCC: Data control center 数据控制中心DCC: Document control center 文件控制中心December:十二月default:值默认值detection侦测develop: 发展diode:二极管.DIP: Dual in line package 双排直插封装diskette: 磁盘磁盘.软盘display: 显示DJ: Discrete job 工单DOS:disk operation system 桌面操作系统down: 向下DRAM动态记忆体●Eeast: 东ECC: Error checking and correction 错误检测与修正ECN: Engineer change notes 工程变更通知ECR: Engineer change request 工程变更需求EDC:enable: 可能的engineer: 工程师.设计.监督enter: 进入.参加.送入ESC , exit : 退出●Ffail 失败fail: 失败fan: 风扇fast: 快FCC: Federal communications commission 无线电通讯委员会FDD软盘Feature:将来from to: 从到●Ggame: 游戏gold 金good 好gray: 灰色green: 绿色●Hhardware: 硬件.硬件heat sink: 散热片●Iin front of 前insert: 插入install: 安装interface: 界面INV: Inventory 库存INV: invoice 发票IQ: Intelligence quotient 智商IQC: Incoming quality control 进料检验IRDA: Infrared date associationISO: International standard organization 国际标准组织Italian 意大利ITALIAN:意大利人●JJanuary: 一月JAPAN: 日本JIS: Japanese industrial standard 日本工业标准JIT: Just in time 实时joystick: 游戏摇杆摇杆JPEG: Joint photographic expents croupJuly: 七月jumper: 跳线.短路插June: 六月JV: Joint venture 合作伙伴●Kkey: 键keyboard: 键盘●Llabel: 标签.贴纸.标记led: 引导.带领.灯Liability: 责任Load BIOS default: 装入BIOS 默认值load: 负荷.重担.装载LOB: Line of balance 生产线平衡Low: 低●MMA: Major defect 主要缺点main board: 主板manager: 经理.管理员.管理程序manual: 说明书mark:标志master:主人.母机.征服.MD: mini discMEMO: 备忘录memory: 记忆menu 菜单message: 消息.讯息MI: Minor defect 次要缺点MIDI: Musical instrument digital interfaceMIL: Military 陆军million: 百万MIL-STD-105D: 美国军用标准105D表minute: 分钟MIS: Management information system 信息管理系统mode:模式.样式module: 组件.模块Monday: 星期一monitor: 显示器mouse: 鼠标move 移动MP: Mass production 量产MRB: Material review board 材料检讨会议MRP: Material request planning 材料需求计划MRS: Marketing request spec. 市场需求规格●NNon-conformity: 不合格none 无North America 北美洲NORTH AMERICA: 北美north: 北●OOA: open an account 开户头Oceania 南极洲OCEANIA: 大洋州October: 十月ODM: Original design manufacture 原厂设计制程OE: order entry 客户订购通知单OEM: Original equipment manufacture 原厂委托制程OFC: Operation flow chart 作业流程图one: 一open: 打开option: 选择权.挑选.选项OQC: out-going quality control 出货品质控制orange 橙orange: 柑橘.橘色out: 出●PP/L: Packing list 包装清单, 装箱单P/L: payload 人事费PACIFIC OCEAN: 太平洋package: 包装parallel port: :并行口parallel: 平行.对比pass: 通过Password set: 密码设定PC: Personal computer 个人计算机PCB: Print current board 印刷线路板PDCC: Production data control center 工厂资料控制中心physicist: 物理学者.唯物论者PI: Preforma invoice 报价单pin: 针.脚PM: Preventive maintenance 预防保金PM: Production marker 产品标识PO: Purchase order 采购单port: 接口power supply: 电源PQC: Process quality control 制程质量控制PR: Pilot run 试生产PR: Purchase request 请购单primary master: 第一级主硬盘primary slave : 第一级次级硬盘primary: 最主要者.初期的.根本的produce 生产produce: 生产品.产出.生产program: 程序.节目ps/2 mouse: ps/2鼠标●QQ’TY: Quantity数量QA: Quality assurance 质量保証Quality audit 质量稽核Quality cost: 质量成本Quality objective: 质量目标Quality policy: 质量政策quarter: 四分之一.一刻钟.四等分.quit: 退出●RRD: Research and development 研究与开发reboot: 重新引导red: 红色Reliability: 信赖度reset: 重新设定Review 审查RMA: 返修品run: 运行RUSSIA: 俄国●SS hr.: Standard hours 标准工时S&D: search and destroySA: System analysis 系统分析save & exit setup: 存盘并退出save: 保存.存盘screen: 屏幕screw: 螺丝SCSI: Small computer system interface 小型计算机系统界面sequence 顺序serial port: 串行口set: 组合.集合.放置.设定setup: 装备.组织.计划设定SI: System integration 系统整合SIMM socket:记SIP: Standard inspection procedure 标准检验指导书SL: Sight letter of cridit 即期信用状sleep: 睡觉slot : 扩充槽SMT: surface mount technology 表面贴装技术SO: Shipping order 装货单socket : 脚座software: 软件SOP: Standard operation process 标准操作指导书SPC: Statistical process control 制程统计管制speed view : 快速观察speed: 速度standard CMOS setupsuccess : 成功Swede 瑞典switch开关Switzerland 瑞士system 系统●TTPM: Total prevention maintenance 全面预防保金TQA: Total quality assurance 全面质量保証Trouble shooting 检修TSD: Test section department 技术支援单位L: Underwriter’s laboratories安规USA United states of America 美利坚合众国●Vvalue 价值VE: Value engineering 价值工程VER. version 版本victory 胜利video 视频Video-CD: 影视碟片violet 紫visitor 来宾VP: Vice president 副总●WWIP: Working in process 半成品●X●Yyear 年yellow 黄Yield rate: 良品率●ZZD: Zero defects 零缺点NG NAME LIST不良名称清单English (英文) Chinese(中文) No power ----------------------------------------- 不开机Regulation test ---------------------------------电压调整Power good delay time--------------------开机延时R i p p l e/n o i s e-------------------------------杂E f f i c i e n c y--------------------------------效率Over load protection(olp)---------------过负载保护Over power protection(opp)------------过功率保护Over current protection-----------------过电流保护S h o r t ci rc u i t t e st-------------------------短路测试O v e r vo l t a ge p ro t e ct i o n---------------过电压测试B u rn-o u t----------------------------------------炸机B u z z---------------------------------杂音R i s e t i m e-----------------------------爬升时间H o l d u p t i m e--------------------------保持时间H i-p o t------------------------------高压绝G r o u n d-------------------------接地阻抗L e a k a g e c u r r e n t-------------------漏电流S h o r t---------------------------短路O p e n-------------------------开路NG NAME LIST不良名称清单English (英文) Chinese(中文)C o mp o n e n t----------------------零件不良Fan no work-------------------风扇不工作Fan-buzz-------------------------风扇有杂音Cable test open-----------------------输出线材开路Do wn----------------------------------当机。

