平安金融中心结构设计[优质PPT]
合集下载
相关主题
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
21
Assumed structural damping ratios 结构阻尼比假定
Strength Design 强度设计 2.0% and 4.0% for 100-year winds
Serviceability Design (checking deflection)使用阶段品质验算 (位移 验算) ▪ 2.0% for 50-year winds without auxiliary dampers (Chinese Standard);
Serviceability Design (checking occupants’ comfort level)使用阶段 品质验算 (居住舒适性验算) ▪ 1.0% for 1 to 10-year winds without auxiliary dampers;
22
Key Results 主要结果
Serviceability Design 使用阶段品质验算 – For checking deflection 位移验算 58m/s (10-minute mean) at 500m reference height for a 50-year return period (Chinese standard) ; or 五十年回归期,500米处参考风速为58m/s。(中国标准) – For occupants’ comfort (building motion)居住舒适性验算 1-year return period speed for events including typhoon, and 1 to 10-year return period speed for events excluding typhoon. 包括台风情况时考虑一年回归期;不包括台风情况时考虑一年至十年回归 期。
Summary of base overturning moments and shears Summary of base over基底力矩和剪力归纳表
R.P.(year) 回归期
50 100 50 100
V(m/s) 参考风速
34.7
37.1
34.7
37.9
My (kN-m) Mx (kN-m)
• 评估平安金融中心周围的风舒适性与风安全性 • To provide the wind loads for structural design • 提供结构设计风荷载 • To provide the wind pressures for cladding design • 提供幕墙设计风压 • To assess the wind-induced tower motions in terms of
10层高室内庭院
13
SOM投标方案
14
FOSTER投标方案
15
高区建筑平面
早期方案 方案报建阶段建筑结构方案
低区建筑平面 16
3、风工程研究
17
平安金融中心风洞试验由RWDI 完成
• To assess the wind environment around the site in terms of safety and comfort
PingAnIFC
1
平安金融中心
1、 项目概述 2、 建筑结构体系发展与演变 3、 风工程研究 4、 地震工程 5、 结构设计 6、 巨型结构设计 7、 楼面结构设计 8、 节点设计讨论
2
1、项目概述
3
PROJECT GOALS • Create a tower form which is not only iconic, but intelligent and environmentally responsible. • Minimize the use of energy and materials by designing an aerodynamic form and efficient structure.
Building Model installed on top of the balance
Force Balance Model
19
Test Method试验方法 Full Aeroelastic Model Tests气动弹性模型试验
Shell to simulate aerodynamic shape
8
•Top of Tower observation deck
9
•Tower massing: aerodynamic form – tapered tower, stepped and chamfered corners
10
2、建筑结构体系发展与演变
11
KPF投标方案
12
室内庭院
结构方案
PAIFC is applying for LEED Gold status.
4
Design overview
•Site location
5
•Building area and section organization
6
•Podium roof terrace Hale Waihona Puke BaiduPodium atrium
7
•Typical office layout
serviceability • 评估塔楼风致振动舒适性品质
18
Test Method试验方法 High-Frequency Force Balance Technique (HFFB)高频测力天平技术
Sway Flexure Torsion Flexure
High-Frequency Force Balance
Metal spine to simulate stiffness
Spine and shell together to simulate mass distribution
20
Recommended Design Wind Speeds 建议的设计风速
Strength Design 强度设计 62m/s (10-minute mean) at 500m reference height for a 100-year return period. 一百年回归期,500米处参考风速为62m/s。
Assumed structural damping ratios 结构阻尼比假定
Strength Design 强度设计 2.0% and 4.0% for 100-year winds
Serviceability Design (checking deflection)使用阶段品质验算 (位移 验算) ▪ 2.0% for 50-year winds without auxiliary dampers (Chinese Standard);
Serviceability Design (checking occupants’ comfort level)使用阶段 品质验算 (居住舒适性验算) ▪ 1.0% for 1 to 10-year winds without auxiliary dampers;
22
Key Results 主要结果
Serviceability Design 使用阶段品质验算 – For checking deflection 位移验算 58m/s (10-minute mean) at 500m reference height for a 50-year return period (Chinese standard) ; or 五十年回归期,500米处参考风速为58m/s。(中国标准) – For occupants’ comfort (building motion)居住舒适性验算 1-year return period speed for events including typhoon, and 1 to 10-year return period speed for events excluding typhoon. 包括台风情况时考虑一年回归期;不包括台风情况时考虑一年至十年回归 期。
Summary of base overturning moments and shears Summary of base over基底力矩和剪力归纳表
R.P.(year) 回归期
50 100 50 100
V(m/s) 参考风速
34.7
37.1
34.7
37.9
My (kN-m) Mx (kN-m)
• 评估平安金融中心周围的风舒适性与风安全性 • To provide the wind loads for structural design • 提供结构设计风荷载 • To provide the wind pressures for cladding design • 提供幕墙设计风压 • To assess the wind-induced tower motions in terms of
10层高室内庭院
13
SOM投标方案
14
FOSTER投标方案
15
高区建筑平面
早期方案 方案报建阶段建筑结构方案
低区建筑平面 16
3、风工程研究
17
平安金融中心风洞试验由RWDI 完成
• To assess the wind environment around the site in terms of safety and comfort
PingAnIFC
1
平安金融中心
1、 项目概述 2、 建筑结构体系发展与演变 3、 风工程研究 4、 地震工程 5、 结构设计 6、 巨型结构设计 7、 楼面结构设计 8、 节点设计讨论
2
1、项目概述
3
PROJECT GOALS • Create a tower form which is not only iconic, but intelligent and environmentally responsible. • Minimize the use of energy and materials by designing an aerodynamic form and efficient structure.
Building Model installed on top of the balance
Force Balance Model
19
Test Method试验方法 Full Aeroelastic Model Tests气动弹性模型试验
Shell to simulate aerodynamic shape
8
•Top of Tower observation deck
9
•Tower massing: aerodynamic form – tapered tower, stepped and chamfered corners
10
2、建筑结构体系发展与演变
11
KPF投标方案
12
室内庭院
结构方案
PAIFC is applying for LEED Gold status.
4
Design overview
•Site location
5
•Building area and section organization
6
•Podium roof terrace Hale Waihona Puke BaiduPodium atrium
7
•Typical office layout
serviceability • 评估塔楼风致振动舒适性品质
18
Test Method试验方法 High-Frequency Force Balance Technique (HFFB)高频测力天平技术
Sway Flexure Torsion Flexure
High-Frequency Force Balance
Metal spine to simulate stiffness
Spine and shell together to simulate mass distribution
20
Recommended Design Wind Speeds 建议的设计风速
Strength Design 强度设计 62m/s (10-minute mean) at 500m reference height for a 100-year return period. 一百年回归期,500米处参考风速为62m/s。