电力负荷计算表

合集下载

电力负荷计算表

电力负荷计算表

、名称为各个设备组,其设备功率为额定功率乘以相对于的系数2、系数Kx,功率系数,计数系数可以参考相对于的电力设计数据3、负荷率=最后的视在功率/选型的变压器容量序需用系数计算系数号K X tgΦ1办公照明2400.30.622车间照明2800.40.623反应釜1320.30.624精馏塔1170.30.625槽型混合机930.30.626多层流化床600.30.627齐多夫定生产线600.70.628P-胸苷生产线450.70.6295-甲基尿苷生产线360.70.6212仓储系统1010.620.85100.8531.50.8525.20.85180.85420.8535.10.8527.90.851120.8539.60.8572名 称工作容量(KW )功率因数COSΦP (KW)13车间净化系统12010.6214天车27.50.30.6215气相色谱 5.250.80.6216离子色谱 6.250.30.6217标准实验箱0.50.30.6218分光光度计20.30.6219高纯度烘干箱 3.50.30.6220无尘分析室100.30.6221原子发射仪 1.20.30.6222组合空调1500.50.6223办公用电500.80.621449.2667.785同时系数KZ 0.85有功负荷系数a 0.75无功负荷系数PP^0.75~0.851449.20.831449.20.9313变压器负荷率800KVA 变压器(1台)无功补偿容量(KVar)总 计(补偿后)0.4车间干线KZ = 0.9〜1;低压母线KZ = 0.8〜0.9a-0.7 ~ 0.8 (平均负荷与计算负荷之比值)(平均负荷与计算负荷之比值)总 计(补偿前)0.660.85750.85400.8530.850.360.850.60.85 1.050.85 1.8750.850.150.858.250.85 4.20.8512084.71558备注6.211.819.537.115.629.611.221.226.049.421.841.317.332.869.4131.824.646.6S (KVA)44.684.7计算负荷P W)Q (Kvar)414.0267567.6173714527.9KH=81.6%压器(1台)121567.6227.00.8〜0.9值)567.6351.946.588.224.847.11.9 3.50.20.40.40.70.7 1.21.22.20.10.25.19.72.6 4.974.4141.2。

电力工程(第二版)课后习题答案.docx

电力工程(第二版)课后习题答案.docx

第一章1-1什么是电力系统?建立联合电力系统有哪些好处?答:电力系统是由发电厂、变电所、输配电线路和电力用户组成的整体。

建立联合电力系统的优点是:可以减少系统的总装机容量;可以减少系统的备用容量;可以提高供电的可靠性;可以安装大容量的机组;可以合理利用动力资源,提高系统运行的经济性。

1-2电能生产的主要特点是什么?对电力系统有哪些要求?答:电能生产的主要特点是:电能不能大量存储;过渡过程十分短暂;与国民经济各部门和人民日常生活的关系极为密切。

对电力系统的基本要求是:保证供电的可靠性;保证良好的电能质量;为用户提供充足的电能; 提高电力系统运行的经济性。

1-3我国规定的三相交流电网额定压等级有哪些?用电设备、发电机、变压器的额定电压与同级电网的额定电压之间有什么关系?为什么?答:我国规定的三相交流电网额定压等级,低压有0.22/0.127 kV, 0.38/0.22 kV和0.66A).38kV;高压有3kV、6kV、10 kV、35 kV、60 kV、110 kV、220 kV> 330 kV、500 kV 和750kV。

用电设备的额定电压规定与同级电网的额定电压相同;发电机的额定电压应比同级电网额定电压高5%;变压器一次绕组的额定电压,对于降压变压器,应等于电网的额定电压,对于升压变压器, 应等于发电机的额定电压;变压器二次绕的额定电压,当二次侧供电线路较长时,应比电网额定电压高10%,当变压器二次侧供电线路较短时,应比同级电网额定电压高5%01-4衡量电能质量的主要指标有哪些?简述它们对电力系统的主要影响。

答:衡量电能质量的主要指标有:频率偏差、电压偏差、电压波动与闪变、高次谐波(波形畸变率)、三相不平衡度及暂时过电压和瞬态过电压。

对电力系统的主要影响(略)。

1-5什么叫小电流接地系统?什么叫大电流接地系统?小电流接地系统发生一相接地时,各相对地电压如何变化?这时为何可以暂时继续运行,但又不允许长期运行?答:中性点不接地和中性点经消弧线圈接地的系统称为小电流接地系统;性点直接接地(或经低电阻接地)的系统称为大电流接地系统。

施工现场用电负荷计算

施工现场用电负荷计算

1.施工现场用电负荷计算施工设备投入情况及总用电负荷计算用电设备负荷计算表根据上述各变压器用电负荷计算,总的视在功率为<额定容量500KVA,故现场业主提供的一台500KVA变压器能够满足现场施工用电需求。

2.电缆导线选型、截面选择导线选型依据配电线路导线的选择主要是选择导线的截面,要同时满足三个条件:a.机械强度的要求。

b.容许电流的要求I=KP/3V cosф(三相五线制线路);I=P/V cosф(二相制线路)式中: I-容许电流(A)P-电力负荷(KVA)K-需用系数V-线路电压(V)cosф-功率因数根据计算的容许电流查找不同类型的导线截面。

c.容许电压要求:就是把电压限制在容许的范围内,确保电压的质量。

(1)U%=∑PL/(C*S)=∑M/(C*S)≤ε式中,S-导线截面(mm²)P一负荷的电功率或导线输送的电功率L-输送电路的距离C-系数,视导线材料送电电压及配电力方式而定,铜线取,铝线取ε-容许的电压降,取5%(供电营业规则)(2)电阻率ρ铜为欧*㎜2/米铝为欧*㎜3/米I=P/*U*COSØ电阻R=ρl/电缆截面电压降△U=IR<5%U就达到要求了(5%U=*380=19V) 。

各主要回路配电系统表各回路电流计算、截面选择总线(ZHL-1)导线选择及压降验算总线(ZHL-1)设备总视在计算功率Sjs(kVA)=(kVA)总视在计算电流Ijs(A)= K1000Sjs/×380)=405(A)查《民用建筑电气设计规范》知铜芯聚乙烯绝缘电力电缆YJV3×185+2*95mm2在空气中明敷安全载流量为410(A)>405A;线路长度为30米,压降验算△U=IR=(594/**)**30/185)=<19V,故总线(ZHL-1)选择导线为一条YJV3×185+2*95mm2电缆。

主回路1(1ZP-01)导线选择及压降验算主回路1(1ZP-01)设备总视在计算功率Sjs(kVA)= (kVA)总视在计算电流Ijs(A)= K1000Sjs/×380)=272(A)查《民用建筑电气设计规范》知铜芯聚乙烯绝缘电力电缆YJV3×120+2*70mm2在空气中明敷安全载流量为310(A)>272(A);线路长度为70米,压降验算△U=IR=(**)**70/120)=<19V,故主回路1(1ZP-01)选择导线为一条YJV3×120+2*70mm2电缆。

电力负荷计算公式与范例

电力负荷计算公式与范例

常用电工计算口诀第一章按功率计算电流的口诀之一1.用途:这是根据用电设备的功率(千瓦或千伏安)算出电流(安)的口诀。

电流的大小直接与功率有关,也与电压,相别,力率(又称功率因数)等有关。

一般有公式可供计算,由于工厂常用的都是380/220 伏三相四线系统,因此,可以根据功率的大小直接算出电流。

2.口诀:低压380/220 伏系统每KW 的电流,安。

千瓦,电流,如何计算?电力加倍,电热加半。

单相千瓦,4 . 5 安。

单相380 ,电流两安半。

3. 说明:口诀是以380/220V 三相四线系统中的三相设备为准,计算每千瓦的安数。

对于某些单相或电压不同的单相设备,其每千瓦的安数.口诀中另外作了说明。

①这两句口诀中,电力专指电动机.在380V 三相时(力率0.8 左右),电动机每千瓦的电流约为2 安.即将“千瓦数加一倍”( 乘2)就是电流, 安。

这电流也称电动机的额定电流.【例1 】5.5 千瓦电动机按“电力加倍”算得电流为11 安。

【例2 】4 0 千瓦水泵电动机按“电力加倍”算得电流为8 0安。

电热是指用电阻加热的电阻炉等。

三相380 伏的电热设备,每千瓦的电流为1.5安.即将“千瓦数加一半”(乘1.5),就是电流,安。

【例1】3 千瓦电加热器按“电热加半”算得电流为4.5 安。

【例2】1 5 千瓦电阻炉按“电热加半”算得电流为2 3 安。

这口诀并不专指电热,对于照明也适用.虽然照明的灯泡是单相而不是三相,但对照明供电的三相四线干线仍属三相。

只要三相大体平衡也可以这样计算。

此外,以千伏安为单位的电器(如变压器或整流器)和以千乏为单位的移相电容器(提高力率用)也都适用。

即是说,这后半句虽然说的是电热,但包括所有以千伏安、千乏为单位的用电设备,以及以千瓦为单位的电热和照明设备。

【例1 】1 2 千瓦的三相( 平衡时) 照明干线按“电热加半”算得电流为1 8 安。

【例2】30 千伏安的整流器按“电热加半”算得电流为45 安。

负荷计算表(石油仓储项目)

负荷计算表(石油仓储项目)

项目名称 PROJ. 装置与工区 UNIT&WORK AREA 设计阶段 STAGE
XXXXXXX项目 全厂性设施 施工图设计 380V及220V动力及照明 380V动力
项目号 PRO NO. 图号(编号) DWG NO. 页数 SHEET POWER AND LIGHTING ON 380V/220V SIDE 照明 LIGHTINGDE 需要容量 REQUIRD CAPACITY (kW) (kVar)
设备容量 EQUIPMENT CAPACITY (kW)
需要 功率 系数 因数 DEMAND POWER FACTOR FACTOR
设计视在容量 APPARENT CAPACITY (kVA)
备注 REMARK
XXXXXXXXX
电气负荷表 ELECTRICAL LOAD LIST 用电设备名称(按不 同工作制分类开列) 序号 EQUIPMENT NAME(LIST NO. BY DIFFERENT WORKING SYSTEM)
项目名称 PROJ. 装置与工区 UNIT&WORK AREA 设计阶段 STAGE
二、燃料油罐区02
1 2 3 4 5 6 燃料油卸车泵 燃料油装车泵 燃料油储罐搅拌器 燃料油储罐搅拌器 防腐防爆边墙排风机 防腐防爆边墙排风机 22.00 22.00 22.00 22.00 0.12 0.12 0.85 0.85 0.85 0.85 0.85 0.85 0.89 0.89 0.89 0.89 0.80 0.80 18.70 18.70 18.70 18.70 0.10 0.10 9.58 9.58 9.58 9.58 0.08 0.08 21.01 21.01 21.01 21.01 0.13 0.13

电力负荷统计表

电力负荷统计表

表10-11-1
需用 设备计算容量 年利用 系数 cos(φ ) tg(φ ) 有功功率 无功功率 视在功率 电 耗(kW.h) 小时数 工作 总计(kW) 工作(kW) KC (kW) (kvar) (kVA) 一台200kVA变压器 1 110.00 110.00 0.70 0.80 0.75 77.00 57.75 96.25 2.18 406560 5280 一台200kVA变压器 0.48 168538 5280 一台100kVA变压器 0.40 1.20 1.20 1.20 80 140 11 2 2 2 6 6 2 2 2 6 6 160.00 280.00 22.00 462.00 462.00 160.00 280.00 22.00 462.00 462.00 0.70 0.70 1.02 0.65 0.70 1.02 0.70 0.70 1.02 112.00 182.00 15.40 309.40 309.40 114.26 185.68 15.71 315.65 315.65 160.00 260.00 22.00 442.00 442.00 5280 5280 5280 591360 960960 81312 1633632 一台630kVA变压器 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.13 15 11 11.4 22 11.4 110 42.5 1.2 2 2 4 2 4 3 2 4 23 23 1 1 3 1 4 3 2 2 17 17 30.00 22.00 45.60 44.00 45.60 330.00 85.00 4.80 607.00 607.00 15.00 11.00 34.20 22.00 45.60 330.00 85.00 2.40 545.20 545.20 0.60 0.70 0.70 0.60 0.70 0.70 0.70 0.60 0.65 0.70 0.80 0.65 0.80 0.80 0.80 0.65 1.17 1.02 0.75 1.17 0.75 0.75 0.75 1.17 9.00 7.70 23.94 13.20 31.92 231.00 59.50 1.44 377.70 377.70 10.52 7.86 17.96 15.43 23.94 173.25 44.63 1.68 295.26 295.26 13.85 11.00 29.93 20.31 39.90 288.75 74.38 2.22 479.41 479.41 5280 5280 5280 5280 5280 5280 5280 5280 0.70 47520 40656 126403 69696 168538 1219680 314160 7603 1994256.00 一台630kVA变压器 0.69 11 4 4 44.00 44.00 0.70 0.80 0.75 30.80 23.10 38.50 5280 0.76 162624