工厂常用英文

工厂常用英文

部分工厂常用英文,供大家参考.Education and Training教育训练proposal improvement/creative suggestion提案改善BS Brain Storming 脑力激荡QCC Quality Control Circle 品质圈PDCA Plan Do Check Action 计划执行检查总结DCC delivery control center 交货管制中心3CComputer 计算机类产品Consumer electronics 消费性电子产品Communication 通讯类产品7SClassification整理(sorting, organization)-seiri Regulation整顿(arrangement, tidiness)-seiton Cleanliness清扫(sweeping, purity)-seiso Conservation清洁(cleaning, cleanliness)-seiktsu Culture教养(discipline)-shitsukeSave 节约Safety安全质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水帄S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商)ECO Engineering Change Order 工程改动要求(客户) PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheetPDCS Process defect correcting sheetGRN Goods receiving noteA/R Accounting receivableA/P Accounting payable三:专业词汇通用类president董事长operator作业员position职务general manager总经理special assistant 特助deputy manager |'depjuti| =vice manager副理deputy supervisor =vice supervisor副课长group leader组长line leader线长supervisor 课长responsible department负责单位Human Resources Department人力资源部Head count 人头数production department生产部门QC Section品管课administration/general affairs dept./总务部production unit生产单位meeting minutes会议记录distribution department分发单位subject主题conclusion结论decision items决议事项pre-fixed finishing date预定完成日Color management 颜色管理Visual management 目视管理production capacity生产力first count初盘first check初盘复棹second count 复盘second check复盘复核quantity of physical inventory second count 复盘点数量physical inventory盘点数量physical count quantity账面数量difference quantity差异量spare parts physical inventory list备品盘点清单cause analysis原因分析waste materials废料description品名specification 规格model机种work order工令revision版次remark备注registration登记registration card登记卡to control管制application form for purchase请购单consume, consumption消耗to notify通知to fill in填写to collect, to gather收集statistics统计cosmetic inspection standard 外观检验规范computer case 计算机外壳(组件)personal computer enclosure 计算机机箱产品front plate前板rear plate后板chassis |'∫æsi| 基座bezel panel面板Hood 上盖base pan 基座bezel 面板flat cable 排线resin film 树脂膜raw materials原料materials物料steel plate钢板roll/coil material卷料spare parts =buffer备品plastic parts塑料件sheet metal parts/stamping parts 冲件material check list物料检查表finished product成品semi-finished product半成品good product/accepted goods/ accepted parts/good parts良品defective product/non-good parts不良品disposed goods处理品warehouse/hub仓库packing material包材basket蝴蝶竺plastic basket胶筐flow chart流程窗体production tempo生产进度现状lots of production生产批量manufacture procedure制程to revise, modify修订to switch over to, switch—to, switching over切换engineering bottleneck, project difficulty工程瓶颈glove(s)手套glove(s) with exposed fingers割手套Band-Aid创可贴Industrial alcohol工业酒精broom扫把mop拖把vacuum cleaner吸尘器rag 抹布garbage container灰箕garbage can垃圾箱garbage bag垃圾袋liaison联络单rags抹布lamp holder灯架to mop the floor拖地to clean a table擦桌子air pipe 气管delivery deadline交货期die worker模工production, to produce生产equipment设备resistance电阻beacon警示灯coolant冷却液crusher破碎机plate电镀power button电源按键reset button重置键forklift叉车Workshop traveler 天车trailer =long vehicle拖板车Hydraulic trolley手压车hydraulic hand jack油压板车casing = containerization装箱velocity速度patent专利coordinate坐标supply and demand供求career card履历卡barricade隔板carton box纸箱to pull and stretch拉深work cell/work shop工作间sub-line支线bottleneck 瓶颈packaging tool打包机packaging打包品质类qualified products, up-to-grade products良品defective products, not up-to-grade products不良品defective product box不良品箱poor processing 制程不良poor incoming part来件不良exposed metal/bare metal金属裸露excessive defect过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格cosmetic defect外观不良lack of painting烤漆不到位slipped screw head/slippery slipped thread滑丝missing part漏件wrong part错件oxidation氧化defective threading抽芽不良poor staking铆合不良deficient purchase来料不良deficient manufacturing procedure制程不良cosmetic inspection外观检查inner parts inspection内部检查blister 气泡angular offset 角度偏差dent 压痕scratch 刮伤deformation 变形filings 铁削defective label 不良标签abrasion 磨损Breaking. (be)broken,(be)cracked 断裂short射料不足nick缺口speck瑕疪shine亮班splay 银纹gas mark焦痕delaminating起鳞speckle斑点mildewed =moldy = mouldy发霉deformation变形burr(金属)flash(塑件)毛边poor staking铆合不良excessive gap间隙过大grease/oil stains油污inclusion杂质shrinking/shrinkage缩水mixed color杂色fold of packaging belt打包带折皱painting make-up补漆discoloration羿色water spots水渍impurity 杂质Mismatch 错位failure, trouble 故障deformation 变形rust 生锈peel 脱漆Shrink 缩水Contamination 脏污water spots 水渍Gap 间隙label error 标签错误Missing label 漏贴rejection criteria 拒收标准Suspected rejects 可疑庇abrasion 损伤、磨损Texture surface 印花纹表面Streak 条纹stains 污点Blotch 斑点discoloration 脱色Inclusion 杂质slug mark 压痕dirt grime 灰尘blush 毛边薄膜sink 下凹Hickey 漏漆labels and logos 贴纸与商标Configuration labels 组合贴纸corrugated container 瓦摆纸箱Delaminating 脱层splattering 散点Gouge 锉孔puckering 折痕烤漆类phosphate皮膜化成viscosity涂料粘度alkalidipping脱脂main manifold主集流脉organic solvent有机溶剂demagnetization去磁;消磁high-speed transmission高速传递heat dissipation热传rack上料volatile挥发性degrease脱脂rinse水洗alkaline etch龄咬desmot剥黑膜D.I. rinse纯水次Chromate铬酸处理Anodize阳性处理seal封孔scraped products报放品disposed products处理品dismantle the die折模auxiliary function辅助功能heater band 加热片thermocouple热电偶derusting machine除锈机degate打浇口dryer烘干机induction感应induction light感应光response =reaction =interaction感应ram连杆edge finder巡边器concave击convex凹cold slug冷块blush 导色gouge沟槽;凿槽satin texture段面咬花witness line证示线grit沙砾granule =pellet =grain细粒sand blasting喷沙grit maker抽粒机cushion缓冲fillet镶;嵌边roller pin formality滚针形式cam driver铡楔shank摸柄crank shaft曲柄轴组装类Assembly line组装线Layout布置图Conveyer流水线运输带Rivet machine拉钉机Rivet gun拉钉枪Screw driver起子Electric screw driver电动起子Hydraulic machine 液压机Pneumatic screw driver气动起子automation自动化to stake, staking, riveting铆合add lubricant oil加润滑油argon welding氩焊cylinder油缸robot机械手conveying belt输送带transmission rack输送架to draw holes抽孔bolt螺栓nut 螺母screw 螺丝identification tag标示单screwdriver plug起子插座automatic screwdriver电动启子to move, to carry, to handle搬运be put in storage入库packing包装staker = riveting machine铆合机fit together组装在一起fasten锁紧(螺丝)fixture 夹具(治具)pallet/skid栈板barcode条形码barcode scanner条形码扫描仪fuse together熔合fuse machine/heat stake热熔机processing, to process加工delivery, to deliver 交货to return delivery to. to send delivery back to return of goods退货easily damaged parts易损件standard parts标准件to lubricate润滑spring 弹簧spare tools location/buffer手工备品仓spare molds location模具备品仓tox machine自铆机waste废料board广告牌sliding rack滑料架to impose lines压线to compress, compressing压缩character die字模to feed, feeding送料material change, stock change材料变更feature change 特性变更prepare for, make preparations for 准备rotating speed, revolution转速abnormal handling异常处理工厂常用缩略语5S:5S管理ABC:作业制成本制度(Activity-Based Costing)ABB:实施作业制预算制度(Activity-Based Budgeting)ABM:作业制成本管理(Activity-Base Management)APS:先进规画与排程系统(Advanced Planning and Scheduling) ASP:应用程序服务供货商(Application Service Provider)ATP:可承诺量(Available To Promise)BOM:物料清单(Bill Of Material)BPR:企业流程再造(Business Process Reengineering)BSC:帄衡记分卡(Balanced ScoreCard)BTF:计划生产(Build To Forecast)BTO:订单生产(Build To Order)CPM:要径法(Critical Path Method)CRM:客户关系管理(Customer Relationship Management) CRP:产能需求规划(Capacity Requirements Planning)CTO:客制化生产(Configuration To Order)DBR:限制驱导式排程法(Drum-Buffer-Rope)DRP:运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC:设计变更/工程变更(Engineer Change)EC:电子商务(Electronic Commerce)EDI:电子资料交换(Electronic Data Interchange)EIS:主管决策系统(Excutive Information System)EOQ:基本经济订购量(Economic Order Quantity)ERP:企业资源规划(Enterprise Resource Planning)FMS:弹性制造系统(Flexible Manufacture System)FQC:成品品质管制(Finish or Final Quality Control)IPQC:制程品质管制(In-Process Quality Control)IQC:进料品质管制(Incoming Quality Control)JIT:实时管理(Just In Time)KM:知识管理(Knowledge Management)L4L:逐批订购法(Lot-for-Lot)LTC:最小总成本法(Least Total Cost)LUC:最小单位成本(Least Unit Cost)MES:制造执行系统(Manufacturing Execution System)MPS:主生产排程(Master Production Schedule)MRP:物料需求规划(Material Requirement Planning)MRPⅡ:制造资源计划(Manufacturing Resource Planning)OEM:委托代工(Original Equipment Manufacture)ODM:委托设计与制造(Original Design & Manufacture)OLAP:线上分析处理(On-Line Analytical Processing)OLTP:线上交易处理(On-Line Transaction Processing)OPT:最佳生产技术(Optimized Production Technology)OQC:出货品质管制(Out-going Quality Control)PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)PERT:计画评核术(Program Evaluation and Review Technique)POH:预估在手量(Project on Hand)QCC:品管圈(Quality Control Circle)RCCP:粗略产能规划(Rough Cut Capacity Planning)ROP:再订购点(Re-Order Point)SCM:供应链管理(Supply Chain Management)SFC:现场控制(Shop Floor Control)SIS:策略信息系统(Strategic Information System)SPC:统计制程管制(Statistic Process Control)TOC:限制理论(Theory of Constraints)TQC:全面品质管制(Total Quality Control)TQM:全面品质管理(Total Quality Management)WIP:在制品(Work In Process)> 5S:5S管理5S是由JP企业研究出来的一种环境塑造方案,其目的在藉由整理(SEIRI)、整顿(SEITON)、清扫(SEISO)、清洁(SEIKETSU)及身美(SHITSUKE)五种行为来创造清洁、明朗、活泼化之环境,以提高效率、品质及顾客满意度。

