高尔夫球场的草坪施工方案(1)
高尔夫球场草坪施工流程
高尔夫球场草坪施工流程English Answer:Golf Course Grass Construction Process.The construction of a golf course grass surface involves several key steps:1. Site Preparation:Clearing and leveling the land.Grading to create contours and slopes.Installing drainage systems to prevent waterlogging.2. Soil Preparation:Amending the soil with organic matter and nutrients.Adjusting pH levels to create an optimal environmentfor grass growth.Compacting and smoothing the soil surface.3. Turf Selection:Choosing grass varieties suitable for the climate, soil conditions, and intended use of the course.Considering factors such as drought tolerance, wear resistance, and aesthetics.4. Turf Establishment:Planting seeds or laying sod.Irrigating regularly to ensure proper root establishment.Fertilizing to promote healthy growth.5. Cultivation and Maintenance:Mowing and watering on a regular schedule.Aerating to promote root development.Applying fertilizers and pesticides as needed.6. Finishing Touches:Installing bunkers, water hazards, and other course features.Creating greens, tees, and fairways to meet design specifications.Additional Considerations:Environmental regulations.Budgetary constraints.Workforce availability.Timeline for completion.Chinese Answer:高尔夫球场草坪施工流程。
高尔夫草坪施工方法
高尔夫草坪施工方法高尔夫是一项受欢迎的休闲运动,而高尔夫球场的关键之一就是草坪的质量。
在高尔夫球场上,绿茵茵的草坪不仅仅是美丽的景观,它对球员的打击和整体游戏体验也有重要影响。
为了建设和维护高质量的高尔夫草坪,施工方法至关重要。
本文将介绍一些常见的高尔夫草坪施工方法。
第一步:土壤分析和准备工作在开始高尔夫草坪的施工之前,首先要进行土壤分析。
土壤分析可以帮助了解土壤的质量和其它相关特性,如酸碱度、养分含量等。
根据土壤分析的结果,可以选择合适的施肥和土壤改良方法。
此外,还需要对场地进行清理和平整,除去杂草和其它不需要的植物。
第二步:草坪设计在施工之前,应该对高尔夫草坪进行设计,并确定各个区域的用途和功能。
高尔夫球场的草坪通常被划分为不同的区域,如果岭、球道、距离标志等。
每个区域的草坪类型和高度要根据其功能需求进行选择。
第三步:草坪铺设草坪的铺设是高尔夫草坪施工的关键步骤之一。
草坪可以选择种植或铺设草皮的方式进行。
对于种植草坪,首先要将土壤松散化,并铺设适当的肥料。
接下来,选择适宜的草种进行播种。
播种后,需要经常进行浇水和养护,以确保草坪的生长和发展。
对于铺设草皮,首先要准备好土壤,保证其平整和肥沃。
然后将草皮割成合适的形状和大小,铺设在场地上。
铺设后,要仔细整理草皮并浇水保湿。
第四步:定期养护和维护高尔夫草坪的定期养护和维护至关重要。
包括定期修剪草坪、除草、施肥、浇水等。
草坪应该保持适当的高度,以确保球在球道上的运动和发球效果。
除草是防止杂草生长并保持草坪质量的重要步骤。
定期施肥可以提供草坪所需的养分。
同时,适量的浇水也是保持草坪健康和生长的必要条件。
第五步:病虫害防治高尔夫草坪容易受到各种病虫害的侵害,如真菌、昆虫和细菌。
为了防治病虫害,应该定期巡检草坪并及时采取措施。
可以使用化学药剂或生物防治方法来防治病虫害。
化学药剂使用时要注意剂量和使用方法,以免对环境和健康造成危害。
总结高尔夫草坪的施工和维护需要投入大量的努力和时间,但这是保持高尔夫球场质量和球员游戏体验的关键。
高尔夫球场草坪建植与养护管理技术方案
高尔夫球场草坪建植与养护管理技术方案(一)概述高尔夫球一般认为起源于苏格兰,但是在苏格兰人打高尔夫球以前,在中国和罗马都曾流行过类似高尔夫球的以杆击球的球戏,公元前200年时,中国各种被称为“摧丸”的球戏,公元前27年与学也有以木杆杰打用关充寒制成的球的游戏。
