General specification CCS robotcutting line

合集下载

造船英语缩略词

造船英语缩略词

ABL above basing line 高于基线A.P.T aft peak tank 尾尖舱AHU air conditioning heating unit 空调室A/E auxiliary engine 辅机AIS automatic identification system 自动识别系统A/M L.O purifier heater auto/manual L.O purifier heater 自动/手动滑油提纯加热器ARPA radar and automatic radar plotting aids 雷达和自动雷达标绘仪B/R bridge room 驾驶室B/W bilge well 污水井B.T bow thrust 首侧推C/R control room 集控室C.L center line 中心线或chain locker 锚链舱C.O cooling oil 冷却油CPP controllable pitch propeller 可调螺距螺旋桨C/H cargo hold 货舱C.E chief engineer 老轨DIA diameter 直径DWT dead weight tonnage 载重吨DB double bottom 双层底或Distribution board 分电箱DEV deviation 偏差DWG drawing 图纸EEBDS 应急逃生呼吸器ER escape trunk 逃生通道E/S engine side 机旁E/R engine room 机舱EL circuit electric circuit 电路E.C.R engine control room 机控室F.O fuel oil 燃油F/W ENG finished with engine 完车F.W fresh water 淡水FB flat bar 扁钢F/V frequency and voltage 频率和电压F.P.T fore peak tank 首尖舱FWD forward 船首/向前G/E generate room 发电机GPS 全球定位系统H/C hatch cover 舱口盖H/P high pressure 高压H/T high temperature 高温HEX hexagon head bolt 六角头螺栓H.F.O heavy fuel oil 重燃油HV AC heating, ventilating and air conditioning 采暖, 通风与空调HYD hydraulic 液压IWO in way of 在…附近IEC international electronics committee 国际电工协会Jacket C.W jacket cooling water 缸套冷却水LI level indicator 液位显示器L.O lubrication oil 润滑油LED light emitting diode 发光二极管L/P low pressure 低压LCD liquid crystal display 液晶显示器LSA 消防救生MCR maximum continuous revolution 最大持续转数M.D.O marine diesel oil 船用柴油/轻柴油MH manhole 人孔M.S mild steel 低碳钢M/E main engine 主机MF/HF 中/高频ND 通径NDT non destructive test 无损探伤检验NUC 失控O.T oil tight 油密O/B over board 舷外PA/TB public address/ talk back 广播和回叫系统P.B power board 配电板PN 分称压力PL plate 钢板P port 左舷R/U run up 运转RAD radius 半径RPM revolution per minute 转数R/C remote control 遥控SW switch 开关S/B stand by 备用SC sea chest 海底门SCA V trunk scavenge trunk 扫气箱S.W.B sea water ballast 压载舱S starboard 右舷S/G steering gear 舵机S/B switch board 开关板S/T stern tube 尾管S.S stainless steel 不锈钢SSAS 船舶保安警戒系统S.D.N.R screw down non-return 螺旋止回阀S.W sea water 海水T/C 透平机TEU twenty equipment unit 集装箱(标箱)THK thickness 厚度TK tank 舱VCD valve control disc 阀门控制站VDR voltage dependent resistor 压感电阻V oyage date recorders 航程数据纪录器W/H wheel house 驾驶台W.T water tight 水密HULL(船体):ABS (American Bureau of Standard)美国船级社ANG (Angle Bar)角钢BFE (Builder Furnish Equipment)建造商提供设备BG (Bulk Carrier)散货船BHD (Bulkhead)舱壁BHP (Break Horsepower)制动马力BL (Base Line)基线BM (Breadth Molded)型宽BV (Bureau Veritas)法国船级社CAD (Computer Aided Design)计算机辅助设计CAM (Computer Aided Manufacturing)计算机辅助制造CB (Center of Buoyancy)浮心CCS (China Classification Society)中国船级社CF (Center of Floatation)漂心CFE (Contractor Furnish Equipment)承包商提供设备CG (Center of Gravity)重心CH (Channel)槽钢CM (Metacenter)稳心CPP (The Controllable Pitch Propeller)可调螺距桨CS (Carbon Steel)碳素钢DB (Double Bottom)双层底DK (Deck)甲板DM (Depth Molded)型深DNV (Det Norske Veritas)挪威船级社DWG (Drawing)图DWL (Design Waterline)设计水线DWT (Deadweight)载重量FAT (Factory Acceptance Test)工厂验收试验FB (Flat Bar)扁钢FEM (Finite Element Method)有限元法FPSO (Floating Production Storage Offloading) 浮(船)式生产储油卸油系统FSO (Floating Storage Offloading)浮(船)式储油卸油系统Fwd (Forward)向船艏GL (Germanischer Lloyd)德国船级社GM (Metacentric Height)初稳心高HP (Half Bulb Plate)球扁钢LBP (Length between Perpendiculars)垂线间长LCG (Longitudinal Center of Gravity)纵向重心LNG (Liquefied Natural Gas Vessel) 液化石油气船LOA (Overall Length)总长Long. (Longitudinal)纵骨LPG (Liquefied Petroleum Gas Vessel) 液化天然气船LR (Lloyd's Register)英国劳氏船级社MDK (Main Deck)主甲板MODU (Mobile Offshore Drilling Units)移动式近海钻井平台MS (Mild Steel)低碳钢MTO (Material Takeoff)材料估算NK (Nippon Kaiji Kyokai)日本海事协会OFE (Owner Furnished Equipment)船东提供设备OT (Oil Tight)油密PL (Plate)板RI (Register Italian)意大利船级社SB (Starboard)右舷Semi- (Semi-submersible Platform)半潜式钻井平台STLP (Suspended Tension Leg Platform)悬式张力腿平台TCG (Transverse Center of Gravity)横向重心TEU (Twenty-foot equivalent Unit)20英尺国际标准集装箱TLP (Tension Leg Platform)张力腿平台UCLL (Ultra Large Crude Carrier)超大型油船VCG (Vertical Center of Gravity)垂向重心VLCC (Very Large Crude Carrier)特大型油船WB (Web Bar)腹板WL (Waterline)水线WT (Water Tight)水密MECHANICAL & PIPING(轮机):AHU (Air Handling Unit)通风装置BHP (Break Horsepower)制动马力A/C (Air Compressor)空气压缩机A/C (Air