工厂常用英文3749724930

工厂常用英文3749724930

欢迎共阅部分工厂常用英文,供大家参考.EducationandTraining教育训练proposalimprovement/creativesuggestion提案改善BSBrainStorming脑力激荡QCCQualityControlCircle品质圈PDCAPlanDoCheckActionDCCdeliverycontrolcenter3C7SClassification整理(sorting,organization)-seiriRegulation整顿(arrangement,tidiness)-seitonCleanliness清扫(sweeping,purity)-seiso Conservation清洁(cleaning,cleanliness)-seiktsu Culture教养(discipline)-shitsukeSave节约Safety安全质量人员名称类QCqualitycontrol品质管理人员POCpassagequalitycontrol段检人员QAqualityassurance质量保证人员OQAoutputqualityassurance出货质量保证人员QEqualityengineering质量工程人员质量保证类FAIfirstarticleinspection新品首件检查FAAfirstarticleassurance首件确认CPcapabilityindex能力指数CPKcapabilityprocessindexFQC运作类CRCritical极严重的MAJMajor主要的MINMinor轻微的Q/R/SQuality/Reliability/Service质量/可靠度/服务P/NPartNumber料号L/NLotNumber批号AODAcceptOnDeviation特采UAIUseAsIt特采FPIRFirstPieceInspectionReportPPMPercentPerMillion百万分之一制程统计品管专类量具之再制性及重测性判DIADiameter直径NNumber样品数其它质量术语类QITQualityImprovementTeam质量改善小组ZDZeroDefect零缺点QIQualityImprovement质量改善QPQualityPolicy目标方针TQMTotalQualityManagement RMAReturnMaterialAudit退料认可7QCTools7QualityControlTools(客户)SIPStandardInspectionProcedure制程检验标准程序SOPStandardOperationProcedure制造作业规范ISInspectionSpecification成品检验规范BOMBillOfMaterial物料清单PSPackageSpecification包装规范SPECSpecification规格DWGDrawing图面系统文件类ESEngineeringStandard工程标准CGOOChinaGeneralPCE IWSInternationalWorkmanStandard部类PCCProductcontrolcenter生产管制中心PPCProductionPlanControl生产计划控制MCMaterialControl物料控制DCDocumentCenter资料中心QEQualityEngineering质量工程(部) QAQualityAssurance质量保证(处) QCQualityControl质量管理(课) PDProductDepartment生产部LABLaboratory实验室IEIndustrialEngineering工业工程R&DResearch&Design设计开发部POPurchasingOrder采购订单MOManufactureOrder生产单D/CDateCode生产日期码ID/CIdentificationCode(供货商)识别码SWRSpecialWorkRequest特殊工作需求L/NLotNumber批号P/NPartNumber料号OEMOriginalEquipmentManufacture原设备制造PCPersonalComputer个人计算机CPUCentralProcessingUnitE-MAILElectrical-Mail电子邮件APPApprove核准,认可,承认CHKCheck确认ASS'YAssembly装配,组装T/PTruePosition真位度5WIHWhen,Where,Who,What,Why,Howto6MMan,Machine,Material,Method,Measurement,Message4MTHMan,Material,Money,Method,Time,How人力,物力,财务,技术,时间(资源)SQAStrategyQualityAssuranceDQADesignQualityAssuranceMQAManufactureQualityAssuranceVCDVideoCompactDiskLCDLiquidCrystalDisplayCADComputerAidedDesignCAMComputerAidedManufacturingCAEComputerAidedEngineering PCBPrintedCircuitBoard印刷电路板CARCorrectionActionReport改善报告NGNotGood不良WDRWeeklyDeliveryRequirement PPMPercentPerMillion百万分之一TPMTotalProductionMaintenance MRPMaterialRequirementPlanningRFIReadFrequencyInput读频输入MMCMaximumMaterialCondition MMSMaximumMaterialSize LMCLeastMaterialConditionLMSLeastMaterialSizeLEDlighting-emittingdiode发光二极管QBRQuarterBusinessRecord CIPContinuousimprovementprocessFGIForecastedGoalInventoryB2CBusinesstocustomerB2BBusinesstobusinessGRNGoodsreceivingnoteA/RAccountingreceivableA/PAccountingpayable三:专业词汇通用类president董事长operator作业员position职务generalmanager总经理supervisor课长responsibledepartment负责单位HumanResourcesDepartment 人力资源部Headcount人头数productiondepartment生产部门QCSection品管课administration/generalaffairsdept./总务部productionunit生产单位meetingminutes会议记录distributiondepartment分发单位subject主题productioncapacity生产力firstcount初盘firstcheck初盘复棹secondcount复盘secondcheck复盘复核quantityofphysicalinventorysecondcount复盘点数量physicalinventory盘点数量physicalcountquantity账面数量differencequantity差异量sparepartsphysicalinventorylistcauseanalysis原因分析wastematerials废料modelremark备注registration登记registrationcard登记卡tocontrol管制applicationformforpurchase请购单consume,consumption消耗tonotify通知tofillin填写tocollect,togather收集statistics统计cosmeticinspectionstandard computercase计算机外壳(组件) personalcomputerenclosureHood上盖basepan基座bezel面板flatcable排线resinfilm树脂膜rawmaterials原料materials物料steelplate钢板roll/coilmaterial卷料spareparts=buffer备品plasticparts塑料件sheetmetalparts/stampingparts冲件materialchecklist物料检查表良品warehouse/hub仓库packingmaterial包材basket蝴蝶竺plasticbasket胶筐flowchart流程窗体productiontempo生产进度现状lotsofproduction生产批量manufactureprocedure制程torevise,modify修订toswitchoverto,switch—glove(s)手套broommopvacuumcleaner吸尘器rag抹布garbagecontainer灰箕garbagecan垃圾箱garbagebag垃圾袋liaison联络单rags抹布lampholder灯架tomopthefloor拖地tocleanatable擦桌子airpipe气管deliverydeadline交货期coolant冷却液crusher破碎机plate电镀powerbutton电源按键resetbutton重置键forklift叉车Workshoptraveler天车trailer=longvehicle拖板车Hydraulictrolley手压车hydraulichandjack油压板车casing=containerization装箱patent专利topullandstretch拉深workcell/workshop工作间sub-line支线bottleneck瓶颈packagingtool打包机packaging打包品质类defectiveproductbox不良品箱majordefect主要缺陷minordefect次要缺陷notuptostandard不合规格cosmeticdefect外观不良lackofpainting烤漆不到位slippedscrewhead/slipperyslippedthread滑丝missingpart漏件wrongpart错件oxidation氧化defectivethreading抽芽不良poorstaking铆合不良deficientpurchase来料不良blisterdent压痕scratch刮伤deformation变形filings铁削defectivelabel不良标签abrasion磨损Breaking.(be)broken,(be)cracked断裂short射料不足nick缺口speck瑕疪shine亮班splay银纹burr(金属)flash(塑件)毛边poorstaking铆合不良excessivegap间隙过大grease/oilstains油污inclusion杂质shrinking/shrinkage缩水mixedcolor杂色foldofpackagingbelt打包带折皱paintingmake-up补漆discoloration羿色waterspots水渍impurity杂质rustpeelShrink缩水Contamination脏污waterspots水渍Gap间隙labelerror标签错误Missinglabel漏贴rejectioncriteria拒收标准Suspectedrejects可疑庇abrasion损伤、磨损Texturesurface印花纹表面Streak条纹stains污点Blotchblush毛边薄膜sink下凹Hickey漏漆labelsandlogos贴纸与商标Configurationlabels组合贴纸corrugatedcontainer瓦摆纸箱Delaminating脱层splattering散点Gouge锉孔puckering折痕organicsolvent有机溶剂demagnetization去磁;消磁high-speedtransmission高速传递heatdissipation热传rack上料volatile挥发性degrease脱脂rinse水洗alkalineetch龄咬desmot剥黑膜D.I.rinse纯水次Chromate铬酸处理sealauxiliaryfunction辅助功能heaterband加热片thermocouple热电偶derustingmachine除锈机degate打浇口dryer烘干机induction感应inductionlight感应光response=reaction=interaction感应ram连杆edgefinder巡边器concave凸blushgougewitnessline证示线grit沙砾granule=pellet=grain细粒sandblasting喷沙gritmaker抽粒机cushion缓冲fillet镶;嵌边rollerpinformality滚针形式camdriver铡楔shank摸柄crankshaft曲柄轴Rivetgun拉钉枪Screwdriver起子Electricscrewdriver电动起子Hydraulicmachine液压机Pneumaticscrewdriver气动起子automation自动化tostake,staking,riveting铆合addlubricantoil加润滑油argonwelding氩焊cylinder油缸robot机械手conveyingbelt输送带boltnutscrewidentificationtag标示单screwdriverplug起子插座automaticscrewdriver电动启子tomove,tocarry,tohandle搬运beputinstorage入库packing包装staker=rivetingmachine铆合机fittogether组装在一起fasten锁紧(螺丝)fixture夹具(治具)pallet/skid栈板barcode条形码toreturndeliveryto.tosenddeliverybacktoreturnofgoods退货easilydamagedparts易损件standardparts标准件tolubricate润滑spring弹簧sparetoolslocation/buffer手工备品仓sparemoldslocation模具备品仓toxmachine自铆机waste废料board广告牌slidingrack滑料架toimposelines压线preparefor,makepreparationsfor准备rotatingspeed,revolution转速abnormalhandling异常处理工厂常用缩略语5S??:5S管理ABC?:作业制成本制度(Activity-BasedCosting)ABB?:实施作业制预算制度ABM?:作业制成本管理APS?:先进规画与排程系统ASP?:应用程序服务供货商(BTO?:订单生产(BuildToOrder)CPM?:要径法(CriticalPathMethod)CRM?:客户关系管理(CustomerRelationshipManagement) CRP?:产能需求规划(CapacityRequirementsPlanning)CTO?:客制化生产(ConfigurationToOrder)DBR?:限制驱导式排程法(Drum-Buffer-Rope)DRP?:运销资源计划(DistributionResourcePlanning) DSS?:决策支持系统(DecisionSupportSystem)EC???:设计变更/工程变更EC???:电子商务EDI?:电子资料交换EIS?:主管决策系统IQC?:进料品质管制(IncomingQualityControl)JIT?:实时管理(JustInTime)KM???:知识管理(KnowledgeManagement)L4L?:逐批订购法(Lot-for-Lot)LTC?:最小总成本法(LeastTotalCost)LUC?:最小单位成本(LeastUnitCost)MES?:制造执行系统(ManufacturingExecutionSystem)MPS?:主生产排程(MasterProductionSchedule)MRP?:物料需求规划MRPⅡ:制造资源计划OEM?:委托代工ODM?:委托设计与制造PDM?:产品数据管理系统(ProductDataManagement)PERT:计画评核术(ProgramEvaluationandReviewTechnique) POH?:预估在手量(ProjectonHand)QCC?:品管圈(QualityControlCircle)RCCP:粗略产能规划(RoughCutCapacityPlanning)ROP?:再订购点(Re-OrderPoint)SCM?:供应链管理(SupplyChainManagement)SFC?:现场控制(ShopFloorControl)SIS?:策略信息系统SPC?:统计制程管制TOC?:限制理论TQC?:全面品质管制>>>5S是由JP企业研究出来的一种环境塑造方案,其目的在藉由整理(SEIRI)、整顿(SEITON)、清扫(SEISO)、清洁(SEIKETSU)及身美(SHITSUKE)五种行为来创造清洁、明朗、活泼化之环境,以提高效率、品质及顾客满意度。