另外,荷兰、俄罗斯和日本也都有声和来国为高尔夫球起源地的报道。
尽管人们对高尔夫球的起源有所争议,但高尔夫球作为一项体育运动,在近代有了长足的发展。
目前世界上约有近千万个高尔夫球场,约有一半在美国,世界上最有影响力的俱乐部是英国圣安德鲁斯皇家古典高尔夫球俱乐部(The Royal and Ancienc Goef Club of st Andrews, 1754)。
目前世界上国际比赛的现则和场地要求即出自这个俱乐部和美国高尔夫球协会。
我国的高尔夫球运动虽然起步较稳,但进步很快,1984年广州中心源泉高尔夫球场开业,并从附近的学校挑选了一批学生组成了我国第一支高尔夫球队。
1985年5月24日经国家体委批准,中国高尔夫球协会在北京宣告成立。
从此中国高尔夫球运动走上了有组织、有发展的道路。
目前我国有已建成的球场40个,在建的有60个。
随着经济建设的不为民发展和人们生活水平的不断提高,高尔夫球运动也一定会在我国得到发展。
(二)场地高尔夫球场一般兴趣在丘陵地带开阔的缓坡草坪上。
其中应有水域和齐木,灌木等点缀期间,球场是地面约60hm2,场地该18个球调(球调教应是18的信教1/2、1、2等)。
每个球场地都包括四部分、发球区、球走区、球洞区和障碍区。
一个标准球场(18洞)的长度为5943.6m-6400.8m。
每个球洞场地应当是首尾相接,即一个球洞场地的球洞区与另一场地的发球区接,这是高尔夫球场的设计原则,具体到每个球场则风格各异。
发球区(Tee):是开球用的一块基坪。
一般都介于地面,开球台上设有两个球状标记,相距5码(5.57m)。
开球线是标记之间的左线,每一个发球台有之强迫了一切开球线,高球洞最近的开球线,称为“冠军”开球线,中间的为另选手使用,最前面的开球线供女选手使用。
高尔夫球场草坪建植.ppt
5粗砂层铺设
粗砂层使水从根 系区渗到砾石中有 一个缓解的过程, 可以稳定果岭结构 并对根系区的沙有 阻挡作用。铺设时 砾石层和粗砂层之 间最好由防砂网隔 开,防止该层与铺 好的砾石层搅拌混 合。
6果岭胶片铺设
在果岭沙质混合料 与外层土壤之间应垂 直安置一圈果岭胶片, 防止果岭水分侧向流 入邻近的干土中,也 防止日后球道草与果 岭草相互侵害。铺装 时其顶端应与周边造 型设计高齐平。
从已确定的果岭 中心线开始,用永 久水准点控制标高, 放出整个果岭的平 面轮廓。以果岭中 心点为圆心,在果 岭周围以4米左右 间隔打桩。
2果岭及周边造型
果岭及周边造型要做的就是:粗造型,细造型 和造型检测。粗造型就是造型师根据施工图和现 场定桩进行土石方平衡达到设计要求。
用覆带式推土机反复压实,以防沉降。 并配合机械和工人进行细造型的 修补使果岭平整,光滑。
二、U S G A 果 岭 建造 标 准
果岭建造 的USGA 标准其 主要优点有 : 1)抗紧实 ; 2) 利于根层的水分渗入和水分过多 时快速 排水 , 避免表层积水 ; 3) 减少 表层径流而增加 有效降水 ; 4) 根际层 具 良好的通气 性 ,可为根系 的 健康生长提供充足的 养分 。 USGA推荐标准要求果岭根带含有较高的沙 , 并对沙子的粒径有特殊 的要求。
(二)喷灌系统
一个完整的喷灌系统一般由喷头、管网、泵 站和水源组成。
四、草种选择
果岭草: 1剪股颖:
1)匍匐本特草(Creeping Bentgrass)常 用:Penncross , Penn A (A-1、A-2、A-4)和 Penn G(G-1、G-2、G-6)系列。
2)细叶剪股颖(Colonial Bentgrass)在耐 低剪、耐践踏及耐寒性方面的表现不如匍 匐剪股颖,目前使用的不是特别普遍。
铺设草坪基层施工方案
铺设草坪基层施工方案1. 引言草坪是一种美观、环保的地面覆盖材料,广泛应用于公园、花园、高尔夫球场等场所。
为了确保草坪的长期稳定,良好的基层施工是非常重要的。
本文将介绍铺设草坪基层的施工方案,包括工具材料准备、施工步骤和注意事项等。
2. 工具材料准备在进行草坪基层施工前,需要准备以下工具和材料:•草坪植被(草皮或种子)•砂土•基层压实机•基层平整工具(如铁锹、长木板等)•喷水器或灌溉设备•疏松土壤工具(如耙子、钉耙等)•洒水器或喷雾器•度量工具(如卷尺、测量工具等)3. 施工步骤3.1 准备地面在施工前,需要清理地面,清除杂草、石块和其他障碍物。
确保地面平整,并清理掉任何多余的残留物。
3.2 设计排水系统良好的排水系统是草坪生长和发展的关键。
根据地势和项目需求,设计合理的排水系统,包括排水沟、渗水井和排水管道等。
3.3 确定基层厚度根据所需草坪的种类和预期负荷,确定基层的厚度。
通常情况下,基层厚度应为10-20厘米。
根据地质和土壤条件,适当调整基层厚度。
3.4 基层填充使用砂土填充基层,确保填充均匀且密实。
可以使用基层压实机对填充的基层进行压实,使其更加坚固。
3.5 基层平整使用铁锹和长木板等工具,对基层进行平整。
确保基层表面平整、水平,并且没有凹陷或凸起。
3.6 紧实基层使用基层压实机对基层进行紧实。
按照规定的施工步骤,依次进行多遍的压实,确保基层的坚固性和稳定性。
3.7 疏松土壤在基层表面使用疏松土壤工具进行疏松,增加土壤的透气性和排水性。
3.8 洒水保湿在基层施工完成后,及时进行洒水保湿。
使用喷水器或灌溉设备对草坪基层进行湿润,促进草坪生根。
4. 注意事项•根据项目需求和地质条件,适当调整施工方案。
