四川预制混凝土化粪池
化粪池价格计算表(调价)

地 下 水 活 动 荷 载 化粪池 垫层 池壁及底板 现浇盖板(有的含现浇梁) 进水井或(预制盖板及井圈) C25级混凝土 I级钢筋 (立方) (Kg) 0.185 0.219 0.302 0.558 0.558 1.616 1.788 1.788 1.788 2.028 2.303 3.592 4.66 0.188 0.222 0.316 0.62 0.62 1.616 1.788 1.788 1.788 2.028 2.303 3.592 4.66 0.185 0.219 0.302 0.558 0.558 1.616 1.788 1.788 1.788 2.028 2.303 3.592 4.66 0.188 0.222 0.316 0.62 0.62 1.616 1.788 1.788 1.788 2.028 2.303 3.592 4.66 24.4 25.2 30 59.4 59.4 174.5 225.7 225.7 225.7 247.9 308.8 537.9 708.6 54 58.6 72.6 184.3 184.3 220.4 279.9 279.9 279.9 306.4 375.4 665.7 887.9 24.4 25.2 30 59.4 59.4 174.5 225.7 225.7 225.7 247.9 308.8 537.9 708.6 54 58.6 72.6 184.3 184.3 220.4 279.9 279.9 279.9 306.4 375.4 665.7 887.9 C25级混凝土 I级钢筋 (立方) (Kg) 0 0 0 1.686 1.934 2.692 2.896 2.896 2.896 3.302 3.898 4.294 5.386 0 0 0 1.686 1.934 2.682 2.896 2.896 2.896 3.482 3.898 4.294 5.818 0 0 0 1.686 1.934 0.766 0.98 0.98 0.98 1.386 1.982 2.378 3.47 0 0 0 1.686 1.934 0.766 0.98 0.98 0.98 1.566 1.982 2.378 3.902 0 0 0 138.6 157.8 203.5 229.7 229.7 229.7 247 281.3 309.7 395.7 0 0 0 138.6 157.8 300.4 335.6 335.6 335.6 396.4 542.3 541.7 696 0 0 0 138.6 157.8 203.5 229.7 229.7 229.7 247 281.3 309.7 395.7 0 0 0 138.6 157.8 300.4 335.6 335.6 335.6 396.4 542.3 541.7 696 防水层(平方) 20厚防水 砂浆抹面 39.36 60.1 69.02 90.26 104.96 161.8 176.5 194.4 212.3 242.9 272.7 354.6 407.6 39.36 60.1 69.02 90.26 104.96 161.8 176.5 194.4 212.3 242.9 272.7 354.6 407.6 39.36 60.1 69.02 90.26 104.96 161.8 176.5 194.4 212.3 242.9 272.7 354.6 407.6 39.36 60.1 69.02 90.26 104.96 161.8 176.5 194.4 212.3 242.9 272.7 354.6 407.6 井盖及 900三通 盖座 管道支架 化粪池土方 化粪池价值 总价值 (元) 4986.74 7285.42 8529.91 12230.75 13856.57 19882.60 22723.48 24954.46 27802.05 33889.19 42779.89 62728.41 80694.34 5696.50 9182.50 10790.89 14870.43 17556.74 20693.92 23639.25 25870.23 28717.82 35177.37 44653.76 64786.47 83675.25 5429.75 7955.85 9265.85 13249.24 15037.97 21487.32 24311.31 27338.20 30292.76 38642.42 48905.35 75643.07 95700.36 6356.88 10467.83 12196.21 16404.86 18815.36 22304.14 25227.08 28253.97 31208.53 39930.61 50779.22 77701.13 98681.28
混凝土化粪池生产工艺流程

混凝土化粪池生产工艺流程混凝土化粪池是一种用于储存和处理家庭或小型社区生活污水的设备。
它是通过混凝土制成的,具有耐用、坚固的特点,能够有效地将污水分解并分离固体和液体部分。
本文将详细介绍混凝土化粪池生产的工艺流程,以及每个环节的具体操作步骤。
首先,混凝土化粪池的生产需要准备一些基础材料,包括水泥、石子、沙子、钢筋等。
在开始生产之前,需要对这些材料进行质量检测,保证其符合相关标准,并确保生产过程中的质量。
第一步是制作模具。
混凝土化粪池的生产通常采用预制模具生产的方式,所以首先需要制作好模具。
通常采用钢模具,需要根据化粪池的设计尺寸进行制作,并确保模具的表面光滑、角度一致。
第二步是搅拌混凝土原料。
根据设计要求,将水泥、石子、沙子等原料按比例进行混合,然后加入适量的清水进行搅拌,直到混凝土达到设计要求的强度和均匀性。
搅拌过程中需要注意保持搅拌机的速度和时间,确保混凝土原料充分混合。
第三步是浇筑混凝土。
在模具制作好并搅拌好混凝土原料之后,就可以进行混凝土的浇筑了。
在浇筑过程中需要注意控制浇筑速度和混凝土的均匀性,确保混凝土能够填满模具,并且表面平整。
第四步是养护混凝土。
混凝土浇筑完成之后,需要对其进行养护,保证其能够在规定时间内达到设计要求的强度和坚固性。
养护过程通常包括保持混凝土表面湿润、避免外力冲击等措施。
第五步是拆模。
经过养护后,混凝土达到设计要求的强度之后,就可以进行模具拆卸了。
在拆模的过程中需要注意操作稳妥,避免对混凝土的损坏。
第六步是进行检验。
在混凝土化粪池生产完成后,需要对其进行质量检验,包括尺寸、强度等检测,确保达到相关标准要求。
最后,是包装和运输。
经过检验合格的混凝土化粪池进行包装,通常采用编织袋或者木箱进行包装。
然后可以根据客户的需求进行运输,确保产品能够准确、安全地到达使用地点。
总的来说,混凝土化粪池生产工艺流程主要包括准备材料、制作模具、搅拌混凝土原料、浇筑混凝土、养护混凝土、拆模、检验、包装和运输等环节。
预制装配式钢筋混凝土化粪池施工工法(2)