电气计算EXCEL表格:电力负荷计算

电气计算EXCEL表格:电力负荷计算

784
0.5
0.80
Pjs(kW) 392
1176
0.5
0.80
588
70
0.8
0.80
56
234
0.7
0.80
164
200
0.7
0.80
140
120
0.7
0.80
84
0.80
1424
-600
0.95
1424
1424
选SBC10-1000变压器 2台变压器 负载率75%
Qjs(kvar)
294 441 42 123 105 63 1068 468 468
245 42
193
71 13 114 9 116 9 115 9 171 13 177 14 1312 423 423
以上负荷基数参考建设单位原有负荷估算表换算而成,原负荷表估算偏小。
Sjs(kVA)
490 735 70 205 175 105 1780 1499
343 59
270
100 19 160 12 163 12 161 13 240 19 247 19 1837 1353
备注
补偿33%
40+8套 48+3套 20+4套 20+4套 20+4套 30+6套 30+6套 补偿50%
1#、2#楼(6+1F)
7137
48
343
0.7
0.70
240
1#、2#楼地下室
2970
20
59
0.7
0.70
42
3#楼高层住宅 (18+1F)
6747

《电力负荷计算》

《电力负荷计算》

7. 企业总计算负荷 (图2-7中的7点)
P30.7 P30.6 PT Q30.7 Q30.6 QT
S30.7
P2 30.7
Q2 30.7
24
1.5 企业计算负荷的确定
二、按需要系数法确定企业的计算负荷
P30Kd Pe
式中,Kd为企业的需要系数,查表2-4;Pe 为全厂用电设备
的总容量(不包括备用设备容量)。
5
0.65 0.25 0.8
3(ε=40% )
3.795(ε=25% ) 0.06 0.2
0.5
1.73
11.9+15=26.9
0.75
3.25+1.25=4.5
1.73 0.228+0.759=0.987
负荷总计
P30=30.38kW Q30=49.37kvar S30=57.97kVA I30=88.1A
Q
2 30
I 30 S 30 3U N
式中,b、c为二项式系数,查书中表2-7;cPx 为由x台容量
最大用电设备投入运行时增加的附加负荷(kW);b Pe 为
该用电设备组的平均负荷(kW)。
15
1.3 确定计算负荷的方法
2.对不同工作制的多组用电设备
P30 (c Px)max (b Pe)
Q30 (c Px)maxtanx [(b Pe)tan]
S30 P320Q320
I30 S30 3UN
式中,(c Px)max为各用电设备组附加负荷 c Px 中的最大
值;(bPe)为各用电设备组平均负荷的总和;tanx 为与
(c Px)max对应的功率因数角的正切值;t an 为各用电设备组
电力工程基础

工厂的电力负荷和曲线及其计算

工厂的电力负荷和曲线及其计算
❖ 特别重要的负荷:除两路电源外,还必须 增设应急电源.为保证对特别重要负荷的供电, 严禁将其他负荷接入应急供电系统.
❖ 常用的应急电源:独立于正常电源的发 电机组、供电网络中独立于正常电源的专门 的馈电线路、蓄电池、干电池等.
➢ 二级负荷:双回路供电.
➢ 二级负荷也属于重要负荷,要求有两个回 路供电,供电变压器也应有两台,当其中一回路 或一台变压器出现故障时,二级负荷不应中断 供电,或中断后能迅速恢复供电.只有当负荷较 小或当地供电困难时,二级负荷可由一回路 6kV及以上的专用架空线路供电.如采用电缆 则必须采用两根电缆并列供电,每个电缆能承 受全部二级负荷.
设 〔2〕功率较大.
备 〔3〕功率因数很低.
〔4〕一般电焊机的配置不稳定,经常移动.
电镀的作用:防止腐蚀,增加美观,提高零件的耐
磨性或导电性等,如镀铜、镀铬.

电镀设备的工作特点是:
镀 设
〔1〕工作方式是长期连续工作的.

〔2〕供电采用直流电源,需要晶闸管整流设备.
〔3〕容量较大,功率因数较低.
③.电热设备
❖ 工程上为了取值和表达方便,将最大负荷P30作 为计算负荷Pc.
❖ 由于导体通过电流达到稳定温升的时间大约需3— 4τ,τ为发热时间常数.截面在16mm2及以上的导体,其 τ大于等于10分钟,因此载流导体大约经过30分钟后 可达到稳定温升.由此可见,计算负荷实际上与从负 荷曲线上查得的半小时最大负荷P30<亦既年最大负 荷Pmax>是基本相当的.所以,计算负荷也可以认为 就是半小时最大负荷.之所以用P30代替PC是因为电 气上的c 已经用来表示电容.所以,我们用P30、Q30、 S30、I30来表示有功计算负荷、无功计算负荷、视 在计算负荷、计算电流.

电力负荷计算表[最新]

电力负荷计算表[最新]

电力负荷计算表[最新]电力负荷计算表台数装机工作需要功率计算负荷序安工备功率容量容量系数因数 Pjs Qjs Sjs 设备名称号 cos装作用 (KW) (KW) (KW) Kx (KW) (KVar) (KVA) Ф1 22.00 22.00 0.85 0.80 18.70 14.03 23.38 中速潜水搅拌机 4 4 0 5.52 3.80 3.80 0.80 0.85 3.04 1.88 3.58 桁车式刮泥机 2 2 0 1.93 水解池污泥回流泵4 4 0 11 44.00 44.00 0.80 0.88 35.20 19.00 40.004 8.80 8.80 0.75 0.85 6.60 4.09 7.76 初沉池排泥泵 4 4 0 2.25 8.80 8.80 0.85 0.80 7.48 5.61 9.35 高速潜水搅拌机 4 4 0 2.26 中速潜水搅拌机 4 4 0 5.5 22.00 22.00 0.85 0.80 18.70 14.03 23.387 中速潜水搅拌机8 8 0 7.5 60.00 60.00 0.85 0.80 51.00 38.25 63.75 8 内回流泵 2 2 0 7.5 15.00 15.00 0.85 0.88 12.75 6.88 14.49 9 污泥回流泵 3 2 1 22 66.00 44.00 0.85 0.88 37.40 20.19 42.50 10 剩余污泥泵 2 1 1 3 6.00 3.00 0.75 0.85 2.25 1.39 2.65 11 电动葫芦 1 1 0 3.4 3.40 3.40 0.20 0.50 0.68 1.18 1.36 12 周边传动吸泥机 2 2 0 1.5 3.00 3.00 0.80 0.85 2.40 1.49 2.82 13 铸铁镶铜闸门 1 1 0 2.2 2.20 2.20 0.20 0.80 0.44 0.33 0.55 140.75 0.75 0.20 0.80 0.15 0.11 0.19 铸铁镶铜闸门 1 1 0 0.7515 单级立式离心泵 3 2 1 22 66.00 44.00 0.50 0.85 22.00 13.63 25.8816 罗茨鼓风机 2 1 1 75 150.00 75.00 0.50 0.85 37.50 23.24 44.12 17 单级双吸卧式离心泵 4 3 1 30 120.00 90.00 0.85 0.85 76.50 47.41 90.00 18 5.50 5.50 0.80 0.85 4.40 2.73 5.18 真空泵 1 1 0 5.519 0.75 0.75 0.85 0.85 0.64 0.40 0.75 立式潜污泵 1 1 0 0.75电动单梁悬挂桥式起重20 3.80 3.80 0.20 0.50 0.76 1.32 1.52 机 1 1 0 3.821 480.00 320.00 0.90 0.88 288.00 155.45 327.27 离心鼓风机 3 2 1 16022 8.30 8.30 0.20 0.50 1.66 2.88 3.32 电动单梁悬挂起重机 1 1 0 8.323 2.20 1.10 0.80 0.88 0.88 0.47 1.00 冷却水循环泵 2 1 1 1.124 1.50 6.00 6.00 0.20 0.80 1.20 0.90 1.50 铸铁闸门 4 4 025 1.50 7.50 7.50 0.20 0.80 1.50 1.13 1.88 铸铁闸门 5 5 026 1.50 6.00 6.00 0.20 0.80 1.20 0.90 1.50 铸铁闸门 4 4 027 1.50 3.00 3.00 0.60 0.75 1.80 1.59 2.40 回转式格栅 2 2 028 2.20 6.60 6.60 0.60 0.75 3.96 3.49 5.28 无轴输送器 3 3 029 污水排污泵 2 2 0 75.00 150.00 150.00 0.88 0.85 132.00 81.81155.29 30 1.50 3.00 3.00 0.60 0.75 1.80 1.59 2.40 转鼓细格栅 2 2 031 0.25 0.50 0.50 0.65 0.75 0.33 0.29 0.43 砂水分离器 2 2 032 风机 2 2 0 5.50 11.00 11.00 0.50 0.85 5.50 3.41 6.47 33 潜水搅拌器 2 2 0 2.00 4.00 4.00 0.85 0.80 3.40 2.55 4.25 34 周边传动吸泥机 2 2 0 1.50 3.00 3.00 0.80 0.85 2.40 1.49 2.8235 潜水排污泵 2 2 0 5.50 11.00 11.00 0.85 0.85 9.35 5.79 11.00 36 潜水排污泵 3 2 1 18.50 55.50 37.00 0.85 0.85 31.45 19.49 37.00 37 3.006.00 3.00 0.80 0.50 2.40 4.16 4.80 二氧化氯发生器 2 1 138 卸酸泵 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 39 动力水泵2 1 1 7.50 15.00 7.50 0.70 0.85 5.25 3.25 6.18 40 3.00 3.00 3.00 0.70 0.80 2.10 1.58 2.63 除磷加药装置 1 1 041 剩余污泥泵 2 1 1 1.50 3.00 1.50 0.75 0.85 1.13 0.70 1.32 42 回流污泥泵 3 2 1 15.00 45.00 30.00 0.85 0.88 25.50 13.76 28.98 43 1.50 3.00 3.00 0.85 0.80 2.55 1.91 3.19 潜水搅拌器 2 2 044 二氧化氯发生器 2 1 1 3.00 6.00 3.00 0.80 0.50 2.40 4.16 4.80 45 卸酸泵 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 46 7.50 15.00 7.50 0.70 0.85 5.25 3.25 6.18 动力水泵 2 1 147 聚合铝加药装置 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 48 除磷加药装置 1 1 0 3.00 3.00 3.00 0.70 0.80 2.10 1.58 2.63 补偿前合计 1477.40 1108.30 0.85 880.89 540.13 1033.30乘同时系数K?p=0.9和K?q=0.95后合计 0.85 836.84 513.13 981.63补偿后功率因数 0.95无功补偿容量 238.07补偿后合计 0.95 836.84 275.06 880.89ΔPT=0.01Sjs 8.81 变压器损耗ΔQT=0.05Sjs 44.04变压器高压侧合计 0.93 845.65 319.10 903.85。