•在施工过程中,严禁进入施工区域。
•根据草坪的种类和预期负荷,选择合适的草坪植被。
•在施工结束后,要定期对草坪进行养护,包括浇水、修剪、施肥等。
•施工期间,应严禁损坏基层和草坪植被。
5. 结论铺设草坪基层施工是保证草坪长期稳定的重要环节。
高尔夫平整场地施工方案
高尔夫平整场地施工方案1. 引言高尔夫球运动是一项需要广阔平整的场地进行的运动项目,场地的施工和平整对于运动的进行至关重要。
本文将介绍高尔夫平整场地的施工方案,并详细讨论每个阶段的工作内容和所需材料。
2. 施工计划在开始施工之前,制定详细的施工计划是至关重要的。
施工计划包括以下几个重要的阶段:2.1 场地勘测和准备在进行场地施工之前,首先需要进行场地勘测和准备工作。
这包括对场地进行测量,确定施工范围,并清理任何障碍物。
同时,还需要评估土壤的质量和排水状况,以便进行后续的施工工作。
2.2 场地平整场地平整是高尔夫场地施工的核心步骤之一。
该步骤包括使用铲土机等工具清除不平整的土地,并填补任何坑洞或凹陷。
场地平整的目的是确保球道的平坦度和一致性,以便球员能够更好地进行击球练习。
2.3 场地排水系统高尔夫场地需要良好的排水系统,以便在降雨后能够快速排水。
在施工过程中,需要确保球道和果岭上都有良好的排水系统。
这包括铺设排水管道和设置排水井,以便将水排到合适的位置。
2.4 草坪种植场地平整和排水系统设置完成后,可以进行草坪种植工作。
选择适合高尔夫场地的草种,并根据需要进行草坪的铺种工作。
在铺种之前,需要确保场地的土壤质量符合草坪生长的要求,并施加适量的肥料。
2.5 球道标识最后,需要在场地进行球道标识工作。
球道标识包括指示牌、标志杆和球洞标记等。
这些标识物应该清晰可见,并符合高尔夫球场的标准。
3. 施工材料进行高尔夫场地施工需要一些常见的材料,包括但不限于以下几种:•铲土机和推土机:用于场地平整和土地清理的主要设备。
•排水管道和排水井:用于设置场地排水系统的管道和排水设施。
•草种:选择适合高尔夫场地的草种,如高羊茅、马齿苋等。
•肥料:用于促进草坪的生长和营养供应。
•标志牌和标志杆:用于球道标识和指示。
4. 安全措施在进行高尔夫场地施工时,需要特别注意安全措施。
施工人员应该使用所需的个人防护设备,如安全帽、手套和护目镜。
高尔夫球场施工方案
高尔夫球场施工方案1. 引言本文档旨在提供一份高尔夫球场施工方案,以满足高尔夫球场建设的需求。
该方案包括选址、设计、施工和维护等内容。
2. 选址选址是高尔夫球场建设的首要步骤,合理的选址可为球场的成功运营打下坚实基础。
在选址过程中,应考虑以下因素: - 土地面积:球场所需的土地面积应满足18洞高尔夫球场的建设要求,通常需要约40至60公顷的土地面积。
- 土地地形:球场最好建在起伏较大的地形上,以增加球场的挑战性和观赏性。
- 地理位置:选择在风景秀丽的地方建设球场,能够吸引更多的高尔夫爱好者。
- 交通便利度:球场应位于交通便利的地方,方便球员和观众的前来参观和观赛。
3. 设计高尔夫球场的设计是关键的一环,好的设计能够影响球场的挑战性、可玩性和观赏性。
在设计过程中,应考虑以下因素: - 洞位规划:根据土地的实际情况和设计要求,合理规划球场的洞位。
通常18洞包括长洞、短洞和标准洞,各个洞位应具备不同的挑战性。
- 理想草坪:选择适合高尔夫球场生长的草坪品种,如柔草、高羊茅等。
合理的草坪维护和管理能够保证球场的打球质量和观赏效果。
- 水hazards:设计球场时可以合理设置水 hazard,如湖泊、小溪等。
水 hazards不仅增加球场的挑战性,还能增加球场的观赏性。
- 打球难度:设计球场时要考虑不同水平的球员,合理设置难度等级,以增加球场的吸引力和竞争性。
4. 施工高尔夫球场的施工是一个复杂的过程,需要专业的团队进行技术操作和管理。
在施工过程中,应注意以下事项: - 土地整理:施工前需要对选址的土地进行整理和平整,以满足球场设计的要求。
- 机械设备:使用适当的机械设备进行土地整理、球场建设和草坪种植等工作,以提高效率和质量。
- 材料选择:选择合适的建设材料,如砾石、草皮等,以保证球场的稳定性和美观性。
- 灌溉系统:建设灌溉系统,进行适当的草坪灌溉和维护,以保持球场的绿化和可玩性。
5. 维护球场的维护是保持球场质量和游戏体验的关键环节。
高尔夫球场草坪建植施工图例
高尔夫球场草坪建植施工图例高尔夫球场草坪建植施工图例南方高尔夫球场草坪草一般采用草茎繁殖方式来建植,本文将简要的采用图示的方法来说明一个球道的建植过程一、肥料农药后备:普通草炭及高级草炭,复合有机肥,灭虫药,杀菌剂这些材料不多详述,具体依靠个人经验喜好二、施工机械设备耙沙机、拖拉机、球场工程车、叶轮滚筒及普通小滚筒三、建植前坪床准备铺沙(不多细述,但注意铺沙完毕后必须留出一定的沙在球道边作为日后修复备用,这点如果在铺沙的时候留心的话,会省很多麻烦和成本)耙平,推土机沙杀均匀地摊平压实后,还需要耙沙机进一步推平细修撒草炭:耙沙机耙平球道后,撒草炭,有条件可以采用旋耕机将草炭拌入;果岭需要用好一点的草炭,并且需要将草炭拌入20cm以下沙层,有条件采用旋耕机,也可以人工使用铁锹拌入然后再用耙沙机反复耙平球道,将草炭均匀拌入沙层进一步拖平,耙沙机耙平撒完草炭的球道后,再用耙沙机拖带重一点的铁框(然后用轻一点的木框)反复拖平,保持球道造型优美及线条光滑,也能使得草炭进一步拌入沙层四、草坪建植球道撒草茎首先将球