介绍工厂的英语单词

介绍工厂的英语单词

介绍工厂的英语单词
介绍工厂的英语单词有很多,以下是一些常见的例子:
1. Factory - 通常指的是生产制造的场所,也可以表示某个具体的制造工厂。

2. Mill - 通常用来指代制造工厂或加工厂,尤其是指那些生产钢铁、纸、塑料等产品的工厂。

3. Plant - 通常用来表示工厂或制造场所,也可以用来描述某个具体的生产设备或机器。

4. Workshop - 通常指的是车间或工作坊,也可以用来描述某个具体的制造设备或工具。

5. Foundry - 通常用来指代铸造厂或铸铁厂,也可以用来描述某个具体的铸造设备或工艺。

6. Factory worker - 指的是工厂工人,通常指的是在工厂里从事生产制造工作的人员。

7. Assembly line worker - 指的是生产线工人,通常指的是在生产线上的工人,负责组装或装配产品。

8. Maintenance worker - 指的是维修工人,通常指的是负责维护和修理工厂设备或机器的人员。

9. Quality inspector - 指的是质量检查员,通常指的是负责检查产品质量的人员。

10. Engineer - 指的是工程师,通常指的是负责设计、开发和改进工厂设备或机器的人员。

工厂常用英文简写

工厂常用英文简写

常用英文缩写P/N ---- Part Number --- a料号 b零件型号SOP --- Standar Operation Procedure ------ 作业标准书5S----- Seiri Seito Seiso Seiketsu Shitsuke ---- 整理 整顿 清扫 清洁 素养 MFG--- Manufacturing ---- 制造部QRA--- Quality Reliability Assurance----品保部ESD----Electrical Static Discharge 静电释放或静电防护SMT----Surface mount technology 表面粘贴技术PTH----Plated- through hole 穿孔插件VMI---Visual mechanical inspection 外观检验PK----- Packing 包装IQC----In-coming quality control 进料检验IPQC---In process quality control 制程检验OBA---Open box audit 开箱检验FQA----Final quality assurance 质量追踪PE ---Production engineer 制程工程师IE-----Induetry engineer 工业工程师CE----Component engineer 材料工程师TE----Test engineer 测试工程师ME-----Machine engineer 机械工程师EE-----Electronic engineer 电子工程师IE-----Industrial engineer 工业工程EN---Engineer notice 工程通告ECN----Engineer change notice 工程变动通告ECO----Engineer change order 工程变更指令ECR----Engineer change request 工程变更申请DCC---Document Control Center 文管中心TECN---- Temporary Engineer change notice 工程临时变动公告 R/I----Run in 运转机器MP----Mass production 量产Design verification test 设计验证测试DVT----Design verification test 设计验证测试EVT----Engineer verification test 工程验证测试MVT---Multi-verification test 多项验证测试PVT-----Production verification test 量产(初次小批量) TPM----Total productivity maintenance 全面生产维护PM----Product manager ;project manager 产品经理;项目经理 WPS----Work procedure sheet 作业说明书P/R---Pilot run;C/R Control run; T/R Trial run 试做ORT---On going reliability test 出货信赖性测试 S/W----Software 软件H/W----Hardware 硬件四、QA ----Quality assurance 质量保证QRA----Quality & reliability assurance 质量与可靠性保证MQA----Manufacturing quality assurance 制造质量保证DQA----Desigan quality assurance 设计质量保证QC----Quality control 质量控制IQC---Incomming quality control 进货质量控制 VQC---Vendor quality control 售货质量控制IPQC----In process quality control 制程质量控制OQA----Out going quality control 出货质量控制QE----Quality engineer 质量工程FQC----Final quality control 最终质量控制。