Conditioning)空调BB (Ball Bearing)滚珠轴承BRG (Bearing)轴承CAS NUT(Castle Nut)蝶型螺帽CCR (Central Control Room)中心控制室COW (Crude Oil Washing)原油洗舱DFO (Diesel Fuel Oil)柴油DPS (Dynamic Position System)动力定位系统DT (Double-Thread)双头螺纹FS (Forged Steel)锻钢FW (Fresh Water)淡水FO (Fuel Oil)燃油GRP (Glass-reinforced Plastic)玻璃钢HV A V (Heating Ventilation and Air-condition)暖通空调系统HPU (Hydraulic Power Unit)液压工作站LSA (Life Saving Apparatus)救生器具LCC (Local Control Console)机旁控制台LO (Lube Oil)滑油MDO (Marine Diesel Oil)船用柴油OS (Operation System)操作系统PLC (Programmable Logic Controller)逻辑控制单元PMS (Power Manage System)动力管理系统ELECTRICAL(电气):AC (Alternative Current)交流电A VR (Automatic V oltage Regulation)自动电压调整计CCTV (Closed Circuit Television)闭路电视CMS (Cargo Monitoring System)货物监控系统DC (Direct Current)直流电DFT (Dry Film Thickness)干膜DG (Diesel Generator)柴油发电机DVD (Digital Video Disc) 数字化视频光盘EMSP (Emergency Shutter Panel)应急关断板ESS (Emergence Shutdown System)应急关闭系统GPS (Global Position System)全球定位系统HG (Harbor Generator)停泊发电机HT (High Temperature)高温JB (Junction Box)接线盒LED (Light Emitting Diode)发光二极管LT (Low Temperature)低温MCU (Main Control Unit)主控器箱MG (Main Generator)主发电机MUR (Manual V oltage Regulation)手动调压器NEMA (National Electrical Manufacturers Association) 国际电气制造业协会PA (Public Address System)公共寻呼系统PWM (Pulse Width Modulation)脉宽调制ST (Starter)启动器SWBD (Switch Board)配电盘,配电板UPS (Uninterrupted Power Supply)不间断电源VCR (Video Cassette Recorder)录像机PAINTING(涂装):ARD (Alkyd Resin Deck)醇酸树脂甲板漆ARF (Alkyd Resin Finish)醇酸树脂面漆ARP (Alkyd Resin Primer)醇酸树脂底漆A/C (Anti-corrosive Paint)防腐漆CAF (Compressed Asbestos Fiber)压缩石棉填料EDP (Epoxy Deck Paint)环氧甲板漆EFP (Epoxy Finish Paint)环氧面漆EPP (Epoxy Primer Paint)环氧底漆ETPF (Epoxy Tank Paint Finish)环氧舱室面漆ETPP (Epoxy Tank Paint Primer)环氧舱室底漆ETP (Epoxy Topside Paint)环氧干舷漆ERL (Erosion Resistant Lacquer)防腐漆ECP (Etching Primer) 磷化底漆EPR (Ethylene-Propylene Rubber)乙丙橡胶F/C (Finish Coating)面漆IZP (Inorganic Zinc Primer)无机锌底漆IZSP (Inorganic Zinc Shop Primer)无机锌车间底漆UTP (Polyurethane Topside Primer)聚氨脂干舷漆TE (Tar Epoxy Paint)环氧焦油漆VTP (Vinyl Tar Primer)聚乙烯焦油底漆ZRP (Zinc Rich Primer)富锌底漆WELDING and Material(焊接与材料):ASTM (American Society for Testing Materials)美国材料实验协会AWS (American Welding Society)美国焊接协会FCAW (Flux Cored Arc Welding)药芯焊丝电弧焊FRP (Fiberglass Reinforced Polyester)玻璃钢GMAW (Gas Metal Arc Welding)气体保护金属极电弧焊GRP (Glass Reinforced Polyester)玻璃钢GTAW (Gas Tungsten Arc Welding)气体保护钨极电弧焊GW (Gravity Welding)重力焊MPI (Magnetic Particle Inspection) 磁粒检验NDE (Nondestructive Evaluation)无损鉴定NDT (Nondestructive Testing)非破坏性检验PWHT (post-welded heat treatment) 焊后热处理PVC (Poly Vinyl Chloride)聚氯乙烯S/W (Spot Weld) 点焊SAW (Submerge Arc Welding)埋弧焊SMAW (Shielded Metal Arc Welding)手弧焊UT (Ultrasonic Test)超声波检验WPS (Welding Procedure Sheet)焊接程序表WQT (Welding Qualification Test)焊工资格检验OTHERS(其它):AE (Assistant Engineer)助理工程师ANSI (American National Standards Institute)美国国家标准局API (American Petroleum Institute)美国石油协会ASME (American Society of Mechanical Engineers)美国机械工程师协会Bbls (Barrels) 桶(美制容量单位1桶= 159升),C.E. (Chief Engineer) 总工程师CEO (Chief Executive Officer)首席执行总裁CIS (Chinese Industrial Standard)中国工业标准CNOOC (China National Offshore Oil Company)中国海洋石油总公司Co Ltd.(Company Limited)(股份)有限公司cu.ft. (Cubic Feet) 立方英尺cu.in. (Cubic Inch) 立方英寸GB (Guo Biao)国标GM (General Manage)总经理H.Q. (Headquarters) 总部HSE (Health, Safety & Environment)健康,安全和环保ID (Inner Dimension)内径IEC (International Electro technical Commission)国际电工协会IMO (Intergovernmental Marine Organization)国际海事组织ISO (International Standardization Organization)国际标准化协会ITU (International Telecommunication Union)国际电信联盟Ksi (kilopounds per square inch)千磅/平方英寸N/A (None Applicable)不适用NACE (National Association of Corrosion Engineer)全国防蚀工程师协会NFPA (National Fire Protection Association)国家防火协会OD (outer Dimension)外径QA (Quality Assurance)质量保证QC (Quality Control)质量管理(检查)ST (Short Ton)短吨SOLAS (International Convention of the Safety of Life at Sea)国际海上人命安全公约Spec. (specification)说明书,规格书sq.ft. (Square Feet) 平方英尺sq.in. (Square Inch) 平方英寸PROPER NOUN(专有名词):Basic Design(基础设计): Preparation of specification and plans/drawings outlining the design and in sufficient detail to gain Class approval.总括性的设计规格书和图纸等,其详细程度仅足可以通过船级社认可其设计思想。