道外边线铺一圈草皮球道大面积撒草茎,然后切入,滚平,见下图有条件一定要采用这种手段,制作叶轮和滚筒,然后用耙沙机拖带经草茎切入沙层,然后用滚筒压实,这样能保持球道造型不变型,也为草茎生长提供一个良好均一的坪床集水井周边50-cm半径铺草皮,cm半径铺一圈草皮,防止雨水冲带淤泥进入集水井污染堵塞排水管道斜坡采用沟植或点播用耙子开沟,然后将草茎载入,然后用铁锨拍平;或者直接一撮一撮草茎插入沙层斜坡每隔2-4米铺草皮带总之,以上几步需要反复多次进行,保证草炭均匀拌入球道,并进一步改善球道造型,优美线条陡坡处直接铺草皮,并用沙袋在陡坡中部、底部扎实沙坑沿沙坑边铺一圈草皮,宽50-cm,沙坑鼻子全部贴草皮有些沙坑要求沙坑唇部也要贴草皮,必须用筷子固定好草皮,防止脱落发球台:发球台边铺一圈草皮,平台撒草茎,方法同球道,如果发球台太小,采用人工将草茎切入;边坡沟植草茎或直接铺草皮果岭:果岭边线铺一圈球道草皮,宽50-cm,然后在里面撒果岭草茎,方法同球道草茎植入方法最后用围网将果岭围起来,防止动物或人为破坏注意为防止果岭草茎和球道草茎的交叉污染,建议首先完成果岭植草,然后用围网将果岭围裹起来最后,看看植草后的整体效果五、维护保养冲刷修复南方雨水比较多,暴雨来临必将冲刷球道,安排工人运沙修平冲刷处,然后栽植草茎或草皮如果栽植一段时间后,仍然有较大面积的空白,可以补植补栽施肥、打药、切根滚压等一般球道栽植后一周不用施肥,一周后开始施撒复合有机肥,每隔7-10天撒一次有机肥,用量要根据季节、生长阶段和环境来定,每平方米10-50克当草茎开始蔓延,施肥后3-4天一般要打灭虫药,草长虫也长,这是道理,然后要经常观察沙坑边、草皮带等,这些地方虫子比较容易发现草坪开始密集以后,开始有计划的打杀菌剂,还有切根滚压等促进草坪生长的手段在这里不详细讨论。
草地高尔夫方案
草地高尔夫方案草地高尔夫是一项受到广大高尔夫爱好者喜爱的运动,它以其独特的环境与挑战性而闻名。
为了打造一场成功的草地高尔夫比赛或是畅快的娱乐活动,需要制定一个精心设计的方案。
本文将介绍一个完善的草地高尔夫方案,旨在为各种规模的比赛和活动提供指导。
1. 总体规划在制定草地高尔夫方案之前,首先需要进行总体规划。
这一阶段的目标是确定场地的大小、形状和地形特征。
通常情况下,一个标准的草地高尔夫球场需要占地较大,具备丰富的地形变化,诸如山丘、水域和沙坑等。
此外,还需要考虑球场的可达性和观赏性,以便吸引参与者和观众。
2. 设计球洞在方案中,设计球洞是至关重要的。
球洞的位置和形状必须能够提供挑战性和公平性,同时也需要考虑球场的整体布局。
在选择球洞的位置时,应充分利用地势和自然障碍,使球员们需要经过一系列的挑战才能完成每一洞的击球。
此外,球洞的编排应该考虑到球场的流线与可玩性。
3. 设计球道球道是球员们进行击球的通道,因此需要细心规划。
球道的安排需要保证各洞之间的差异性,既要确保各洞之间的连贯性又要确保它们是独立的。
在球道设计中,需要考虑球道的长度、宽度、弯曲度和障碍物的设置。
良好的球道设计能够为球员提供各种战术选择,增加比赛的趣味性和挑战性。
4. 建立沙坑和水域沙坑和水域是草地高尔夫球场的重要组成部分,它们既能增加球场的观赏性,又能给球员带来额外的挑战。
沙坑的位置应该充分考虑球洞和球道的设计,使其成为一个需要策略和技巧的障碍。
水域的设置也需要细致周到,以避免给球员带来过多的压力,同时又能增加比赛的趣味性。
5. 考虑球场维护和管理除了设计和规划,球场的维护和管理也是草地高尔夫方案中不可忽视的一部分。
一个良好维护的球场能够提供更好的游戏体验,并且能够延长球场的使用寿命。
在方案中,应考虑草坪的选择、浇水系统的设计、球道和球洞的修剪以及草坪肥料和害虫防治等问题。
6. 安全和环保措施最后,草地高尔夫方案必须考虑到安全和环保问题。
果岭草施工方案
果岭草施工方案1. 背景介绍果岭是高尔夫球场中的重要组成部分,它是球道与果园之间的区域,被设计成具有平整、柔软的草皮,以提供球员准确且可控的击球环境。
果岭草施工是保证果岭质量,确保球场维护的重要环节。
2. 施工前准备在进行果岭草施工之前,需要先进行一些准备工作,以确保施工的顺利进行:2.1. 清除杂草和病虫害首先,需要对果岭进行彻底清除,将杂草、病虫害等有害物质清除干净,以确保新的草皮能够生长良好。
2.2. 土壤处理接下来,对果岭的土壤进行处理,包括土壤酸碱度的调节、有机质的添加等,以提供良好的生长环境。
2.3. 平整果岭表面在进行施工之前,需要确保果岭表面平整,并修剪好果岭的边缘,以提供施工的基准线。
3. 选择草种选择合适的草种对果岭草施工的成功至关重要。
常用的果岭草种包括高羊茅、细羊茅、苦草等。
选择草种时需要考虑球场的环境、气候条件等因素,以确保草皮能够适应球场的使用需求。
4. 施工步骤果岭草施工主要包括:草皮铺设、水肥管理、修剪修整等步骤。
4.1. 草皮铺设选择好草种后,需要将草皮铺设到果岭表面。
首先,将草皮切成适当的大小,保证与果岭表面完全覆盖。
然后,将草皮按照规定的方向依次铺设,确保草皮之间的接缝紧密、平整。
4.2. 水肥管理草皮铺设完成后,需要对新的草皮进行水肥管理。
根据草种的要求,合理浇水并施加适量肥料,以促进草皮的生长和发展。
4.3. 修剪修整随着草皮的生长,需要进行定期的修剪和修整工作。
修剪草皮可以控制草坪的高度和密度,使果岭保持良好的外观和性能。