工厂中常用英语及缩写

工厂中常用英语及缩写

英文缩写英文全称4M&1E Man, Machine, Method, Material, Environment "BABT" Mark British Approval Board of Telecommunications "BEAB" Mark British Electrotechnical Approval Board "CCC" Mark China Compulsory Certificate"CE" Mark Conformite Europenne"CSA" Mark Canadian Standard Association"D" Mark Demko (Denmark National Certification Body) "ENEC" Mark European Norm Electrical Certification. "FCC" Mark Federal Communication Commission"FI" Mark Fimko (Finland National Certification Body) "GS" Mark Geprufte Siecherheit (Safety-Tested in German) "N" Mark Nemko (Norway National Certification Body) "S" Mark Semko (Sweden National Certification Body) "UL" Mark Underwriters Laboratory"VCCI" Mark Voluntary Control Council for Interference3S Standardization Simplfication Specification4M Man Machine Material Method5S Housekeeping Term (Japanese)7QC Tools7 Quality Control Tools8-D8-DisciplineA2LA American Assosiation for LaboratoryAC Alternating CurrentAc/Re Accept/RejectACR Action and Countermeasure ReportADSL Asymmetric Digital Subscriber LineAGM Assistant Genaral ManagerAGPAI Automatic InsertionAL Aluminium wireAM Assistant ManagerANSI American National Standard InstituteAP Accounts PayableAPQP Advanced Product Quality PlanAPS Advanced Planning SchedulingAQL Acceptable Quality LevelAQL Acceptance Quality LevelAQL Acceptable Qulity LevelART ArtworkARTWRK ArtworkASAP As soon as possibleASFASL Approved Supplier ListASP Analog Signal ProcessorASSY AssemblyASTM American Society of Testing MaterialATAPI AT Attachment Peripheral InterfaceATE Automatic Test EquipmentATO Assembly To OrderATP Available To PromiseATXAUDAVL Approved Vendor ListAWB Air Way BillB/L Bill of LadingB/L Bill of LandingB/S Balance SheetBAT Baby ATBBSBCC Blink Carbon CopyBD BoardBGA Ball Grid ArrayBIOS Basic Input Output SystemBL BaselineBL Back Light DisplayBLK Black ColourBM BenchmarkBOC Breach of ContractBOM Bill of MaterialBR Best RegardsBRKT BracketBS British StandardBTO Built to OrderBTW By the wayBUM Business Unit ManagerBV Book ValueBX BoxC&ED/CAED Cause and Effect DiagramC.O.O.Country of Origin / Certificate of OriginC.Y.Container YardC/N Credit NotesCA Corrective ActionCAD Computer-aided DesignCADCAD Computer Aided DesignCAM Computer Aided ManufacturingCAM Computer Aided CenterCAP Capacitor [C]CAR Corrective Action Request / Corrective Action ReportCAR Corrective Active ReportCAV Constant Angular VelocityCB Certification BodiesCBL Cable [J or W]CC Carbon CopyCCAP Ceramic Capacitor [C]CCAR Customer Corrective Action Request / Customer CorrectiveAction ReportCCB Change Control BoardCCIC China Import & Export Commodity Inspection Corporation CD Clock Digit DisplayCDBD Card BoardCD-DACD-I Computer Disc-InteractiveCD-MO CD-Magnet OpticalCD-ROM Compact Disc-Read Only MemoryCDTCD-WO CD-Write OnceCD-WriteCE Commuttee of EuropeCEO Chief Executive OfficerCFO Chief Finance OfficerCFR Cost And Freight (…named port of destination)CFS Container Freight StationCHFCI Continuous ImprovementCI Custom InvoiceCIF Cost, Insurance & Freight (…named port of destination)CIF Cost Insurance and FreightCIP Carriage and Insurance Paid to (…named port of destination) CIRC Cross-Interleaved Reed solomon CodeCI報單CKD Component KitCLCA Closed Loop Corrective ActionCLV Constant Linear VelocityCNYCOB Chip on BoardCOC Certificate of ConformanceCOD Cash on DeliveryCOM Customer Order ManagementCONN Connector [J or P]CONN HSG Connector HousingCOO Chief Operating OfficerCOQ Customer Oriented QualityCPK Indixes of Capability ProcessCPN Customer Part NumberCPT Carriage Paid to (…destination)CPU Central Processing UnitCPU Center processor UnitCQE Customer Quality EngineerCR Cargo ReceiptCR Critical DefectCRES Ceramic Resistor [R]CRP Capacity Requirement PlanningCRR Contract /PO Review RecordCS Customer SampleCT Cycle TimeCTF Critical-to-FunctionCTQ Critical-to-QualityCVR CoverCWO Cash with OrderCX Cotco Specially DisplayD&B Dice BondingD&T Data (electronic document)D.N.Delivery NoteD.O.Delivery OrderD/A Document Against AcceptanceD/A Delivery Against AcceptanceD/A Documents Against AcceptanceD/D Demand DraftD/L DownloadD/P Document Against Payment / Delivery PreformanceD/P Delivery Against PaymentD/P Documents Against PaymentDA Deviation AuthorizationDC Direct CircuitDCC Document Control CentreDCC Data Control CenterDE Design EngineerDFM Design for ManufacturabilityDFMEA Design Failure Mode and Effect Analysis DFMEA Design Failure Model Effective Analysis DFSS Design for Six SigmaDFT Design for TestDIO Diode [D]DIOD Diode [D]DIP Dual In-line PackageDJ Discrete JobDKKDLC Direct Labor CostDM Dot Matrix DisplayDMR Defect Material ReviewDN Deviation NoticeDOA Dead On ArrivalDOCCON Document ControlDOE Design of ExperimentDOE Design Of ExperimentsDP Decimal PointDPPM Defective Part Per MillionDR Delivery RequisitionDSC Differential Scanning ColorimeterDSP Digital Signal ProcessorDTD Door to DoorDV Design Verification / Design Validation DVD Digital Video DiscDVI Digital Video InteractiveDVT Design Verification TestDWG,DrawingDZDE.&.O.E Errors and Omissions Exceptede.g.For ExampleECC Error Checking and CorrectionECN Engineering Change NoticeECN Engineering Corrective NoticeECN Engineer Change NotesECO Engineering Change OrderECR Engineer Change RequestEDC Error Detection and CorrectionEDI Electronics Data InterchangeEE Electrical EngineerELG Export Letter of GuaranteeEMC Electromagnetic Compatibility Testing EMC Electromagtic ComponentEMCEMI Electromagnetic InterferenceEMI Electromagtic InterferenceEMIEMS Equipment Management System / Electronic ManagementSystemEMS Electronics Manufacturing ServicesEOL End-of-LifeEOM End of MonthEOW End of WeekEPP Engineering Pre-productionEPR Engineering Pilot RunEQ Emotion QuotientERP Enterprise Resource PlanningES Engineering SampleESD Electrostatic DischargeETA Expected Time of ArrivalETA Estimated Time of ArrivalETD Expected Time of DeliveryETD Estimated Time of DepartureEURF/T Functional TestF1FO First-In-First-OutFA First Article / Failure AnalysisFAE Failure Analysis EngineerFAE Field Application EngineerFAR Failure Analysis ReportFC Formal ContractFCA Free Carrier (…named place)FCB Flexible Circuit BoardFCBA Flexible Circuit Board AssemblyFCC Federal Communications CmmissionFCL Full Container LoadFCT Functional TestFDA Food and Drags AdministrationFERR FerriteFFF Fit Form FunctionFFT Final Functional TestFG Finished GoodsFGS Finished Goods StoreFI Final InspectionFIFO First-In & First-OutFIFO First In First OutFLTR Filter [FL]FM Force MajureFM Factory ManagerFMEA Failure Mode and Effect AnalysisFMEA Failure Model Effective AnalysisFOB Free On Board (…named port of shipment)FOB Free On BoardFPC Flexible Printed CircuitFPCA Flexible Printed Circuit AssemblyFPW Flexible Printed WiringFPWB Flexible Printed Wiring BoardFPY First Pass YieldFQC Final Quality ControlFSTNR FastenerFTY First Test YieldFU Fuse [F]FV Forward CircuitFW FirmwareFYI For your informationGBPGE General ElectronicGIP General Inspection PlanGM Genaral ManagerGR&R Gauge Repeatability & ReproducibilityGS Golden SampleHE Hardware EngineerHER Earn HoursHKDHL HandloadHPN Hip Fung Part NumberHR Human ResourcesHTOL High Temperature Operational LifeHV High VoltageI/M Instruction ManualI/O Input / OutputI/S Inspection StandardI/T Inventory TurnIBM International of Business AdministrationiBOM Indented Bill of MaterialIC Inspection CertificateIC Integrated CircuitIC Integrated Circuit [U]IC SKT IC SocketICT In-circuit TestIDA Infrared Data AssociationIDCTR Inductor [L, T, X]IDE Integrated Drive ElectronicsIE Industrial EngineerIE Industrial EngineeringIEC Internatonal Electrotechnical CommissionIEC International Electronics CommitteeIECEE International Electrotechnical Commission for ElectricalEquipmentIF Invariable FrequencyIFF Information Feedback FormILC Irrevocable Letter of CreditILC Indirect Labor CostILG Import Letter of GuaranteeIND Inductor [L, T, X]INSTR InstructionINSTR MNL Instruction ManualINT Inter mittentINV InvoiceINV InventoryIP Inspection ProcedureIPA Isopropyl AlcoholIPC Institute of Packaging and InterconnectsIPO International Purchasing OperationIPO Internation Purchasice OfficeIPQC In-process Quality ControlIQ Intelligence QuotientIQA Internal Quality AuditIQA Incoming Quality Assurance/ Internal Quality Auditor IQC Incoming Quality ControlIR Infra-redIR Reverse CurrentIRRISO International Organization for StandartizationISO International Standard OrganizationIT Information TechnologyITS Information Technology SystemJEDEC Joint Electron Device Engineering CouncilJIS Japanese Industrial StandardsJIS Japanese Industrial StandardJISC Japanese Industrial Standards CommitteeJIT Just In TimeJMPR Jumper wire [J or W]JPEG Joint Photographic Experts GroupJPYJQA Japan Quality Assurance OrganizationJSA Japanese Standards AssosiationJV Joint VentureKEMA K-E-M-AKETI Korean Electric Testing InstituteKPI Key Performance IndicatorKPIV Key Process Input VariableKPOV Key Process Output VariableKT Kepner Tregoe Potential Problem AnalysisKTL Korea Testing Laboratory (formerly KAITECH) KWDL/A Lead AuditorL/C Letter of CreditL1, L2, …L7Level 1, level 2…..level 7LAR Lot Acceptance RateLB Light Bar DisplayLBL LabelLC Letter of CreditLCD Liquid Crystal DisplayLCL Lower Control LimitLCL Loose Container Load / Less Than Container Load LD Led Digit DisplayLED Light Emitting Diode [LED or D]LED Light Emitting DiodeLG Letter of GuaranteeLIFO Last-In-First-OutLOB Line of BalanceLOI Letter of IntentLPXLQC Line Quality ControlLSL Lower Specification LimitLSR Line Stoppage ReportLYT Low Yield TriggingM ManagerMA Manual AssemblyMA Major DefectMAIC Measure-Analyze-Improve-ControlMAT'L MaterialMBP Master Build PlanMD Managing DirectorMD Mini DiscMDS Master Demand ScheduleME Manufacturing Engineer / Mechanical Engineer/MaterialEngineerME Manufacturering EngineerMEMO MEMOMES Management Execution SystemMFL Material Follow-up ListMI Manual InsertMI Minor DefectMIDI Musical Instrument Digital InterfaceMIL MilitaryMil-Std Military StandardMIS Management Information SystemMMS Material Management SystemMN Manufacturing NoticeMNC Multi-national CompaniesMNL ManualMOPMOQ Minimum Order QuantityMOU Memorandum of UnderstandingMP Mass ProductionMPEG Moving Picture Experts GroupMPI Manufacturing Process InstructionsMPN Manufacturing Part NumberMPS Master Production SchedulingMPS Mass Production ScheduleMR Material RequisitionMRB Material Review BoardMRP Material Requirement PlanningMRP Material Require PlanningMRR Management Review ReportMRS Marketing Require SpecificationMRSO Material Resume Ship OrderMS Manual SolderingMS Master SchedulingMSA Measurement System AnalysisMSD Moisture-sensitive DevicesMSDS Material Safety Data SheetMSSO Material Stop Ship OrderMT Mail TransferMTBA Mean Time Between AssistMTBF Mean Time Between FailureMTBF Mean Time Between FailureMTC Material Transfer ChitMTF Material Transfer FormMTM Motion & Time Study MethodMTO Make To OrderMTS Make To StockMTS Motion & Time StudyMTTR Mean Time To RepairMTTR Mean Time Te RepairMYRN/A Not AcceptanceN/A or NA Not ApplicableNCB National Certification BodiesNCN Non-conformity NoticeNCR Non-conformity / Non-conformance ReportNDA Non Disclosure AgreementNG No GoNIST National Institute of Standard & TechnologyNOKNPI New Product IntroductionNPXNRE Non Recovery Expanses /Non Returnable Expanses NRP Non-conformity Recurrent Prevention Report NRS Non-conformity Return SheetNZDO/E Order EntryO/I Operational InstructionOA Open AccountOA Open AccountOBA Out-of-Box AuditOBI Out-of-Box InspectionOBM OriginalOBUOC Out-of-ControlOCAP Out-of-Control Action PlanODM Original Design ManufacturerODM Original Design ManufacturingODM Original Design ManufactureOEM Original Equipment ManufacturerOEM Origianal Equipment ManufactureOFC Operation Flow ChartOHI On Hand InventoryOJT On-Job-TrainingOJT On Job TrainningOM Operations ManagerOpen Open circuitOQA Out-going Quality AssuranceOQC Out-going Quality ControlOQM Outgoing Quality ManagementORT On-going Reliability TestOSC Oscillator [Y]OSHA Occupational Safety and Health Administration OTD On time deliveryOTW On the wayOWB Ocean Way BillP&P Pick & PlaceP.O Purchase OrderP.O.Purchase Order / Payment OrderP/I Proforma InvoiceP/IP/L Packing ListP/N Purchase NumberP/N Parts NumberP/O Purchase OrderPA Preventive ActionPC Purchase ContractPC Production ControllerPC Personal ComputerPCB Printed Circuit BoardPCB Print Current BoardP-Chart Pecentage ChartPCM Pulse Code ModulationPCN Packing Corrective NoticePCP Process Control PlanPD Product DesignPDA Perisonal Digital AssistantPDC Passive Data CollectionPDCA Plan-Do-Check-ActionPDCC Production Data Control CenterPDR Process Deviation Request/ReportPE Product Engineer / Process Engineer/Procurement Engineer PE Product EngineeringPERT Program Evaluation and Review TechniquePFC Power Factor CorrectionPhoto-CDPHPPI Preforma InvoicePIC Person-in-ChargePKRPL Packing ListPM Preventive MaintenancePM Program Manager / Purchasing Manager / Production Manager PM Production MarketPMC Production Material ControllerPMC Production and Material planning&ControlPMG Process Monitor GroupPMI Product Manufacturing InstructionPMP Process Management PlanPN Purge NoticePNL PanelPO Purchase OrderPP Pre-productionPP Production PlanningPPA Potential Problem AnalysisPPAP Production Part Approval ProcessPPM Part per MillionPPM Parts Per MillionPPR Production Pilot RunPQC Production Quality CertificationPQC Process Quality ControlPQE Product Quality EngineerPQR Process Qualification Report / Product Qualification Report PR Process ReviewPR Purchase RequisitionPR Pilot RunPRO ProductionPROD ProductionPS Production SamplePS Production SupervisorPSS Production Scheduling SystemPTH Plated Through HolePV Product ValidationPW BRD Printed Wiring BoardPWA Printed Wiring AssemblyPWB Printed Wiring BoardPWBA Printed Wiring Board AssemblyQ.I.Quality IndexQ.I.P Quality Improvement ProgramQA Quality AssuranceQC Quality ControlQCC Quality Control CirclesQE Quality EngineerQM Quality Manual / Quality ManagerQM Quality ManagerQMR Quality Management RepresentativeQMS Quality Management SystemQP Quality PolicyQRE Quality Reliability EngineeringQS Quality System / Quality StandardQTY QuantityQ'TY QuantityQVL Quality Vendor ListQ監Quality AuditR&D Research & DevelopmentR&D Research&DevelopmentR.P.N Risk Process NumberRD Research & DevelopmentRef ReflectorRES Resistor [R]RESP ResponsibleREV RevisionRFC Response Flow ChartRFQ Request For QuotationRH Relative HumidityRI or R/I Receiving InspectionRLY Relay [K]RMA Return Material AuthorizationRMA Return Material AuthorizedRPN Risk Priority NumberRTV Return-to-VendorRVT RivetRWK ReworkS & P Sales and Purchase AgreementS.O.Sales OrderS/O Shipping OrderS/S or SS Sample SizeSA Shipping AdviceSA System AnalyseSA System AnalysisSAE Settement after exportSAR Supplier Audit ReportSBE Settement before exportSBR Special Build RequestSC Sales ContractSCAR Supplier Corrective Action Request/Report SCC Standards Council of CanadaSCHEM Schematic DiagramSCM Supplier Chain ManagementSCRN ScreenSCRW ScrewSCSI Small Computer System InterfaceSD Surface Digit DisplaySDSD Sale DepartmentSE Software Engineer / System Engineer SEKSFC Shop Floor ControlSGDSGS Sosiete Generale de SurveillanceShort Short CircuitSHR Standard HoursSI Source Inspector/ Source InspectionSI System IntegrationSIP Standard Inspection ProcedureSKD Semi KitSKT SocketSL Surface LED LampSL Sight Letter of CriditSLA Skipped-lot AuditSM Sales Manager / Senior ManagerSMD Surface-mount DevicesSMD Surface Mounted DeviceSML Shortage Material ListSMT Surface-mount TechnologySMT Surface Mounted TechnologySMT Surface Mount TechnologySNR Sample Run NoticeSO Shipping OrderSOP Standard Operating ProcedureSOP Standard Opeation ProcessSOP Standard Operation ProcedureSPC Statistical Process ControlSPC Statistic Process ControlSPC Statistical Prcess ControlSPCR SpacerSPEC SpecificationSQC Statistical Quality ControlSQE Supplier Quality EngineerSR Sales ReturnSR-Chart Short-Run ChartSSCRN Silk Screen PrintingSSO Stop Ship OrderSTS Ship-to-StockSTS Ship To StockSUB-ASSY Sub-AssemblySURSW Switch [SW]SWB Sea Way BillSWP Standard Work ProcedureT & C Term and ConditionT/S Trouble - ShootingT/T A Advance Telegraphic TransferTAT Turn-around-TimeTCB Telecommunication Certification Body TE Test EngineerTEMP TemperatureTg Glass TransitTH Through HoleTHBTMCL Temperature Cycle Reliability Test TNKY TurnkeyTOV Time of ValidityTPEDP Third Party Test Data ProgramTPM Total Prevention MaintenanceTPY Throughput YieldTQ Thank YouTQA Total Quality AssuranceTQM Total Quality ManagementTR Trust ReceiptTSD Test Support DepartmentTT Telegraphic TransferTUV TUV Rheinland GroupTWDTYP TypicalU/L UploadU/P or UP Unit PriceUAI Use-as-IsUC Undertaking ClauseUCL Upper Control LimitUKAS United Kingdom Accreditation ServiceUL Underwriters LaboratoriesUL Underwriter's LaboratoriesUL Usance Letter of CreditUML Urgent Material ListUSB Universal Serial BusUSDUSL Upper Specification LimitUV Ultra-violetUV UltravioletVA Visual AidVA/VE Value Anglysis / Value Engineering VAD Visual Aid DisplayVCAR Vendor Corrective Action Request/Report VE Value EngineeringVer VersionVF Variance FrequencyVHR Vendor History RecordVideo-CDVIP Very ImportantVMI Visual Mechancial InspectionVMI Vendor Managed InventoryVOC Voice of CustomerVP Vice PresidentVR Variance RateVR Voltage Regulator [VR, V or U]VSR Vendor Scoring &RatingW&B Wire BondingW/WithW/O WithoutWHT White ColourWHTOLWHTRBWI Work InstructionWIP Work In ProgressWIP Work In ProcessWIP Working in ProcessWN Waiver NoticeWR Wire [J or W]WR TERM Wire TerminalWS Work Standard / Workmanship Standard WS Working SampleWSHR WasherXFMR Transformer [T]XSTR Transistor [Q or U]X'TAL Crystal [Y]ZD Zero DefectsReviewAuditBurn-InQuality CostQuality PolicyQuality ObjectiveConformityNon-ConformityReliabilityLiabilityMIL-STD-105D Yield Rate Operation Process Operation Research Optimum Solution Work Simplify Brain Storming Outstanding Blance Debit Note Railway Bill Phase-InPhase-Out System Procedure IndexReleaseProject Plan WindowProject Leader Plug And Play Bare Bone PostponeWork In Process Lead Time Alternate BOM Pending Assemble Component Reservation Access Time Random Seek SwapDVD-RAMDVD-Title Inflation DeflationVendor Rating Life TestSpindle Motor Control Run Report Error CodeOrderBufferClean Room中文解释人,机器,方法,物料,环境- 可能导致或造成问题的根本原因为IT,无线电通讯和电讯产品提供认证和服务的机构为销售到英国(UK)的电气产品的安全性提供认证的独立机构中国强制认证 -中国于2003年8月1日将"CCIB"和"CCEE"归纳于"CCC"认证中,将原有的进出口货品检查和出口产品质量认证归纳于这一体系“CCC”。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