电力负荷计算表完整版

电力负荷计算表完整版

单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)一铅锡合金电解1熔铅锅223060600.80.750.754533.752阳极锅113030300.80.750.7522.516.883阳极板铸型1133.233.233.20.80.750.6521.616.194残极洗涮机113330.80.750.65 1.95 1.465光棒机11 5.5 5.5 5.50.80.750.65 3.58 2.686阴极锅113030300.80.750.7522.516.887真空蒸馏炉4330012009000.80.750.87205408始极片锅113030300.80.750.7522.516.889铅始极片制造机组1131.5531.5531.550.80.750.6520.5115.3810电铅锅熔体搅拌机111515150.80.750.710.57.881150t锅搅拌机111515150.80.750.710.57.8812铅泵22 5.511110.80.750.758.25 6.1913吊钩桥式起重机11232.8232.8232.80.5 1.730.1534.9260.4814熔铅锅熔体搅拌机221530300.80.750.72115.7515阳极锅搅拌机111515150.80.750.710.57.8816其他115005005000.80.750.7350262.517离心风机115555550.80.750.7541.2530.9418螺旋卸灰机33 5.516.516.50.71.020.6510.7310.94电力负荷计算表受电设备名称序号备注计算负荷Kctg¢COS¢数量(台)19离心风机223774740.80.750.7555.541.6320离心风机117575750.80.750.7556.2542.1921玻璃钢净化塔循环泵112222220.80.750.7516.512.3822空调器66 3.923.423.40.80.750.7517.5513.1623空调器55 5.5527.7527.750.80.750.7520.8115.6124照明50500.80.750.84030小计25862285.71584.371225.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-480补偿后1425.93684.21581.62X1250变压器损耗15.8279.0810KV侧负荷0.81441.75763.271631.360008650.49动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二铅电解直流负荷1电解直流负荷114754754750.90.480.8380184.04422.22变压器损耗 4.2221.1110KV侧负荷0.88384.22205.1560002305.33整流变压器4754751X475S11-M-1250/10 .10/0.4 2台计算负荷电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc备注1164.21425.93单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)三烟化炉风机房离心鼓风机(10KV)单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)四收尘变电所(一)分银炉收尘1布袋除尘器控制柜22510100.80.750.757.5 5.6变频2卸灰阀1212336360.7 1.020.621.622.043电动蝶阀220.090.180.180.7 1.020.60.110.114电动蝶阀440.27 1.080.180.7 1.020.60.320.335风机221322642640.80.750.75198148.56埋刮板输送机225.511110.71.020.657.27.331528022560序号受电设备名称2310.33绕线电机5605500 电力负荷计算表4200.75计算负荷备注数量(台)COS¢tg¢Kc数量(台)COS¢tg¢Kc0.750.8计算负荷备注电力负荷计算表序号受电设备名称7照明及其他115550.80.750.843小计327.3327.26239.01187.23(二)铋转炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.2 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.80.750.759974.25 6埋刮板输送机22 5.511110.7 1.020.657.27.3 7电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 8照明及其他115550.80.750.843小计176.2176.22125.8199.99(三)贵铅炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.090.090.090.7 1.020.60.050.06 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.1174.13126.4100.11(四)锑熔练反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.2174.22126.46100.17(五)精练炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.023电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机22 5.511110.7 1.020.657.27.37照明及其他111051051050.80.750.88463小计249.6249.63188.58146.39(六)(一)-(五)合计11011101.5806.25633.88乘同时系数Ky=0.9 Kw=0.95无功补偿-2402X630补偿后725.63362.18810.99变压器损耗8.1140.5510KV侧负荷0.88733.74402.7383760004402.42动力变压器S11-M-630/10 .10/0.4 2台725.63602.18单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)五贵金属熔炼变电所(一)阳极泥库及配料1阳极泥搅拌槽114440.80.750.7 2.8 2.12矿浆二次压滤泵112222220.80.750.7516.512.383二次箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.944滤液输送泵111515150.80.750.7511.258.445洗液输送泵117.57.57.50.7 1.020.6511.258.446圆盘给料机227.515150.7 1.020.659.759.957定量给料皮带机113330.7 1.020.65 1.95 1.998电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.699抓斗挢式起重机1162.762.762.70.5 1.730.318.8132.5810定量给料皮带机99 2.219.819.80.7 1.020.6512.8713.1311惯性振动给料机220.55 1.1 1.10.7 1.020.650.720.7312鄂式破碎机222244440.80.750.753324.7513离心风机117575750.80.750.7556.2542.1914螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6515轴流风机44 1.5660.80.750.75 4.5 3.3816空调器551.658.258.250.80.750.75 6.19 4.6417照明及其他50500.80.750.84030小计393.3393.3259.76222.05序号受电设备名称计算负荷备注数量(台)COS¢tg¢Kc电力负荷计算表(二贵金属熔练)1双钩桥式起重机11126.4126.4126.40.5 1.730.1518.9632.842贵铅炉111515150.80.750.7511.258.443电动平板车11 3.7 3.7 3.77 1.020.65 2.41 2.454分银炉111515150.80.750.7511.258.445银阳极板浇铸车440.37 1.48 1.480.7 1.020.650.960.986电动平板车44 2.28.88.80.7 1.020.65 5.72 5.847铋转炉111111110.80.750.77.7 5.788胶带输送机33 2.2 6.6 6.60.7 1.020.65 4.29 4.389胶带输送机112222220.7 1.020.6514.314.5910电动单梁起重机119.99.99.90.5 1.020.15 1.49 2.5711铋精炼锅651006005000.80.750.75375281.2512电动葫芦12 4.9 4.9 4.90.5 1.730.150.74 1.2713精炼炉113330.80.750.75 2.25 1.6914抽铋机55 1.57.57.50.80.750.7 5.25 3.9415颜氏喷火机22 3.77.47.40.80.750.75 5.55 4.1616颜氏喷火机33 1.5 4.5 4.50.80.750.75 3.38 2.5317离心风机119090900.80.750.7567.550.6318喷淋塔循环泵117.57.57.50.80.750.75 5.63 4.2219螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6520轴流风机113330.80.750.75 2.25 1.6921池氯报警及吸收装置1118.518.518.50.80.750.7513.8810.4122照明及其他1001000.80.750.88060小计1072971.68643.31511.72(三(一)-(二)合计14651365903.03733.77)乘同时系数:812.76697.09Ky=0.9 Kw=0.95无功补偿-360补偿后812.76337.09879.892X800变压器损耗8.843.9910KV侧负荷0.91821.56381.08905.6460004929.37动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)六金属砷回收1电动单梁桥式起重机44 6.927.627.60.5 1.730.15 4.147.172除尘器44520200.80.730.71410.53除尘器附离心风机22 5.511110.80.750.758.256.194螺旋给料机22 2.2 4.4 4.40.7 1.020.65 2.86 2.925砷蒸馏电阻炉404035140014000.80.750.811208406卸灰阀22 1.1 2.2 2.20.7 1.020.6 1.32 1.357埋刮板输送机22 5.511110.7 1.020.657.157.298碱液制备槽224880.80.750.7 5.6 4.29碱液循环泵221122220.80.750.7516.512.3810污水输送泵221122220.80.750.7516.512.3811离心风机221122220.80.750.7516.512.3812照明及其他1501500.80.750.812090小计17001700.21332.821006.74乘同时系数:Ky=0.9 Kw=0.95无功补偿-4001199.54956.4tg¢Kc电力负荷计算表数量(台)COS¢备注计算负荷S11-M-800/10 .10/0.4 2台序号受电设备名称补偿后1199.54556.41322.32X1000变压器损耗13.2266.1210KV侧负荷0.891212.76622.521363.260007276.57动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)七金银电解变电所(一)金银电解1银电解槽1112.612.612.60.80.750.810.087.562金电解槽110.40.40.40.80.750.80.320.243出. 刮银粉机220.75 1.5 1.50.80.750.7 1.050.794手动单工位清洗机112525250.80.750.717.513.135离心式过滤机11 1.5 1.5 1.50.80.750.7 1.050.796通风罩11 1.1 1.1 1.10.80.750.70.770.587恒温干燥箱113330.80.750.8 2.4 1.88高频坩埚锅炉114440.80.750.8 3.2 2.49热水泵110.750.750.750.80.750.750.560.4210电解液循环泵114440.80.750.753 2.2511输送泵66424240.80.750.751813.512干燥机114440.80.750.8 3.2 2.413液下泵113330.80.750.75 2.25 1.6914电动葫芦1110.610.610.60.51.730.151.592.75备注Kc计算负荷数量(台)COS¢tg¢电力负荷计算表S11-M-1000/10. 10/0.4 2序号受电设备名称15造液槽11 1.5 1.5 1.50.80.750.7 1.050.7916废电解液处理槽11 1.5 1.5 1.50.80.750.7 1.050.7917烘烤电阻炉111010100.80.750.88618中频感应电炉221002002000.80.750.816012019银阳极浇铸车110.370.370.370.7 1.020.650.240.2520银铸锭车110.370.370.370.7 1.020.650.240.2521台钻110.370.370.370.7 1.020.650.240.2522真空泵110.370.370.370.80.750.750.280.2123电动单梁起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.7924离心风机117.57.57.50.80.750.75 5.63 4.2225轴流风机220.040.080.080.80.750.750.060.0526轴流风机440.120.480.480.80.750.750.360.2727轴流风机220.060.120.120.80.750.750.090.0728玻璃钢净化塔1120.520.520.50.80.750.7515.3811.5329空调器11 2.32.3 2.30.80.750.75 1.73 1.2930照明及其他10100.80.750.886小计357.8357.81268.34204.03(二)综合维修站11127.68127.7127.680.7 1.020.563.8465013(三)化验及环监站11115.64115.6115.640.7 1.020.557.8258.99(四)综合仓库,贵金属产品库1126.526.526.50.71.020.513.2513.25(五)(一)-(二)合计627.6627.63403.25341.66乘同时系数:Ky=0.9 Kw=0.95无功补偿-150补偿后369.93174.58402.731X630变压器损耗 4.0320.1410KV侧负荷0.88366.95194.72415.4260002201.72动力变压器362.93324.58S11-M-630/10 .10/0.4 1台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)八余热电站(一)余热电站1余热发电站170900.80.750.7567.550.632化水站75450.80.750.7533.7525.31小计245135101.2575.94(二)富氧侧吹熔炼炉收尘1电收尘器5514.9574.7574.750.7 1.020.644.8545.762阴阳极振打机17170.37 6.29 6.290.7 1.020.5 3.1 3.23电加热器1515690900.80.750.872544布袋除尘器控制柜115550.80.750.75 3.82.8变频5卸灰阀1111333330.7 1.020.619.820.26埋刮板输送机22 5.511110.7 1.020.657027.37照明及其他112525250.80.750.82015小计245245.04170.7148.27(三)富氧侧吹还原炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.71.020.61.81.84计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表3电动蝶阀110.180.180.180.7 1.020.60.110.114风机112222220.80.750.7516.512.385电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.176照明及其他112525250.80.750.82015小计59.6859.6842.8333.3(四)烟化炉收尘1袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀55315150.7 1.020.699.183电动蝶阀110.270.270.270.7 1.020.60.160.174风机111101101100.80.750.7582.561.885埋刮板输送机11 5.5 5.5 5.50.7 1.020.65 3.6 3.66照明及其他112525250.80.750.82015小计160.8160.77118.9992.68(五)铜浮渣反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.7 1.020.6 1.8 1.843电动蝶阀110.180.180.180.7 1.020.60.110.114风机1145454580.750.7533.7525.315照明及其他112525250.80.750.82015小计78.1878.1859.4145.07(六)(一)-(五)合计788.7678.67493.13395.27乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后443.86195.54852X500变压器损耗 4.8524.2510KV侧负荷0.9448.71219.75499.6360002692.23443.86375.5动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)九制酸(一)制酸系统变电所净化工段1电除雾器22661321320.7 1.020.679.280.8 2压滤机213630.80.750.65 1.95 1.46 3一级循环泵2118.53718.50.80.750.7513.8810.41 4填料塔循环泵212244220.80.750.7516.512.38 5二级循环泵2118.53718.50.80.750.7513.8810.41 6清洗泵2118.53718.50.80.750.7513.8810.41 7清液泵217.5157.50.80.750.75 5.63 4.22 8污酸泵1118.518.518.50.80.750.7513.8810.41 9起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.79 10照明及其他20200.80.750.81612小计353.4265.4175.81154.27干吸工段1干燥塔循环泵113030300.80.750.7522.516.88 2一级塔循环泵113030300.80.750.7522.516.88 3二级塔循环泵113030300.80.750.7522.516.88 4地下槽泵111515150.80.750.7511.258.44 5干吸酸冷器441440.80.750.753 2.25备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-500/10 .10/0.4 2台6电动葫芦33 6.318.918.90.5 1.730.15 2.84 4.91 7照明及其他20200.80.750.81612小计147.9147.9100.5978.22转化工段1起重机1112.712.712.70.5 1.730.15 1.91 3.3 2电动葫芦22 6.312.612.60.5 1.730.15 1.89 3.27 3照明及其他10100.80.750.886小计35.335.311.812.57尾吸工段1洗涤器循环泵212244220.80.750.7516.512.38 2洗涤塔循环泵212244220.80.750.7516.512.38 3氨水泵21 5.511 5.50.80.750.75 4.13 3.09 4硫胺泵217.5157.50.80.750.75 5.63 4.22 5引风机111111110.80.750.758.25 6.19 6电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 7照明及其他10100.80.750.886小计137.6137.659.3944.93成品工序1地下槽泵111515150.80.750.7511.258.44 2电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 3电动蝶阀3030130300.7 1.020.61818.36 4电动蝶阀44 2.28.88.80.7 1.020.6 5.28 5.39 5照明及其他10100.80.750.886小计66.466.442.9238.86综合楼1排风机220.190.380.380.80.750.750.290.21 2空调器99 2.219.819.80.80.750.7514.8511.14 3照明及其他10100.80.750.886小计30.1830.1823.1417.35硫酸循环水260.2148.160.80.750.7103.7177.78生产污水处理449.4345.170.80.750.7241.62181.21(1)-(8)合计1480111.91758.97605.21乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后683.07334.95760.771X1250变压器损耗7.6138.0410KV侧负荷0.88690.68372.99784.9560004144.06动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)(二)1#开工电炉115405405400.90.481540261.536001X630变压器损耗63010KV侧负荷0.88546291.5618.96400218.4动力变压器单台功率设备功率(KW)最大负荷年耗电量备注tg¢Kc计算负荷数量(台)COS¢tg¢计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢Kc电力负荷计算表序号574.95 683.07受电设备名称S11-M-1250/10 .10/0.4 1 S11-M-630/10. 10/0.4 1台总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(三)2#开工电炉112702702700.90.481270130.773001X315变压器损耗31510KV侧负荷动力变压器0.88273145.8309.48400109.2(四)硫酸风机(10KV)114504504500.80.750.75337.5253.1355001856.25变频(五)(一)-(四)合计27402379.11847.181063.416327.91单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)(十)熔炼变电所(一)熔炼13#胶带输送机112222220.7 1.020.6514.314.592圆筒混合制粒机113737370.80.750.6524.0518.043氧化炉移动带式输送机114440.7 1.020.65 2.6 2.6544#胶带输送机1118.518.518.50.7 1.020.6512.0312.275还原炉移动式输送机114440.7 1.020.65 2.6 2.6561#定量给料机11 2.2 2.2 2.20.7 1.020.65 1.43 1.467斗式提升机117.57.57.50.71.020.654.884.97COS¢tg¢备注Kc电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称S11-M-315/10. 