所有船舶常用的英文缩写

所有船舶常用的英文缩写

所有船舶常用的英文缩写Company Document number:WTUT-WT88Y-W8BBGB-BWYTT-19998第一部分1 A/B Above Base Line 基准线以上2 A/C Anticorrosive Paint 防腐涂料3 A/F Antifouling Paint 防污漆4 ABS American Bureau of Shipping 美国船级社5 Abt Abt (About ) 大约,关于6 ACCOM. Accommodation 船室,居住区7 Accommodation Ladder 舷梯8 ACCU Automatic control system certified for unattended eng. Room 无人机舱自动控制系统鉴定9 AFRAMAX Average Freight Rate Assessment at the max. of Deadweight 最大负载时平均运费率评估10 Bhd After Peak Bulkhead 船尖舱舱壁11 ANSI American National Standards Institute 美国国家标准协会12 AP After Perpendicular 艉垂线13 API American Petroleum Institute 美国石油组织14 APT After Peak Tank 尾尖舱15 ARPA Automatic Rader Plotting Aids 自动雷达测图仪16 ASTM American Society of Testing Materials 美国材料实验协会17 B mld Moulded Breadth 型宽18 B/C Bulk Carrier 散货船19 Base line 基线20 Basic Design 基本设计21 Ballast Control Room 压载控制室22 BHP Brake Horse Power 制动马力23 BOG Boil-off Gas 蒸发气体24 BOM Bill of Material 材料清单25 Bkt Bracket 支架,肘板26 BHD Bulkhead 隔壁, 防水壁27 C/H Cargo Hold 货舱28 Cable Trunk 电缆管道29 CCI Class Comment Item 船级社说明项目30 CCR Cargo Control ?31C, C/L Center Line 中心线32 Center of Gravity 重心33Cert. Certificate 证书34CFR Code of Federal Regulations 联合代码35CGT Compensated Gross Tonnage 补偿总吨36 Chain Locker 锚链舱37C/Eng. Chief Engineer 轮机长38C/D Cofferdam 隔离舱,围堰39COLREG International Regulations for Preventing Collisions at Sea 国际海上避碰规则40Corr. Bhd Corrugated Bulkhead 波形舱壁41COT Crude Oil Tanker 原油油船42 COT Cargo Oil Tank 货油舱43 CPU Central Processing Unit 中央处理器44 CRI Client Request Item 船东的要求项目45 Cyl. Liner Cylinder Liner 气缸套46 D mld Moulded Depth 型深47 D/B Double Bottom 双层底48 D/B Double Bottom Water Ballast Tank 双层底水压载舱49 Td Designed Load Draft 设计满载吃水50 DGPS Differential Global Positioning System 微型全球定位系统51 D/G Diesel Generator 柴油发电器(D/G)52 DLW Design Load Water Line 设计载重水线53 DNV Det Norske Veritas 挪威船级社54 DOT Diesel Oil 柴油55 DWT Deadweight Tonnage 载重量56 E/Rm Arr't Engine Room Arr't 机舱布置图57 ECR Engine Control Room 发动机控制台58 EHP Effective Horse Power 有效马力59 Elev. Elevation 侧面图60 Fab Fabrication 加工61 FEM Finite Element Method 有限单元法62 FEU Forty-Feet Equivalent Unit 40尺集装箱63 FOC Fuel Oil Consumption 燃料消耗量64 F'cle Dk Forecastle Deck 首楼甲板65 FP Fore Perpendicular 船首垂线66 FPP Fixed Pitch Propeller 定螺距螺旋浆67FPSO Floating Production,Storage and Offloading Vessel浮式生产储油卸油船68 FPT Forepeak Tank 首尖舱69 Fr. Frame 构架70 Frame Space 肋骨间隔71 FWT Fresh Water Tank 淡水舱72 G/A General Arrangement 总体布置图73 GL Germanisher Lloyd 德国船级74 GM Metacentric Height 稳心高度75 GMDSS Global Maritime Distress and Safety System ?全球海上遇险和安全系统76 GT Gross Tonnage 总吨数77 HFO Heavy Fuel Oil 重质燃油79 I/E Inclining Experiment 倾斜试验80 IACS International Association of Classification Socities ?国际船级联合会81 ICCP Impressed Current Cathodic Protection 外加电流阴极防护82 ID IdentificationNo. 身份证号码83 IEC International Electrotechnical Commission 国际电气标准会议84 IGC International Gas Code 国际气体代码85 ILLC International Load Line Convention 国际船舶载重线协定86 ILO International Labor Organization 国际劳动机构87 IMDG International Maritime Dangerous Goods Code ?国际海上危险物规定88 IMO International Maritime Organization 国际海上机构89 INMARSATInternational Maritime Satellite system国际海上卫星系统90 INS Integrated Navigation System 综合式集成导航系统91 IOPP International Oil Pollution Prevention Certificate ?国际防止原油污染证书92 ISO International Standardization Organization ?国际标准化机构93 ITU International Telecommunication Union 国际电子通信联盟94 JB Junction Box 接线盒,分线盒95 JIS Japanese Industrial Standard 日本标准工业规则96 K/L Keel Laying 铺设龙骨97 KR Korean Register of Shipping 韩国船级协会98 KS Korean Industrial Standard 韩国工业标准99 Kts Knots 节(船速)100L/C Launching 下水101LBP Length Between Perpendiculars 两柱间长102LCG Longitudinal Center of Gravity 纵方向上重心103LNG Liquified Natural Gas 液态天然气104LO Lubricating Oil 润滑油105LOA Length Over all 全长106Longl. BhdLongitudinal Bulkhead 纵舱壁107 Longitudinal Space 纵通材间隔108LPG Liquified Petroleum Gas 液化石油气109LR Lloyd's Register of Shipping 英国船级社110 Stor. TkLub. Oil Storage Tank 润滑油储存舱111M/V Motor Vessel 内燃机船112MARPOL The Prevention of Marine Pollution from Ships ?海洋防船舶污染113MDO Marine Diesel Oil 船用柴油114MEPC Maritime Environment Protection Committee ?海洋环境保护委员会115MMSI Maritime Mobile Service Identification No. ?海洋移动通信认证号116MSC Maritime Safety Committee 海事安全委员会117NK Nippon Kaiji Kyokai 日本船级社118NM Nautical Mile 海里(合公里)119NMD Norwegian Maritime Directorate 挪威海事高级别会议120NT Net Tonnage 净吨数121OBO Ore-Bulk-Oil Carrier 矿石散装油轮122OCIMF Oil Companies' International Maritime Forum ?油类公司的国际海事法庭123ODME Oil Discharge Monitoring Equipment 油泄监视设备124P & ID Piping and Instrumentation Diagram管路及仪器装设系统图125P/C Product Carrier 油船,成品油船126P/N Part Number 零件编号127PCC Pure Car Carrier 纯载车船128PO Purchase Order 订购单129POR Purchase Order Request 订购单要求130 Pre-Erection 先行合拢131PSC Port State Control 港口国管理132QCV Quick Closing Valve 速闭阀133R & D Research and Development 研究开发134RINA Registro Italiano Navale 意大利船级135Rise of Floor 船底倾斜度136RO/RO Roll-On/Roll-Off) Ship 滚装船137Rolling 横倾138RS Russia Register of Shipping 俄罗斯船舶检验局139SATCOM Satellite Communication 卫星通信140SBG See Berufasgenossenshaft 德国船舶安全事项检查机关141SC Steel Casting 铸钢件142Sec. Section 剖面图143SF Stowage Factor 积载因素144SHP Shaft Horse Power 轴马力145SLWL Summer Load Water Line 夏季满载吃水线146SNAME The Society of Naval Architects and Marine Engineers 造船与轮机工程师协会147SNMA Swedish National Maritime Administration 瑞典海事局148SOLAS (Safety of Life at Sea) Convention 海上人命安全公约149Spec. Specification 详细说明书150SPM Single Point Mooring 单点泊系151S/C Steel Cutting 切割刚材152S/G Rm Steering Gear Room 舵机室154stiff. Stiffener 加强件155Stri.) Stringer 纵梁(纵向加强肋,吊绳)156SUS Stainless Steel 不锈钢157SWBM Still Water Bending Moment 静水中弯曲力矩158SWL Safe Working Load 安全工作负荷159sym. Symmetrical 对称的160T/Top Tank Top 内底板液舱顶盖161TCG Transverse Center of Gravity 横向重心162TEU (Twenty-Feet Equivalent Unit) 20英尺集装箱163TPC Tonnes per Centimeter Immersion 每厘米吃水吨数164ULCC Ultra Large Crude Oil Carrier 300K ?