上海市公路工程静钻根植桩补充预算定额2014.04.21
公路工程预算补充定额培训资料全
公路工程预算补充定额一.路基工程1—1 现浇混凝土边沟1—2 混凝土预制块边沟1—3 路基注浆加固 工作容:(1)水泥粉煤灰浆拌和、灰浆装车;(2)载重汽车运浆、清理及保养搅拌设备;(3)准备、确定孔位、钻孔、钻机移位、场地清理;(4)准备、清孔、插拔注浆管、压浆、清洗压浆设备、清理现场。
1—4 防沙固沙工作容:防沙栅栏:放样、打桩、牵引、锚固木桩、挖沟埋夹芦苇(束)、铁丝加固全部过程;芦苇方格:放样、芦苇搬运、截断、插埋、踏紧芦苇全部过程;1、芦苇栅栏为疏透型,适用于苇高150㎝,埋入沙中20㎝,外露130㎝,与此不符者可调整芦苇用量;2、芦苇方格适用于苇高35㎝,埋入沙中15㎝,外露20㎝型。
新资料、新知识、新思维、新起点、新坐标尽在巅峰造价!登珠穆朗玛,上巅峰造价!→→→6120.x5dj.txxmsy发表于: 2008-05-04 21:01 引用删除修改 (2楼) 1—5 盐渍土路基隔断层工作容:1、塑膜或土工布:放样、清扫检查下层,铺设土工布或塑膜;2、沙土保护层:放样、摊铺砂土、整平、碾压;3、风积沙:放样、整理下承层、填培包边土、摊铺风积沙、整平、碾压;4、砂砾石:放样、整理下承层、摊铺砂砾石、整平、碾压。
注:砂土保护层、风积沙需洒水时,水费另计。
1-6-1 渗沟及排水管的填碎石100m31-6-3 渗沟及排水管的透水型土工布铺设 100㎡1-7-1 路基填土掺石灰含量5%拌和机拌和 100m3注:运料、推铺和碾压在土方工程中计列。
1-9-1 铺设土工格栅 1000㎡注:路基边坡表面铺设土工个栅可参照本定额,工程数量按坡面面积计算。
1-10-1水泥粉喷搅拌桩孔深10m以,桩径φ50cm水泥含量15%新资料、新知识、新思维、新起点、新坐标尽在巅峰造价!登珠穆朗玛,上巅峰造价!→→→6120.x5dj.txxmsy发表于: 2008-05-04 21:02 引用删除修改 (3楼)注:水泥粉喷搅拌桩均含复拌深度3米,如需增加复拌深度,应按“复拌每增10m”定额另计。
上海市市政工程预算定额样例.xls
上海市市政工程预算定额样例.xls通用项目*一般项目**除草*** S1-1-1除草m2挖树根*** S1-1-2挖树根Φ200以内棵S1-1-3挖树根Φ300以内棵S1-1-4挖树根Φ300以外棵平整场地*** S1-1-5平整场地m2 S1-1-6薄滚碾压m2挖淤泥流砂*** S1-1-7挖淤泥m3S1-1-8挖流砂m3湿土排水*** S1-1-9湿土排水m3筑拆集水井*** S1-1-10混凝土管集水井座S1-1-11竹箩滤井座抽水*** S1-1-12抽水m3施工路栏*** S1-1-13施工路栏封闭式混凝土基础mS1-1-14施工路栏封闭式砖基础mS1-1-15施工路栏移动式m·天脚手架*** S1-1-16脚手架双排高10m以内m2S1-1-17脚手架双排高20m以外m2S1-1-18脚手架简易m2S1-1-19脚手架桥梁立柱高10m以内m2S1-1-20脚手架桥梁立柱高20m以内m2S1-1-21脚手架桥梁盖梁高10m以内m2S1-1-22脚手架桥梁盖梁高20m以内m2整修坡面*** S1-1-23整修坡面Ⅰ 、Ⅱ类土m2S1-1-24整修坡面Ⅲ 、Ⅳ类土m2预埋铁件*** S1-1-25预埋铁件单件重量 30kg以内tS1-1-26预埋铁件单件重量 30kg以外t 钢筋接头*** S1-1-27钢筋接头锥螺纹个S1-1-28钢筋接头冷压套管个S1-1-29钢筋接头电渣压力焊个商品混凝土输送及泵管安拆使用*** S1-1-30商品混凝土输送泵车m3S1-1-31商品混凝土输送固定泵m3S1-1-32商品混凝土输送垂直泵管安拆mS1-1-33商品混凝土输送垂直泵管使用m·天S1-1-34商品混凝土输送水平泵管安拆mS1-1-35商品混凝土输送水平泵管使用m·天土方场内运输*** S1-1-36土方场内运输运距1km以内运土m3S1-1-37土方场内运输运距1km以内装运土m3S1-1-38运距每增加1km以内m3筑拆围堰**筑拆草土围堰*** S1-2-1筑拆草土围堰草包围堰(高1m以内) 筑拆mS1-2-2筑拆草土围堰草包围堰(高1m以内) 养护m·次S1-2-3筑拆草土围堰草包围堰(高2m以内) 筑拆mS1-2-4筑拆草土围堰草包围堰(高2m以内) 养护m·次S1-2-5筑拆草土围堰草包围堰(高3m以内) 筑拆mS1-2-6筑拆草土围堰草包围堰(高3m以内) 养护m·次S1-2-7筑拆草土围堰土坝筑拆m3筑拆圆木桩围堰***S1-2-8筑拆园木桩围堰高3m以内筑拆mS1-2-9筑拆园木桩围堰高3m以内养护m·次S1-2-10筑拆园木桩围堰高4m以内筑拆mS1-2-11筑拆园木桩围堰高4m以内养护m·次筑拆型钢桩围堰*** S1-2-12筑拆型钢桩围堰高3m以内筑拆mS1-2-13筑拆型钢桩围堰高3m以内使用m·天S1-2-14筑拆型钢桩围堰高3m以内养护m·次S1-2-15筑拆型钢桩围堰高4m以内筑拆mS1-2-16筑拆型钢桩围堰高4m以内使用m·天S1-2-17筑拆型钢桩围堰高4m以内养护m·次S1-2-18筑拆型钢桩围堰高5m以内筑拆mS1-2-19筑拆型钢桩围堰高5m以内使用m·天S1-2-20筑拆型钢桩围堰高5m以内养护m·次筑拆钢板桩围堰*** S1-2-21筑拆钢板桩围堰高3m以内筑拆mS1-2-22筑拆钢板桩围堰高3m以内使用m·天S1-2-23筑拆钢板桩围堰高3m以内养护m·次S1-2-24筑拆钢板桩围堰高4m以内筑拆mS1-2-25筑拆钢板桩围堰高4m以内使用m·天S1-2-26筑拆钢板桩围堰高4m以内养护m·次S1-2-27筑拆钢板桩围堰高5m以内筑拆mS1-2-28筑拆钢板桩围堰高5m以内使用m·天S1-2-29筑拆钢板桩围堰高5m以内养护m·次S1-2-30筑拆钢板桩围堰高6m以内筑拆mS1-2-31筑拆钢板桩围堰高6m以内使用m·天S1-2-32筑拆钢板桩围堰高6m以内养护m·次筑拆拉森钢板桩围堰*** S1-2-33筑拆拉森钢板桩围堰高7m以内筑拆mS1-2-34筑拆拉森钢板桩围堰高7m以内使用m·天S1-2-35筑拆拉森钢板桩围堰高7m以内养护mS1-2-36筑拆拉森钢板桩围堰高每增减1m 筑拆m·天S1-2-37筑拆拉森钢板桩围堰高每增减1m 使用m 翻挖拆除项目**翻挖沥青柏油类道路面层及基层*** S1-3-1翻挖沥青柏油类道路面层及基层翻挖沥青柏油类厚10m m2S1-3-2翻挖沥青柏油类道路面层及基层翻挖沥青柏油类每增减1cm m2翻挖混凝土道路面层*** S1-3-3翻挖混凝土道路面层空压机翻挖混凝土厚20cm m2S1-3-4翻挖混凝土道路面层空压机翻挖混凝土每增减1cm m2 S1-3-5翻挖混凝土道路面层空压机翻挖钢筋混凝土厚20cm m2 S1-3-6翻挖混凝土道路面层空压机翻挖钢筋混凝土每增减1cm m2S1-3-7翻挖混凝土道路面层液压镐翻挖混凝土厚20cm m2S1-3-8翻挖混凝土道路面层液压镐翻挖混凝土每增减1cm m2 S1-3-9翻挖混凝土道路面层液压镐翻挖钢筋混凝土厚20cm m2 S1-3-10翻挖混凝土道路面层液压镐翻挖钢筋混凝土每增减1cm m2翻挖二渣及三渣类道路基层*** S1-3-11翻挖二渣及三渣类道路基层二渣及三渣类厚20cm m2S1-3-12翻挖二渣及三渣类道路基层二渣及三渣类每增减1cm m2翻挖块石、碎石类道路基层*** S1-3-13翻挖块石、碎石类道路基层块石厚30cm m2S1-3-14翻挖块石、碎石类道路基层块石每增减1cm m2S1-3-15翻挖块石、碎石类道路基层块石厚15cm m2S1-3-16翻挖块石、碎石类道路基层块石每增减1cm m2翻挖侧平石*** S1-3-17翻挖侧石mS1-3-18翻挖平石mS1-3-19翻挖侧平石m 翻挖人行道及斜坡*** S1-3-20翻挖人行道预制人行道人行道板m2S1-3-21翻挖人行道预制人行道彩色预制块m2S1-3-22翻挖人行道现浇人行道厚6.5cm m2S1-3-23翻挖人行道现浇人行道每增减1cm m2S1-3-24翻挖人行道现浇斜坡厚10cm m2S1-3-25翻挖人行道现浇斜坡每增减1cm m2拆除排水管道*** S1-3-26拆除排水管道混凝土管道Φ300内mS1-3-27拆除排水管道混凝土管道Φ600内mS1-3-28拆除排水管道混凝土管道Φ1000内mS1-3-29拆除排水管道混凝土管道Φ1400内mS1-3-30拆除排水管道混凝土管道Φ1600内m 拆除砖砌体*** S1-3-31拆除砖砌体进水口m3S1-3-32拆除砖砌体窨井m3S1-3-33拆除砖砌体砖结构m3拆除石砌体***S1-3-34拆除石砌体干砌块石m3S1-3-35拆除石砌体浆砌块石m3拆除混凝土结构***S1-3-36拆除混凝土结构m3S1-3-37拆除钢筋混凝土结构m3拆除钢拉条***S1-3-38拆除钢拉条Φ25cm以内根S1-3-39拆除钢拉条Φ25cm以外根临时便桥便道及堆场**搭拆便桥***S1-4-1搭、拆普通便桥机动车道m2S1-4-2搭、拆普通便桥非机动车道m2S1-4-3搭、拆非机动车道沟槽便桥槽宽3m以内座·次S1-4-4搭、拆非机动车道沟槽便桥槽宽5m以内座·次S1-4-5搭、拆机动车道沟槽便桥槽宽3m以内座·次S1-4-6搭、拆机动车道沟槽便桥槽宽5m 