10/0.4 1台8单机袋式收尘器11 6.25 6.25 6.250.80.750.75 4.69 3.52 93#埋刮板输送机11 4.2 4.2 4.20.7 1.020.65 2.73 2.79 10粗铅铸锭机11 5.5 5.5 5.50.80.750.7 3.85 2.89 11离心通风机2218.537370.80.750.7527.7520.81 12电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 13吊钩桥式起重机1127.527.527.50.5 1.730.15 4.137.14 14抓斗挢式起重机1133.233.233.20.5 1.730.15 4.988.65 15螺旋给料机4241680.7 1.020.65 5.2 5.31 16防爆轴流风机660.8 4.8 4.80.80.750.75 3.6 2.7 17给煤机4241680.7 1.020.65 5.2 5.31 18脉冲袋式收尘器110.430.430.430.80.750.75 3.20.24 19防爆离心通风机4231260.80.750.75 4.5 3.38 20冲渣循环泵49.427.40.80.750.7520.5515.41 21电动葫芦118.38.38.30.5 1.730.15 1.25 2.16 22电炉112002002000.80.750.8160120 23照明及其他20200.80.750.81612小计540.3496.28327.3270.07(二)烟化炉风机房1高压鼓风辅助设备221530300.80.750.824182电动单梁起重机1110.610.610.60.5 1.730.15 1.59 2.753自洁式空气过滤器111501501500.80.750.710578.754电动阀22 2.2 4.4 4.40.7 1.020.6 2.64 2.69 5电动阀44312120.7 1.020.67.27.35 6照明10100.80.750.886小计217217148.43115.54(三)余热锅炉房1侧吹还原炉给水泵2190180900.80.750.7567.550.632侧吹熔原炉给水泵119090900.80.750.7567.550.633烟化炉锅炉给水泵2190180900.80.750.7567.550.634贵铅炉锅炉给水泵1118.518.518.50.80.750.7513.8810.415铜浮渣反射炉锅炉给水泵1118.518.518.50.80.750.7513.8810.416氧化锑还原炉熔炼精炼反射炉锅炉给水泵7清水离子泵212244220.80.750.7516.512.388埋刮板出渣机66 5.533330.7 1.020.6521.4521.889爆破清灰装置33515150.7 1.020.57.57.710高效弹性振打电机65650.5535.7533.750.7 1.020.517.918.211组合加药装置 1.95 1.650.80.750.75 1.240.9312乙炔瓶排风机22 1.5330.80.750.75 2.25 1.6913电动阀661.5990.7 1.020.6 5.4 5.5114照明10100.80.750.886小计657.2454.9324.34257.36(四)成品库1电动单梁起重机119.99.99.90.5 1.730.3 2.97 5.142扒渣机114545450.80.750.6529.2521.943振动筛11 2.2 2.2 2.20.7 1.020.65 1.43 1.464电磁振荡动给料机110.650.650.650.7 1.020.650.420.435液下泵111.11.11.10.80.750.750.830.621113.8810.4118.518.518.50.750.750.86电动平板车11 2.2 2.2 2.20.7 1.020.65 1.43 1.467电动葫芦118.38.38.30.5 1.730.15 1.25 2.168照明及其他550.80.750.843小计74.3574.3541.5736.21(五粉煤制备)1电动蝶阀110.50.50.50.7 1.020.60.30.312钢球磨煤机112752752750.80.750.82201653圆盘给料机11 5.5 5.5 5.50.7 1.020.65 3.58 3.654排粉风机117575750.80.750.7556.2542.195布袋除尘器113330.80.750.7 2.1 1.586脉冲阀30300.020.540.540.7 1.020.60.320.337排风机1118.518.518.50.80.750.7513.8810.418气动输送泵113030300.80.750.7522.516.8895#胶带输送机11 1.1 1.1 1.10.80.750.750.830.6210电磁除铁器111110.7 1.020.70.70.7111电动葫芦113030300.5 1.730.15 4.57.7912轴流风机11 1.1 1.1 1.10.80.750.750.830.6213防爆风机330.250.750.750.80.750.750.560.4214除尘器11 5.3 5.3 5.30.80.750.7 3.71 2.7815空调器11 3.63 3.63 3.630.80.750.75 2.72 2.0416照明及其他10100.80.750.886小计467.3467.32344.82265.67(六(一)-(五)合计19561709.91186.45944.86)乘同时系数:1067.81897.61Ky=0.9 Kw=0.95无功补偿-450补偿后1067.8447.611157.82X1000变压器损耗11.758.4910KV侧负荷0.91079.51536.11205.360006477.04动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十一精矿仓及配料变电所(一)精矿仓及配料1抓斗挢式起重机11188.1188.1188.10.5 1.730.356.4397.742定量给料皮带机1111333330.7 1.020.6521.4521.88变频31#胶带输送机117.57.57.50.7 1.020.65 4.88 4.9742#胶带输送机11 5.5 5.5 5.50.7 1.020.65 3.58 3.655惯性振动给机220.55 1.1 1.10.7 1.020.650.720.736编织袋破碎清洗机1129.529.529.50.80.750.720.6515.497压滤机1118.518.518.50.80.750.712.959.718循环泵117.57.57.50.80.750.7 5.25 3.949箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.9410离心风机113737370.80.750.7527.7520.8111除尘器螺旋卸灰机22 5.511110.7 1.020.657.157.2912离心风机112222220.80.750.7516.512.3813除尘器机组117.57.57.50.80.750.7 5.25 3.9414空调器223.97.87.80.80.750.75 5.85 4.3915照明及其他10100.80.750.886小计389.7389.7198.99214.86数量(台)COS¢tg¢S11-M-1000/10. 10/0.4 2电力负荷计算表序号受电设备名称Kc计算负荷备注(二)煤气站465.7268.720.80.750.75201.54151.16(三)(一)-(二)合计855.4658.42400.53366.02乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后360.47167.71397.58变压器损耗 3.9819.8810KV侧负荷0.89364.45187.59409.8960002186.69动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十二制氧站(一)氧气站高压用电设备1罗茨鼓风机(10KV)117107107100.80.750.75532.5399.382罗茨真空泵(10KV)22800160016000.80.750.7512009003氧压机(10KV0213807603800.80.750.75285213.754小计307026902017.51513.13600012105(二)低压用电设备1氧气站低压用电设备52520.80.750.753929.252螺杆式空压机322507505000.80.750.75375281.253再生干燥机323090600.80.750.754533.75计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表360.47347.71S11-M-500/10. 10/0.4 2台4离心式空压机211322641320.80.750.759974.25小计1156744558418.5697.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后502.2217.58变压器损耗 5.4727.3710KV侧负荷0.9507.67244.94563.6760003046.04(三)以上小计422634342525.171758.073076.915151动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十三锌净化变电所(一)锌电积1新液转槽泵电机221530300.80.750.7522.516.882冷风机电机2218.537370.80.750.7527.7520.813循环泵电机331545450.80.750.7533.7525.314废液泵电机111515150.80.750.7511.258.445转槽泵电机1118.518.518.50.80.750.7513.8810.416阳极泥泵电机1118.518.518.50.80.750.7513.8810.417小循环泵电机1118.518.518.50.80.750.7513.8810.418循环泵电机114545450.80.750.7533.7525.31tg¢Kc计算负荷备注电力负荷计算表COS¢S11-M-630/10 .10/0.4 2台502.2397.58受电设备名称数量(台)序号9液下泵电机22 2.2 4.4 4.40.80.750.75 3.3 2.48 10液下泵电机22 5.511110.80.750.758.25 6.19 11硫酸泵电机113330.80.750.75 2.25 1.69 12增压泵电机33 5.516.516.50.80.750.7512.389.28 13废水泵电机111111110.80.750.758.25 6.19 14配制等泵电机557.537.537.50.80.750.7528.521.5 15刷板机电机113330.80.750.7 2.1 1.58 16绝缘行车电机111111110.5 1.730.3 3.3 5.7222 5.511110.5 1.730.3 3.3 5.7211 2.2 2.2 2.20.5 1.730.30.66 1.1417真空泵电机114545450.80.750.7533.7525.31 18轴流风机14140.18 2.52 2.520.80.750.75 1.89 1.42 19照明及其它1001000.80.750.88060小计485.6485.62358.18275.76(二)锌净化及镉回收1一次净化槽222244440.80.750.730.823.1 2一次净化压滤泵212244220.80.750.715.411.55 3一次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 4二次净化槽2222440.80.750.730.823.1 5二次净化压滤泵212244220.80.750.715.411.55 6二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.897二次净化液冷却塔111515150.80.750.710.57.888三次净化槽222244440.80.750.730.823.1 9三次净化压滤泵212244220.80.750.715.411.55 10二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 11吊挂锌粉圆661660.80.750.7 4.2 3.15 12溶液输送泵551575750.80.750.752.539.38 13浆化槽224880.80.750.7 5.6 4.2 14矿浆输送泵221530300.80.750.72115.7515电动单梁悬挂起重机1111.411.411.40.80.750.72115.75 16洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 17铜镉渣浸出槽227.515150.80.750.710.57.88 18铜镉渣浸出液压滤泵111111110.80.750.77.7 5.78 19铜镉渣浸出液压滤机11 1.1 1.1 1.10.80.750.70.770.58 20镉置换槽117.57.57.50.80.750.7 5.25 3.94 21镉置换槽压滤泵111111110.80.750.77.7 5.78 22镉置换槽压滤机11 1.1 1.1 1.10.80.750.70.770.58 23镉棉溶解槽113330.80.750.7 2.1 1.5824镉棉溶解液压滤泵111111110.80.750.77.7 5.7825镉棉溶解液压滤机11 1.1 1.1 1.10.80.750.70.770.5826净化除铜槽113330.80.750.7 2.1 1.5827净化除铜液压滤泵111111110.80.750.77.7 5.7828净化除铜压滤机11 1.1 1.1 1.10.80.750.70.770.58 29熔铸电炉116060600.80.750.74231.5 30溶液输送泵66 5.533330.80.750.723.117.33 31污水泵22 5.511110.80.750.77.7 5.78 32镉电解114545450.80.750.731.525.233玻璃钢酸雾净化塔113333330.80.750.7524.7518.5634照明及其它1001000.80.750.88060小计792.7726.7520.34391.83(三)铟回收1萃取反萃机电机44312120.80.750.78.4 6.3 2离心风机电机44312120.80.750.759 6.75 3电动葫芦电机113330.5 1.730.150.450.78 4轴流风机电机22 2.2 4.4 4.40.80.750.75 3.3 2.485中和压滤泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 6搅拌机电机11 2.2 2.2 2.20.80.750.7 1.54 1.16 7压滤机电机113330.80.750.7 2.1 1.58 8压团机电机11 1.5 1.5 1.50.80.750.7 1.050.79 9液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 10搅拌机电机11 1.1 1.1 1.10.80.750.70.770.58 11盐酸泵电机11 1.5 1.5 1.50.80.750.75 1.130.84 12萃取反萃机电机44 5.522220.80.750.715.411.55 13搅拌机电机223660.80.750.7 4.2 3.15 14压滤泵电机223660.80.750.7 4.2 3.15 15压滤机电机11 1.5 1.5 1.50.80.750.7 1.050.79 16洗油机电机11 1.1 1.1 1.10.80.750.70.770.58 17液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 18离心风机电机224880.80.750.756 4.519玻璃钢酸雾净化塔1116.516.516.50.80.750.7512.389.2820照明及其它50500.80.750.84030小计168.3168.3124.1193.52(四)锌熔铸1锌直线铸定机11 5.5 5.5 5.50.80.750.7 3.85 2.89 2电炉辅助设备66 2.213.213.20.80.750.759.97.43 3离心风机电机117.57.57.50.80.750.75 5.63 4.22 4吊钩桥式起重机2219.939.839.80.5 1.730.27.9613.79 5离心风机电机113737370.80.750.7527.7520.81 6照明及其它12312371.0961.13小计15701503.61073.71822.24(五)(一)-(四)合计15701503.61073.71822.24乘同时系数:Ky=0.9 Kw=0.95966.33781.13无功补偿-360补偿后966.33421.131054.12X800变压器损耗10.552.7110KV侧负荷0.9976.88473.38108660005861.25电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十四锌浸出变电所(一)浓密1酸洗浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.362高浸浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.363沉矾浓密机22 3.5770.80.750.7 4.9 3.684低浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.845中浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.846备用浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.847浓密机底流泵77151051050.80.750.773.555.138熔液输送泵1010151501500.80.750.710578.759污水泵225.511110.80.750.77.7 5.7810照明及其后50500.80.750.84030小计342.5342.5244.75183.36(二)氧化锌球磨碱洗1QZ型抓斗桥式起重机1162.762.762.70.51.730.159.4116.29Kc计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢S11-M-800/10KV 2台2螺旋输送机11 4.5 4.5 4.50.7 1.020.65 2.93 2.98 3湿式球磨机117575750.80.750.86045 4矿浆泵227.515150.80.750.7511.258.44 5碱洗槽222244440.80.750.730.823.1 6碱洗压滤泵222244440.80.750.753324.75 7厢式压滤机44 4.9519.819.80.80.750.713.8610.4 8滤液输送泵111515150.80.750.7511.258.44 9洗液输送泵117.57.57.50.80.750.75 5.63 4.22 10浆化槽224880.80.750.7 5.6 4.2 11矿浆输送泵111515150.80.750.7511.258.44 12浆化液输送泵111515150.80.750.7511.258.44 13LD型电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.69 14洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 15污水泵11 5.5 5.5 5.50.80.750.75 4.13 3.09 16离心风机112222220.80.750.7516.512.3817除尘器螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6518轴流风机220.090.180.180.80.750.750.140.1 19小计417.4417.38273.07216.75(三)锌浸出1中浸反应槽332266660.80.750.746.234.65 2中浸矿浆泵211530300.80.750.7511.258.44 3低酸浸出槽332266660.80.750.746.234.65 4低浸矿浆泵211530150.80.750.7511.258.44 5沉矾槽442288880.80.750.761.646.2 6沉矾矿浆泵421560300.80.750.7522.516.88 7螺旋电子秤441440.80.750.7 2.8 2.1 8高酸浸出槽222244440.80.750.730.823.1 9高浸矿浆泵211530150.80.750.7511.258.44 10酸洗槽112222220.80.750.715.411.5511酸洗矿浆泵111515150.80.750.7511.258.44 12备用反应槽112222220.80.750.715.411.55 13矿浆泵111515150.80.750.7511.258.44 14硫酸泵117.57.57.50.80.750.75 5.63 4.22 15矿浆搅拌中间槽33 5.516.516.50.80.750.711.558.66 16矿浆压滤泵332266660.80.750.7549.537.13 17厢式压滤机66 3.722.222.20.80.750.715.5411.66 18滤液输送泵331545450.80.750.7533.7525.31 19矿浆输送泵111515150.80.750.7511.258.44 20浆化槽224880.80.750.7 5.6 4.2 21洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 22电动单梁悬挂起重机11 5.7 5.7 5.70.15 6.590.150.86 5.64 23污水泵22 5.511110.80.750.88.8 6.624玻璃钢酸雾净化塔113333330.80.750.7524.7518.5625旋流板塔1116.516.516.50.80.750.7512.389.2826照明及其后50500.80.750.84030小计790.6715.6518.29393.71(四)(一)-(三)合计15501475.51036.1794乘同时系数:Ky=0.9 Kw=0.95无功补偿-300补偿后932.49454.321037.32X800变压器损耗10.3751.8610KV侧负荷0.88942.86506.18107060005657.2电力变压器S11-M-800/10KV 2台932.49754.32电力负荷计算表单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十五熔锌感应电炉1熔锌感应电炉113003003000.90.481300145.3333.331X400变压器损耗 3.3316.6710KV侧负荷0.88303.33161.96343.8750001516.7电力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十六生活设施1水处理设备47.627.10.80.750.7520.3315.242办公生活设施4004000.80.750.75300225小计447.6427.1320.33240.24乘同时系数:Ky=0.9 Kw=0.95无功补偿-120补偿后288.29108.23307.94变压器损耗 3.0815.410KV侧负荷0.92291.31123.65316.5160001748.23备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-400/10KV288.29228.23动力变压器S11-M-630/10.10/0.41台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十七循环水1循环水1524963.580.80.750.75722.69542.01乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后650.42274.91706.13变压器损耗7.0635.3110KV侧负荷0.9657.48310.22726.9960003944.87电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注650.42514.91动力变压器S11-M-1000/10.10/0.42台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十八(一)-(十九)合计244732164514817.98225.2383639乘同时系数:Ky=0.95 Kw=0.97无功补偿-3600补偿后140774378.48147422X10000变压器损耗147.42737.1110KV侧负荷9414224.45115.615116 电力负荷计算表电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注0.87140777978.516181单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)二十余热发电机组112000200020000.8-0.7512000-150013460二十一计及余热发电的负荷0.8812224.46615.61390070179无功补偿-3600补偿后12224.43015.612591变压器损耗125.9629.546500818.435KV侧负荷0.9612350.33645.131287770997.4单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二十二锌电积1锌电积直流负荷117540754075400.90.480.860322921.436702.2无功补偿-1500补偿后60321421.436197.21X8000变压器损耗67.02335.1135KV侧负荷0.966099.021756.546346.9485029580.3电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注。