预制装配式钢筋混凝土化粪池施工工法一、前言预制装配式钢筋混凝土化粪池施工工法是一种高效、节省时间和成本的施工方法,能够提高化粪池建设的效率和质量。
本文将详细介绍该工法的特点、适应范围、工艺原理、施工工艺、劳动组织、机具设备、质量控制、安全措施、经济技术分析以及工程实例。
二、工法特点该工法采用了预制装配式钢筋混凝土模块化结构,具有以下特点:1. 施工快速:预制装配式化粪池的构件在工厂预先制作,减少现场施工时间;2. 施工效率高:工人只需进行简单的组装和连接操作,无需繁琐的浇筑和模板搭设;3. 施工成本低:节省大量人力和材料,减少施工成本;4. 施工质量好:模块化结构保证了施工质量的一致性和可靠性;5. 使用寿命长:预制装配式化粪池具有良好的耐久性和抗腐蚀性。
三、适应范围该工法适用于各种规模的化粪池建设,无论是乡村、农田、工矿企业还是城市,都可以采用预制装配式钢筋混凝土化粪池施工工法。
四、工艺原理预制装配式钢筋混凝土化粪池的工艺原理是基于以下几个方面的技术措施:1. 模块化结构设计:将化粪池划分为多个预制装配式构件,减少现场施工时间和操作难度;2. 钢筋混凝土材料选用:选择高强度的钢筋混凝土材料,确保化粪池具有良好的强度和稳定性;3. 连接方式设计:采用可靠的连接方式,构件间无缝连接,确保化粪池的整体性能;4. 耐久性设计:针对化粪池的特殊环境进行耐久性设计,避免腐蚀和渗漏问题。
五、施工工艺 1. 土方开挖:按照设计要求进行土方开挖,并清理现场;2. 基础施工:进行化粪池的基础施工,采用预制构件来组装基础结构;3. 壁板组装:安装化粪池的壁板,将预制的模块化结构进行连接;4. 钢筋安装:按照设计要求进行钢筋的安装工作;5. 混凝土浇筑:进行混凝土的浇筑,并进行养护;6. 附属设施安装:安装必要的附属设施,如进出口管道、阀门等;7. 水密性测试:进行水密性测试,确保化粪池的水密性达到设计要求;8. 收尾工作:进行清理、整理和环境恢复的工作。
四川化粪池施工方案

四川化粪池施工方案1. 引言四川是一个人口众多的省份,农村地区的生活污水处理一直是一个重要的问题。
其中,化粪池是一种常见的污水处理设施。
本文将介绍四川地区化粪池的施工方案,包括工程前期准备、材料选择、施工流程以及施工后的维护要求等。
2. 工程前期准备在进行化粪池施工前,需要进行以下准备工作:2.1 地勘工作在选址前,需要进行地勘工作,了解地下水位、土质情况以及地形状况等。
这些信息对化粪池的选址和设计起到了重要的指导作用。
2.2 施工许可申请根据当地相关法规,需要申请施工许可证。
申请过程中需要提供相应的资料,包括工程设计方案、施工单位资质证明等。
2.3 材料采购根据化粪池的设计要求,采购化粪池施工所需的材料,包括混凝土、钢筋、防水材料等。
3. 材料选择3.1 混凝土化粪池的施工主要采用钢筋混凝土结构。
混凝土的强度、耐久性和抗渗透性等性能应符合相关规定。
选择具有良好品质和材料安全证明的混凝土。
3.2 钢筋钢筋是混凝土结构中的加强材料,必须符合国家标准。
根据化粪池的设计要求,选择适当直径和强度的钢筋。
3.3 防水材料化粪池需要采取防水措施,以确保不会发生渗漏。
选择满足防水要求的防水材料,如防水涂料、防水卷材等。
4. 施工流程4.1 地基处理在化粪池选址后,需要进行地基处理工作。
地基处理包括挖掘地坑、回填垫层、夯实等工序。
4.2 模板安装根据设计要求制作化粪池的模板,并进行安装。
模板的安装需要保证尺寸和水平度的准确性。
4.3 浇筑混凝土在模板安装完毕后,开始浇筑混凝土。
浇筑过程中需要注意控制混凝土的流动性和坍落度,并进行适时的振捣工作。
4.4 钢筋绑扎在混凝土初凝后,进行钢筋的绑扎工作。
钢筋的绑扎应符合相关规范和设计要求。
4.5 防水处理待混凝土养护完毕后,进行防水处理。
涂刷防水涂料或安装防水卷材等,确保化粪池的密封性。
4.6 模板拆除经过一定的养护期后,可以进行模板的拆除工作。
拆除时需要小心操作,以保证混凝土结构的完整性。
四川水泥化粪池施工方案