以内座·次S1-4-7搭、拆过道桥板板长2m块·天S1-4-8搭、拆过道桥板板长3m块·天搭拆装配式钢桥***S1-4-9搭、拆装配式钢桥单排单层加强搭拆mS1-4-10搭、拆装配式钢桥单排单层加强使用m·天S1-4-11搭、拆装配式钢桥双排双层加强搭拆mS1-4-12搭、拆装配式钢桥双排双层加强使用m·天S1-4-13搭、拆装配式钢桥三排单层加强搭拆mS1-4-14搭、拆装配式钢桥三排单层加强使用m·天S1-4-15搭、拆装配式钢桥双排双层加强搭拆mS1-4-16搭、拆装配式钢桥双排双层加强使用m·天S1-4-17搭、拆装配式钢桥三排双层加强搭拆mS1-4-18搭、拆装配式钢桥三排双层加强使用m·天铺筑施工便道及堆场***S1-4-19铺筑施工便道及堆场施工便道m2S1-4-20铺筑施工便道及堆场堆料场地m2井点降水**轻型井点***S1-5-1轻型井点安装根S1-5-2轻型井点拆除根S1-5-3轻型井点使用套·天喷射井点***S1-5-4喷射井点安装根S1-5-5喷射井点拆除根S1-5-6喷射井点使用套·天S1-5-7喷射井点(15m) 安装根S1-5-8喷射井点(15m) 拆除根S1-5-9喷射井点(15m) 使用套·天S1-5-10喷射井点(20m) 安装根S1-5-11喷射井点(20m) 拆除根S1-5-12使用喷射井点(20m) 使用套·天S1-5-13喷射井点(25m) 安装根S1-5-14喷射井点(25m) 拆除根S1-5-15使用喷射井点(25m) 使用套·天S1-5-16喷射井点(30m) 安装根S1-5-17喷射井点(30m) 拆除根S1-5-18使用喷射井点(30m) 使用套·天大口径井点***S1-5-19大口径井点(15m) 安装根S1-5-20大口径井点(15m) 拆除根S1-5-21大口径井点(15m) 使用套·天S1-5-22大口径井点(25m) 安装根S1-5-23大口径井点(25m) 拆除根S1-5-24大口径井点(25m) 使用套·天真空深井井点***S1-5-25真空深井井点(19m) 安装座S1-5-26真空深井井点(19m) 拆除座S1-5-27真空深井井点(19m) 使用座·天S1-5-28真空深井井点(每增减1m) 安装座S1-5-29真空深井井点(每增减1m) 使用座·天地基加固**树根桩***S1-6-1树根桩围护m3S1-6-2树根桩承重m3深层搅拌桩***S1-6-3深层搅拌桩钻进空搅m3S1-6-4深层搅拌桩一喷二搅水泥掺量12 %m3S1-6-5深层搅拌桩二喷四搅水泥掺量12 %m3S1-6-6深层搅拌桩水泥掺量每增减1 %m3分层注浆***S1-6-7分层注浆钻孔mS1-6-8分层注浆注浆m3压密注浆***S1-6-9压密注浆人工钻孔mS1-6-10压密注浆机械钻孔mS1-6-11压密注浆注浆m3高压旋喷桩***S1-6-12高压旋喷桩钻孔mS1-6-13高压旋喷桩喷浆双重管m3S1-6-14高压旋喷桩喷浆三重管m3粉喷桩***S1-6-15粉喷桩水泥掺量每米45kg m3S1-6-16粉喷桩水泥掺量每米增减5kg m3道路工程*路基工程**人工挖土方***S2-1-1人工挖土方Ⅰ、Ⅱ类土m3S2-1-2人工挖土方Ⅲ类土m3S2-1-3人工挖土方Ⅳ类土m3机械挖土方***S2-1-4机械挖土方m3机械推土方***S2-1-5机械推土方距离20m以内m3S2-1-6机械推土方距离每增加10m m3填土方***S2-1-7填土方人行道m3S2-1-8填土方车行道密实度90%m3S2-1-9填土方车行道密实度93%m3S2-1-10填土方车行道密实度95%m3S2-1-11填土方车行道密实度98%m3耕地填前处理***S2-1-12耕地填前处理挖腐植土m3S2-1-13耕地填前处理填前压实m2填筑粉煤灰路堤***S2-1-14填筑粉煤灰路堤人行道m3S2-1-15填筑粉煤灰路堤车行道密实度90%m3S2-1-16填筑粉煤灰路堤车行道密实度93%m3S2-1-17填筑粉煤灰路堤车行道密实度95%m3S2-1-18填筑粉煤灰路堤车行道密实度98%m3二灰填筑***。
上海地区公用管线工程预算定额计算规则(2000).docx
* *上海市公用管线工程预算定额工程量计算规则2000* *上海市市政工程定额管理站总则一、《上海市公用管线工程预算定额工程量计算规则》以下简称本规则是根据沪建建(98 )第 0323 号“关于修编本市建设工程预算定额的批复”及其有关规定在《上海市公用管线工程预算定额》( 1993 )及《全国统一市政工程预算定额》(1998)的基础上结合国家及本市的现行设计规范、施工验收规范、安全操作规程技术质量标准并参照原定额工程量计算规则多年来的执行情况经重新修编与《上海市公用管线工程预算定额》( 2000 )配套使用的工程量计算规则。
二、本规则是统一本市公用管线工程预决算工程量计算与计量单位的依据,是完成规定计量单位分项工程人工、材料、施工机械台班消耗量的计算标准,是编制施工图预算、进行工程招投标、办理竣工结算及编制公用管线工程量清单、概算定额、估价指标以及技术经济指标工程量计算的基础。
三、本规则与《上海市公用管线工程预算定额》( 2000 )配套适用于本市行政区域内的公用管线工程。
四、本规则的使用应结合下列资料:1、《上海市公用管线工程量预算定额》(2000)及册章说明2、工程项目的招投标技术文件及合同文件3、现行设计规范、标准及图纸4、工程项目的设计及施工技术文件五、凡工程项目套用其他定额时工程量计算规则适用的程序是:1、按合同约定的工程量计算规则。
2、套用其他定额部分的工程量计算仍按本规则。
3、对本定额中缺项的子目需套用其他定额时根据定额编制原则和工程的具体情况分别套用相应的工程量计算规则。
六、本规则中册章系数的使用,凡属增减工程量或变更工作内容的册章系数与其他系数同时使用时,应分别计算不可连乘。
七、本规则计算系数中注有“≤”者均在系数上限内选取。
八、本规则中未包含的、或合同注明工程量计算要求或方法的,可参照与之相近的工程量计算规则、或按合同规定的要求或方法计算。
第一册通用项目工程第一章拆除工程一、路面、路基及人行道拆除,按“m2 ”计算,构筑物拆除,按“m3 ”计算。
2014版计价定额有关问题答复汇总(20160524)剖解
2014版计价定额有关问题汇总(市政)1、市政定额(1-814)彩钢板护栏(彩钢板围栏搭拆)未注明高度,实际施工高度一般要求在2.2米左右,如套用本定额综合单价与实际价格偏差较大,不知定额中人、材、机消耗量量是如何考虑的,是否合理?回复:1-814子目采用的是1.8m高3mm厚的彩钢板,钢管支撑,是一种较简易的护栏。
如实际施工中使用的材料不同,应另行计价。
2、8.11.3压密注浆定额,1-845注浆(m3),是按什么计量,是按注入的浆计量,还是按要求注浆加固的体积计量,另外此注浆的配合比是多少,配合比不一样,是否可以换算,如何换算。
回复:1-845子目是按加固的土体体积计算,其影响半径为0.75m。
如设计配合比不同,可以换算;仅材料换算,人工和机械其余不变。
3、关于1-442至1-465挖运碴子目。
大量的工程设计文件中几乎没见过“碴”这个字。
建议删除,或明确以上子目的适用情况;即使保留该子目,其定额含量也需要调整,单价太高。
建议新增补充各种拆除物如各类道路结构层拆除物、砖石砌体的装车、运输的子目,此类情况在造价编制过程中经常遇到,但却没有合适的子目套用,往往就参照“碴”的子目,其实不妥。
回复:不采纳所提建议,石碴的概念字典上很清楚,所提项目皆有定额可套。
4、深井降水安装子目1-697、1-699中钢筋砼井管材料单价450元/米,没这么贵,应是大小数错误。
回复:应是小数点错误,工作中砼井管材料单价应按市场价调价。
5、路基灰土填筑定额子目(1-378),与道路灰土基层定额子目(2-72),两者施工工艺一样,但二定额水平相差近20%,请核查相关消耗量是否有误?回复:1-378是土路基加固,属土方工程。
2-72是路面结构层中的基层,属路面工程。
路基土方执行路基施工规范,路面结构中的基层执行路面施工规范,施工要求不同当然定额水平不同。
6、市政工程中,第一册通用项目临时工程及地基加固中,压密注浆定额子目(1-845)注浆,水泥掺量比例不明确,其水泥消耗量明显偏低,请核查;(1-844)压密注浆钻孔,实际施工过程中可能需要在土、水稳、混凝土等不同材料上钻孔,单价相差很大,遇到不同的钻孔材质,应该如何调整定额?回复:实际施工过程中如遇在水稳、混凝土等不同材料上钻孔属于破除障碍物,应按实计算增加的人、材、机消耗。
上海市2000市政定额文字说明