电力负荷计算

电力负荷计算
的关系。
这种曲线的负荷从大到小依次排列
年每日最大负荷曲线, 反映了全年当中不同 时段的电能消耗水平, 是按全年每日的最大 半小时平均负荷来绘 制的。
专用来确定经济运行方式用的
年负荷曲线
图2-2 年负荷持续时间曲线的绘制 a) 夏日负荷曲线 b) 冬日负荷曲线 c) 年负荷持续时间曲线
绘制方法:从夏季日负荷曲线和冬季日负荷曲线中的最大功率开始, 以功率递减的顺序,依次绘制到年持续负荷曲线坐标系中(注意横坐 标最大值为8760h)
电热设备的工作特点是:
➢(1)工作方式为长期连续工作方式。
➢(2)电力装置一般属二级或三级负荷。
➢(3)功率因数都较高,小型的电热设备 可达到1。
照明设备
常用照明设备 ➢白炽灯、卤钨灯、荧光灯、高压汞灯、高压钠灯、钨卤 化物灯和单灯混光灯等。
照明设备的工作特点: ➢(1)工作方式属长期连续工作方式。 ➢(2)除白炽灯、卤钨灯的功率因数为1外,其它类型的 灯具功率因数均较低。 ➢(3)照明负荷为单相负荷,单个照明设备容量较小。
Wa=a·A
有功计算负荷为:
P30
Wa Tmax
2. 车间生产面积负荷密度法
已知车间生产面积S(m2)和负荷密度指标ρ(kW/m2)时, 车间平均负荷为:
Pav=ρ·S 负荷密度指标查表,S表示车间面积。
二、按需要系数法确定计算负荷
需要系数法
需要系数是按照车间以上的负荷情况来 确定的,适用于变、配电所的负荷计算。
(2)求尖峰电流:目的用于计算电压波动、电压损失,选择熔断 器和保护元件等。(校验设备)
(3)求平均负荷:目的计算全厂的电能需要量、电能损耗以及选择 无功补偿容量等。(节能措施)
4. 电力负荷的类型

电力负荷计算

电力负荷计算

一.民用建筑用电设备的需要系数Kx二.民用建筑照明负荷需要系数Kx三.旅馆宾馆需要系数Kx和cosφ四.照明用电设备的cosφ与tgφ五.用电设备的需要系数Kx 、cosφ六.电梯需要系数Kx和同时系数Kt查七.住宅需要系数查询民用建筑用电设备的需要系数K x和cosφ·tgφ表2.5.2-1民用建筑照明负荷需要系数K x表2.5.2-2旅馆宾馆需要系数K x和cosφ表2.5.2-3照明用电设备的cosφ与tgφ表2.5.2-4用电设备的需要系数K x 、cosφ及tgφ表1-1① 点焊机的需要系数0.2仅用于电子行业。

功率因数0.7(交流电梯)0.8(直流电梯)同时系数取 0.8~1.0同时系数取0.93~1.0系数Kx和cosφ数Kxφφosφ数Kt查询φ表2.5.2-1cos φtgφ0.80.750.950.330.80.751010100.950.330.80.750.870.570.5 1.730.7 1.020.5 1.730.750.880.5 1.730.850.620.80.750.80.7510100.7 1.02100.850.620.5 1.730.35 2.680.5 1.730.6 1.330.5 1.730.5 1.730.80.750.80.750.80.750.80.750.6 1.33表2.5.2-2K x0.7~0.80.6~0.7表2.5.2-3表2.5.2-4表1-1。