四川水泥化粪池施工方案一、项目背景在城市化进程不断加快的情况下,生活污水的处理逐渐成为一个紧迫的问题。
在四川地区,由于地理、气候等因素,传统的化粪池成为一个常见的处理方式。
水泥化粪池作为一种低成本、可靠性较高的处理方式,被广泛应用于城市和农村地区。
本文将介绍一种适用于四川地区的水泥化粪池施工方案。
二、施工材料和设备1.施工材料:–水泥:选用优质的硅酸盐水泥,符合国家标准。
–砂料:选用粒径均匀、无腐蚀性的河沙。
–骨料:选用坚硬、无块状物的砾石。
–钢筋:选用符合国家标准的钢筋,保证强度和防腐蚀性。
2.施工设备:–混凝土搅拌机:用于搅拌混凝土。
–钢筋切割机:用于切割和处理钢筋。
–手动挖掘机:用于挖掘施工现场。
–手工工具:如水平仪、笔尺、扳手等。
三、施工步骤1.确定施工地点:根据实际情况选择合适的地点进行施工,确保周围环境适宜、土质良好。
2.清理施工现场:清理施工现场,并进行必要的平整和清理工作。
3.施工图纸和标高设置:根据设计要求,确定化粪池的尺寸和布局,并进行标高设置。
4.挖掘基坑:使用手动挖掘机进行基坑的挖掘,根据施工图纸的要求,确保基坑的尺寸和深度符合设计要求。
5.基坑加固:在基坑的周边设置加固措施,如钢筋混凝土护坡,确保基坑的稳定性。
6.钢筋安装:根据设计要求,在基坑内安装钢筋,包括底部钢筋和壁面钢筋。
钢筋的间距和直径要符合设计要求,加强化粪池的强度和耐久性。
7.浇筑混凝土:使用混凝土搅拌机将配制好的混凝土倒入基坑中,进行均匀浇筑、震实,保持表面平整。
8.完成化粪池结构:根据施工图纸要求,在混凝土未完全凝固前,安装化粪池的进出口管道、排放管道等附件。
9.养护:在混凝土凝固后,进行养护,保持水泥化粪池的强度和耐久性。
四、施工质量控制1.施工材料的质量要符合国家标准,严禁使用劣质材料。
2.施工人员应经过专业培训,熟悉施工要求和操作技能。
3.施工现场要保持清洁,确保施工质量。
4.施工过程中严格按照施工图纸要求进行,确保尺寸、标高等准确。
钢筋混凝土化粪池施工方案正文

广安鼎恒新能源锂离子电池产业项目倒班房化粪池工程施工方案编制人:审核人:批准人:编制单位:成都民正建设工程有限公司编制日期:2014年5月28日一、编制依据1、《钢筋混凝土化粪池图集》(03S702)2、《倒班房施工设计图》3、《现行建筑施工规范大全》4、《混凝土结构工程施工质量验收规范》(GB50204-2002)5、《建筑工程施工质量验收统一标准》(GB50300-2001)6、《建筑基地基础工程施工质量验收规范》(GB50202-2002)二、工程概况该钢筋砼化粪池为四川广安鼎恒新能源大功率锂离子动力电池产业化倒班房区域污水处理池,位于倒班房7#楼北侧,与7#楼相距19米,挖土深度4.52米,覆土厚度为2.08米,砼等级C30,抗渗等级P6,有效容积100m3。
长13.2m,宽3.5m,高3.72m具体详细尺寸及施工图见图集《钢筋混凝土化粪池03S702》,型号G13-100SQF,根据实地测量以及图纸设计标高确定,采用有覆土形式,并且顶面过汽车。
三、施工目标由于该化粪池为倒班房1#~10#楼所有污水处理池。
该工程备受关注和重视。
我们将竭尽全力确保该工程按期、优质、安全完工。
计划工期挖土3天,垫层1天,钢筋绑扎4天,模板安装6天,砼浇筑2天,满水试验2天,土方回填1天,预制盖板吊装2天,井筒制安4天,合计25天。
坚持“安全第一、预防为主”的方针,在施工过程中杜绝一切重大质量安全事故的发生。
四、施工准备1、施工技术准备:组织管理人员认真学习施工规范,熟悉施工图纸规范,了解设计意图、编制具体基础施工方案。
2、物质准备:根据施工图纸和进度计划要求,编制施工机具需要量计划、物资计划详下表Φ503、劳动力准备:计划投入管理人员6人,木工10人,钢筋工5人,普工2人,电焊工1人,电工1人。
四、主要施工方案施工工艺流程:基坑定位放线→基坑土方开挖→基坑土体护坡加固→基底清槽→基底夯实处理→池底垫层→底板、池壁钢筋制安→止水钢板安装→底板砼浇筑→进出水口管道安装→池壁、顶板模板安装→顶板钢筋安装→池壁、顶板砼浇筑→模板拆除→池壁抹灰→满水试验→土方回填→预制顶盖安装1、土方工程施工顺序:定位放线→土方开挖→修整、清理→挖排水沟、集水坑→验槽→土方回填1.1定位放线:本化粪池位于7#楼1轴向北延长线上距离P轴19m,使用仪器设备以7#楼为基准参照物依次测出化粪池四角位置,并定好木桩,按照放坡比例放出土方开挖边线。
钢筋混凝土(砖)化粪池主要材料及价格表(调价)