5. 施工注意事项在进行果岭草施工时,需要注意以下事项:•在选择草种时,要考虑球场的实际情况和气候条件,选择适合的草种。
•在草皮铺设时,要注意草皮之间的接缝是否紧密,避免出现缝隙或过多的草皮重叠。
•在水肥管理过程中,要合理浇水并施加适量的肥料,避免过量或不足。
•定期修剪修整果岭草皮,保持草坪的良好状态。
6. 结论果岭草施工是高尔夫球场维护的重要环节,通过选择合适的草种和进行科学的施工管理,可以确保果岭草皮的质量和表现。
高尔夫球场草坪施工流程
高尔夫球场草坪施工流程下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。
文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor.I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!高尔夫球场草坪施工的全面解析高尔夫球场,以其绿色、广阔和优雅的环境,一直是人们休闲娱乐的理想之地。
高尔夫球场种草流程
草坪部草坪建植流程制度
一、建植坪床
准备良好的建植基床是建植的基本条件。
在建植和建造阶段均可实施,此外施肥在建植时效果更佳。
确保有效土层有足够的厚度有利于根系扩展;
二、坪床的清理
1、树木清理:乔木、灌木以及倒木、树桩和树根等(可防止菌类发生,避免残体腐烂形成洼地→破坏草坪一致性)。
2、石砾的清理坪床以下不少于30cm,并用土填平(无大于2cm石块)
3、建植前杂草的防治。
(1)物理防除→人工连根拔除或土壤翻耕工具翻挖土壤除杂草。
(2)化学防除→化学药剂使杂草枯死(三到五日后反复施用)。
①采用灭生性除草剂如草甘磷、磷酸甘氨酸等。
②熏蒸法土壤消毒,熏杀剂主要有溴甲烷、五硝基甲烷(蒸发剂)。
三、平整
1、粗平整:挖掉突起和填平低洼
2、细平整:地表平滑、流畅。
四、种植
暖季型草大部分采用草茎繁殖,不采用种子繁殖。
所以种植草坪有两种方式为:撒草茎和铺设草皮。
1、撒草茎
草茎质量要求每个草茎要求具备3个以上的节,具有很好的成活率;
草茎撒播密度草茎散播按照1:4的比例扩繁。
(1平方米的草皮撕碎后可
以扩繁4平方米)
撒种草茎流程撒种草茎----滚压----铺沙(约5mm)-----压实----浇水
2、铺设草皮
草皮要求:按具体要求裁剪适宜规格,铺设草皮时将草皮错开铺设(缝隙交错)。
铺设草皮流程:坪床整理----苗圃起草皮----铺设草皮----用沙将缝隙填实----滚压----浇水
草坪部。
高尔夫球场施工方案(1)
第一部分工程总体概况一、球场地理、自然工程地质概况:(一)。
地理位置和地形条件:球场地理位置优越,交通便利,自然环境优美.球场建设规模为国际标准18洞高尔夫球场。
建成后的高尔夫球场地形地势起伏蜿蜒曲折,湖内绿水清波,景色宜人,将吸引众多高尔夫球友荟萃于此。
(二)。
气象状况:气候宜人,年平均气温℃,相对湿度,平均降水量mm.无霜期天,冬季最低气温℃,七月中旬最高气温℃,全年平均风速m/s。
(三).土壤植被状况:本球场土壤类型多为土,但因设计师提高球场区整体地形,将要进大量客土才能满足要求.本球场原为园林苗圃基地,内有等多种树木,但多为小树,将在施工前按设计图要求进行移植。
(四).施工条件目前工地已建成办公室和宿舍,供水为深井,供电由甲方拉入施工用电,应能满足施工用水和用电需要。
增建民工房、仓库等临时设施,以满足工程需要.二.工程施工特点(一)优良条件:1、本球场位于北京,交通方便。
2、公司球场工程部由有多个高尔夫球场的设计和施工经验的工程技术人员组成,各类专业学科的技术人员齐全,技术力量稳定,工程人员具有诚实耐劳、勇于吃苦的精神,可进行高度专业化施工。
我司工程人员在北京地区已建造、监理了多个国际标准球场,技术能力较强,对北京地区气候条件熟悉,材料市场比较了解,便于组织施工。
3、本公司各类施工机械完整齐全;球场专用造形机械设备为美国产CAT(卡特比勒)和日本产KOMATSU(小松)品牌,使用性能高;4、对国内、外材料市场熟悉,与供应商有长期的合作关系,供货渠道畅通,便于材料组织。
(二)限制因素:1、气候因素干扰:球场建造属户外作业,受气候影响大。
北京地区四季分明,夏季比较炎热,每年初夏北京进入雨季,暴雨频繁,降水量集中。
冬季比较寒冷,上冻后必须采用多种防寒措施方能保证施工。
这些气候因素直接制约着球场的施工进度。
2、业主的建设资金及时供给和对工程建设的协调与支持.3、工期紧:业主要求本项目施工工期尽量缩短,考虑到业主要求,综合当地气候、地质、土壤条件,依据高尔夫球场施工规律,我司加强组织施工,利用公司集团优势,合理安排施工。
高尔夫球场平整专项施工方案
高尔夫球场平整专项施工方案1. 简介本文档旨在提供一份完整的高尔夫球场平整专项施工方案,以确保球场的优良平整度和球员的游戏体验。
2. 施工目标- 提升球场平整度,确保球道、果岭和沙坑的表面平整。
- 修复球场的不平整区域,包括草坪和土壤的平整。
- 优化球道的排水系统,减少积水问题。
- 提供球员友好的球场环境,以提高游戏体验和球场使用率。
3. 施工步骤3.1 清理和准备工作- 清理球道、果岭和沙坑表面的杂物和杂草。
- 清除任何表面障碍物,如大石块或树根。
- 卸载并储存沙坑内的沙子。
- 准备所需的施工设备和工具。
3.2 球道平整- 使用专业的平整设备对球道进行平整,消除凸起和凹陷。
- 使用次表土和砂土填充不平整的区域,确保平整度。