电力负荷计算表完整版.xls

电力负荷计算表完整版.xls

单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)一铅锡合金电解1熔铅锅223060600.80.750.754533.752阳极锅113030300.80.750.7522.516.883阳极板铸型1133.233.233.20.80.750.6521.616.194残极洗涮机113330.80.750.65 1.95 1.465光棒机11 5.5 5.5 5.50.80.750.65 3.58 2.686阴极锅113030300.80.750.7522.516.887真空蒸馏炉4330012009000.80.750.87205408始极片锅113030300.80.750.7522.516.889铅始极片制造机组1131.5531.5531.550.80.750.6520.5115.3810电铅锅熔体搅拌机111515150.80.750.710.57.881150t锅搅拌机111515150.80.750.710.57.8812铅泵22 5.511110.80.750.758.25 6.1913吊钩桥式起重机11232.8232.8232.80.5 1.730.1534.9260.4814熔铅锅熔体搅拌机221530300.80.750.72115.7515阳极锅搅拌机111515150.80.750.710.57.8816其他115005005000.80.750.7350262.517离心风机115555550.80.750.7541.2530.9418螺旋卸灰机33 5.516.516.50.71.020.6510.7310.94备注tg¢COS¢受电设备名称序号电力负荷计算表数量(台)计算负荷Kc19离心风机223774740.80.750.7555.541.6320离心风机117575750.80.750.7556.2542.1921玻璃钢净化塔循环泵112222220.80.750.7516.512.3822空调器66 3.923.423.40.80.750.7517.5513.1623空调器55 5.5527.7527.750.80.750.7520.8115.6124照明50500.80.750.84030小计25862285.71584.371225.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-480补偿后1425.93684.21581.62X1250变压器损耗15.8279.0810KV侧负荷0.81441.75763.271631.360008650.49动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二铅电解直流负荷1电解直流负荷114754754750.90.480.8380184.04422.22变压器损耗 4.2221.1110KV侧负荷0.88384.22205.1560002305.33整流变压器4754751X475备注1164.21425.93tg¢COS¢受电设备名称序号数量(台)计算负荷KcS11-M-1250/10 .10/0.4 2台 电力负荷计算表单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)三烟化炉风机房离心鼓风机(10KV)单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)四收尘变电所(一)分银炉收尘1布袋除尘器控制柜22510100.80.750.757.5 5.6变频2卸灰阀1212336360.7 1.020.621.622.043电动蝶阀220.090.180.180.7 1.020.60.110.114电动蝶阀440.27 1.080.180.7 1.020.60.320.335风机221322642640.80.750.75198148.56埋刮板输送机225.511110.71.020.657.27.3备注绕线电机备注2310.3355003154200.75Kctg¢0.75tg¢COS¢0.8COS¢56056028022受电设备名称受电设备名称序号序号电力负荷计算表数量(台)计算负荷电力负荷计算表数量(台)计算负荷Kc7照明及其他115550.80.750.843小计327.3327.26239.01187.23(二)铋转炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.2 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.80.750.759974.25 6埋刮板输送机22 5.511110.7 1.020.657.27.3 7电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 8照明及其他115550.80.750.843小计176.2176.22125.8199.99(三)贵铅炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.090.090.090.7 1.020.60.050.06 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.1174.13126.4100.11(四)锑熔练反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.693电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机117.57.57.50.7 1.020.65 4.957照明及其他115550.80.750.843小计174.2174.22126.46100.17(五)精练炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.023电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机22 5.511110.7 1.020.657.27.37照明及其他111051051050.80.750.88463小计249.6249.63188.58146.39(六)(一)-(五)合计11011101.5806.25633.88乘同时系数Ky=0.9 Kw=0.95无功补偿-2402X630补偿后725.63362.18810.99变压器损耗8.1140.5510KV侧负荷0.88733.74402.7383760004402.42动力变压器602.18725.63S11-M-630/10 .10/0.4 2台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)五贵金属熔炼变电所(一)阳极泥库及配料1阳极泥搅拌槽114440.80.750.7 2.8 2.12矿浆二次压滤泵112222220.80.750.7516.512.383二次箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.944滤液输送泵111515150.80.750.7511.258.445洗液输送泵117.57.57.50.7 1.020.6511.258.446圆盘给料机227.515150.7 1.020.659.759.957定量给料皮带机113330.7 1.020.65 1.95 1.998电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.699抓斗挢式起重机1162.762.762.70.5 1.730.318.8132.5810定量给料皮带机99 2.219.819.80.7 1.020.6512.8713.1311惯性振动给料机220.55 1.1 1.10.7 1.020.650.720.7312鄂式破碎机222244440.80.750.753324.7513离心风机117575750.80.750.7556.2542.1914螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6515轴流风机44 1.5660.80.750.75 4.5 3.3816空调器551.658.258.250.80.750.75 6.19 4.6417照明及其他50500.80.750.84030小计393.3393.3259.76222.05备注Kctg¢COS¢受电设备名称数量(台)计算负荷序号电力负荷计算表(二)贵金属熔练1双钩桥式起重机11126.4126.4126.40.5 1.730.1518.9632.842贵铅炉111515150.80.750.7511.258.443电动平板车11 3.7 3.7 3.77 1.020.65 2.41 2.454分银炉111515150.80.750.7511.258.445银阳极板浇铸车440.37 1.48 1.480.7 1.020.650.960.986电动平板车44 2.28.88.80.7 1.020.65 5.72 5.847铋转炉111111110.80.750.77.7 5.788胶带输送机33 2.2 6.6 6.60.7 1.020.65 4.29 4.389胶带输送机112222220.7 1.020.6514.314.5910电动单梁起重机119.99.99.90.5 1.020.15 1.49 2.5711铋精炼锅651006005000.80.750.75375281.2512电动葫芦12 4.9 4.9 4.90.5 1.730.150.74 1.2713精炼炉113330.80.750.75 2.25 1.6914抽铋机55 1.57.57.50.80.750.7 5.25 3.9415颜氏喷火机22 3.77.47.40.80.750.75 5.55 4.1616颜氏喷火机33 1.5 4.5 4.50.80.750.75 3.38 2.5317离心风机119090900.80.750.7567.550.6318喷淋塔循环泵117.57.57.50.80.750.75 5.63 4.2219螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6520轴流风机113330.80.750.75 2.25 1.6921池氯报警及吸收装置1118.518.518.50.80.750.7513.8810.4122照明及其他1001000.80.750.88060小计1072971.68643.31511.72(三)(一)-(二)合计14651365903.03733.77乘同时系数:Ky=0.9 Kw=0.95无功补偿-360补偿后812.76337.09879.892X800697.09812.76变压器损耗8.843.9910KV侧负荷0.91821.56381.08905.6460004929.37动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)六金属砷回收1电动单梁桥式起重机44 6.927.627.60.5 1.730.15 4.147.172除尘器44520200.80.730.71410.53除尘器附离心风机22 5.511110.80.750.758.256.194螺旋给料机22 2.2 4.4 4.40.7 1.020.65 2.86 2.925砷蒸馏电阻炉404035140014000.80.750.811208406卸灰阀22 1.1 2.2 2.20.7 1.020.6 1.32 1.357埋刮板输送机22 5.511110.7 1.020.657.157.298碱液制备槽224880.80.750.7 5.6 4.29碱液循环泵221122220.80.750.7516.512.3810污水输送泵221122220.80.750.7516.512.3811离心风机221122220.80.750.7516.512.3812照明及其他1501500.80.750.812090小计17001700.21332.821006.74乘同时系数:Ky=0.9 Kw=0.95无功补偿-400备注956.41199.54Kctg¢COS¢受电设备名称S11-M-800/10 .10/0.4 2台电力负荷计算表数量(台)计算负荷序号补偿后1199.54556.41322.32X1000变压器损耗13.2266.1210KV侧负荷0.891212.76622.521363.260007276.57动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)七金银电解变电所(一)金银电解1银电解槽1112.612.612.60.80.750.810.087.562金电解槽110.40.40.40.80.750.80.320.243出. 刮银粉机220.75 1.5 1.50.80.750.7 1.050.794手动单工位清洗机112525250.80.750.717.513.135离心式过滤机11 1.5 1.5 1.50.80.750.7 1.050.796通风罩11 1.1 1.1 1.10.80.750.70.770.587恒温干燥箱113330.80.750.8 2.4 1.88高频坩埚锅炉114440.80.750.8 3.2 2.49热水泵110.750.750.750.80.750.750.560.4210电解液循环泵114440.80.750.753 2.2511输送泵66424240.80.750.751813.512干燥机114440.80.750.8 3.2 2.413液下泵113330.80.750.75 2.25 1.6914电动葫芦1110.610.610.60.51.730.151.592.75备注Kctg¢COS¢受电设备名称序号S11-M-1000/10. 10/0.4 2电力负荷计算表数量(台)计算负荷15造液槽11 1.5 1.5 1.50.80.750.7 1.050.7916废电解液处理槽11 1.5 1.5 1.50.80.750.7 1.050.7917烘烤电阻炉111010100.80.750.88618中频感应电炉221002002000.80.750.816012019银阳极浇铸车110.370.370.370.7 1.020.650.240.2520银铸锭车110.370.370.370.7 1.020.650.240.2521台钻110.370.370.370.7 1.020.650.240.2522真空泵110.370.370.370.80.750.750.280.2123电动单梁起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.7924离心风机117.57.57.50.80.750.75 5.63 4.2225轴流风机220.040.080.080.80.750.750.060.0526轴流风机440.120.480.480.80.750.750.360.2727轴流风机220.060.120.120.80.750.750.090.0728玻璃钢净化塔1120.520.520.50.80.750.7515.3811.5329空调器11 2.32.3 2.30.80.750.75 1.73 1.2930照明及其他10100.80.750.886小计357.8357.81268.34204.03(二)综合维修站11127.68127.7127.680.7 1.020.563.8465013(三)化验及环监站11115.64115.6115.640.7 1.020.557.8258.99(四)综合仓库,贵金属产品库1126.526.526.50.71.020.513.2513.25(五)(一)-(二)合计627.6627.63403.25341.66乘同时系数:Ky=0.9 Kw=0.95无功补偿-150补偿后369.93174.58402.731X630变压器损耗 4.0320.1410KV侧负荷0.88366.95194.72415.4260002201.72动力变压器324.58362.93S11-M-630/10 .10/0.4 1台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)八余热电站(一)余热电站1余热发电站170900.80.750.7567.550.632化水站75450.80.750.7533.7525.31小计245135101.2575.94(二)富氧侧吹熔炼炉收尘1电收尘器5514.9574.7574.750.7 1.020.644.8545.762阴阳极振打机17170.37 6.29 6.290.7 1.020.5 3.1 3.23电加热器1515690900.80.750.872544布袋除尘器控制柜115550.80.750.75 3.82.8变频5卸灰阀1111333330.7 1.020.619.820.26埋刮板输送机22 5.511110.7 1.020.657027.37照明及其他112525250.80.750.82015小计245245.04170.7148.27(三)富氧侧吹还原炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.71.020.61.81.84Kctg¢受电设备名称序号电力负荷计算表数量(台)计算负荷COS¢备注3电动蝶阀110.180.180.180.7 1.020.60.110.114风机112222220.80.750.7516.512.385电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.176照明及其他112525250.80.750.82015小计59.6859.6842.8333.3(四)烟化炉收尘1袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀55315150.7 1.020.699.183电动蝶阀110.270.270.270.7 1.020.60.160.174风机111101101100.80.750.7582.561.885埋刮板输送机11 5.5 5.5 5.50.7 1.020.65 3.6 3.66照明及其他112525250.80.750.82015小计160.8160.77118.9992.68(五)铜浮渣反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.7 1.020.6 1.8 1.843电动蝶阀110.180.180.180.7 1.020.60.110.114风机1145454580.750.7533.7525.315照明及其他112525250.80.750.82015小计78.1878.1859.4145.07(六)(一)-(五)合计788.7678.67493.13395.27乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后443.86195.54852X500变压器损耗 4.8524.2510KV侧负荷0.9448.71219.75499.6360002692.23375.5443.86动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)九制酸(一)制酸系统变电所净化工段1电除雾器22661321320.7 1.020.679.280.82压滤机213630.80.750.65 1.95 1.463一级循环泵2118.53718.50.80.750.7513.8810.414填料塔循环泵212244220.80.750.7516.512.385二级循环泵2118.53718.50.80.750.7513.8810.416清洗泵2118.53718.50.80.750.7513.8810.417清液泵217.5157.50.80.750.75 5.63 4.228污酸泵1118.518.518.50.80.750.7513.8810.419起重机116.96.9 6.90.5 1.730.15 1.04 1.7910照明及其他20200.80.750.81612小计353.4265.4175.81154.27干吸工段1干燥塔循环泵113030300.80.750.7522.516.882一级塔循环泵113030300.80.750.7522.516.883二级塔循环泵113030300.80.750.7522.516.884地下槽泵111515150.80.750.7511.258.445干吸酸冷器441440.80.750.7532.25备注Kctg¢受电设备名称序号电力负荷计算表数量(台)计算负荷COS¢S11-M-500/10 .10/0.4 2台6电动葫芦33 6.318.918.90.5 1.730.15 2.84 4.91 7照明及其他20200.80.750.81612小计147.9147.9100.5978.22转化工段1起重机1112.712.712.70.5 1.730.15 1.91 3.3 2电动葫芦22 6.312.612.60.5 1.730.15 1.89 3.27 3照明及其他10100.80.750.886小计35.335.311.812.57尾吸工段1洗涤器循环泵212244220.80.750.7516.512.38 2洗涤塔循环泵212244220.80.750.7516.512.38 3氨水泵21 5.511 5.50.80.750.75 4.13 3.09 4硫胺泵217.5157.50.80.750.75 5.63 4.22 5引风机111111110.80.750.758.25 6.19 6电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 7照明及其他10100.80.750.886小计137.6137.659.3944.93成品工序1地下槽泵111515150.80.750.7511.258.44 2电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 3电动蝶阀3030130300.7 1.020.61818.36 4电动蝶阀44 2.28.88.80.7 1.020.6 5.28 5.39 5照明及其他10100.80.750.886小计66.466.442.9238.86综合楼1排风机220.190.380.380.80.750.750.290.21 2空调器99 2.219.819.80.80.750.7514.8511.14 3照明及其他10100.80.750.886小计30.1830.1823.1417.35硫酸循环水260.2148.160.80.750.7103.7177.78生产污水处理449.4345.170.80.750.7241.62181.21(1)-(8)合计1480111.91758.97605.21乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后683.07334.95760.771X1250变压器损耗7.6138.0410KV侧负荷0.88690.68372.99784.9560004144.06动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(二)1#开工电炉115405405400.90.481540261.536001X630变压器损耗63010KV侧负荷0.88546291.5618.96400218.4动力变压器单台功率设备功率(KW )最大负荷年耗电量备注备注574.95683.07KcKctg¢tg¢COS¢受电设备名称受电设备名称数量(台)计算负荷S11-M-630/10. 10/0.4 1台电力负荷计算表数量(台)计算负荷序号序号COS¢S11-M-1250/10 .10/0.4 1 电力负荷计算表总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(三)2#开工电炉112702702700.90.481270130.773001X315变压器损耗31510KV侧负荷动力变压器0.88273145.8309.48400109.2(四)硫酸风机(10KV)114504504500.80.750.75337.5253.1355001856.25变频(五)(一)-(四)合计27402379.11847.181063.416327.91单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)(十)熔炼变电所(一)熔炼13#胶带输送机112222220.7 1.020.6514.314.592圆筒混合制粒机113737370.80.750.6524.0518.043氧化炉移动带式输送机114440.7 1.020.65 2.6 2.6544#胶带输送机1118.518.518.50.7 1.020.6512.0312.275还原炉移动式输送机114440.7 1.020.65 2.6 2.6561#定量给料机11 2.2 2.2 2.20.7 1.020.65 1.43 1.467斗式提升机117.57.57.50.71.020.654.884.97备注备注KcKctg¢tg¢COS¢COS¢受电设备名称S11-M-315/10. 