超大型原油运输船(300K以上)165UMS Unattended Machinery Space 无人机械区166USCG United States Coast Guard 美国海岸警卫队167VCG Vertical Center of Gravity 垂直重心168V/D Vendor Drawing 制作者图纸169V/L Vertical Ladder 直梯170VLBC Very Large Bulk Carrier 超大型散货船171VLCC Very Large Crude Oil Carrier 超大型原油运输船172VRC Valve Remote Control 远距离控制阀173W-1 One-man Watch Keeping 一人持续操作174 Bhd Watertight Bulkhead 水密舱墙175WBT Water Ballast Tank 压载水舱第二部分ABS (American Bureau of Standard)美国船级社ANG (Angle Bar)角钢BFE (Builder Furnish Equipment)建造商提供设备BG (Bulk Carrier)散货船BHD (Bulkhead)舱壁BHP (Break Horsepower)制动马力BL (Base Line)基线BM (Breadth Molded)型宽BV (Bureau Veritas)法国船级社CAD (Computer Aided Design)计算机辅助设计CAM (Computer Aided Manufacturing)计算机辅助制造CB (Center of Buoyancy)浮心CCS (China Classification Society)中国船级社CF (Center of Floatation)漂心CFE (Contractor Furnish Equipment)承包商提供设备CG (Center of Gravity)重心CH (Channel)槽钢CM (Metacenter)稳心CPP (The Controllable Pitch Propeller)可调螺距桨CS (Carbon Steel)碳素钢DB (Double Bottom)双层底DK (Deck)甲板DM (Depth Molded)型深DNV (Det Norske Veritas)挪威船级社DWG (Drawing)图DWL (Design Waterline)设计水线DWT (Deadweight)载重量FAT (Factory Acceptance Test)工厂验收试验FB (Flat Bar)扁钢FEM (Finite Element Method)有限元法FPSO (Floating Production Storage Offloading) 浮(船)式生产储油卸油系统FSO (Floating Storage Offloading)浮(船)式储油卸油系统Fwd (Forward)向船艏GL (Germanischer Lloyd)德国船级社GM (Metacentric Height)初稳心高HP (Half Bulb Plate)球扁钢LBP (Length between Perpendiculars)垂线间长LCG (Longitudinal Center of Gravity)纵向重心LNG (Liquefied Natural Gas Vessel) 液化石油气船LOA (Overall Length)总长Long. (Longitudinal)纵骨LPG (Liquefied Petroleum Gas Vessel) 液化天然气船LR (Lloyd's Register)英国劳氏船级社MDK (Main Deck)主甲板MODU (Mobile Offshore Drilling Units)移动式近海钻井平台MS (Mild Steel)低碳钢MTO (Material Takeoff)材料估算NK (Nippon Kaiji Kyokai)日本海事协会OFE (Owner Furnished Equipment)船东提供设备OT (Oil Tight)油密PL (Plate)板RI (Register Italian)意大利船级社SB (Starboard)右舷Semi- (Semi-submersible Platform)半潜式钻井平台STLP (Suspended Tension Leg Platform)悬式张力腿平台TCG (Transverse Center of Gravity)横向重心TEU (Twenty-foot equivalent Unit)20英尺国际标准集装箱TLP (Tension Leg Platform)张力腿平台UCLL (Ultra Large Crude Carrier)超大型油船VCG (Vertical Center of Gravity)垂向重心VLCC (Very Large Crude Carrier)特大型油船WB (Web Bar)腹板WL (Waterline)水线WT (Water Tight)水密MECHANICAL & PIPING(轮机):AHU (Air Handling Unit)通风装置BHP (Break Horsepower)制动马力A/C (Air Compressor)空气压缩机A/C (Air Conditioning)空调BB (Ball Bearing)滚珠轴承BRG (Bearing)轴承CAS NUT(Castle Nut)蝶型螺帽CCR (Central Control Room)中心控制室COW (Crude Oil Washing)原油洗舱DFO (Diesel Fuel Oil)柴油DPS (Dynamic Position System)动力定位系统DT (Double-Thread)双头螺纹FS (Forged Steel)锻钢FW (Fresh Water)淡水FO (Fuel Oil)燃油GRP (Glass-reinforced Plastic)玻璃钢HVAV (Heating Ventilation and Air-condition)暖通空调系统HPU (Hydraulic Power Unit)液压工作站LSA (Life Saving Apparatus)救生器具LCC (Local Control Console)机旁控制台LO (Lube Oil)滑油MDO (Marine Diesel Oil)船用柴油OS (Operation System)操作系统PLC (Programmable Logic Controller)逻辑控制单元PMS (Power Manage System)动力管理系统ELECTRICAL(电气):AC (Alternative Current)交流电AVR (Automatic Voltage Regulation)自动电压调整计CCTV (Closed Circuit Television)闭路电视CMS (Cargo Monitoring System)货物监控系统DC (Direct Current)直流电DFT (Dry Film Thickness)干膜DG (Diesel Generator)柴油发电机DVD (Digital Video Disc) 数字化视频光盘EMSP (Emergency Shutter Panel)应急关断板ESS (Emergence Shutdown System)应急关闭系统GPS (Global Position System)全球定位系统HG (Harbor Generator)停泊发电机HT (High Temperature)高温JB (Junction Box)接线盒LED (Light Emitting Diode)发光二极管LT (Low Temperature)低温MCU (Main Control Unit)主控器箱MG (Main Generator)主发电机MUR (Manual Voltage Regulation)手动调压器NEMA (National Electrical Manufacturers Association) 国际电气制造业协会PA (Public Address System)公共寻呼系统PWM (Pulse Width Modulation)脉宽调制ST (Starter)启动器SWBD (Switch Board)配电盘,配电板UPS (Uninterrupted Power Supply)不间断电源VCR (Video Cassette Recorder)录像机PAINTING(涂装):ARD (Alkyd Resin Deck)醇酸树脂甲板漆ARF (Alkyd Resin Finish)醇酸树脂面漆ARP (Alkyd Resin Primer)醇酸树脂底漆A/C (Anti-corrosive Paint)防腐漆CAF (Compressed Asbestos Fiber)压缩石棉填料EDP (Epoxy Deck Paint)环氧甲板漆EFP (Epoxy Finish Paint)环氧面漆EPP (Epoxy Primer Paint)环氧底漆ETPF (Epoxy Tank Paint Finish)环氧舱室面漆ETPP (Epoxy Tank Paint Primer)环氧舱室底漆ETP (Epoxy Topside Paint)环氧干舷漆ERL (Erosion Resistant Lacquer)防腐漆ECP (Etching Primer) 磷化底漆EPR (Ethylene-Propylene Rubber)乙丙橡胶F/C (Finish Coating)面漆IZP (Inorganic Zinc Primer)无机锌底漆IZSP (Inorganic Zinc Shop Primer)无机锌车间底漆UTP (Polyurethane Topside Primer)聚氨脂干舷漆TE (Tar Epoxy Paint)环氧焦油漆VTP (Vinyl Tar Primer)聚乙烯焦油底漆ZRP (Zinc Rich Primer)富锌底漆WELDING and Material(焊接与材料)ASTM (American Society for Testing Materials)美国材料实验协会AWS (American Welding Society)美国焊接协会FCAW (Flux Cored Arc Welding)药芯焊丝电弧焊FRP (Fiberglass Reinforced Polyester)玻璃钢GMAW (Gas Metal Arc Welding)气体保护金属极电弧焊GRP (Glass Reinforced Polyester)玻璃钢GTAW (Gas Tungsten Arc Welding)气体保护钨极电弧焊GW (Gravity Welding)重力焊MPI (Magnetic Particle Inspection) 磁粒检验NDE (Nondestructive Evaluation)无损鉴定NDT (Nondestructive Testing)非破坏性检验PVC (Poly Vinyl Chloride)聚氯乙烯S/W (Spot Weld) 点焊SAW (Submerge Arc Welding)埋弧焊SMAW (Shielded Metal Arc Welding)手弧焊UT (Ultrasonic Test)超声波检验WPS (Welding Procedure Sheet)焊接程序表WQT (Welding Qualification Test)焊工资格检验OTHERS(其它):AE (Assistant Engineer)助理工程师ANSI (American National Standards Institute)美国国家标准局API (American Petroleum Institute)美国石油协会ASME (American Society of Mechanical Engineers)美国机械工程师协会Bbls (Barrels) 桶(美制容量单位 1桶 = 159升),. (Chief Engineer) 总工程师CEO (Chief Executive Officer)首席执行总裁CIS (Chinese Industrial Standard)中国工业标准CNOOC (China National Offshore Oil Company)中国海洋石油总公司Co Ltd.(Company Limited)(股份)有限公司. (Cubic Feet) 立方英尺. (Cubic Inch) 立方英寸GB (Guo Biao)国标GM (General Manage)总经理. (Headquarters) 总部HSE (Health, Safety & Environment)健康,安全和环保ID (Inner Dimension)内径IEC (International Electro technical Commission)国际电工协会IMO (Intergovernmental Marine Organization)国际海事组织ISO (International Standardization Organization)国际标准化协会ITU (International Telecommunication Union)国际电信联盟Ksi (kilopounds per square inch)千磅/平方英寸N/A (None Applicable)不适用NACE (National Association of Corrosion Engineer)全国防蚀工程师协会NFPA (National Fire Protection Association)国家防火协会OD (outer Dimension)外径QA (Quality Assurance)质量保证QC (Quality Control)质量管理(检查)ST (Short Ton)短吨SOLAS (International Convention of the Safety of Life at Sea)国际海上人命安全公约Spec. (specification)说明书,规格书. (Square Feet) 平方英尺. (Square Inch) 平方英寸PROPER NOUN(专有名词):Basic Design(基础设计): Preparation of specification and plans/drawings outlining the design and in sufficient detail to gain Class approval.总括性的设计规格书和图纸等,其详细程度仅足可以通过船级社认可其设计思想。

