Total management staff are over 600. 公司管理、专业人员已经达到600人并持续增长。
Total contract value is up to 6.5 billion ringgit. 自成立来,总合同额累计约65亿马币,包括10多个项目。
Organization Chart:
On 30 April 2017, The Astaka project has made the achievement of 3 million working hours without an accident.
1、The Astaka
On-going Projects
The customer satisfaction survey towards the Astaka project which done by Astaka Padu Holding Ltd (The Client) in June 2017 is showing the average score of 8 on comprehensive evaluation of overall construction performance.
1、The Astaka
Project Name: The Astaka (Johor Bahru)
Client: Astaka Padu Sdn Bhd GFA: 170,000 m2 Contract period:05/01/2015-31/05/2018 Description: 3‐storey basement ,6 storey podium( 5‐storey elevated carpark and 1 storey Mezzanine), Tower A–64 storey and Tower B–59 Storey.
On-going Projects
13th MOSHPA OSH Excellence Award 2017 for OSHE Management in High Rise Civil Construction to Lakeville Project
3、Lakeville Residence(Phase 2)
On-going Projects
13th MOSHPA OSH Excellence Award 2017 for OSHE Management in High Rise Civil Construction to Astaka Project
1、The Astaka
On-going Projects
4、9 Seputeh
On-going Projects
Project Name: 9 Seputeh Residence (Kuala Lumpur)
Client: MRCB Builders Sdn Bhd GFA:340,000 m2 Contract period:15/11/2015-14/08/2018 Description:2 storey basement, 8 storey elevated carpark, Tower A-36 storey, Tower B 34 storey, Tower C-36 storey, Tower D-34 strey, SOHO-12 storey.
Skyscraper: 453m The tallest building in overseas constructed by Chinese enterprise. 中国企业在海外承建的最高建筑。
2、Signature Tower
On-going Projects
PROGRESS: • Core wall and maiBiblioteka Baidu structure completed • External steel frame structure completed to level 92
2、Signature Tower
On-going Projects
On 5th,June,2017,Najib visits TRX project site, and he is satisfied with the progress of the project.
3、Lakeville Residence(Phase 2)
On-going Projects
3、Lakeville Residence(Phase 2)
12th MOSHPA OSH Excellence Award 2016-Gold Award for QSH Management in Construction to Lakeville Project
Johor Bahru Office: Lot 0425, 4th Floor, Wisma SP Setia, No. 15, Jalan Indah, 81200 Johor Tel: +607 239 5236 Fax: +607 239 5217
Kuala Lumpur Office: Suite A-13A, Level 13A, Hampshire Place, Jalan Mayang Sari, 50450 Kuala Lumpur Tel: +603 2714 2089 Fax: +603 2714 2079
Market
Malays ia
Indones ia
Kuala Lumpur Office (HQ):
Suite A-13A-2, Level 13A, Hampshire Place, Jalan Mayang Sari, 50450 Kuala Lumpur Tel: +603 2714 2089 Fax: +603 2714 2079
1、The Astaka
On-going Projects
On 01 October 2018, The Astaka project had got its certificate of practical completion.
2、Signature Tower
On-going Projects
吉隆坡办公室:
地址:Suite A-13A, Level 13A, Hampshire Place, Jalan Mayang Sari, 50450 Kuala Lumpur
电话:+603 2714 2089 传真:+603 2714 2079
Johor Bahru Office: Lot 0425, 4th Floor, Wisma SP Setia, No. 15, Jalan Indah, 81200 Johor Tel: +607 239 5236
Highlights:
The highest building in JB(275m)
Luxury residence
On-going Projects
1、The Astaka
On-going Projects
PROGRESS: • Overall structure completed • Completed over 90% on façade installation work.
Project Name: Lakeville Residence (Phase 2) (Kuala Lumpur)
Client: Enchanting heights Sdn. Bhd(Mah Sing Group) GFA:280,000 ㎡ Contract Period:15/12/2015-14/01/2019 Description: 2 block 38-storey service apartment; 2 block 42-storey service apartment; 1 block 35storey affordable apartment.
平均建设速度3天一层,打破马来西亚超高层 建设速度的记录。
2、Signature Tower
On-going Projects
PROGRESS: latest site view
2、Signature Tower
On-going Projects
12th MOSHPA OSH Excellence Award 2016-Gold Award for QSH Management in Construction to Signature Tower
Project Name: Signature Tower (Tun Razak Exchage 106)
Client: Mulia Property Development Sdn.Bhd. GFA: 380,000 m2 Contract period:15/02/2016-14/09/2018 Description: Super high-rise building, 7 storey basement,93 storey super structure.
1、The Astaka
On-going Projects
PROGRESS latest site view
1、The Astaka
12th MOSHPA OSH Excellence Award 2016-Gold Award for QSH Management to Astaka Project
Highlights:
1.19000m3 concrete pouring in one time, creating new record in Malaysia.
基础大底板浇筑19000m3,创造马来西亚建筑 史上单次浇筑量记录。
2. Average construction speed is 3 days per floor, break the fastest record of super high rise building construction in Malaysia.
4、9 Seputeh
On-going Projects
CIDB-Based on project basis Wholly owned and exclusively authorized as the entity to operate in Malaysia by parent company-CSCEC. 中国建筑马来西亚有限公司为母公司(中建股份)全资拥有并唯一授权的 在马经营机构。
2、Signature Tower
On-going Projects
The customer satisfaction survey towards Signature Tower project which done by Mulia Property Development Sdn Bhd (The Client) in June 2017 is showing the average score of 9 on comprehensive evaluation of overall construction performance.
On-going Projects
The customer satisfaction survey towards Lakeville 2 project which done by Enchanting Heights Sdn Bhd (The Client) in June 2017 is showing the average score of 8.83 on comprehensive evaluation of overall construction performance.
Fax: +607 239 5217
China State Construction Engineering (M) S/B:
Incorporated in Malaysia under Company act 1965 in 3th, Sep, 2013. 2013年9月3日,中国建筑马来西亚有限公司成立。