目录2000市政定额文字说明----------------------------------------------- 1总说明---------------------------------------------------------- 1第一册通用项目说明-------------------------------------------- 5第二册道路工程说明-------------------------------------------- 9第三册道路交通管理设施工程说明------------------------------- 11 第四册桥梁及护岸工程说明------------------------------------- 14 第五册排水管道工程说明--------------------------------------- 20 第六册排水构筑物及机械设备安装工程说明----------------------- 28 第七册隧道工程说明------------------------------------------- 33 2000市政定额计算规则---------------------------------------------- 36 通用项目说明--------------------------------------------------- 36 道路工程说明--------------------------------------------------- 50 道路交通管理设施工程说明--------------------------------------- 53 桥梁及护岸工程说明--------------------------------------------- 58 排水管道工程说明----------------------------------------------- 68 排水构筑物及机械设备安装工程说明------------------------------- 75 隧道工程说明--------------------------------------------------- 81 2000市政定额讲义交底---------------------------------------------- 95 第一讲修编概况及总说明--------------------------------------- 95 第二讲上海市建设工程施工费用计算规则------------------------ 105 第三讲通用项目---------------------------------------------- 116第四讲道路工程---------------------------------------------- 129 第五讲道路交通管理设施工程---------------------------------- 139 第六讲桥梁及护岸工程---------------------------------------- 152 第七讲排水管道工程------------------------------------------ 172 第八讲排水构筑物及机械设备安装工程-------------------------- 186 第九讲隧道工程---------------------------------------------- 2002000市政定额文字说明总说明一、上海市市政工程预算定额(2000)(以下简称本定额)是在上海市市政工程预算定额(一九九三)以及全国统一市政工程预算定额(GYD-301-1999-GYD-308 -1999)的基础上,结合“新技术、新工艺、新材料、新设备”的广泛应用,按量价分离原则编制的预算定额。
公路工程预算补充定额培训资料(doc 92页)
公路工程预算补充定额培训资料(doc 92页)公路工程预算补充定额一.路基工程1—1 现浇混凝土边沟顺序号项目单位代号现浇混凝土边沟11 人工工日 1 31.02 15号水泥混凝土m³- (10.2)3 锯材m³11 0.024 425号水泥t 243 2.8775 水m³268 126 中(粗)砂m³286 5.207 碎石(4㎝)m³321 9.088 其他材料费元391 2.89 250L以内混凝土搅拌机台班569 0.8710 基价元999 1941 1—2 混凝土预制块边沟顺序号项目单位代号混凝土预制块边沟10m³11 人工工日 1 91.672 锯材m³11 0.0983 铁钉㎏151 13.74 425号水泥t 243 3.15 水m³268 276 中(粗)砂m³286 5.597 砂砾m³287 19.68 碎石(2㎝)m³320 8.899 其他材料费元391 58.710 250L以内混凝土搅拌机台班569 0.711 4T以内载重汽车台班640 1.512 小型机具使用费元998 6.713 基价元999 39481—3 路基注浆加固工作内容:(1)水泥粉煤灰浆拌和、灰浆装车;(2)载重汽车运浆、清理及保养搅拌设备;(3)准备、确定孔位、钻孔、钻机移位、场地清理;(4)准备、清孔、插拔注浆管、压浆、清洗压浆设备、清理现场。
顺序号项目单位代号灰浆拌和灰浆汽车运输钻孔注浆10 m³10 m³m 10 m³10Km以内1 2 3 41 人工工日 1 0.9 - 0.2 32 合金钻头个40 - - 0.01 -3 钻杆㎏136 - - 0.02 -4 水泥粉煤灰浆m³241 - - - (10.2)5 8—12#铁丝㎏153 - - - -6 425号水泥t 243 3.825 - -7 水m³268 9 0.125 0.958 粉煤灰m³313 4.15 - -9 其他材料费元391 3.7 1.5 3.62 15.64 1—4 防沙固沙工作内容:防沙栅栏:放样、打桩、牵引、锚固木桩、挖沟埋夹芦苇(束)、铁丝加固全部过程;芦苇方格:放样、芦苇搬运、截断、插埋、踏紧芦苇全部过程;卵砾石护坡:挂线、整平、铺石。
上海市市政工程预算定额计算规则
上海市市政工程预算定额工程量计算规则(2000)上海市市政工程定额管理站总则第0.0.1条为统一上海市市政工程预算工程量的计算,特制定本规则。
第0.0.2条本规则适用于上海市市政工程编制工程预、结算及工程量清单,也适用于工程设计变更后的工程量计算。
本规则与《上海市市政工程预算定额》(2000)相配套,作为足额定市政工程造价及消耗量的依据。
第0.0.3条市政工程预算工程量的计算除依据《上海市市政工程预算定额》(2000)及本规则各项规定外,尚应依据以下文件:1、经审定的施工设计图纸及其说明;2、经审定的施工组织设计或施工技术措施方案;3、经审定的其他有关技术经济文件。
第0.0.4条本规则的计算尺寸,以设计图纸表示的尺寸或设计图纸能读出的尺寸为准。
除另有规定外,工程量的计量单位应按下列规定计算:1、以体积计算的为立方米(m3);2、以面积计算的为平方米(m2);3、以长度计算的为米(m);4、以重量计算的为吨或千克(t或kg);5、以座(台、套、组或个)计算的为座(台、套、组或个)。
汇总工程量时,其准确度取值:m3,m2,m小数点以后取两位,t小数点以后取三位,千克、座(台、套、组或个)取整数。
第0.0.5条计算工程量时,应依施工图纸顺序,分部、分项依次计算,并尽可能采用计算表格及微机计算,简化计算过程。
第一章通用项目第一节一般项目第1.1.1条挖油泥工程量按水抽干后的实挖体积计算。
第1.1.2条挖流沙定额适用于不采用井点降水而出现局部流沙的情况,其工程量按水抽干后的实挖体积计算,不包括涌砂数量。
第1.1.3条湿土排水按原地面1.0m以下的挖土数量计算。
第1.1.4条筑拆集水井按排水管道开槽埋管工程每40m设置一只,其他工程一般按每个基坑设置一只,大型基坑按批准的施工组织设计确定。
第1.1.5条抽水定额适用于河塘及坝内河水的排除,工程量按实际排水体积计算。
第1.1.6条施工路栏长度应根据施工现场实际需要设置,移动式路栏使用天数按施工合同计算。
公路工程补充定额[1]
公路工程预算补充定额公路工程预算补充定额二OO六年十二月公路工程预算补充定额目录一.路基工程······················································································1-1现浇混凝土边沟····························································································1-2 混凝土预制块边沟 ························································································1-3 路基注浆加固 ······························································································1-4 防沙固沙 ····································································································1-5 盐渍土路基隔断层 ························································································1-6-1 渗沟及排水管的填碎石 ··············································································1-6-2 