船舶英文缩写的意思

船舶英文缩写的意思
VTP (Vinyl Tar Primer)聚乙烯焦油底漆
ZRP (Zinc Rich Primer)富锌底漆
WELDING and Material(焊接与材料):
ASTM (American Society for Testing Materials)美国材料实验协会
CB (Center of Buoyancy)浮心
CCS (China Classification Society)中国船级社
CF (Center of Floatation)漂心
CFE (Contractor Furnish Equipment)承包商提供设备
HULL(船体):
ABS (American Bureau of Standard)美国船级社
ANG (Angle Bar)角钢
BFE (Builder Furnish Equipment)建造商提供设备
BG (Bulk Carrier)散货船
BHD (Bulkhead)舱壁
DK (Deck)甲板
DM (Depth Molded)型深
DNV (Det Norske Veritas)挪威船级社
DWG (Drawing)图
DWL (Design Waterline)设计水线
DWT (Deadweight)载重量
FAT (Factory Acceptance Test)工厂验收试验
Fwd (Forward)向船艏
GL (Germanischer Lloyd)德国船级社
GM (Metacentric Height)初稳心高
HP (Half Bulb Plate)球扁钢
LBP (Length between Perpendiculars)垂线间长

汽车行业英文缩写用语中文英文日本对照表

汽车行业英文缩写用语中文英文日本对照表


Product Reliability
设计验证和产品可靠性
Design Verification plan and

Report
设计验证计划及报告

Engineering Change Notice
设计变更通知书

Engineering Change Proposal
工程变更提案

Electromagnetic Susceptibility 电磁感受性
美国福特机动车公司
○ FAW Car Co., ltd.
一汽轿车股份公司

First In First Out
先进先出
Potential Failure Mode and Effect

Analysis
潜在失效模式影响分析
○ Ford Of Australia
澳大利亚福特机动车公司
设计検证及び制品の信頼度
全米自动者产业界
○ sanyo AutoMotive Company
三洋汽车公司
オートモーティブカンパニー

Attribute Prototype
手工试作
AP(EP 前の手作り试作)
Advanced Product Quality Planning
制品品质先行计画及びコント

产品品质先期策划和控制计划
109 Ppk
110 PPM 111 PPV 112 PQPT 113 PSA 114 PSW 115 PTC 116 PV
○ ○

○ ○
○ ○

○ ○ ○


○ ○ ○ ○
○ ○ ○

船舶焊接工艺

船舶焊接工艺

南通亚华船舶制造有限公司船舶焊接工艺QW-YH —JS-032006年6月28日发布 2006年7月1日实施1.编制说明:船舶焊接施工工艺是船体施工工艺中的一项重要内容,为了保证公司产品的质量,要求公司有关人员按照此标准严格执行。