10/0.4 1台电力负荷计算表数量(台)计算负荷序号受电设备名称序号8单机袋式收尘器11 6.25 6.25 6.250.80.750.75 4.69 3.52 93#埋刮板输送机11 4.2 4.2 4.20.7 1.020.65 2.73 2.79 10粗铅铸锭机11 5.5 5.5 5.50.80.750.7 3.85 2.89 11离心通风机2218.537370.80.750.7527.7520.81 12电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 13吊钩桥式起重机1127.527.527.50.5 1.730.15 4.137.14 14抓斗挢式起重机1133.233.233.20.5 1.730.15 4.988.65 15螺旋给料机4241680.7 1.020.65 5.2 5.31 16防爆轴流风机660.8 4.8 4.80.80.750.75 3.6 2.7 17给煤机4241680.7 1.020.65 5.2 5.31 18脉冲袋式收尘器110.430.430.430.80.750.75 3.20.24 19防爆离心通风机4231260.80.750.75 4.5 3.38 20冲渣循环泵49.427.40.80.750.7520.5515.41 21电动葫芦118.38.38.30.5 1.730.15 1.25 2.16 22电炉112002002000.80.750.8160120 23照明及其他20200.80.750.81612小计540.3496.28327.3270.07(二)烟化炉风机房1高压鼓风辅助设备221530300.80.750.824182电动单梁起重机1110.610.610.60.5 1.730.15 1.59 2.753自洁式空气过滤器111501501500.80.750.710578.754电动阀22 2.2 4.4 4.40.7 1.020.6 2.64 2.69 5电动阀44312120.7 1.020.67.27.35 6照明10100.80.750.886小计217217148.43115.54(三)余热锅炉房1侧吹还原炉给水泵2190180900.80.750.7567.550.632侧吹熔原炉给水泵119090900.80.750.7567.550.633烟化炉锅炉给水泵2190180900.80.750.7567.550.634贵铅炉锅炉给水泵1118.518.518.50.80.750.7513.8810.415铜浮渣反射炉锅炉给水泵1118.518.518.50.80.750.7513.8810.416氧化锑还原炉熔炼精炼反射炉锅炉给水泵7清水离子泵212244220.80.750.7516.512.388埋刮板出渣机66 5.533330.7 1.020.6521.4521.889爆破清灰装置33515150.7 1.020.57.57.710高效弹性振打电机65650.5535.7533.750.7 1.020.517.918.211组合加药装置 1.95 1.650.80.750.75 1.240.9312乙炔瓶排风机22 1.5330.80.750.75 2.25 1.6913电动阀661.5990.7 1.020.6 5.4 5.5114照明10100.80.750.886小计657.2454.9324.34257.36(四)成品库1电动单梁起重机119.99.99.90.5 1.730.3 2.97 5.142扒渣机114545450.80.750.6529.2521.943振动筛11 2.2 2.2 2.20.7 1.020.65 1.43 1.464电磁振荡动给料机110.650.650.650.7 1.020.650.420.435液下泵111.11.11.10.80.750.750.830.6210.4113.880.750.750.818.518.518.5116电动平板车11 2.2 2.2 2.20.7 1.020.65 1.43 1.467电动葫芦118.38.38.30.5 1.730.15 1.252.168照明及其他550.80.750.843小计74.3574.3541.5736.21(五)粉煤制备1电动蝶阀110.50.50.50.7 1.020.60.30.312钢球磨煤机112752752750.80.750.82201653圆盘给料机11 5.5 5.5 5.50.7 1.020.65 3.58 3.654排粉风机117575750.80.750.7556.2542.195布袋除尘器113330.80.750.7 2.1 1.586脉冲阀30300.020.540.540.7 1.020.60.320.337排风机1118.518.518.50.80.750.7513.8810.418气动输送泵113030300.80.750.7522.516.8895#胶带输送机11 1.1 1.1 1.10.80.750.750.830.6210电磁除铁器111110.7 1.020.70.70.7111电动葫芦113030300.5 1.730.15 4.57.7912轴流风机11 1.1 1.1 1.10.80.750.750.830.6213防爆风机330.250.750.750.80.750.750.560.4214除尘器11 5.3 5.3 5.30.80.750.7 3.71 2.7815空调器113.633.63 3.630.80.750.75 2.72 2.0416照明及其他10100.80.750.886小计467.3467.32344.82265.67(六)(一)-(五)合计19561709.91186.45944.86乘同时系数:Ky=0.9 Kw=0.95无功补偿-450补偿后1067.8447.611157.82X1000变压器损耗11.758.4910KV侧负荷0.91079.51536.11205.360006477.04897.611067.81动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十一精矿仓及配料变电所(一)精矿仓及配料1抓斗挢式起重机11188.1188.1188.10.5 1.730.356.4397.742定量给料皮带机1111333330.7 1.020.6521.4521.88变频31#胶带输送机117.57.57.50.7 1.020.65 4.88 4.9742#胶带输送机11 5.5 5.5 5.50.7 1.020.65 3.58 3.655惯性振动给机220.55 1.1 1.10.7 1.020.650.720.736编织袋破碎清洗机1129.529.529.50.80.750.720.6515.497压滤机1118.518.518.50.80.750.712.959.718循环泵117.57.57.50.80.750.7 5.25 3.949箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.9410离心风机113737370.80.750.7527.7520.8111除尘器螺旋卸灰机22 5.511110.7 1.020.657.157.2912离心风机112222220.80.750.7516.512.3813除尘器机组117.57.57.50.80.750.7 5.25 3.9414空调器223.97.87.80.80.750.75 5.85 4.3915照明及其他10100.80.750.886小计389.7389.7198.99214.86备注Kctg¢COS¢ 电力负荷计算表数量(台)计算负荷序号受电设备名称S11-M-1000/10. 10/0.4 2(二)煤气站465.7268.720.80.750.75201.54151.16(三)(一)-(二)合计855.4658.42400.53366.02乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后360.47167.71397.58变压器损耗 3.9819.8810KV侧负荷0.89364.45187.59409.8960002186.69动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十二制氧站(一)氧气站高压用电设备1罗茨鼓风机(10KV)117107107100.80.750.75532.5399.382罗茨真空泵(10KV)22800160016000.80.750.7512009003氧压机(10KV0213807603800.80.750.75285213.754小计307026902017.51513.13600012105(二)低压用电设备1氧气站低压用电设备52520.80.750.753929.252螺杆式空压机322507505000.80.750.75375281.253再生干燥机323090600.80.750.754533.75备注347.71360.47Kctg¢COS¢受电设备名称电力负荷计算表数量(台)计算负荷序号S11-M-500/10. 10/0.4 2台4离心式空压机211322641320.80.750.759974.25小计1156744558418.5697.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后502.2217.58变压器损耗 5.4727.3710KV侧负荷0.9507.67244.94563.6760003046.04(三)以上小计422634342525.171758.073076.915151动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十三锌净化变电所(一)锌电积1新液转槽泵电机221530300.80.750.7522.516.882冷风机电机2218.537370.80.750.7527.7520.813循环泵电机331545450.80.750.7533.7525.314废液泵电机111515150.80.750.7511.258.445转槽泵电机1118.518.518.50.80.750.7513.8810.416阳极泥泵电机1118.518.518.50.80.750.7513.8810.417小循环泵电机1118.518.518.50.80.750.7513.8810.418循环泵电机114545450.80.750.7533.7525.31备注397.58502.2Kctg¢COS¢受电设备名称S11-M-630/10 .10/0.4 2台电力负荷计算表数量(台)计算负荷序号9液下泵电机22 2.2 4.4 4.40.80.750.75 3.3 2.48 10液下泵电机22 5.511110.80.750.758.25 6.19 11硫酸泵电机113330.80.750.75 2.25 1.69 12增压泵电机33 5.516.516.50.80.750.7512.389.28 13废水泵电机111111110.80.750.758.25 6.19 14配制等泵电机557.537.537.50.80.750.7528.521.5 15刷板机电机113330.80.750.7 2.1 1.58 16绝缘行车电机111111110.5 1.730.3 3.3 5.7222 5.511110.5 1.730.3 3.3 5.7211 2.2 2.2 2.20.5 1.730.30.66 1.1417真空泵电机114545450.80.750.7533.7525.31 18轴流风机14140.18 2.52 2.520.80.750.75 1.89 1.42 19照明及其它1001000.80.750.88060小计485.6485.62358.18275.76(二)锌净化及镉回收1一次净化槽222244440.80.750.730.823.1 2一次净化压滤泵212244220.80.750.715.411.55 3一次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 4二次净化槽2222440.80.750.730.823.1 5二次净化压滤泵212244220.80.750.715.411.55 6二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.897二次净化液冷却塔111515150.80.750.710.57.888三次净化槽222244440.80.750.730.823.1 9三次净化压滤泵212244220.80.750.715.411.55 10二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 11吊挂锌粉圆661660.80.750.7 4.2 3.15 12溶液输送泵551575750.80.750.752.539.38 13浆化槽224880.80.750.7 5.6 4.2 14矿浆输送泵221530300.80.750.72115.7515电动单梁悬挂起重机1111.411.411.40.80.750.72115.75 16洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 17铜镉渣浸出槽227.515150.80.750.710.57.88 18铜镉渣浸出液压滤泵111111110.80.750.77.7 5.78 19铜镉渣浸出液压滤机11 1.1 1.1 1.10.80.750.70.770.58 20镉置换槽117.57.57.50.80.750.7 5.25 3.94 21镉置换槽压滤泵111111110.80.750.77.7 5.78 22镉置换槽压滤机11 1.1 1.1 1.10.80.750.70.770.58 23镉棉溶解槽113330.80.750.7 2.1 1.5824镉棉溶解液压滤泵111111110.80.750.77.7 5.7825镉棉溶解液压滤机11 1.1 1.1 1.10.80.750.70.770.5826净化除铜槽113330.80.750.7 2.1 1.5827净化除铜液压滤泵111111110.80.750.77.7 5.7828净化除铜压滤机11 1.1 1.1 1.10.80.750.70.770.58 29熔铸电炉116060600.80.750.74231.5 30溶液输送泵66 5.533330.80.750.723.117.33 31污水泵22 5.511110.80.750.77.7 5.78 32镉电解114545450.80.750.731.525.233玻璃钢酸雾净化塔113333330.80.750.7524.7518.5634照明及其它1001000.80.750.88060小计792.7726.7520.34391.83(三)铟回收1萃取反萃机电机44312120.80.750.78.4 6.3 2离心风机电机44312120.80.750.759 6.75 3电动葫芦电机113330.5 1.730.150.450.78 4轴流风机电机22 2.2 4.4 4.40.80.750.75 3.3 2.485中和压滤泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 6搅拌机电机11 2.2 2.2 2.20.80.750.7 1.54 1.16 7压滤机电机113330.80.750.7 2.1 1.58 8压团机电机11 1.5 1.5 1.50.80.750.7 1.050.79 9液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 10搅拌机电机11 1.1 1.1 1.10.80.750.70.770.58 11盐酸泵电机11 1.5 1.5 1.50.80.750.75 1.130.84 12萃取反萃机电机44 5.522220.80.750.715.411.55 13搅拌机电机223660.80.750.7 4.2 3.15 14压滤泵电机223660.80.750.7 4.2 3.15 15压滤机电机11 1.5 1.5 1.50.80.750.7 1.050.79 16洗油机电机11 1.1 1.1 1.10.80.750.70.770.58 17液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 18离心风机电机224880.80.750.756 4.519玻璃钢酸雾净化塔1116.516.516.50.80.750.7512.389.2820照明及其它50500.80.750.84030小计168.3168.3124.1193.52(四)锌熔铸1锌直线铸定机11 5.5 5.5 5.50.80.750.7 3.85 2.89 2电炉辅助设备66 2.213.213.20.80.750.759.97.43 3离心风机电机117.57.57.50.80.750.75 5.63 4.22 4吊钩桥式起重机2219.939.839.80.5 1.730.27.9613.79 5离心风机电机113737370.80.750.7527.7520.81 6照明及其它12312371.0961.13小计15701503.61073.71822.24(五)(一)-(四)合计15701503.61073.71822.24乘同时系数:Ky=0.9 Kw=0.95781.13 966.33无功补偿-360补偿后966.33421.131054.12X800变压器损耗10.552.7110KV侧负荷0.9976.88473.38108660005861.25电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十四锌浸出变电所(一)浓密1酸洗浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.362高浸浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.363沉矾浓密机22 3.5770.80.750.7 4.9 3.684低浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.845中浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.846备用浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.847浓密机底流泵77151051050.80.750.773.555.138熔液输送泵1010151501500.80.750.710578.759污水泵225.511110.80.750.77.7 5.7810照明及其后50500.80.750.84030小计342.5342.5244.75183.36(二)氧化锌球磨碱洗1QZ型抓斗桥式起重机1162.762.762.70.51.730.159.4116.29tg¢COS¢受电设备名称序号S11-M-800/10KV 2台电力负荷计算表数量(台)计算负荷Kc备注2螺旋输送机11 4.5 4.5 4.50.7 1.020.65 2.93 2.98 3湿式球磨机117575750.80.750.86045 4矿浆泵227.515150.80.750.7511.258.44 5碱洗槽222244440.80.750.730.823.1 6碱洗压滤泵222244440.80.750.753324.75 7厢式压滤机44 4.9519.819.80.80.750.713.8610.4 8滤液输送泵111515150.80.750.7511.258.44 9洗液输送泵117.57.57.50.80.750.75 5.63 4.22 10浆化槽224880.80.750.7 5.6 4.2 11矿浆输送泵111515150.80.750.7511.258.44 12浆化液输送泵111515150.80.750.7511.258.44 13LD型电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.69 14洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 15污水泵11 5.5 5.5 5.50.80.750.75 4.13 3.09 16离心风机112222220.80.750.7516.512.3817除尘器螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6518轴流风机220.090.180.180.80.750.750.140.1 19小计417.4417.38273.07216.75(三)锌浸出1中浸反应槽332266660.80.750.746.234.65 2中浸矿浆泵211530300.80.750.7511.258.44 3低酸浸出槽332266660.80.750.746.234.65 4低浸矿浆泵211530150.80.750.7511.258.44 5沉矾槽442288880.80.750.761.646.2 6沉矾矿浆泵421560300.80.750.7522.516.88 7螺旋电子秤441440.80.750.7 2.8 2.1 8高酸浸出槽222244440.80.750.730.823.1 9高浸矿浆泵211530150.80.750.7511.258.44 10酸洗槽112222220.80.750.715.411.5511酸洗矿浆泵111515150.80.750.7511.258.4412备用反应槽112222220.80.750.715.411.5513矿浆泵111515150.80.750.7511.258.4414硫酸泵117.57.57.50.80.750.75 5.63 4.2215矿浆搅拌中间槽33 5.516.516.50.80.750.711.558.6616矿浆压滤泵332266660.80.750.7549.537.1317厢式压滤机66 3.722.222.20.80.750.715.5411.6618滤液输送泵331545450.80.750.7533.7525.3119矿浆输送泵111515150.80.750.7511.258.4420浆化槽224880.80.750.7 5.6 4.221洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.1622电动单梁悬挂起重机11 5.7 5.7 5.70.15 6.590.150.86 5.6423污水泵22 5.511110.80.750.88.8 6.624玻璃钢酸雾净化塔113333330.80.750.7524.7518.5625旋流板塔1116.516.516.50.80.750.7512.389.2826照明及其后50500.80.750.84030小计790.6715.6518.29393.71(四)(一)-(三)合计15501475.51036.1794乘同时系数:Ky=0.9 Kw=0.95无功补偿-300补偿后932.49454.321037.32X800变压器损耗10.3751.8610KV侧负荷0.88942.86506.18107060005657.2电力变压器932.49 电力负荷计算表S11-M-800/10KV 2台754.32单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十五熔锌感应电炉1熔锌感应电炉113003003000.90.481300145.3333.331X400变压器损耗 3.3316.6710KV侧负荷0.88303.33161.96343.8750001516.7电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十六生活设施1水处理设备47.627.10.80.750.7520.3315.242办公生活设施4004000.80.750.75300225小计447.6427.1320.33240.24乘同时系数:Ky=0.9 Kw=0.95无功补偿-120补偿后288.29108.23307.94变压器损耗 3.0815.410KV侧负荷0.92291.31123.65316.5160001748.23备注备注228.23288.29Kctg¢tg¢COS¢受电设备名称受电设备名称序号序号数量(台)计算负荷数量(台)计算负荷S11-M-400/10KV电力负荷计算表COS¢Kc动力变压器S11-M-630/10.10/0.41台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十七循环水1循环水1524963.580.80.750.75722.69542.01乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后650.42274.91706.13变压器损耗7.0635.3110KV侧负荷0.9657.48310.22726.9960003944.87备注514.91650.42Kctg¢COS¢受电设备名称电力负荷计算表数量(台)计算负荷序号动力变压器S11-M-1000/10.10/0.42台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十八(一)-(十九)合计244732164514817.98225.2383639乘同时系数:Ky=0.95 Kw=0.97无功补偿-3600补偿后140774378.48147422X10000变压器损耗147.42737.1110KV侧负荷9414224.45115.615116备注161817978.514077Kctg¢COS¢0.87序号电力负荷计算表数量(台)计算负荷电力负荷计算表受电设备名称单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)二十余热发电机组112000200020000.8-0.7512000-150013460二十一计及余热发电的负荷0.8812224.46615.61390070179无功补偿-3600补偿后12224.43015.612591变压器损耗125.9629.546500818.435KV侧负荷0.9612350.33645.131287770997.4单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二十二锌电积1锌电积直流负荷117540754075400.90.480.860322921.436702.2无功补偿-1500补偿后60321421.436197.21X8000变压器损耗67.02335.1135KV侧负荷0.966099.021756.546346.9485029580.3备注备注KcKctg¢tg¢COS¢受电设备名称序号序号电力负荷计算表数量(台)计算负荷数量(台)计算负荷受电设备名称COS¢。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