渗沟及排水管的防水型土工布铺设·······························································1-6-3 渗沟及排水管的透水型土工布铺设·······························································1-6-4 渗沟及排水管的PVC管安装φ300mm···························································1-6-5 渗沟及排水管的PVC管安装φ200mm···························································1-6-6 渗沟及排水管的PVC管安装φ100mm···························································1-6-7 渗沟及排水管的PVC管安装φ50mm ····························································1-7-1 路基填土掺石灰含量5%拌和机拌和 ·····························································1-7-2 路基填土掺石灰含量5%拖拉机带铧拌和 ·······················································1-7-3 掺石灰每增减1% ·····················································································1-7-4 路基填土掺水泥含量3%拌和机拌和 ·····························································1-7-5 路基填土掺水泥含量3%拖拉机带铧犁拌和 ····················································1-8-6 掺水泥每增减1% ·····················································································1-9-1 铺设土工格栅···························································································1-10-1水泥粉喷搅拌桩孔深10m以内,桩径φ50cm水泥含量15% ·······························1-10-2 水泥粉喷搅拌桩孔深10m以内,桩径φ50cm,水泥含量20% ·····························1-10-3 水泥粉喷搅拌桩孔深10m以内,桩径φ50cm水泥含量25% ····························1-10-4 水泥粉喷搅拌桩孔深10m以内,桩径φ50cm复拌每增10m ·····························1-11 路基注浆加固··························································································1-12洒水汽车运水 ·····························································································1-13土工格栅防护 ·····························································································1-14粉煤灰路基压实 ··························································································1-15水泥搅拌桩 ································································································1-16混凝土预制块边沟 ·······················································································1-17 3:7 灰土基础 ··························································································1-18 水泥粉喷搅拌桩··························································································1-19-1机械碾压粉煤灰路基··················································································1-19-2机械碾压填砂路基·····················································································二.路面工程······················································································2-1-1 混凝土预制块路缘石预制············································································2-1-2 混凝土预制块路缘石安装············································································2-2-1级配砂砾路面垫层 ······················································································2-2-2级配砾石掺石基层 ······················································································2-3 乳化沥青透层·····························································································2-4-1 挖除混凝土路面板人工破碎混凝土································································2-4-2 挖除混凝土路面板凿岩机破碎混凝土·····························································2-4-3 挖除混凝土路面板破碎机破碎混凝土·····························································2-4-4 挖除混凝土路面板破碎机破碎钢筋混凝土·······················································2-4-5 挖路缘石·································································································2-5-1 水泥混凝土路面初期保护 ············································································2-5-2 水泥混凝土路面养生麻袋 ············································································2-5-3 水泥混凝土路面养生保湿膜 ·········································································公路工程预算补充定额2-6-1 滑模摊铺机铺筑第一个1km路面厚20cm ························································2-3-2 滑模摊铺机铺筑第一个1km每增减1cm ··························································2-3-4 滑模摊铺机铺筑每增运1km每增减1cm ··························································2-4-1 沥青玛蹄脂碎石混合料拌和设备拌和(SMA路面) ········································2-4-2 沥青玛蹄脂碎石混合料铺筑 ·········································································2-5 手摆片石基层 ······························································································2-6-1 改性沥青混凝土拌和预算定额·····································································2-6-2自卸汽车运输沥青混合料 ·············································································2-6-3 改性沥青混凝土摊铺碾压预算定额 ································································2-7 200t/h沥青混合料拌和设备拌和 ···································································2-8沥青混凝土路面现场热再生预算定额(试行)·····················································2-9基层混合料机械铺筑······················································································2-10热熔标线 ···································································································2-11高性能土壤固化剂路面基层 ···········································································三.隧道工程······················································································3-1 隧道中空锚杆预算定额 ··················································································3-2 隧道防水卷材 ······························································································3-3隧道混凝土台车衬砌······················································································3-4隧道大管棚支护····························································································3-5 隧道大管棚注浆支护 ·····················································································四.桥梁工程······················································································4-1现浇桥头搭板·······························································································4-2抽水机抽水··································································································4-3-1 现浇混凝土桥头搭板 ·················································································4-3-2 现浇混凝土枕梁 ·······················································································4-3-3 桥头搭板钢筋 ··························································································4-4 先张法张拉钢绞线预算定额 ·········································································4-5 钢管拱桥拱肋吊装补充预算定额···································································4-6 钢管拱桥拱肋砼灌注 ··················································································4-7灌注桩检测管制作安装···················································································4-8-1 毛勒伸缩缝·······························································································4-8-2 TST伸缩缝 ···························································································4-8-3 TST碎石桥梁伸缩缝 ···············································································4-9 灌注桩检测管制作安装 ················································································4-10 纵向涵管安装(D=50cm) ·············································································4-11混凝土简易蒸汽养生 ····················································································五.防护工程······················································································5-1 岩面注浆单液浆 ··························································································5-2 岩面注浆双液浆 ··························································································5-3 边坡锚喷防护预算定额 ················································································5-4 喷射混凝土支护 ···························································································5-5石板镶面·····································································································六.其他工程及沿线设施 ······································································6-1防眩板········································································································6-2 热熔标线 ····································································································6-3-1 打入式立柱路基土质Ⅲ类以下 ····································································6-3-2 打入式立柱路基土质Ⅳ类以 ·······································································上6-3-3 抽换式立柱基础混凝土 ·········································································6-3-4 抽换式立柱基础钢筋 ················································································。