* 区域(area)由生产点确定的物理的、地理的或逻辑的成组组合。

注:它可包含过程段、生产单元以及生产线。

* 可利用的产能(avaliable capacity)可达到的生产能力部分,但不承诺用于目前或今后的生产。

* 提单(bill of lading-BOL)货物的合同或收据,承运人同意将货物从一个地方运输到另一地方,然后送交给一位指定的人,或根据合同所述条件给予赔偿。

* 物料清单(blll of material-BOM)所有组装件、零件和/或生产一种产品所用物料的清单,包括制造一种产品所需要的每种物料的数量。

* 能力(capability)采取行动的能力,包括能力(与产能类似)的资格和度量方面的属性。

* 资源清单(bill of resources)所有资源以及在生产一种产品的生产过程中所需要的资源清单。

注:它也是制造一种产品所需要的关键资源清单,组织形式与生产段相同.并经常用来预测主生产计划中活动改变对资源供应的影响。

* 产能(capacity)采取行动的能力的度量,它是能力的一个子集.例子:生产率、流速、质量或体积的度量。

* 分析证书(certificate of analysis-COA)产品或物料符合质量标准或技术规范的证明。

注:它可包括分析结果和过程信息的一张表或证明书。

它也往往需要物料的保管移交。

* 承担的产能(committed capacity)当前正在使用或计划中要使用的生产能力的一部分。

* 消耗品(consumables)通常不包括在物料清单内的资源,或在具体的生产要求中并不个别地计量的资源。

* 控制域(control domain)在本部分中,控制域是与制造运行和控制域同义的.* 企业(enterprise)一个或更多个组织.它们共同承担一个明确的使命、目标和目的,以提供一种诸如产品或服务等的输出。