1617 1485
(400.0)
1165.4 519.7 1276
12.8 1178.1
63.8 583.5
1315
446.3 361.3 574
1.8 0.864
7.7
5.5
58.5 43.9
97.5 168.7
612
580
843
550.6 522.2 759
5.5
26.1
556.1 548.3 781
q=0.95
变压器损
耗:
合计
65
6
磨矿系统 变配电室
1)
磨矿系统 变配电室
44
2) 1#精矿库 43
3)
1#精矿库 除尘
6
177
2413 2331
160
2
1325.3 1325.3 1.5
19
626
413
132
14
149.1 132.1
30
35
2100 1870
132
35
2100 1870
132
57 693.99 674.99 220
84
1766 1565
188
84
1766 1565
188
544 11543 10600 220
560 21563 20620 2400

事故电源 部分:
22
19
855.4 659.9 132
力 负荷计算表
2009年4月30日
图号:
计算系数
计算负荷
计算电 流
备注
OUNT COEFFICILENT
COSφ
耗:
合计
188
主引风系
4 统变配电

1
3) 锅炉房
16
小计
42
Kp=0.9,K
q=0.95
补偿
补偿后
变压器损
耗:
合计
42
煤粉制备
5 系统变配
电室
1) 煤粉制备 59
2) 氮气设施 0
3) 柴油库
4
成品及原
4) 料检验制 1
样间
5) 备件库
1
小计
65
Kp=0.9,K
工程名称:首秦龙汇200万吨氧化球团工程
车间电力 负荷计算表
2009年4月3
变电所 数量(台)
设备容量Ps(kW)
或受电
QTY.
CAP.
号 设备组 总的 工作 总的 工作 最大
名称 TOTAL
RUN
TOTAL
RUN
MAX
一 高压负
原料及配
1 混除尘风 1

成品仓下
2 汽车卸料 1
除尘风机
环冷及成
3 品除尘风 1
补偿
补偿后
变压器损
耗:
合计
99
2
造球系统 变配电室
1) 造球系统 117
2) 2#转运站 3
3) 空压站
5
中心化验
4) 室(综合 1
楼)
主控室
5) (综合
楼)
小计
126
Kp=0.9,K
q=0.95
补偿
补偿后
变压器损
耗:
合计
126
3
赔烧系统 变配电室
1) 链蓖机室 68
回转窑、
2) 环冷机系 62

3)
0
0
2
0
3
14
9.5
5.5
1
90
90
0
1
150
150
0
62
948
926
220
62
948
926
220
35 1002.9 801.8
81
43 633.55 633.55 187.5
6
130
130
90
小计
93
Kp=0.9,K
q=0.95
变压器损
耗:
合计
93
低压 (二 ) 合 613 计
高低压 (一、 629 二)合计 乘同时系 数: Ky=0.9, Kw=0.95 无功补 偿:(在 10kV侧) 补偿后
108
2259 1987
110
108
2259 1987
110
64 497.17 474.17 59.4 59 1223.87 1164.64 160
17
77.9 76.8
30
5
57.5 38.5
15
22
466.9 486.9 132
5
40
40
0
5
50
50
0
177
2413 2331
160
补偿
补偿后
变压器损

球磨机
4 (同步电
2
机)
5 排粉风机
1
1#环冷鼓
6 风机(变 1
频)
7
2#-4#环 冷鼓风机
3
主引风机
8 电机(变 1
频)
耐热风机
9 主电机
2
(变频)
10 空压机
3
1
560
560
560
1
280
280
280
1
450
450
450
2
2000 2000 1000
1
280
280
280
1
500
500
500
3
1200 1200
回热风系 统
19
4) 余热利用 7
5) 成品系统 22
成品仓下
6)
汽车卸料 系统布袋
5
除尘
环冷及成
7) 品布袋除 5

小计
188
Kp=0.9,K
q=0.95
78 2055.8 1919.3 187.5
99
1686 1411
110
3
203.4 204.4 110
5
60
62
18
1
110
110
0
200
200
24
2) 混合室
3
原料及配
3) 混布袋除 5

4) 2#精矿库 65
5) 预留脱硫
6)
1#、2#汽 车蘅
2
小计
99
23
71.3 67.3
5.5
3
372.9 377.9
75
5
60
60
0
45 1257.6 1120.1 187.5
250
250
2
44
44
22
78 2055.8 1919.3 187.5
Kp=0.9,K q=0.95
2x1600kV A
543.7 247.6
100
426.5 264.3 78.64
0.76
0.83 0.86 0.85 0.96
891 802.2
8.0 810.2
769 731.0
36.5 767.5
1177 1085
1116
6175 4111 7418
14016 8147 16211
12614 7740 14799
2x1250kV A
2x1600kV A
0.87 0.80 0.91
0.73
(360.0)
1440.1 797.6 1646
16.5 1456.6
82.3 879.9
1702
2x1600kV A
863.5 644.9
326.4 105.0
245.0 78.2
1295 1165.4
968 919.7
400
1
2400 2400 2400
2
1600 1600
800
3
750
750
250
计算系数
COUNT COEFFICILENT
KI Kx
(C)
(b)
0.8
0.8
0.8
0.75
0.8
0.8 0.8 0.8
0.8 0.7
小计
16
16
10020 10020 2400
二 低压负
1
配混系统 变配电室
1) 配料室
tgφ
CALCULATED LOAD
Km Pjs Qjs Sjs
(CPnx)
(kW)
(kVar)
(kVA)
Ijs
REMARK S
(A)
0.8
0.75
448
336
0.8
0.75
224
168
0.8
0.75
360
270
-0.9
0.8
0.8
-0.48
0.75
0.75
0.8
0.75
0.8
0.75
1500 224 400 960 1920
-720 168 300 720 1440
0.8 0.8 0.89
0.75 0.75
1280 525 7841
960 393.8 4036
8819
0.74
38.9 289.4
42.0
401.4 200.0 35.2
30.9 216.5
37.0
452.1 150.0 26.4
1006.9 912.9 1359
1737 1596
(360.0)
1242.8 641.3 1399
相关文档