Content and services服务的内容
A3: Checking of executed construction work 检查已完成的工程 Check documentation and confirmation of executing companies (mostly paperwork) 检查并确认施工公司(书面工作为主)
2
Copyright © VDE-Institute 2012. All rights reserved
Objectives and purpose of the new VDE product portfolio VDE 新服务的目的
Confirm safety, performance and reliable system operation of the complete PV power system at the moment of system acceptance
从电气安全、性能、可靠性、寿命和融资能 力方面保证光伏电站的质量
1
Copyright © VDE-Institute 2012. All rights reserved
VDE‘s new product portfolio for PV power systems VDE在光伏电站方面的新服务
During site inspections, documentation check, Comprehensive testing etc to demonstrate safe and defect-free installation 通过现场检查、文件审核、测试等方法证实 安装安全而无严重缺陷
Source: Siemens AG
9
Copyright © VDE-Institute 2012. All rights reserved
Content and services服务的内容
A4: Checking of all documentation from construction? inspection (client self-acceptance)检查工程的所有文件
Copyright © VDE-Institute 2012. All rights reserved
7
Content and services服务的内容
A2: Checking of documentation for completeness检查文件的完整性
Precondition 前提条件: All components & sub-assemblies have to comply with their relevant product standards and be approved by a neutral & independent certification body. 所有的元器件和部件都必须满足相应的产品标准并获得中立第三方认证机构的批准。 If this precondition is not fulfilled, further verification tests are necessary. 如果不能达到此前提条件,则需要附加的确认测试。
Detailed project data 具体的项目信息 Planning documents 计划文件 List of all involved companies and sub-contractors 参与公司和协作厂总表 Special characteristics (e.g.) 特殊特性 Planned or existing lightning protection system 计划的或已有的防雷系统 Fire protection 防火措施 Emergency plan 紧急措施 Expert reports, supporting documents 专家报告,支持文件 Energy yield report 电量报告 Geological survey 地质评估 Structural analysis 结构分析 Climate and environmental conditions 气候和环境条件 Note 注释: the contractor is obliged to contribute all required data and documentation 对方必须提供所有所需的数据和文件
Copyright © VDE-Institute 2012. All rights reserved
Note 注释: the contractor is obliged to contribute all required data and documentation
供应商必须提供所有的数 据的文件
Grounding system 接地系统 DC system 直流系统 Labeling and identification 布线和标识 Rating 标称 Functional check 功能检验 Routing of Cables 走线 Switches & fuses 开关和保险丝 AC cabling 交流电线 Rating 标称 Routing of Cables 走线 Switches & fuses 开关和保险丝
Copyright © VDE-Institute 2012. All rights reserved
3ቤተ መጻሕፍቲ ባይዱ
Core foundations of bankability –the increasing relevance of technical aspect 融资能力的核心基础----更多地提及技术层面
Business plan/ Balance sheet strength 业务计划 资产负债表表的 优势
Track record 历史记录
Technical bankability: Independently proven quality of entire systems 融资能力的技术面:独立 方对系统的质量评估
The proper rating (electrical, mechanical, environmental) of all components has to be demonstrated. 所有的元器件必须有合适的(电气、机械、环境)标称。 These topics must be included in the documentation from the contractor. 此内容必须包括在供应商的文件里。
Management Team 管理团队
Risk analysis: Sustainability of long term business and market share 风险分析:长期业务 的可持续性和市场份额
…
Approval of financing for PV system 光伏电站的融资批准
Präsentation
PV Power Plant Certification 光伏电站认证
Cutting-edge quality assurance of PV power plant to support electrical safety, performance, reliability, durability and technical bankability
5
Copyright © VDE-Institute 2012. All rights reserved
Content and services服务的内容
A0: Client advisory services and general project overview 向客户介绍服务,项目概况
Obtain general data on the project 取得项目的基本数据 Size, location, owner 如电站规模、地点、业主等 Is the project already finished or still under construction? 项目已完成,还是建设中? a quotation
Bill of materials 物料清单 Documents, Datasheets and certificates of all used components 所有元器件的文件、数据及证书
PV-modules 光伏组件 Inverter 逆变器 Mounting rack 安装架 Cables 电线 Connectors 连接器 Switches 开关 Transformer 变压器 Combiner boxes 汇流箱 Monitoring system 监视系统 Lightning protection components (if applicable) 防 雷元器件 Surge protection components (if applicable) 防浪涌装置
Mounting construction 安装施工 Mounting of modules 组件安装 Correct cable routing (AC/DC) 正确的走线(AC/DC电线) Lightning protection (if applicable) 防雷(如需要) Equipotential bonding system 等电位连接 Transformer stations 变电站
--No guarantee of long-term performance
确认光伏电站在系统验收时的安全性、性能和可靠运行 --但是,不保证长期性能
Provide independent verification to demonstrate reduced risk 通过独立的确认,展示风险大幅降低 Support the achievement of technical bankability for the acquisition of financing 提高技术方面的融资能力
4
Copyright © VDE-Institute 2012. All rights reserved
Content and services 服务的内容
Service segments 服务项目
A0:
Client advisory services and general project overview 向客户介绍服务,项目概况 A1: Collection of detailed project information and gathering of all related documents and data 收集详细的项目信息,汇总相关的文件及数据 A2: Checking of documentation for completeness 检查文件的完整性 A3: Checking of executed construction work 检查已完成的工程 A4: Checking of all documentation from construction? inspection (client selfacceptance) 检查工程的所有文件 A5: Laboratory testing of modules and on-site system visit with final acceptance 在实验室测量组件,现场检查验收 A6: Issuance of report and certificate 出具报告,发证 Additional options出具报告,发证
Generate
作出报价
6
Copyright © VDE-Institute 2012. All rights reserved
Content and services服务的内容
A1: Collection of detailed project information and gathering of all related documents and data收集详细的项目信息,汇总相关的文件及数据