2014版市政工程计价定额应用精讲
19%,利润率10%(14费用定额)。取费基数为人工费+机械费。注意: 大型土石方工程取费:管理费率6%,利润率 4% 。 2.2 道路册人工下调 10%,人行道铺设一章除外。管理费率三类工程取 19%,利润率10%。取费基数为人工费+机械费。其中交通设施一章管 理费率取 42%,利润率 13%。取费基数为人工费。
2、省站统一调整人工消耗量
2.7 燃气册人工下调10%。管理费率三类工程取36%,利润率13%。 取费基数为人工费。
2.8 路灯册第七、八章人工下调10%。管理费率取42%,利润率 13%。取费基数为人工费。
3、总说明的变化
3.1 第二条 增加了“本定额计价单位为元,默认尺寸单位为毫米。 3.2 第七条第二点关于泵送混凝土的计算。 3.2.1 对厂站工程 定额人工数量扣30%,定额混凝土搅拌机械数量全
7.2 本次编修删除了大口径井点子目(6个),将省补定额中的深 井井点移入本章(5个)。同时修改如下:使用定额单位改为 “套.天”或“座.天”,井点使用定额子目除深井井点外机械乘 系数0.6。
7.3 将1-679~1-682子目(4个)(原属第六章 脚手架及其他工 程)移至“临时工程及地基加固”章。(施工护栏)
系数,调整辅助机械配置系数:挖方不装车子目推土机配置系数 为0.25,挖方装车子目推土机配置系数为0.75。(机械作业特 点)
2.12 自卸汽车运土:原计价表机械消耗量为正铲挖机装车,如 系反铲挖掘机装车,则自卸汽车台班乘1.1系数;本次定额编修 为反铲挖机挖土装车,考虑定额消耗量偏大,修编时将自卸汽车 消耗量降10%左右;综合以上情况,自卸汽车消耗量不变,但 系反铲挖机挖土装车。
上海市建筑工程综合预算定额93
上海市建筑工程综合预算定额总说明第一分部基础、打桩工程第二分部柱梁工程第三分部墙身工程第四分部楼、地、屋面工程第五分部门窗工程第六分部装饰工程第七分部耐酸、防腐、保温隔热工程第八分部金属结构工程第九分部构筑物工程第十分部杂项工程第十一分部附属工程第十二分部建筑物超高费用上海市建筑工程综合预算定额总说明一、上海市建筑工程综合预算定额(一九九三)( 以下简称本定额) 系在《上海市建筑工程预算定额》(一九九三)(以下简称预算定额)的基础上,在合理确定定额水平的前提下,适当综合扩大,代替预算定额作为编制施工图预算,进行工程拨款和办理工程结算以及编制概算定额和指标的基础,也是编制工程标底的依据。
本定额适用于一般工业与民用建筑的新建、扩建工程,不适用于拆除、修缮、改建、临时工程以及国防科研的特殊工程。
本定额中未包括的项目,一次性的可根据本定额的编制原则、方法,自行综合补充,并报市建设工程定额管理总站备案;不需综合者,可直接按预算定额的项目计算。
预算定额中沉井、沉箱、筑岛、顶埋管及水工,连续墙等分部未曾综合编列,仍沿用预算定额相应分部分项计算。
二、本定额所综合的内容和含量,系经过测算比较分析后取定,不得因具体工程的内容和含量不同而修改定额。
除定额中说明允许调整外,一般不予调整。
三、本定额所列的人工工日数和工资标准、材料及制品的消耗量、机械台班使用量等,系根据预算定额规定计算,除本定额中说明允许换算者外,均不调整。
四、本定额中的材料、成品、半成品均已包括从工地仓库、现场堆放点或集中加工点至操作点的水平和垂直运输所需的人工和机械。
周转性的模板、脚手料等均已包括场内外的运输费用。
五、本定额的垂直运输,多层建筑和单层建筑(不包括构筑物)均按二十米以内(高度系指设计室内地坪面至檐口屋面板面)计算。
如超过上述规定时, 应另按超高费用规定计算。
装配式结构吊装机械编有一类机械和二类机械,凡符合下表规定条件者,本跨内安装的全部构件按二类机械定额价格计算,其余则按一类机械定额价格计算。
08公路定额上海市补充规定
上海市市政工程管理局文件沪市政计〔2008〕597号关于发布《上海市公路基本建设工程概算、预算编制办法补充规定》的通知各有关单位:根据交通部2007年公布施行的《公路工程基本建设项目概算预算编制办法》(JTG B06-2007)及《公路工程概算定额》(JTG/T B06-01-2007)、《公路工程预算定额》(JTG/TB06-02-2007)、《公路工程机械台班费用定额》(JTG/T B06-03-2007),结合本市公路工程基本建设的实际情况,现制定《上海市公路基本建设工程概算、预算编制办法补充规定》(以下简称“补充规定”)并予发布,请遵照执行。
本“补充规定”由上海市市政公路工程定额管理站负责管理和解释。
在执行中如遇问题,请联系上海市市政公路工程定额管理站。
特此通知。
二○○八年八月二十日主题词:公路工程预算通知抄送:交通运输部、市发展改革委、市建设交通委、市财政局、交通运输部公路工程定额站、市建筑建材市场管理总站上海市市政工程管理局办公室2008年8月20日印发(共印50份)上海市公路基本建设工程概算、预算编制办法补充规定为了进一步明确上海市公路工程基本建设项目概算、预算编制,以合理地确定工程造价,(JTG B06-2007)根据交通部2007年公布施行的《公路工程基本建设项目概算预算编制办法》及《公路工程概算定额》(JTG/T B06-01-2007)、《公路工程预算定额》(JTG/T B06-02-2007)、《公路工程机械台班费用定额》(JTG/T B06-03-2007)(以下简称“新定额及部编制办法”),结合本市公路工程基本建设的实际情况,现就上海市公路基本建设工程概算、预算编制办法补充规定如下:。
一、凡在2008年7月1日前已批准的公路工程基本建设项目造价文件,仍执行原定额和办法,造价不再进行调整;在2008年7月1日前上报尚未审批的公路工程基本建设项目造价文件,应按《新定额及部编制办法》编制;自2008年7月1日起一律执行新定额及部编制办法。
14版建筑工程计价定额
3、高压旋喷桩:成孔与喷浆分设列。钻孔按自然地面至桩底标高, 喷浆按设计桩长乘以截面面积。定额水泥用量按18%计算。组与组 间搭接不扣除。
4、钢板桩、钢支撑以摊销量计入。 5、喷射砼护壁:30%损耗,按常用配合比计入。 6、锚杆支护、斜拉锚桩 如入岩,另外增加费用。
第六章 混凝土工程
1、基础混凝土垫层移入。增加泵送商品砼子目。增加空心现浇楼板。 混凝土线条执行小型构件。
2、现浇空心楼板:空心部分体积应扣除。计算含模量时,空心部分 体积不扣除。
3、不扣除伸入垫层的桩头所占体积。楼梯不扣除宽度500mm以内的 楼梯井。劲性砼构件内的钢构件体积应扣除。
4、柱按全高计算。板不扣除单个截面积0.3平米以内的柱。 5、混凝土防水坎套有梁板,空调板、飘窗上下挑板按板式雨篷,混
第三章 桩基工程
1、预制桩机械消耗量调低5%。 2、钻入岩石以软岩为准。饱和单轴抗压强度≥5MPa。 3、试桩:打桩、灌注混凝土乘系数,泥浆外运不乘。 4、钻孔灌注桩钻孔深度超过50m、人工挖孔桩挖孔深度超过15m,整
个桩乘系数,而不是仅超过部分。 5、灌注桩后注浆:注浆管、声测管按照自然地面标高至桩底标高
0 -0.35% -0.35%
4
钢结构工程 -5.71% -5.73% -5.35% 0 -5.71% -5.74%
第一章 土、石方工程
1、土壤及岩石的划分《岩土工程勘察规范》GB50021-2019(2009年版)
14计价定额 极软岩 软岩 较软岩、较硬岩 硬质岩
04计价表 松石 次坚石
普坚石
特坚石
《上海市建筑和装饰工程预算定额》土建2000定额说明.doc
总说明一、《上海市建筑和装饰工种预算定额》(以下简称本定额)是根据沪建建(98)第0323号文“关于修编本市建筑工种预算定额的批复”及其有关规定,在《上海市建筑工程预算定额》(一九九三)、《上海市建筑装饰工程预算定额》(一九九三)及《全国统一建筑工程基础定额》(GJD-101-95)的基础上,殉年来的招待情况,以及“新技术、新工艺、新材料、新设备”的广泛应用,并体现量价完全分离而编制的预算定额。
二、本定额是统一本市建筑工程预结算工程量计算规则、项目与计量单位的依据;是完成规定计量单位分项工种计价的人工、材料、施工机械台班消耗量的标准,是编制施工图预算、进行工程招投标、办理竣工结算、编制本市建筑工程概算定额、估价指标以及技术经济指标的基础。