垫层砖砌体900三通井盖支架池号型 号C10级混凝土MU10砖M7.5砂浆C25级混凝土I 级钢筋C25级混凝土I 级钢筋C25级混凝土I 级钢筋C25级混凝土I 级钢筋C25级混凝土I 级钢筋C25级混凝土I 级钢筋20厚防水砂浆抹面涂热沥青(个)(套)(付)材料及人工土方人工总价值(元)1号1-2B000 3.740.37364.40.18526.10.042 3.2 1.44200.43477.139.63222¥4,393.96604453.962号2-4B0008.760.967112.40.21927.30.20814.8 2.8920 1.079152.562.63222¥8,487.701208607.703号3-6B00010.11 1.0071160.30135.20.2623.6 3.1610 1.116193.671.56222¥9,590.921809770.924号4-9B00013.18 1.114183.90.55863.70.35841 5.150.48149 1.208206.493.21232¥13,413.7427013683.745号5-12B00016.19 1.114183.90.55863.70.35841 5.150.48149 1.208250108.77232¥14,818.4436015178.446号6-16B00019.5 1.611238.8 1.016133.80.6446.67.4010.48149 1.569390.7129.4242¥19,627.2448020107.247号7-20B00021.16 1.807254.7 1.138144.10.852748.3570.48149 1.661407.9142.6242¥21,471.0060022071.008号8-25B00024.89 1.807254.7 1.138144.10.852748.3570.48149 1.661407.9161.4242¥22,926.9075023676.909号9-30B00028.62 1.807254.7 1.138144.10.852748.3570.48149 1.661407.9180.2242¥24,382.8090025282.8010号10-40B00032.82 2.03285.8 1.308161 1.144103.29.6950.48149 1.92491.7208.5242¥28,057.40120029257.4011号11-50B00036.55 2.284353.6 1.503179.6 1.492146.611.2250.481492.216561.9235.6242¥31,931.20150033431.201号1-2B0103.740.36269.20.18861.40.0629 1.4420.43477.139.63222¥4,638.64604698.642号2-4B0108.760.934135.70.22268.50.30844 2.892 1.079152.562.63222¥9,009.941209129.943号3-6B01010.110.973139.20.31593.50.38880 3.161 1.116193.671.56222¥10,362.0018010542.004号4-9B01013.18 1.067201.90.62199.80.533142.9 5.150.48166.1 1.208206.493.21232¥14,928.8627015198.865号5-12B01016.19 1.067201.90.62199.80.533142.9 5.150.48166.1 1.208250108.77232¥16,333.5636016693.566号6-16B01019.5 1.518260.9 1.627340.80.848108.57.4010.48166.1 1.569390.7128.3242¥21,583.5648022063.567号7-20B01021.16 1.644276.7 1.872388 1.176189.78.3570.48166.1 1.661407.9141.4242¥23,982.1460024582.148号8-25B01024.89 1.644276.7 1.872388 1.176189.78.3570.48166.1 1.661407.9160.2242¥25,438.0475026188.049号9-30B01028.62 1.644276.7 1.872388 1.176189.78.3570.48166.1 1.661407.9178.9242¥26,893.1490027793.1410号10-40B01032.82 1.849339.5 2.127426.7 1.592260.79.6950.48166.1 1.92491.7207.1242¥31,158.00120032358.0011号11-50B01036.55 2.082393 2.419509 2.082434.211.2250.48166.12.216561.9234242¥36,072.60150037572.601号1-2B010.667 5.950.65674.90.18526.10.0423.2 1.126470.71888.142.1822.83222¥6,213.90606273.902号2-4B10 1.0368.760.967112.40.21927.30.20814.8 1.78574.4 1.079188.762.3632.39222¥9,297.381209417.383号3-6B10 1.3513.73 1.428128.30.30135.20.2623.6 2.385150.1 1.536209.174.1138.64222¥12,801.4218012981.424号4-9B10 1.86617.06 1.565200.10.55863.70.35841 3.349310.90.48149 1.659222.395.8347.86232¥17,361.4827017631.485号5-12B10 1.86620.96 1.565200.10.55863.70.35841 3.349334.30.48149 1.659268.2111.8756.89232¥19,377.7036019737.706号6-16B1024.6 2.229256 1.016133.80.6446.6 4.818585.90.48149 2.136438.6132.160.2242¥25,203.6448025683.647号7-20B1026.54 2.405272.4 1.138144.10.85274 5.51694.80.48149 2.259458.2145.362.9242¥27,648.8660028248.868号8-25B1031.23 2.405272.4 1.138144.10.85274 5.51694.80.48149 2.259458.2164.472.1242¥29,608.7675030358.769号9-30B1035.92 2.405272.4 1.138144.10.85274 5.51694.80.48149 2.259458.2183.681.2242¥31,567.6690032467.6610号10-40B1041.41 2.712304.6 1.308161 1.144103.2 6.54960.50.48149 2.602525.921293.7242¥37,153.20120038353.2011号11-50B1046.35 3.062374.21.503179.6 1.492146.67.7181311.80.481492.994597.8239.1105.4242¥43,426.06150044926.061号1-2B110.667 5.950.645800.18861.40.0629 1.126470.71888.142.1822.83222¥6,460.14606520.142号2-4B11 1.0368.760.934135.70.22268.50.30844 1.78574.4 1.079188.762.3632.39222¥9,819.621209939.623号3-6B11 1.3513.73 1.394152.60.31593.50.38880 2.385150.1 1.536209.174.1138.64222¥13,578.2218013758.224号4-9B11 1.86617.06 1.518219.20.62199.80.533142.9 3.349310.90.48166.1 1.659222.395.8347.86232¥18,882.3227019152.325号5-12B11 1.86620.96 1.518219.20.62199.80.533142.9 3.349334.30.48166.1 1.659268.2111.8756.89232¥20,898.5436021258.546号6-16B1025.68 2.085279.4 1.627340.80.848108.5 4.818585.90.48166.1 2.136438.613160.2242¥27,519.2248027999.227号7-20B1027.89 2.242295.7 1.872388 1.176189.7 5.51694.80.48166.1 2.259458.214462.9242¥30,638.4660031238.468号8-25B1032.82 2.242295.7 1.872388 1.176189.7 5.51694.80.48166.1 2.259458.2163.272.1242¥32,683.1675033433.169号9-30B1037.75 2.242295.7 1.872388 1.176189.7 5.51694.80.48166.1 2.259458.2182.381.2242¥34,725.2690035625.2610号10-40B1043.3 2.53360.3 2.127426.7 1.592260.7 6.54960.50.48166.1 2.602525.9210.693.7242¥40,925.20120042125.2011号11-50B1048.242.864152.4195092.082434.27.7181311.80.48166.12.994597.8237.5105.4242¥48,236.24150049736.24地下水无地下水有地下水活动荷载顶面不过汽车顶面可过汽车顶面不过汽车顶面可过汽车砖砌化粪池主要材料及价格表化粪池顶部圈梁现浇盖板预制盖板底板进水井中部圈梁防水层(平方)化粪池价值。
预制钢筋混凝土化粪池标准