* 设备类别(equipment class)一组基于角色的有类似特性设备。

* 事件(event)代表一个经过请求者或者未经请求的事实,它说明了企业中的状态的改变。

* 制成品(finished goods)已完成所有处理和生产的最终物料。

* 制成品废弃(finished good waivers)对偏离标准的产品技术规范的确认。

* 半成品放弃要求(in-process waiver requests)在保证标准的产品技术规范的场合,在正常生产过程中,由于物料、设备或质量度量标准偏离而提出的放弃要求。

* 场所(location)设备层次中的一个元素确定的交换的信息的范围。

* 制造业务和控制域(manufacturing operations and control domain-MO&C)包括所有的活动和往复于第1、2、3层之间并越过边界至第4层的信息流的域。

* 制造业务管理域(manufacturing operations management domain)包括所有第3层内的活动和往复于第1、2、4层之间的信息流的域。

它是MO&C的子集。

* 物料类别(material class)一组有类似特性的物料。

* 物料批量(material lot)唯一可确认的物料数量。

注:它描述可利用物料的实际总量或数量、它的当前状态及其特性值。

* 物料定义(material definition)一种物质的性质的定义。

* 物料分批量(material sublot)唯一可确认的物料批量的子集,包括数量和地点。

* 人员类别(personnel class)一组有类似特性的工作人员。

* 过程段(process segment)是对一个生产段所需资源集合的视图。

在支持业务过程的细节层上,与任何特定的产品无关,该业务过程可能也与任何特定产品无关。

注:它可能包括物料,能源,工作人员或设备。

* 产品(product)要求的输出或者一个企业生产过程的副产品。

* 产品定义(Product definition)创建一个产品需要包括资源、生产调度规则的信息收集。

产品定义有材料清单、产品生产规则,以及资源清单等的外部引用。

* 产品段(Product segment)用一组逻辑的人力资源、设备资源和材料规格来完成特定产品的某一生产步骤的过程段。

* 生产的产能(production capacity)在企业内完成生产的各种资源的能力。

生产的产能包括这些资源的产能,并代表:a) 人员、设备、物料,以及过程段能力的汇集;b) 目前承担的、可利用的,以及生产设施难以达到的产能的总和;c) 对给定的产品混合、原材料、工人工作量、工厂和设备,系统可达到的最高可持续保持的产出率。

* 生产控制(production control)在一个工场或区域内管理所有生产的功能的汇总。

* 生产线(production line)专用于生产特定数量产品或产品系列的一系列设备。

* 生产规则(production rules)用来指导制造过程中如何生产某种产品的信息。

* 生产单元(production unit)一组生产设备。

它用于一种或多种原料的转换、分离或反应,生产出中间或最终产品。

* 特性(property)表示执行一个实体的细节特征的对象。

* 实物资产(Physical asset)在设备维护和/或财务中唯一确定和跟踪的物理对象。

* 产品段(product segments)某一特定产品的资源清单和生产规则间共享的信息。

注:它是完成生产步骤所需要的人力资源、设备资源,以及物料技术规范的一种逻辑分组。

* 资源(resource)企业实体,它提供执行企业活动和/或业务过程所需的一些或所有的能力(在本部分的内容中,是人员、设备,和/或物料的集合)。

* 生产点(Site)制造企业的组成部分,在企业范围内用物理、地理或者逻辑分段标识。

* 贮存单元(Storage unit)指定的物理空间,和/或专用贮存物料的设备,和/或设备为一个贮存区域中的工作单元。

* 贮存区域(Storage zone)指定的物理空间,和/或专用贮存物料的设备,和/或设备的工作中心。

* 不能达到的产能(unattainable capacity)生产的产能中不能达到的部分。

注:典型悄况是由于诸如设备不可利用性、非最优的调度或资浑有限等因素所致。

* 工段(work cell)一些不相似的机器组合在一起以生产一系列有相似制造要求的零件。

* 工作中心(work center)进行生产、储存、物料移动、或任何其他三级或四级预定的活动的区域下的设备元素。

* 工作单元(work unit)进行生产、储存、物料移动、或任何其他三级或四级预定的活动的工作中心下的设备元素。

ISA88常用的名词解释* 分配(allocation)把某个资源分配给一个批或者一个单元的一种协调控制形式。

* 仲裁(arbitration)协调控制的一种形式,当同时对某个资源的请求数大于能够接纳的请求数时,这种控制形式可以确定应怎样分配这个资源。

* 区域(area)生产点的组成部分,在一个生产点中可以用物理、地理或者逻辑分段标注。

* 基本控制(basic control)专门用来建立和保持装置或过程条件的某个特定状态的控制。

基本控制可以包括调节控制、互锁、监测、异常处理以及离散控制或者顺序控制。

* 批(batch)a)执行一次批过程所处理或生产出的物质。

b)代表过程中任一点处的物质生产的一个实体。

批既表示由过程生产的和在过程中生产的物质,同时也表示代表生产该物质的实体。

批是“批生产”的抽象缩写。

* 批控制(batch control)指一些控制活动和控制功能,它们提供一种在有限的时间内,使用一台或多台装置,通过一组有序的处理活动来处理有限量的输入材料的方法。

* 批过程(batch process)指在有限的时间内,使用一台或多台装置,通过一组有序的处理活动来处理输入材料量,生产有限量材料的过程。

* 批调度表(batch schedule)在某个特定过程组元中将要生产的一些批的清单,如制丝工段作业计划。

注:批调度表一般包含比如生产什么、生产多少、需要在什么时候生产或者需要按怎样的批量生产以及使用些什么装置等信息。

* 公共资源(common resource)可以向二个以上的请求者提供服务的一种资源。

既可以把公共资源看成是专用资源,也可以看作是共享资源。

* 控制模块(control module)物理模型中,能执行基本控制的最底层装置组群。

* 控制技术标准(control recipe)执行产品生产技术标准,可确定一批特定产品的生产。

* 协调控制(coordination control)指导、启动和/或修改程序控制的执行以及装置实体使用的一种控制。

* 企业(enterprise)协调一个或多个生产点运行的组织。

* 装置控制(equipment control)装置所特有的功能性,它为装置实体提供实际控制能力(包括程序控制、基本控制和协调控制),不属于产品生产技术标准范围。

* 装置实体(equipment entity)为执行某个控制功能或一组控制功能组合在一起的一些物理处理和控制装置。

* 装置模块(equipment module)装置的一个功能组,它能执行有限次数的特定小的处理活动。

注 1:装置模块一般大约处于过程装置(称重罐、过程加热器、洗涤器等)的中心。

本术语适用于实际装置和装置实体。

注2 :小的处理活动的例子有计量和称重* 装置操作(equipment operation)属于装置控制一部分的一种操作。

* 装置阶段(equipment phase)属于装置控制一部分的一个阶段。

* 装置程序(equipment procedure)属于装置控制一部分的一种程序。

* 装置单元程序(equipment unit procedure)属于装置控制一部分的一种单元程序。

* 异常处理(exception handling)处理批控制工况异常事件或过程意外的那些功能。

* 专用资源(exclusive-use resource)在任何特定时间只有一个用户才能使用的公共资源。

* 配方单(formula)一种包括过程输入、过程参数和过程输出的技术标准。

* 通用技术标准(general recipe)与装置和生产点无关的产品生产技术标准。

* 文件头(header)关于技术标准的用途、来源和版本的信息,比如技术标准和产品的标识、创建人和发布日期等。

* 标识ID批、批量、操作员、技术人员和原材料用的一种唯一标识自己的标识符。

* 批(lot)具有一组共同特征的特定量的材料。

* 主技术标准( master recipe)说明装置能力并可能包含过程组元特定信息的一种技术标准。

相关文档