三、本定额适用于本市行政区域范围内的工业与民用建筑及构筑物的新建、扩建、改建及装饰工程。
四、本定额是按照正常的施工条件、多数施工企业的装备设备、成熟的施工工艺、合理的劳动组织为基础编制的,反映了上海地区的社会平均消耗量水平。
五、本定额是依据现行有关国家及本市强制性标准、推荐性标准、设计规范、施工验收规范、质量评定标准、安全操作规程,并参照了有代表性的工程设计、施工资料和其他资料编制的。
六、本定额人工工日消耗量按现行全国建筑安装工程统一劳动定额和上海市补充劳动定额为基础计算,并考虑了在综合劳动定额项目外必须增加的基本用工幅度差。
每日按八小时工作制计算。
七、本定额机械台班消耗量已考虑了按合理施工方法及综合劳动定额所需增加的机械幅度差。
定额中的机械类型、规格是在正常施工条件下,按常用的机械类型确定,与定额中的台班消耗量相对应。
难以计量的零星机械即其他机械费以该项目机械费之和的百分率表示。
八、本定额材料消耗包括主要材料、辅助材料、零星材料等。
凡能计量的材料、成品、半成品均按品种、规格逐一列出数量,并计入了相应损耗,其内容和范围包括:从工地仓库、现场集中堆放地点或现场加工地点至操作或安装地点的运输损耗、施工操作损耗、施工现场堆放损耗。
14定额桩基工程计价及计量
14定额桩基⼯程计价及计量任务8桩基⼯程计量与计价8.1桩基⼯程清单⼯程量计算8.1.1桩基⼯程清单⼯程量计算要点⼀、2013《房屋建筑与装饰⼯程⼯程量计算规范》主要清单项⽬打桩清单项⽬及计算规则灌注桩清单项⽬及计算规则⼆、⼯程量计算规则及要点1.预制钢筋混凝⼟⽅桩、预制钢筋混凝⼟管桩等项⽬计量单位为“⽶”时,⼯程量按图⽰桩长(包括桩尖)计算;计量单位为⽴⽅⽶时,按截⾯积乘以图⽰桩长(包括桩尖)计算;计量单位为“根”时,⼯程量以根数计算。
预制钢筋混凝⼟⽅桩、预制钢筋混凝⼟管桩项⽬以成品桩编制,应包括成品桩购置费,如果⽤现场预制,应包括现场预制桩的所有费⽤。
预制钢筋混凝⼟⽅桩、预制钢筋混凝⼟管桩⼯程内容有:⼯作平台搭拆、桩机竖拆、移位、沉桩、接桩、送桩、桩尖制作安装、填充材料、刷防护材料等。
2.截(凿)桩头项⽬适⽤于规范附录B 和C 所列桩的截(凿)。
3.打试验桩和打斜桩应按相应项⽬单独列项,并在项⽬特征中注明试验桩或斜桩(斜率)。
4.项⽬特征中的桩长应包括桩尖,空桩长度=孔深-桩长,孔深为⾃然地⾯到设计桩底的深度。
5.项⽬特征中的桩截⾯(桩径)、混凝⼟强度等级、桩类型等可以直接⽤标准图代号或设计桩型进⾏描述。
8.1.2桩基⼯程清单⼯程量计算举例例8.1.1 某单独招标打桩⼯程,断⾯及⽰意如图所⽰,设计静⼒压预应⼒圆形管桩75根,设计桩长18m(9+9m),桩外径400mm ,壁厚35mm ,⾃然地⾯标⾼-0.45m ,桩顶标⾼-2.1m ,螺栓加焊接接桩,管桩接桩接点周边设计⽤钢板,根据当地地质条件不需要使⽤桩尖,成品管桩市场信息价为2500元/m3。
本⼯程⼈⼯单价、除成品管桩外其他材料单价、机械台班单价、企业管理费费率11%,利润费率6%,按《计价定额》执⾏不调整,机械进退场费为6500元,检验试验费费率0.2%,临时设施费费率1.0%,安全⽂明施⼯措施费按1.8%,⼯程排污费费率1‰,社会保障费费率1.2%,公积⾦费率0.22%,税⾦费率3.477%,其他未列项⽬暂不计取,应建设单位要求管桩场内运输按定额考虑。
2014版计价定额有关问题汇总政
2014版计价定额有关问题汇总(市政)1、市政定额(1-814)彩钢板护栏(彩钢板围栏搭拆)未注明高度,实际施工高度一般要求在2.2米左右,如套用本定额综合单价与实际价格偏差较大,不知定额中人、材、机消耗量量是如何考虑的,是否合理?回复:1-814子目采用的是1.8m高3mm厚的彩钢板,钢管支撑,是一种较简易的护栏。
如实际施工中使用的材料不同,应另行计价。
2、8.11.3压密注浆定额,1-845注浆(m3),是按什么计量,是按注入的浆计量,还是按要求注浆加固的体积计量,另外此注浆的配合比是多少,配合比不一样,是否可以换算,如何换算。
回复:1-845子目是按加固的土体体积计算,其影响半径为0.75m。
如设计配合比不同,可以换算;仅材料换算,人工和机械其余不变。
3、关于1-442至1-465挖运碴子目。
大量的工程设计文件中几乎没见过“碴”这个字。
建议删除,或明确以上子目的适用情况;即使保留该子目,其定额含量也需要调整,单价太高。
建议新增补充各种拆除物如各类道路结构层拆除物、砖石砌体的装车、运输的子目,此类情况在造价编制过程中经常遇到,但却没有合适的子目套用,往往就参照“碴”的子目,其实不妥。
回复:不采纳所提建议,石碴的概念字典上很清楚,所提项目皆有定额可套。
4、深井降水安装子目1-697、1-699中钢筋砼井管材料单价450元/米,没这么贵,应是大小数错误。
回复:应是小数点错误,工作中砼井管材料单价应按市场价调价。
5、路基灰土填筑定额子目(1-378),与道路灰土基层定额子目(2-72),两者施工工艺一样,但二定额水平相差近20%,请核查相关消耗量是否有误?回复:1-378是土路基加固,属土方工程。
2-72是路面结构层中的基层,属路面工程。
路基土方执行路基施工规范,路面结构中的基层执行路面施工规范,施工要求不同当然定额水平不同。
6、市政工程中,第一册通用项目临时工程及地基加固中,压密注浆定额子目(1-845)注浆,水泥掺量比例不明确,其水泥消耗量明显偏低,请核查;(1-844)压密注浆钻孔,实际施工过程中可能需要在土、水稳、混凝土等不同材料上钻孔,单价相差很大,遇到不同的钻孔材质,应该如何调整定额?回复:实际施工过程中如遇在水稳、混凝土等不同材料上钻孔属于破除障碍物,应按实计算增加的人、材、机消耗。
上海市公用管线定向钻进工程预算定额
上海市公用管线定向钻进工程补充预算定额上海市建筑建材业市场管理总站二○一二年二月目录说明 3 第一章前期、后期及辅助项目工程1 地下管线复核 92 测量放线 103 钻机安装、拆除、调试 114 穿越管道地面布设 125 充填式注浆 166 压密注浆 177 泥浆抽集 18 第二章定向钻进管线工程1 聚乙烯管安装(热熔) 192 拖头安装、拆卸 203 聚乙烯管道法兰安装 244 电火花测试 265 钻导向孔 276 扩孔 307 管线回拖 36说明一、《上海市公用管线定向钻进工程补充预算定额》(以下简称本定额)依据国家和本市的现行设计规范、安全技术操作规范、施工验收标准,在《上海市公用管线工程预算定额(2000)》和《水平定向钻进敷设给水管道预算定额(试行)》的基础上,结合本市公用管线定向钻进工程工艺特点,并参照近年来本市公用管线定向钻进有关工程项目的资料编制而成。
二、本定额适用于上海市行政区域范围内的公用管线定向钻进工程。
三、本定额是统一本市公用管线定向钻进工程预结算工程量计算规则、项目划分与计量单位的依据,是完成规定计量单位分项工程计价的人工、材料、施工机械台班消耗量的标准,是编制施工图预算、进行工程招投标、办理竣工结算及编制单位估价表以及技术经济指标的基础。
四、本定额中未包含的项目可套用《上海市公用管线工程预算定额(2000)》和其它相应的预算定额,也可编制补充定额。
补充定额需报上海市建筑建材业市场管理总站备案。
五、本定额中人工工日按综合工日取定,人工消耗量以《上海市公用管线工程预算定额(2000)》为依据,并参照近年来本市公用管线定向钻进有关工程项目的资料,结合施工现场测定资料为基础综合取定,已考虑了增加相应的人工幅度差。
六、本定额中材料消耗量以《上海市公用管线工程预算定额(2000)》为依据,并参照近年来本市公用管线定向钻进有关工程项目的资料取定。
定额子目中仅列出主要材料及主要辅助材料等。
上海市公路设施养护维修预算定额补充项目测算表
工程名称定额名称
施工单位施工地点
施工日期项目负责人
工程内容
(按施工顺序排
列)
劳动组合工作时间完成工程数量施工条件
及操作方法
材料消耗情况
机具配备
情 况
项目名称单位数量项目名称单位数量人工综合人工工日405.0机械4t载重车台班22.5材料内燃空气压缩机台班22.5大理石板1200*600*20m2536.4风镐台班22.5 1:2.5水泥砂浆m315.0切缝机台班9.0风镐凿子根 1.0
切缝机刀片把 1.0
草酸kg 6.0
上光蜡kg25.0
水m320.0其他
填表人:复核人:填表日期:2007.11.30
项目耗用量人工、材料
机械台班(注明单位)
525m2
翻挖大理石、整理现场,清理基层、拌制砂浆灰、铺筑大理石,灌注灰缝,湿治养生、清理场地、废料外运。
技工3人,普工15人每日:6.00-10.30,13.30-16.30,17.30-20.30
利用载重汽车运料至现场,工作人员翻挖大理石、整理现场,清理基层、拌制砂浆灰、铺筑大理石,灌注灰缝,湿治养生、清理场地、废料外运,第二天重复进场实施,直至全部更换结束。
1200*600*20大理石板 745片,1:2.5水泥砂浆15.0m3、风镐凿子1根、切缝机刀片1把
4t载重车一台、6.0m3内燃空气压缩机一台、切缝机1
台、风镐1把
上海市公路设施养护维修预算定额补充项目测算表
大理石人行道翻铺
上海申闵公路养护建设有限公司
2007.09.01—2007.09.20