预制钢筋混凝土化粪池标准预制钢筋混凝土化粪池是一种广泛应用于农村地区的重要环保设施,其标准直接关系到设施的质量和性能。
本文将从预制钢筋混凝土化粪池标准入手,介绍其各项技术要求和规范,为相关领域的设计、施工和验收提供参考。
一、标准概述预制钢筋混凝土化粪池是一种用于处理生活污水的环保设施,其标准主要包括《预制钢筋混凝土化粪池》和《环境保护产品技术要求预制钢筋混凝土化粪池》两部分。
这些标准对预制钢筋混凝土化粪池的设计、施工、验收等环节进行了全面规范,以确保设施的质量和性能。
二、技术要求1. 基础要求预制钢筋混凝土化粪池应采用现浇混凝土基础,基础深度应不小于1.2米,并应按要求设置伸缩缝和沉降缝。
在特殊地质条件下,如软土地基等,应采取相应的地基处理措施。
2. 池体要求预制钢筋混凝土化粪池的池体应采用高强度、抗腐蚀、耐久性好的钢筋混凝土材料制成。
池体应具有足够的承载能力和稳定性,能够承受内部压力和外部荷载的作用。
同时,池体应设置进水管、出水管、通风管等管道,并应按要求设置相应的接口和密封件。
3. 管道要求预制钢筋混凝土化粪池的管道应采用耐腐蚀、易清洗的材料制成,如塑料管道、不锈钢管道等。
管道的直径、坡度、连接方式等应符合设计要求,并应保证管道的密封性和通畅性。
4. 密封要求预制钢筋混凝土化粪池应采用可靠的密封技术,以确保池体内部的污水不泄漏到外部环境中。
密封材料应具有耐腐蚀、耐磨损、耐高温等性能特点,并应按要求进行安装和维护。
5. 安全要求预制钢筋混凝土化粪池应设置安全设施,如防滑、防坠落等装置,以确保使用安全。
同时,在施工过程中和使用过程中,应采取相应的安全措施,如佩戴安全帽、定期检查安全设施等。
三、施工规范1. 施工前准备在施工前,应对施工现场进行清理和平整,并应按要求设置临时设施和安全设施。
同时,应对施工图纸进行审核和技术交底,确保施工质量和安全。
2. 基础施工在基础施工过程中,应按要求进行地基处理,并应按要求设置基础垫层和伸缩缝。
预制混凝土化粪池的施工技术方案

化粪池专项施工方案2023年1月目录一、编制依据 (2)二、工程概况及编制说明 (2)三、施工方案 (2)四、护壁施工 (4)五、化粪池安装 (4)六、土方回填 (5)七、施工要点 (5)八、质量保证措施 (6)九、安全措施 (7)十、文明施工保障措施 (8)十一、成品保护 (9)十二、应急预案 (9)预制混凝土化粪池的施工技术方案一、编制依据1、《钢筋混凝土化粪池图集》( 03S702)2、《工程测量规范》 (GB50026-2007)3、《地基与基础工程施工质量验收规范》(GB50202-2002)4、《混凝土结构工程施工质量验收规范》(GB50204-2002)5、《建筑工程施工质量验收统一标准》(GB50300-2001)6、《建筑机械使用安全技术规范》(JGJ33-2001)7、《施工现场临时用电安全技术规范》(JGJ46-2005)8、本工程室外雨污水施工图。
二、工程概况及编制说明1、工程概况总用地面积约 122 亩,总建筑面积142313 平方米,共 18栋(其中16栋住宅,2栋商业配套),住宅层数为9或11层。
主要建设内容包括住宅、配电房、商业、配套服务用房、地下车库、室外工程等。
2、编制说明本施工方案是项目的专项方案,在施工过程中,我们将在此基础上,就各分部分项工程编制进一步的作业指导书和技术交底,补充施工中的细节问题,使该方案真正具有可操作性、合理性。
本工程化粪池采用钢筋混凝土组合式化粪池3座。
三、施工方案1、施工工艺流程施工准备→测量放线→基坑开挖→护壁施工→垫层施工→化粪池安装施工→土方回填2、施工准备(1)核对基坑平面尺寸和坑底标高,熟悉土层、水文地质资料。
(2)结合施工现场的实际情况,绘制施工总平面图和基坑开挖图,确定开挖路线、顺序、范围、边坡坡度。
(3)设置测量控制点,根据施工现场的实际情况将水准标高测设到周围的建筑物上,并于适当( 不受施工现场工作影响) 的地方设置半永久性的水准点。
预制化粪池施工方案