本工艺由焊接工艺、焊接作业控制、焊条的领用、焊接材料使用部位的一般规定及使用不锈钢焊条的一般要求等内容组成.2。

船体焊接工艺2.1焊接是本公司生产过程中的关键工序.要求施工人员严格遵照焊接施工工艺的要求进行焊接。

如施工中工艺与下列焊接工艺船级社认可文件不符合,需得公司总工程师及技术人员认可并在试验的基础上才能采纳。

2。

2焊接工艺船级社认可文件(附焊接工艺船级社认可文件目录) 2。

2.1手工电弧焊角接焊(J507)的施工工艺按照“G16-HDF07”执行。

2.2.2手工电弧焊角焊(J507,J422)的施工工艺按照“G17-HDF03”执行。

2。

2.3埋弧自动焊施工工艺按照“G16—HDF01"执行.2。

2。

4手工电弧焊对接焊(J422)的施工工艺按照“G17-HDF02"执行。

2.2。

5埋弧自动焊与手工电弧焊仰焊对接焊相结合的施工工艺按照“G16—HDF05”分发号:执行.2。

2。

6手工电弧焊:平焊的施工工艺按照“G16-HDF010”执行。

2.2.7手工电弧焊:横焊的施工工艺按照“G16—HDF011”执行.2.2.8手工电弧焊:立焊的施工工艺按照“G16—HDF012”执行。

2.2.9手工电弧焊:仰焊的施工工艺按照“G16—HDF013”执行.2。

2.10手工电弧焊对接焊(J507)25mm钢板,70mm锻件按照“G17—HDF04~05"执行.2。

2。

11二氧化碳保护焊打底单面埋弧自动焊(25mm)施工工艺按照“G16-HDF08”执行.2.2.12二氧化碳保护焊打底单面埋弧自动焊(14mm)施工工艺按照“G16—HDF14”执行。

分油机-中英文1-主动njlz

分油机-中英文1-主动njlz

技术协议TECHNICAL AGREEMENT需方(The Buyer): ****造船有限公司代表 (On Behalf Of):设计(The Designer): *****船舶技术有限责任公司代表(On Behalf Of):供方(The Seller): *****************有限公司代表(On Behalf Of):1概述Outline1.1 本技术规格书是用中文和英文书写,若有矛盾,以中文为准。

The agreement is written in Chinese and English, the Chinese versionis the standard if any contradiction.1.2 本协议为合同附件,是合同组成部分。

The agreement is the annex to the contract, and it is an impartiblepart of the contract.1.3 待合同签定生效后,本协议方能生效。

The agreement will go into force after the contract signed and takeeffect.1.4 本协议一式 3 份,需方 1 份,供方 1 份,设计 1 份。

The total of the agreement is 3 copies which are in uniformity,the Buyer takes 1 copies, the Seller takes 1 copies, The Designertakes 1 copies。

2 环境条件和技术要求Environment and technical requirements2.1 分离机在下列环境条件下应能正常工作:The separator runs normally under the conditions of the followings:2.1.1 使用环境温度不高于50℃The temperature is not more than 50℃.2.1.2 使用相对湿度不大于95%The relative humidity is not more than 95%.2.1.3 横摇±22.5°(10-12s)纵摇±7.5°(10-12s)Rolling ±22.5°(10-12s) Pitching ±7.5°(10-12s)横倾±15°纵倾±5°Transverse inclination ±15° Longitudinal inclination ±5°2.1.4 使用环境有盐雾、霉菌;With salt spray/mist, oil mist or fungus.2.2 技术要求Technical requirements2.2.1 分离机应符合GB/T5745-2002《船用碟式分离机》的规定。