大理石人行道翻铺
都市路
陈国威。
公路工程预算补充定额
公路工程预算补充定额一.路基工程1—1 现浇混凝土边沟工作内容:清理基底、模板制作、安装、拆除、修理、混凝土配运料、拌和、运送、浇筑、抹平、养生单位:1—2 混凝土预制块边沟1—3 路基注浆加固工作内容:(1)水泥粉煤灰浆拌和、灰浆装车;(2)载重汽车运浆、清理及保养搅拌设备;(3)准备、确定孔位、钻孔、钻机移位、场地清理;(4)准备、清孔、插拔注浆管、压浆、清洗压浆设备、清理现场。
1—4 防沙固沙工作内容:防沙栅栏:放样、打桩、牵引、锚固木桩、挖沟埋夹芦苇(束)、铁丝加固所有过程;芦苇方格:放样、芦苇搬运、截断、插埋、踏紧芦苇所有过程;1、芦苇栅栏为疏透型,合用于苇高150㎝,埋入沙中20㎝,外露130㎝,与此不符者可调整芦苇用量;2、芦苇方格合用于苇高35㎝,埋入沙中15㎝,外露20㎝型。
新资料、新知识、新思维、新起点、新坐标尽在巅峰造价!登珠穆朗玛,上巅峰造价!→→→ ://6120.x5djtxxmsy刊登于: 2023-05-04 21:01 引用删除修改 (2楼) 1—5 盐渍土路基隔断层工作内容:1、塑膜或土工布:放样、打扫检查下层,铺设土工布或塑膜;2、沙土保护层:放样、摊铺砂土、整平、碾压;3、风积沙:放样、整顿下承层、填培包边土、摊铺风积沙、整平、碾压;4、砂砾石:放样、整顿下承层、摊铺砂砾石、整平、碾压。
项目或名称单位代号塑膜或土工织物风积沙砂砾石塑料薄膜土工织物砂土保护层风积沙包边料厚10㎝每增减1㎝1000m²1000m³1000m³1 2 3 4 5 6 71 人工工日 1 4.0 4.2 2.8 0.3 18.5 183.7 5.02 土工布m²210 - 1050.00 - - - - -3 塑膜m²213 1050.00 - - - - - -4 土m³280 - - - - - 1300.00 -5 风积沙m³281 - - - - 1220.00 - -6 砂土m³285 - - 130.0 13.00 - - -7 砂砾m³287 - - - - - (1300.00)-8 砂砾石m³302 - - - - - - 1200.009 105KW履带式推土机台班405 - - - - - - 0.89注:砂土保护层、风积沙需洒水时,水费另计。
上海市市政工程预算编制与实例
市市政工程预算编制与实例一、总说明适用围:本定额是市市政工程专业统一定额,适用于新建、扩建、改建及大修工程,不适用于中小修及养护工程工厂、居住小区、开发区红线围的道路桥梁、排水管道,若采用市政工程设计标准、施工验收规及质量评定标准时,也可套用本定额。
人工:本定额人工不分工种、技术等级,均以综合工日表示。
定额中人工包括基本用工、辅助用工、超运距用工及人工幅度差。
作业时间的计算:本定额中人工都是按每工日八小时工作制计算,但隧道盾构掘进及垂直顶升按每工日六小时工作制计算。
材料及损耗:本定额中的材料分为主要材料和辅助材料。
损耗的容和围包括:从工地仓库、现场集中堆放地点或现场加工地点至操作或安装地点的现场运输损耗、施工操作损耗、施工现场堆放损耗。
周转性材料:周转性材料是指脚手架、模板、钢管支撑。
周转性材料已按规定的周转次数所计算的摊销量计入定额中。
材料场运输:隧道盾构掘进定额中已包括管片的场运输,排水管道铺设定额中已包括成品管的场运输。
桥涵及护岸工程不包括预制构件的场运输。
机械台班消耗量:本定额中机械以台班为单位,机械台班消耗量已包括机械幅度差。
混凝土及砂浆强度等级换算:如定额中强度等级与设计强度等级不同时,可按设计强度等级进行换算。
当设计图纸要求采用抗渗混凝土(P6及以上者),可按原混凝土强度等级增加C5计算。
钢筋混凝土工程:钢筋子目已计入损耗。
钢筋按设计图纸数量(不再加损耗)直接套用相应定额计算。
施工用筋经建设单位认可后可以增列计算。
预埋铁件按设计数量(不再加损耗)套用预埋铁件定额。
施工用“铁件”已包含在定额之中,不能再计算。
挖土土壤类别:挖土土壤类别按开挖的难易程度划分为四类。
定额中人工挖土分为Ⅰ、Ⅱ类土、Ⅲ类土、Ⅳ类土;而机械挖土方则综合取定,不分土壤类别。
【例】某道路工程车行道挖土800 m,挖土可利用方量为500 m,车行道需填土方600 m(密实度93%),人行道需填土方210 m3,采用机械填筑,挖、填土方采用现场平衡,请列项并计算相应工程量。
上海市公路工程静钻根植桩补充预算定额2014.04.21
各有关单位: 静钻根植桩工艺已在我市公路工程中开展应用,为规范静钻根植桩
的计价行为,现将静钻根植桩补充预算定额(试行)予以发布,并作如下 说明。
一、定额说明 (一)静钻根植桩定额包括成孔、注浆、植桩、送桩。预应力混凝土 管桩按成品桩考虑; (二)定额中未包括接桩、管桩填芯,可按公路定额相应项目计算; (三)钻孔产生的渣土和泥浆,其外运及处置另计; (四)定额已考虑注浆充盈量因素,不另行计算。 二、工程量计算规则 (一)成孔工程量按成孔深度乘以成孔截面积以“m3”计算;成孔深度 为原地面至设计桩底的长度,设计桩径是指预应力混凝土管桩竹节外径。 1、扩底以上部分成孔工程量 =(成孔深度-扩底高度)×{(设计桩径+10cm)/2}2×π 2、扩底部分成孔工程量 =扩底高度×(扩底直径/2)2×π (二)注浆工程量由扩底以上部分和扩底部分组成,其中: 1、扩底以上部分注浆工程量 =(设计桩长-扩底高度)×{(设计桩径+10cm)/2}2×π×0.3 2、扩底部分注浆工程量=扩底部分成孔工程量 (三)植桩工程量按设计桩长以“m”计算。 (四)送桩工程量=设计桩顶标高-原地面自然标高+0.5m,以“m” 计算。 三、本定额有关费用计算与《上海市公路基本建设工程概算、预算 编制办法补充规定》配套使用。 四、本定额自发布之日起施行。 五、本定额由上海市建筑建材业市场管理总站。
送桩:安卸桩垫、吊安送桩器,送桩,拔放送桩器。
定 额编号
项
目
沪公补 1401
静钻根 植桩成
孔 设计桩 径(mm)
沪公补 1402
沪公补 1403 静钻根 植桩注 浆
水灰比
≤650 ≤800 0.6:1
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
各有关单位: 静钻根植桩工艺已在我市公路工程中开展应用,为规范静钻根植桩
的计价行为,现将静钻根植桩补充预算定额(试行)予以发布,并作如下 说明。
一、定额说明 (一)静钻根植桩定额包括成孔、注浆、植桩、送桩。预应力混凝土 管桩按成品桩考虑; (二)定额中未包括接桩、管桩填芯,可按公路定额相应项目计算; (三)钻孔产生的渣土和泥浆,其外运及处置另计; (四)定额已考虑注浆充盈量因素,不另行计算。 二、工程量计算规则 (一)成孔工程量按成孔深度乘以成孔截面积以“m3”计算;成孔深度 为原地面至设计桩底的长度,设计桩径是指预应力混凝土管桩竹节外径。 1、扩底以上部分成孔工程量 =(成孔深度-扩底高度)×{(设计桩径+10cm)/2}2×π 2、扩底部分成孔工程量 =扩底高度×(扩底直径/2)2×π (二)注浆工程量由扩底以上部分和扩底部分组成,其中: 1、扩底以上部分注浆工程量 =(设计桩长-扩底高度)×{(设计桩径+10cm)/2}2×π×0.3 2、扩底部分注浆工程量=扩底部分成孔工程量 (三)植桩工程量按设计桩长以“m”计算。 (四)送桩工程量=设计桩顶标高-原地面自然标高+0.5m,以“m” 计算。 三、本定额有关费用计算与《上海市公路基本建设工程概算、预算 编制办法补充规定》配套使用。 四、本定额自发布之日起施行。 五、本定额由上海市建筑建材业市场管理总站负责解释。 特此通知。
班 机
台 履带式起重机 90t
班
BZ-20 水泥自动配料搅拌设 台
备
班
械
台
履带式单斗挖掘机 1m3
班
0.232 0.232
注:送桩器摊销已列入其他材料费中。
13.350 2.220 0.185
0.185
6.540 1.620 18.00 0.135
0.135 0.135
7.600 1.620 18.00 0.135
预应力混凝土管桩 材
水泥 42.5
10m³ 工
2.784 日 m
t
100m
2.220 0.810 0.810
1.278
(101.00)
11.009 7.676
3.840
锯材
m³ 0.070 0.050
0.090
0.090
水
m³ 13.654
天 元
台 履带式单轴钻孔机
附件:上海市公路工程静钻根植桩补充预算定额(试行)
上海市建筑建材业市场管理总站 2014 年 4 月 21 日
类别:公路
发布时间:2014-04-21
附件:上海市公路工程静钻根植桩补充预算定额(试行)
静钻根植桩
工作内容:成孔:测量放线、桩机就位、定位、钻孔、修孔、扩底。
注浆:喷水泥浆并重复上下搅拌。
植桩:吊机就位,吊桩,植桩。
送桩:安卸桩垫、吊安送桩器,送桩,拔放送桩器。
定 额编号
项
目
沪公补 1401
静钻根 植桩成
孔 设计桩 径(mm)
沪公补 1402
沪公补 1403 静钻根 植桩注 浆
水灰比
≤650 ≤800 0.6:1
沪公补 1404
1:1
沪公补 1405
植桩
沪公补 1406
送桩
人 人工
工
0.135 0.135
2.556 0.213
9.216 21.50 0.640 0.128