-选用符合国家标准的预制化粪池材料。
-对进场材料进行质量检验,确保材料合格。
4.设备准备
-准备所需的施工机械和设备,如吊车、运输车辆等。
-确保设备性能良好,满足施工需求。
四、施工流程
1.预制化粪池制作
-根据设计图纸,采用高强混凝土和高性能复合材料制作预制化粪池。
-严格控制生产过程,确保产品质量。
四、施工保障措施
1.技术保障:组织专业技术人员进行施工指导,确保施工过程中的技术问题得到及时解决。
2.质量保障:设立质量监督小组,对施工过程进行全程监控,确保施工质量。
3.安全保障:建立健全安全生产责任制,制定应急预案,加强现场安全巡查。
4.进度保障:合理安排施工计划,确保施工进度。
5.环保保障:严格执行环保措施,对施工现场进行定期检查。
3.施工流程
(1)化粪池设计:根据工程需求,进行化粪池结构、尺寸、材料等设计,并出具施工图纸。
(2)预制化粪池制作:按照设计图纸,在工厂内完成化粪池的预制生产。
(3)化粪池运输:将预制化粪池运输至施工现场。
(4)化粪池安装:采用吊装设备,将预制化粪池安装至设计位置。
(5)化粪池调试:安装完成后,对化粪池进行调试,确保其正常运行。
5.验收
-施工完成后,组织相关单位进行验收。
-检查施工质量,确保工程符合设计要求和规范标准。
五、施工质量控制
1.施工过程中严格执行施工图纸、技术规范和质量标准。
2.设立质量监督小组,对施工过程进行全程监控。
3.对关键工序实行旁站监理,确保施工质量。
4.定期对施工人员进行质量教育,提高质量意识。
六、施工安全管理
4.施工要求
(1)施工质量:严格按照施工图纸、技术规范和操作规程进行施工,确保施工质量。
预制钢筋混凝土砼组合式化粪池

适用范围:
• 任何环境都适合,特别适合以下几方面: • 1、土质较差,地下水丰富,基坑易塌方、基坑处理难度大的地方; • 2、需要满足各种荷载的车道; • 3、工期紧的工程;
施工要点:
• 1、根据图纸设计化粪池的容量大小,确定化粪池的组数和组合方式。 • 2、定位放线:开挖基坑土方,做好边坡支护。对于地下水丰富的地区或是雨季施工,可在坑底设置积水坑 和污水泵,及时将坑内的积水及时排出,保证化粪池底座下土质不受扰动,必要时可在化粪池底部施工混 凝土垫层。 • 3、若现场土质较好,基坑可一次开挖成型,通过吊车吊装化粪池就位,每一节化粪池身连接处通过人工坐 浆连接,对土方开挖边坡要求不太严格,但要保证不塌方伤人。 • 4、若现场土质不好,可一次开挖一个化粪池的土方,挖一个,安装一个,再挖第二个,安装第二个化粪池, 依次类推,至安装完整组化粪池。通过这样的方法来减少基坑土体暴露的时间,降低基坑边坡土体塌方的 机率和边坡支护的费用,提高施工的安全性。 • 5、预制钢筋混凝土化粪池为定制的成品,每一节化粪池池身均设有进水口和出水口,对于未使用的孔口要 及时用细石混凝土和水泥浆进行封堵。
• 3、由于施工进度较快,在雨季施工或土质较差的地区施工,能减少基坑土方支护和降水等费用。
• 4、预制钢筋混凝土化粪池可根据设计容量选用单组或多组进行组合,组合灵活。可将设计容量较大的化 粪池分解为若干个相互连通的小型预制化粪池,随开挖、随安装、随回填,对周边其它工程施工影响较小。 • 5、对于临近建筑物且埋置深度较深的化粪池,采用预制化粪池施工能减少基坑暴露的时间,可显著降低 由于大开挖对建筑物基础的扰动(土体流失或不均匀沉降)。 • 6、省工、省钱、省维护、省清淘。比现浇钢混省30%以上,比砖混省10%左右。
预制水泥化粪池的建造步骤

预制水泥化粪池的建造步骤
步骤一:准备工作
1. 定位 - 确定化粪池的安装位置,考虑到排水系统的布局和要求。
2. 清理 - 清理施工区域,确保地面平整,无障碍物。
步骤二:施工
1. 挖掘 - 根据设计要求,用挖掘机挖掘化粪池的坑,确保坑的尺寸和形状符合规范。
2. 基底处理 - 在坑底铺设一层夯实的砂子或砾石,以提供稳定的基础。
3. 安装墙板 - 将预制的水泥墙板依次安装在坑的内部,使用适当的胶粘剂或密封胶进行固定。
4. 固定墙板 - 使用金属支护材料等工具来加固墙板的固定。
步骤三:密封与连接
1. 密封化粪池 - 使用密封胶、橡胶垫等材料,确保水泥墙板之间的连接处无渗漏。
2. 连接入口与出口 - 安装化粪池的入口和出口管道,确保与排水系统的连接紧密可靠。
步骤四:完成工作
1. 检查 - 检查化粪池的所有连接点和密封处,确保没有漏水和渗漏。
2. 填平 - 在化粪池周围填平土壤,确保化粪池的稳定和安全。
3. 通水测试 - 打开水龙头,检查化粪池的排水能力和水密性。
以上是预制水泥化粪池的建造步骤。
根据具体的项目要求和设计,施工中还需要遵守相关的安全规范和施工标准。
请在施工前咨询专业人士以确保工作的顺利进行和安全完成。
2009年《四川省建设工程工程量清单计价定额》市政