- 使用压实机具将填充的土壤固定。
3.3 果岭平整- 使用专业的果岭平整设备对果岭进行平整。
- 去除果岭表面的凹陷和凸起。
- 使用曲线板将果岭面板边界修整成标准形状。
- 使用压实机具将果岭表面压实。
3.4 沙坑平整- 清理杂物并将沙子储存在临时储存区。
- 清理沙坑内的水和泥浆。
- 使用专业的平整设备将沙坑表面平整化。
- 还原沙坑的原始深度和形状。
- 添加新的洗沙土和沙子。
3.5 排水系统优化- 检查球道和果岭的排水系统。
- 清理并疏通排水沟和下水道。
- 修复损坏的排水系统,包括防止渗漏和修复管道。
- 安装新的排水管和过滤器。
4. 施工安排在进行施工工作之前,进行详细的规划和时间安排,以确保施工过程的顺利进行。
保证施工过程不干扰球员的游戏,并尽可能缩短施工时间。
5. 质量控制在施工完成后,进行质量检查以确保球场平整度和施工质量符合预期。
修复任何存在的问题,并进行最终的测试和验收。
结论本文档提供了一份高尔夫球场平整专项施工方案,包括清理和准备工作、球道、果岭和沙坑的平整,排水系统的优化,施工安排以及质量控制等方面。
通过按照方案进行施工,可确保球场的优良平整度,并提供优质的球场环境。
高尔夫球场的草坪施工方案 (1)
高尔夫球场的草坪施工方案果岭(Green)是高尔夫球场最重要的一个区域,从草坪的养护角度来讲,如果说高尔夫草坪代表了草坪养护学上的最高水平,高尔夫球场质量的高低是由果岭来决定的.一、果岭区坪床建造高尔夫球场果岭区山峦起伏,沙坑陪衬,地形变化丰富,是整个球道中最漂亮的部分.果岭区既要有平整、光滑、低矮、美观的草坪击球表面,还要能在除雷暴雨以外的任何天气状况下都可以击球,并且坪面不能有积水。
1 果岭坪床结构按图纸设计要求,通过方格网法控制果岭范围内的竖向施工,严格放线、打桩、开挖形成果岭的基面,果岭基面是一个平行且低于设计高程30 ㎝的曲面.果岭表面——根部混合物最小深度30cm,沙85—90%、分解的有机物10—15%鹅卵石床10cm直径10cmPVC 打孔柔性排水管,铺在果岭下排成鱼骨形,排水管有统一的坡度,在沟中有深入地基10mm 深的石子。
2 排灌水系统设置在果岭基面上,挖30 ㎝深30 ㎝宽的排水管沟,沟底铺10 ㎝砾石,然后铺设多孔排水管,再填砾石盖住管身10 ㎝,上面覆一层防沙网(细目尼龙网布)防止细纱下沉,在尼龙网布上铺盖经清洗、过筛的粗沙5 ㎝,使果岭区基本平滑。
果岭面下埋设喷水管道系统,在果岭基面上挖30 ㎝深的沟,布设管道并安装喷头回填少量土,试水喷洒正常后将管沟填平,并通过喷水使管沟沉降。
3 基面材料铺设混合层材料的组成主要有粗沙、中沙、细沙、黏土、有机肥、无机肥、泥炭土。
一般在场外将混合层材料拌好,边铺边碾压,混合层厚度30 ㎝左右,最后压实并细修果岭面.粗沙和中等沙--必须有60%的颗粒属此范围细沙-—在此范围内的颗粒不多于20%泥炭土——不多于5%有机质——多于10%黏土——不多于5%,在此范围颗粒之和不大于10%二、草种选择1 果岭区草坪草种的标准,果岭草坪是草坪中质量要求最高的一类.因此,对果岭草坪草的标准要求极高.应符合以下条件:低矮、耐低修剪:生长点低,能耐0。
高尔夫球场草坪建植
云南农业大学 12园林高尔夫 段仕红
完整编辑ppt
1
草坪建植包括
一、高尔夫果岭床坪建造 二、U S G A 果 岭 建造 标 准 三、排灌系统 四、草种选择
完整编辑ppt
2
一、高尔夫果岭床坪建造
1测量和放样定桩 2果岭及周边造型 3排水系统安装 4砾石层铺设 5粗砂层铺设
6果岭胶片铺设 7根际混合层铺设 8喷灌系统安装 9果岭表层细造型
3.3 发球台盲排
发球台盲排布置应充分考虑发球台坡向和 外排管的走向,遵照排水工程量最小化的 原则,确定发球台的出水口、盲排主管及 盲排支管的位置。发球台盲排管的布列有 鱼骨式、旗帜式排列。
完整编辑ppt
26
3.4 球道盲排
球道盲排常从集水井口开始两向、或三 向、或四向布列盲排管,有鱼骨式、自然 式或混合式排列,主管多设于较低处并沿 汇水区域延伸,支管则多设于边坡并尽量 垂直于水流方向,以拦截渗水。集水井附 近盲排管较密,管线间隔 3-5m;距集水井 较远、坡度较大的区域,盲排管间隔可加 大到 6-8m。
3肯塔基早熟禾有:Freedom III、Midnight II、Ginney、Diva等。
完整编辑ppt
33
4杂交百慕达 有:Tifway 419、Tifway II、 Tifsport、Aussie Green、Princess、MSChoice等等。
5结缕草有:Belaire、ElToro、Zorro(9601)、 Cashmere、Empress等等。
19
2.1 球场排水管材的选择
球场深排水管的管径一般为ф 110~ 2000mm 之间,一般当球场管道埋深不超过 4.0m、管径为ф 110 ㎜、 160 ㎜、 200 ㎜ 250 ㎜、 315 ㎜、 400 ㎜、 500 ㎜的排水管 材大多采用等级规格为 S2 的 UPVC 双壁波 纹管。
人造草坪施工方案(3篇)
第1篇一、前言人造草坪作为一种新型地面材料,具有绿色环保、耐用、易维护等优点,广泛应用于运动场、公园、高尔夫球场、屋顶绿化等领域。
为了确保人造草坪施工质量,提高施工效率,本方案将从施工准备、施工流程、施工质量控制等方面进行详细阐述。
二、施工准备1. 施工图纸及技术资料施工前,应仔细阅读施工图纸及相关技术资料,了解人造草坪的设计要求、规格、颜色、尺寸等。