CCS船级社40尺集装箱说明

CCS船级社40尺集装箱说明

T E C H N I C A L S P E C I F I C A T I O NFOR40’°8’°9’6” ISO 1AAA TYPESTEEL DRY CARGO CONTAINER(CHINA SHIPPING)SPECIFICATION NO.: S-S4H-10B-001DRAWING NO.: S4H-10E-001MODEL NO.: MS4H-10APISSUE DATE: Oct. 8, 2010REVISION DATE : July 4, 2011S C O P EThis specification covers the design, construction, materials, testing, inspection and performance requirements for ISO, 1AAA type steel dry cargo containers manufactured by FACTORY.The containers specified herein are manufactured under the quality control of FACTORY within the perimeters as such set forth by the Classification Societies.CONTENTS1 GENERAL (3)2 APPROVAL AND CERTIFICATES (3)............................................................………………………………………3-43 HANDLING4 TRANSPORTATION (4)5 DIMENSIONSRATINGS .............................................……………………………4-5 AND6 CONSTRUCTION ........................................................………………………………...5-107 PRESERVATION ........................................................…………………………………10-128 MARKINGS ............................................................……………………………………. 12-139 TESTING AND INSPECTION ...............................................……………………….... 13-1410 DOCUMENTS SUBMISSION (14)11 GUARANTEE (15)12 MATERIALS ......................................................………………………………………...15-1613 REVISION RECORD…………………………………………………………………………16-181. General1.1 Operational EnvironmentThe container will be designed and constructed for the transportation of general cargo on sea (above or under deck) and on land (road or rail) throughout the world, and will be suitable for the environmental conditions imposed by those modes of transport. All materials used in the construction will be able to withstand extreme temperature ranging from -30°C to 80°C without effect on container's strength and watertightness.1.2 Standards and Regulations1.2.1 Standards and RegulationsContainers shall comply with following in their latest editions :1) ISO/TC-104668------- Series 1 freight containers-Classification, external dimensions and ratings6346------ Coding, identification and marking for freight containers1161------ Specification of corner fittings for series 1 freight containers1496/1--- Specification and testing of series 1 freight containersPart 1 : General cargo containers for general purposes830------- Freight containers-Terminology6359------ Freight containers-Consolidated date plate2) The International Union of Railway (UIC) code 592-1 OR and 592-2 OR.3) The Customs Convention on the International Transport of Goods (TIR).4) The International Convention for Safe Containers (CSC).5) Transportation Cargo Containers and Unit Loads Quarantine Aspects andProcedures by Commonwealth of Australia Department of Health. (TCT)1.2.2 To satisfy the requirements of rules of classification society.2. Approval and Certificates2.1 Classification CertificateAll the containers shall be certified for design type and individually inspected by the classification society of CCS .2.2 Production CertificateThe Production Certificate of series containers to be issued by the classification society.The Society’s seal shall be provided.2.3 TCT CertificateCertificate of timber treatment to the requirement of Australia Department of Health.2.4 UIC RegistrationAll the containers will be registered & comply with the International Union of Railways.2.5 Customs Certificate (TIR)Customs’ Approval and Certificate to be issued by the Customs.2.6 CSC CertificateAll the containers will be certified and comply with the requirements of the International Convention for Safe Containers.3. HandlingThe container will be constructed to be capable of being handled without any permanent deformation which will render it unsuitable for use or any other abnormality during thefollowing conditions :1) Lifting, full or empty, at the top corner fittings vertically by means of spreaders fitted withhooks, shackles or twistlocks.2) Lifting, full or empty, at the bottom corner fittings using slings with appropriate terminalfittings at slings angle of thirty (30) degrees.4. TransportationThe container shall be constructed to be suitable for transportation for following modes without any permanent deformation which will render the container unsuitable to use or any abnormality.4.1 Marine :In the ship cell guides : Seven (7) high stacked (max gross weight 32,500 kg).On the deck : Six (6) high stacked and secured by suitable vertical and diagonal wire lashings.4.2 Road − On flat bed or skeletal chassis :Secured by twistlocks or the equivalent at the four bottom corner fittings.4.3 Rail − On the flat cars or special container car :Secured by twistlocks or the equivalent at the four bottom corner fittings.5. Dimensions and Ratings5.1 Overall Dimensions-10)12,192(0,LengthExternal (mm) Width 2,438(0, -5)-5)2,896(0,Height-10)12,031(0,LengthInternal (mm) Width 2,352(0, -5)-5)Height2,697(0,Door opening (mm) Width 2,340(0, -5)-5)Height2,585(0,5.2 Gooseneck Tunnel DimensionsmmLength 3,315Width 1,029 mm (+3, 0)Height 120 mm (0, -3)5.3 Inside Cubic Capacity : 76.4 cu.m (2,697 cu.ft)5.4 RatingMax. Gross Weight 32,500 kg 71,650 lbsTare Weight 3,890 kg 8,575 lbsMax. Payload 28,610 kg 63,075 lbs5.5 Corner Protrusions1) The upper faces of the top corner fittings will protrude above the highest level of the roofconstruction except corner plate by 6 mm.2) The outer side faces of the corner fittings will protrude from the outside faces of thecorner post by minimum 3 mm for side structure and 4mm for front end structure. The outer side faces of the corner fittings will protrude from the outside faces of the side walls by nominal 7 mm and from the outside faces of the front end wall by 8 mm.3) For the containers under the condition such as the load equal to 1.8R-T is uniformlydistributed over the floor, no part of the container base will deflect by more than 6 mm below the lower faces of the bottom corner fittings.6. Construction6.1 GeneralThe container will be constructed with steel frames, fully vertically corrugated steel side and end walls, die-stamped corrugated steel roof, wooden flooring, corrugated double hinged doors and ISO corner fittings at eight corners. All steelworks will be built up by means of automatic and semi-automatic CO2 gas arc welding (MAG welding). All exterior weldings including that on base structure will be continuous to give perfect watertightness. All the welds, even spots, will have full penetration without undercutting or porosity.6.1.1 Welding operations and electrodes will be to classification requirement.All contaminants such as water, mill scale, rust, oil, grease, dirt and paint etc. impairing the quality of the welding seam will be removed before welding.6.1.2 All welds shall be exempt of slags, cracks, undercuts, lack of penetration and fusion,including porosity etc. prior to blasting. Weld spatters must be removed and weld areas are to be blasted as per “ Abrasive Blasting ” and “ Surface Roughness”.6.1.3 The welding between the corner posts and the rails shall be continuous single welding.6.1.4 The external welding between the corner posts and the front/side panels shall becontinuous welding and the internal welding shall be as following:The continuous welding shall be 150MM from the top and 150MM from the bottom.The intermediate ”tack welding” shall be 25mm in every 250MM.6.1.5 Welding penetration at connection point between side/front panels and frame should beMin.90%, between panels should be Min.95%.6.1.6 The tensile strength of the welding rod will be equal to or higher than 490 N/mm2 .6.2 Corner FittingsCorner fittings will be designed in accordance with ISO/1161 standard, and manufactured at the workshops approved by the classification society. Steel Cover of corner fittings used on both ends to prevent floor to be cracked.6.3 Base FrameThe base frame will be composed of two (2) bottom side rails, a number of crossmembers and a gooseneck tunnel, which are welded together as a sub-assembly.6.3.1 Bottom Side RailEach bottom side rail is built of a steel pressing made in one piece. The bottom flange face outwards so as to be easily repaired and hard to corrode.Qty. : 2 pcs.Shape : Double “Z” sectionDimension : 158 x 52 x 30 x 28 x 4.5 mm6.3.2 UnderstructureA. CrossmemberCrossmembers are composed of a number of small pressed channel section and some large one located beneath each board joint of the plywood with certain center distance.Shape : "C" sectionSmall one : 122 x 45 x 45 x 4.0 mm, Qty. : 24 pcs.Large one : 122 x 75 x 45 x 4.5 mm, Qty. : 3 pcs.B. Gooseneck tunnelThe gooseneck tunnel consists of one piece pressed hat section, 12 pcs of tunnel bows, one welded box section and outriggers. The gooseneck tunnel is designed according to ISO standard :Tunnel plate : 4.5 mm thick, Qty. : one piece.Tunnel bow : 4.5 mm thick, Qty. : 12 pcs.Bolster: 150 x 100 x 4.0 mm, Qty. : one piece.Outrigger : 4.0 mm thick, Qty. : 16 pcs.6.3.3 Base GussetFour corner gussers, these protection plates will be welded from side rail to corner fittings.Dimension : 200 x 4.0 mm6.4 Front EndThe front end will be composed of front end frame and corrugated end wall, which are welded together as a sub-assembly.6.4.1 Front End FrameThe front end frame will be composed of two corner posts, one top end rail (sub-assembly), one bottom end rail and four corner fittings.6.4.1.1 Corner PostPost is made of a 6 mm thick section to ensure suitable strength and easy maintenance. 