天然湿 度下平 均密度 (kg/m3)
极限压 用轻钻孔 碎强度 机钻进
1m 耗 时 (kg/cm2) (min)
开挖 方法 及工具
紧固 系数
f
2700
2700
2700
1000~ 1200
用爆破方 15.0 法开挖 10~12
2600
2600
2800
2900
2600 2800
1200~ 1400
用爆破方 18.5 法开挖 12~14
采用其他方法爆破时,可参考《全国统一城镇控制爆破工程硐室大爆破工程预算定额》。 (四)石方爆破定额是按电力启爆编制的,如采用火雷管启爆,应将电雷管换为火雷管,雷管数量不变,
将胶质导线换为导火索,导火索长度均按每个火雷管 2.12m 计算。 (五)雷管、炸药仓库距施工爆破点>2km 者,由仓库至现场的运输费按实计算,定额中≤2km 的运输不
予扣除,余料退库运费也不再计算。 (六)炸药的防水费已综合考虑在定额内,石方爆破孔中遇有渗水积水时,采用防水措施发生的费用,不
另计算。 (七)人工摊座、修整边坡定额只适用于石方爆破工程中的永久性边坡。 四、其他说明 (一)挡土板支撑中的密撑指满铺挡板;疏撑指间隔铺挡板。 (二)挡土板支撑项目按槽、坑两侧同时支挡土板考虑,如一侧支挡土板时,人工乘以系数 1.33, 除挡
积 10%以内
泥板岩
2000
不含或含量重达 10kg 的顽石
1950
用尖锹并 同时用镐 0.8~1.0 开挖 30%
用尖锹并 同时用镐
1.0~1.5 和撬棍开
挖 30%
定额分 类
普 式 分类
土壤及岩石名称
天然湿 度下平 均密度 (kg/m3)
预制混凝土化粪池施工技巧

预制混凝土化粪池施工技巧一、前言预制混凝土化粪池是一种常用的污水处理设备,广泛应用于城市生活污水处理、工业废水处理等领域。
它具有结构简单、成本低、耐用性好等优点。
本文将重点介绍预制混凝土化粪池的施工技巧,以便工程师和施工人员能够更好地掌握其施工方法和注意事项。
二、预制混凝土化粪池的构造预制混凝土化粪池由上部、中部和下部三部分构成。
上部为进水口和出水口,中部为反应池,下部为沉淀池。
其主要结构包括进水口、进水管道、进水格栅、出水口、出水管道、沉淀池、出泥口、反应池、曝气装置、隔板等。
三、预制混凝土化粪池的施工技巧1. 地基的处理预制混凝土化粪池的地基应选择坚实、平整、排水良好的地面。
在施工前,需要对地面进行清理,去除杂草、石头等障碍物。
2. 预制件的安装预制混凝土化粪池的预制件在运输和搬运过程中需要特别注意,避免在运输过程中发生损坏。
在安装时,需要按照设计图纸的要求进行安装,根据要求对预制件进行定位和连接。
3. 砼的浇筑砼浇筑前应先进行模板的搭建和安装,模板的安装应符合要求,确保模板的平整度和垂直度。
在浇筑前,应先在模板内布置钢筋,钢筋的布置应符合设计要求。
砼的浇筑应分层进行,每层的厚度应符合设计要求,并严格按照施工技术规范进行操作。
4. 隔板的安装隔板的安装应在砼浇筑完成后进行。
在安装隔板之前,需要先用打磨机将砼表面打磨平整,确保隔板能够安装在平整的砼表面上。
隔板的安装应按照设计图纸要求进行,需要对隔板进行定位和固定。
5. 曝气装置的安装曝气装置的安装应在隔板安装完成后进行。
在安装曝气装置之前,需要先在砼表面进行挖孔,然后将曝气器安装在挖孔中。
曝气器的数量和布置应符合设计要求。
6. 沉淀池和出泥口的安装沉淀池和出泥口的安装应在曝气装置安装完成后进行。
沉淀池的安装应按照设计要求进行,需要对沉淀池进行定位和固定。
出泥口的安装应在沉淀池安装完成后进行,需要对出泥口进行定位和固定。
四、施工注意事项1. 安全第一在施工过程中,必须始终以安全为第一位。
预制钢筋混凝土化粪池安装施工工法