2. 施工队伍及设备组建一支具备丰富经验的人造草坪施工队伍,确保施工质量。
施工设备包括卷材切割机、卷材铺设机、滚筒、切割刀、焊接机、吹风机等。
3. 材料准备根据设计要求,准备相应规格、颜色的人造草坪卷材、专用胶水、底布、填缝材料等。
4. 施工场地准备确保施工场地平整、干净,无杂物、积水,必要时进行基础处理。
三、施工流程1. 施工前准备(1)清理施工场地,确保无杂物、积水。
(2)检查基础,如有必要进行基础处理。
(3)验收材料,确保材料符合设计要求。
2. 人造草坪铺设(1)根据设计图纸,确定人造草坪的铺设方向。
(2)使用卷材切割机,将人造草坪切割成所需尺寸。
(3)铺设第一排人造草坪,确保边缘整齐。
(4)依次铺设其余人造草坪,注意相邻卷材的拼接。
(5)使用焊接机将相邻卷材焊接牢固。
3. 底布铺设(1)根据人造草坪尺寸,裁剪底布。
(2)将底布铺设在人造草坪底部,确保底布与草坪边缘贴合。
4. 填缝处理(1)使用吹风机将填缝材料吹入缝隙。
(2)检查填缝效果,如有必要进行补缝。
5. 施工验收(1)检查人造草坪铺设质量,确保边缘整齐、无破损。
(2)检查底布铺设质量,确保底布与草坪边缘贴合。
(3)检查填缝效果,确保填缝材料均匀、饱满。
四、施工质量控制1. 材料质量严格按照设计要求,选用符合国家标准的人造草坪、底布、填缝材料等。
2. 施工质量(1)施工人员应具备丰富的施工经验,确保施工质量。
(2)严格按照施工流程进行施工,确保每道工序质量。
(3)施工过程中,注意检查和调整施工参数,确保施工效果。
高尔夫球场的草坪施工方案(一)
高尔夫球场的草坪施工方案(一)范本一:高尔夫球场的草坪施工方案一.项目背景在本项目中,我们将详细说明高尔夫球场的草坪施工方案。
二.项目目标本项目的目标是构建一座高质量的高尔夫球场,为球员提供优质的球场体验。
三.项目范围本项目的范围包括以下几个方面:1. 地面准备:包括土壤处理、平整、排水系统的建设等。
2. 草坪选择:选择适合高尔夫球场的草种,包括质量、耐用性、抗病性等因素。
3. 草坪种植:包括播种、施肥、浇水等工作。
4. 草坪维护:包括修剪、除草、打理等维护保养工作。
四.项目1. 地面准备1.1 土壤测试:进行土壤测试,了解土壤的质地、营养含量等指标。
1.2 土壤改良:根据土壤测试结果,采取相应的土壤改良措施,提高土壤质量。
1.3 地面平整:利用专业设备对球场地面进行平整处理,确保球场的平整度和平滑度。
1.4 排水系统建设:根据地形和地下水情况,设计并建设合适的排水系统,确保球场排水畅通。
2. 草坪选择2.1 草种选择:根据气候、土壤等条件选择适合高尔夫球场的草种,包括果岭草和球道草。
2.2 草坪质量:选择高质量的草种,确保草坪的美观度和耐用性。
2.3 草坪抗病性:选择具有良好抗病性的草种,减少病虫害对球场的影响。
3. 草坪种植3.1 播种方式:选择适合球场的播种方式,包括直播和插条播种。
3.2 施肥:根据土壤测试结果,合理施肥,为草坪提供充足的营养。
3.3 浇水:根据草坪的需要,进行适量的浇水,保持草坪的湿润度。
4. 草坪维护4.1 修剪:定期修剪草坪,保持草坪的高度和整洁度。
4.2 除草:及时清除杂草,确保草坪的纯净度。
4.3 打理:进行适当的打理工作,包括修复球道、果岭等。
五.项目交付本项目将根据工期计划,按照项目范围执行并完成各项。
交付后,我们将提供相应的草坪维护指南。
附件:无法律名词及注释:无范本二:高尔夫球场的草坪施工方案一.项目背景高尔夫球场的草坪施工是一个复杂的过程,需要考虑多个因素。
高尔夫球场果岭草坪建植
高尔夫球场果岭草坪建植果岭作为高尔夫球场球洞中最重要的部分,对草坪质量的要求是极其严格的。
果岭草坪建植的良好与否,直接关系到能否满足球员的理想要求以及日后维持优质果岭养护管理难度。
因此,果岭草坪的合理建植和养护是极其重要的。
其建植步骤分述如下:一、坪床准备:果岭细造形完成后,根系层混合物已经铺设好,土壤的改良工作已在根系层混合物配制过程中完成。
因此,在果岭草坪建植过程中,不存在坪床建造工程。
果岭坪床准备要有坪床土壤pH值的调整、坪床消毒处理、施入基肥、果岭表面细平整等工作。
1、坪床土壤pH值的调整:pH值调整的大部分工作应在种植之前完成。
调整材料至少应混合在10~15cm深的根层上部,农用石灰石最常用与酸性土壤,调整精细的颗粒有利于其迅速反应。
大理石用于含铁镁的酸性土壤中,硫一般施入碱性很强的土壤中,团料施入的数量依据土壤测试的结果。
假设根系层混合物相同并且混合适当,对所有果岭的施量应是一样的。
值得注意的是,调整材料可在根层混合物放入场地后混入,也可在根层混合物混合时加入。
后一种方法能保证整个材料在根层混合物中彻底混合调整pH值,但有可能施入的材料数量较大。
2、坪床消毒处理:坪床消毒处理是对果岭坪床进行化学药物处理,杀灭土壤中的杂草种子、病原菌、虫卵和其它有生活力的有机体的过程。
熏蒸法是对土壤进行消毒的较有效的方法,常用的熏蒸剂有溴甲烷、氯化吕、甲基溴化物等。
熏蒸后2~5天可进行播种。
果岭坪床是否需要进行消毒处理,根据具体情况而定,一般以下情况需要进行:①线虫易感地区②杂草严重地区③根系层中混入了未经消毒的土壤。
3、施入基肥:几乎所有果岭根系层在种植前都需要施入一定量的基肥。
基肥的种类和需要的施入量要根据草坪品种的要求和土壤营养成分测试结果决定。