预制钢筋混凝土化粪池安装施工工法预制钢筋混凝土化粪池安装施工工法一、前言随着城市化进程的加快,化粪池作为一种处理城市生活污水的重要设施,需求量不断增加。
然而,传统的现场浇筑化粪池存在施工周期长、质量难以保证等问题。
为了解决这些问题,预制钢筋混凝土化粪池安装施工工法应运而生。
本文将对该工法的特点、适应范围、工艺原理、施工工艺、劳动组织、机具设备、质量控制、安全措施以及经济技术分析进行详细介绍。
二、工法特点预制钢筋混凝土化粪池安装施工工法具有以下几个特点:1. 快速施工:预制化粪池可在工场内进行生产,减少现场施工时间,提高施工效率。
2. 质量可控:预制化粪池经过严格工厂化生产,质量可靠,不受现场环境和工人技术水平的影响。
3. 适应性强:预制化粪池可根据需要进行定制,尺寸灵活,适应各种场地条件。
4. 施工难度低:预制化粪池的安装施工相对简单,不需要大量的人力和机械设备。
5. 使用寿命长:预制钢筋混凝土化粪池具有耐腐蚀、抗渗透等优点,使用寿命长,维护成本低。
三、适应范围预制钢筋混凝土化粪池安装施工工法适用于城市生活污水处理、农村生活污水处理以及工业废水处理等场景。
无论是新建还是改造工程,都可以采用该工法。
四、工艺原理预制钢筋混凝土化粪池安装施工工法的工艺原理是将化粪池在工场内进行预制,采用混凝土和钢筋结合的方式,通过模板进行成型,然后将预制好的化粪池运输到现场进行安装。
该工法通过工厂化生产来保证化粪池的质量稳定,减少现场施工时间和人力需求。
五、施工工艺 1. 基础处理:根据设计要求进行土建施工,确保基础平整、坚固。
2. 预制化粪池生产:在工场内进行化粪池的预制生产,包括混凝土配制、钢筋绑扎、模板成型等工序。
3. 运输和安装:将预制好的化粪池运输到现场,通过吊装设备进行安装,确保化粪池与基础连接牢固。
4. 后续工程:进行化粪池的连通管道、阀门、检修井等配套设施的安装和调试,以确保化粪池的正常运行。
六、劳动组织预制钢筋混凝土化粪池安装施工工法的劳动组织主要包括项目经理、工班长、技术工人、吊装工、机械操作工等。
预制化粪池(混凝土)施工做法

精心整理化一号化粪池施工要求1.占地面积:10.8平方米(二层)2.容积:9.4立方米3.组合件数:ф2000x1000x145带底2节ф2000x1000x145筒2节ф2310x150盖2个4.施工方法:(1)化粪池基础部分100厚c20砼基层找平,将带底节放入。
(2)管体接合处用1:2水泥砂浆及防渗漏剂做浆,再用非织造布加塑高强防水卷材处理。
(3)连通孔口结合处用TS系列聚乙烯丙伦复合防水卷材做防水处理。
(4)(5)5.1.2.容积:3.фф4.(2)(3)(4)进水口、出水口方向可按需要设置,但进、出水口及其上面检查并口方向应取得一致。
(井盖上部捡口可采用铸铁盖)(5)池顶盖板以上覆土,进水管埋深0.5-1.5米,出水管埋深0.6-1.6米。
5.特点:本产品安装简便快捷安全,经久耐用,价格合理,且水排放可达环保要求。
三号化粪池施工要求1.占地面积:21.34平方米(三层)2.容积:18.8立方米3.组合件数:ф2000x1000x145带底4节ф2000x1000x145筒4节ф4.(2)(3)(4)(5)5.1.2.容积:3.фф2310x150盖4个4.施工方法:(1)化粪池基础部分100厚c20砼基层找平,将带底节放入。
(2)管体接合处用1:2水泥砂浆及防渗漏剂做浆,再用非织造布加塑高强防水卷材处理。
(3)连通孔口结合处用TS系列聚乙烯丙伦复合防水卷材做防水处理。
(4)进水口、出水口方向可按需要设置,但进、出水口及其上面检查并口方向应取得一致。
(井盖上部捡口可采用铸铁盖)(5)池顶盖板以上覆土,进水管埋深0.5-1.5米,出水管埋深0.6-1.6米。
5.特点:本产品安装简便快捷安全,经久耐用,价格合理,且水排放可达环保要求。
五号化粪池施工要求1.2.容积:3.фф4.(2)(3)(4)(5)5.六号化粪池施工要求1.占地面积:32平方米(三层)2.容积:47立方米3.组合件数:ф2000x1000x145带底6节ф2000x1000x145筒12节ф2310x150盖6个4.施工方法:(1)化粪池基础部分100厚c20砼基层找平,将带底节放入。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
化粪池根据建筑材料和结构的不同,主要可分为砖砌化粪池、现浇钢筋混凝土化粪池、预制钢筋混凝土化粪池、玻璃钢化粪池等。
今天主要来讲一讲预制化粪池,特别是现在农村用的比较多,但是还有很多人不清楚预制化粪池有什么用。
化粪池是一种利用沉淀和厌氧微生物发酵的原理,以去除粪便污水或其他生活污水中悬浮物、有机物和病原微生物为主要目的的小型污水初级处理构筑物。
污水通过化粪池的沉淀作用可去除大部分悬浮物(SS),通过微生物的厌氧发酵作用可降解部分有机物(CODcr、BOD5),池底沉积的污泥可用作有机肥。
通过化粪池的预处理可有效防止污水管道被堵塞,亦可有效降低后续处理单元的有机污染负荷。
但化粪池处理效果有限,一般不能直接排放水体,需经后续好氧生物处理单元或生态技术单元进一步处理。
化粪池应进行防水、防渗和防腐处理,以防止污染地下水并保证后续污水处理单元处理水量。
化粪池应定期清淘,保持进出水畅通,清掏物作为固废进一步处理或用于农田施肥。
优点:结构简单、易施工、造价低、维护管理简便、无能耗、运行费用省、
卫生效果好。
不足:沉积污泥多,需定期进行清理;沼气回收率低,综合效益不高;化粪池处理效果有限,一般不能直接排放水体,需经后续好氧生物处理单元或生态技术单元进一步处理。
化粪池适用范围:可广泛应用于省内农村生活污水的预处理,特别适用于生态卫生厕所的粪便与尿液的预处理。
关于预制化粪池就给大家介绍到这里了,如果说有客户想购买预制化粪池,一定要找专业的厂家咨询,比如说价格、大小、安装方法等。
成都有很多厂家在生产预制化粪池,我们在选的时候可以看看哪家口碑好。