P、K肥是基肥中两种主要肥料,若根系层以沙为主,往往也比较缺乏微量元素。
基肥一般要施入到表层10~15cm深的根系层中,并将之与根系层混合物混耙均匀。
有时,基地也在根系层混合物制作时施入。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
高尔夫球场的草坪施工方案
果岭(Green)是高尔夫球场最重要的一个区域,从草坪的养护角度来讲,如果说高尔夫草坪代表了草坪养护学上的最高水平,高尔夫球场质量的高低是由果岭来决定的。
一、果岭区坪床建造
高尔夫球场果岭区山峦起伏,沙坑陪衬,地形变化丰富,是整个球道中最漂亮的部分。
果岭区既要有平整、光滑、低矮、美观的草坪击球表面,还要能在除雷暴雨以外的任何天气状况下都可以击球,并且坪面不能有积水。
1果岭坪床结构
按图纸设计要求,通过方格网法控制果岭范围内的竖向施工,严格放线、打桩、开挖形
成果岭的基面,果岭基面是一个平行且低于设计高程30 cm的曲面。
果岭表面一一根部混合物最小深度30cm,沙85—90%分解的有机物10—15%
鹅卵石床10cm
直径10cmPVC打孔柔性排水管,铺在果岭下排成鱼骨形,排水管有统一的坡度,在沟中有深入地基10mm深的石子。
2排灌水系统设置
在果岭基面上,挖30 cm深30 cm宽的排水管沟,沟底铺10 cm砾石,然后铺设多孔
排水管,再填砾石盖住管身10 cm,上面覆一层防沙网(细目尼龙网布)防止细纱下沉,在
尼龙网布上铺盖经清洗、过筛的粗沙 5 cm,使果岭区基本平滑。
果岭面下埋设喷水管道系
统,在果岭基面上挖30 cm深的沟,布设管道并安装喷头回填少量土,试水喷洒正常后将管沟填平,并通过喷水使管沟沉降。
3基面材料铺设
混合层材料的组成主要有粗沙、中沙、细沙、黏土、有机肥、无机肥、泥炭土。
一般在
场外将混合层材料拌好,边铺边碾压,混合层厚度 粗沙和中等沙——必须有 60%的颗粒属此范围 细沙一一在此范围内的颗粒不多于 20%
泥炭土一一不多于 5% 有机质一一多于10%
黏土一一不多于5% ,在此范围颗粒之和不大于 二、草种选择
1 果岭区草坪草种的标准
cm 以下的超低修剪; 匍匐性、均一性好: 覆
盖性好,质地均一;叶直立、叶质细: 要求草种的叶片纤细, 并且具有直立性和有适当的弹性, 合打球时
的停球推球要求; 色泽美
观。
2果岭区草坪草种选择
为了使果岭区达到以上质量要求,
使果岭区草坪美观一致,
我们采用翦股颖品种中的一
个品种(penncross)进行单播。
此草种的特性是中等深绿色,质地中细,密度的生长茂盛, 抗寒耐热,低温下保绿性好,成坪迅速,恢复力好,但易感黑粉病,氮肥过多时易形成芜枝
三草坪建植
1播种建坪
建坪果岭区面积700怦左右,果岭面(坪床)整平后,先在果岭面上分两个区,每个区 采用人工播种,播种量 12g/ m 2
,播种后覆沙,覆沙厚度 0.2 cm,使草种盖上一层细纱,然 后用碾压设备对播种面压实, 以使草种更好的覆盖,最后用无纺布覆盖并喷水,防止种子冲
跑。
四、建坪初期的管理
建坪初期要经常使坪面保持湿润,
以使种子或草段迅速出苗,
尽快成坪,喷水时间在早
晨或晚上,视天气情况一天喷水一次或两次。
初次修剪的时间应在幼苗长到
7〜10 cm 左右
时进行,修剪时掌握三分之一的原则,以后逐渐增加剪草频率,逐渐降低草坪草高度, 最后
一天剪一次,直到草坪高达达到
0.5 cm 以下。
草坪草在幼苗期易发生病害,特别是气温较
高时更易发病。
幼苗期主要病害有猝倒病、立枯病及褐斑病等。
为防止病害发生, 幼坪时期
应定期喷施杀菌药,可用
75%多菌灵可湿性粉剂、50%乙磷铝可湿性粉剂、70%代森锰锌可湿
性粉剂500〜1000倍液,每1〜2周喷施一次进行防治。
1施肥
由于多次的定期修剪,草坪的养分消耗较大。
因此,需要连续不断地定期施肥,才能保
30 cm 左右,最后压实并细修果岭面。
10%
对果岭草坪草的标准要求极高。
应符
,果岭草坪是草坪中质量要求最高的一类。
因此, 合以下条件:低矮、耐低修剪:生长点低,能耐0.5 草坪草具有
铺匐茎,分蘖能力强,形成的草坪密实,
证草坪正常生长。
翦股颖果岭每100 m每10〜15个生长天施水溶性氮肥0.04〜0.13 kg 或用缓效肥料,每20〜30 个生长天每100 m施肥0.13〜0.28 kg。
并施少量钾肥、磷肥和微量元素。
2灌溉
适度的灌溉是保证草坪质量必须的环节。
由于低修剪使草坪根系变浅,从而减少了草坪
从土壤中获取水分的能力,因而要满足草坪生长的要求,必须在生长季节和干旱、高温时进行灌溉。
灌溉的原则以少量多次,每天少量的灌溉对果岭是必要的
3覆沙
覆沙的目的是修正凹凸不平的草坪表面,改善土壤结构。
在生长季节,每3〜4周覆
沙1次,厚度为1〜2mm覆沙材料必须是淡水沙子,粒径为0.25〜1mm其中有75%的0.25〜0.5mm的颗粒为最好。
覆沙一定要在晴天进行,撒布均匀,然后用扫帚按不同方向扫几次,
使地表平整。
4打孔
打孔的目的是为清除枯草层,使新生的根系有充足的生长空间,改善土壤的通气透水性
能,增强根系吸收养分、水分的能力,让老化的草坪恢复青春,保持长久的生命力。
在每年
生长季节需打孔2次,分别在4月底至5月初和9月初进行。
5碾压
碾压是保证草坪表面平整的重要手段,同时,还有利于草皮与土壤充分接触。
在建植草
坪初期和进行重大赛事时进行碾压时要注意设备的重量,千万不要过重,以免损坏草坪。