6.4.1.2 Top End Rail (sub-assembly)The front top end rail is constructed with steel square tube lower part and steel plate upper part. The upper part is extended inwards of the container certain distance with full width from front part of top corner fittings.Lower rail : 60 x 60 x 3.0 mm RHSUpper part : 3.0 mm thick6.4.1.3 Front SillThe front sill to be made of 60 x 60 x 3.0 mm RHS reinforced by 4 stiffener plates of which two 6.0mm thick plates are welded with gooseneck tunnel and two 9.0mm thick plates are welded to bottom corner fittings.Square tube 60 x 60 x 3.0 mm RHSFlat strips: 3.0 mm thick, Qty. : 2 pcs.6.4.2 Front End WallThe front end wall is composed of steel sheet fully vertically corrugated into trapezium section, butt joint together to form one panel by means of automatic MAG welding.Panel thickness : 2.0 mmDepth : 45.6 mmOuterface : 110 mmInterface : 104 mmSlope : 18 mmPitch : 250 mm6.5 Rear EndRear end is composed of Rear End Frame which consists of two corner posts, one rear header with header plate, one door sill and four corner fittings, which are welded togetheras a sub-assembly, and Door Systems which are with locking devices.6.5.1 Corner PostEach post is constructed from an inner part of channel shaped hot-rolled section steel and an outer part of steel pressing, welded together to form a hollow section to ensure the door opening and suitable strength against the stacking and racking force. Four (4) sets of hinge pin lugs are welded to each outer part of the corner post.Inner part : 113 x 40 x 12 mmOuter part : 6.0 mm thick6.5.2 Door HeaderThe door header is constructed from a lower part of a "U" shaped steel pressing with internal stiffener ribs at the location of the back of cam keeper and an upper part of steel pressing rear header plate, they are welded together to form a box section to provide a high rigidity.Rear header : 4.0 mm thickHeader plate : 3.0 mm thickRib : 4.5 mm thick, Qty. : 4 pcs.6.5.3 Door SillThe door sill is built of a special channel open section steel pressing which extended to the first cross member, with internal ribs as stiffeners at the back of each cam keeper. The upper face of the sill has a slope for better drainage and the highest part is on the same level to the upper face of the wooden floor. Two channel section steel recesses are provided adjacent to the bottom fitting to prevent damage due to any twistlock misalignment.Door sill : 4.5 mm thick, Slope : 10 mmStiffener ribs : 4.5 mm thick, Qty. : 4 pcs.Channel section : 200 x 75 x 9.0 mm6.6 Door SystemsDoors will consist of two door leaves, each leaf with two locking devices, four hinges and pins, seal gaskets and the door holders. The doors will be installed by hinge pins to the rear end frame and capable of swinging about 270 degrees.6.6.1 Door LeavesEach leaf consists of door panel, steel door frame which consists of vertical (inner & outer) and horizontal (upper & lower) members. They are welded together to form the rectangular door leave. The door are so arranged that the left leaf can not be opened without displacement of the right leaf.1) Door panel : With 3 corrugations.Panel thickness : 2.0 mmDepth : 43 mmInterface : 70 mmSlope : 32 mm2) Door frame :Vertical door member : 100 x 50 x 4.0 mm RHS (inner & outer)Horizontal door member : Channel section, 150 x 50 x 4.0 mm.6.6.2 Locking DevicesTwo locking bars are of steel tube with handles, anti-racking rings and cam ends, and fixed to each door leaf with bolts / nuts and six huck-bolts according to TIR requirements, by topand bottom bearing brackets and bar guide brackets. The bars are suspended in bearing brackets with bush of self-lubricating synthetic material "Nylatron".a) Locking device type full system: Shanghai HaiHang HH-ET/CSL or Shanghai SuralocSL-B with secure cam/keeper and pressed handle.b) Locking bars treatment : Hot-dip galvanized (75 microns) except catches and keepers.c) The 3rd cam and cam keeper has a hole for seals.6.6.3 Hinges and PinsFour forged hinges, providing with bushed hole, are welded to each door leaf.Bushing Self-lubricating synthetic - "Oilless"Pin Material : Stainless steelWasher Material : Brass (at the bottom of hinge)6.6.4 Seal GasketsThe door seal gaskets (black colour) are of EPDM rubber assembled by rivets at an about 145 mm pitch, using strip retainers and adhesive sealant on the back.Gasket's shape :"J-C" typeRetainer : Stainless steelRivet : Stainless steel6.6.5 Door Holder and ReceptacleA door holder per door, made of mixed nylon rope, is tied to the center side locking rod &the receptacle (door hook) is welded to each bottom side rail to remain the door at the open position.6.6.6 Shim3mm EPDM Shim will be placed over holes on the door except 1mm EPDM Shim for large bearing brackets.6.7 Side Wall Assembly6.7.1 Top Side RailsRail : 60 x 60 x 3.0 mm square tube section.6.7.2 Side WallsEach side wall will be composed of a number of sheets for the intermediate (inner) parts and outer panels at each end of side wall, fully vertically corrugated into trapezium section, butt welded together to form one panel by automatic MAG welding.Depth : 36 mmOuterface : 72 mmInterface : 70 mmSlope : 68 mmPitch : 278 mmInner panel : 1.6 mm thick, Qty. : 9 pcs / each side.Outer panel : 2.0 mm thick, Qty. : 2 pcs / each side.6.8 RoofThe roof will be constructed by several die-stamp corrugated steel sheets with a certain upwards camber at the center of each trough and corrugation, these sheets are butt jointed together to form one panel by automatic MAG welding.Corrugation shape Depth : 20 mmOuterface : 91 mmInterface : 91 mmSlope : 13.5 mmPitch : 209 mmCamber upwards : 6.0 mmPanel thickness : 2.0 mmSheet Qty. : 11 pcs.6.8.1 Roof Reinforcement PlateFour reinforcement plates shall be mounted around the four corner fittings.The dimension : 300 x 270 x 4.0 mm.6.9 Floor6.9.1 The Floor BoardsThe floor should be manufactured according to the IICL TB 001 standard and the otherrelated rules.The floor consists of plywood or bamboo, and treated with preservative according to thelatest requirement of Commonwealth Department of Health, Australia.The floor surface including side should be varnished with 80 micro PU, or pre coated with PSF.Floor thickness : 28 mmFloor moisture content : Less than 14%Floor material : Plywood or BambooAdhesive: Phenol formaldehyde, per B.S. 1203:1979 (as amended) with B.S. WBP rating.Bond quality for all adhesives should be no less than two (2) and the average value no less than five (5) per B.S. 1088 & 4079:1966 (as amended).Floor ply number :1) 19 plies min. if the material is Apitong or Kerung.2) 21 plies min. if the material including Bamboo,Eucalyptus, Malas, etc.Note: 3 plies min. Apitong or Kerung/14 plies min. Eucalyptus, Malas, Bamboo/ 4 pliesmax. other hardwood material.The thickness of Apitong or Kerung per ply no less than 1.2 mm after assembly.The other material can not be used without CSCL confirmation.3) 21 plies min. if all material is Bamboo.Recommended Tests:The maximum load applied at failure to the tested Specimens shall be greater than 7500N at the IICL Short Span Bending Test for the floor.*The floor manufacturer should prove the result by formal physical & chemical test report including material name,assembled method,digital photo, etc.6.9.2 Arrangement and FixingThe plywood boards are longitudinally laid on the crossmember with a pre-blasted painted and free floating flat steel at the center and two angle steel along the gooseneck tunnel.The plywood boards are tightly secured to each crossmember with countersunk self-tapping electro-zinc plated steel screws. These heads of the floor screws are countersunk below the level of the upper surface of the floor by 2.0 mm to 2.5 mm. All tapping screws shall be applied with HIFLOOR SC.Screws : M8 x 45 x Φ16 (head), electro zinc platedScrews’ Qty. : 7 pcs / end row and joint, 3 pcs / outrigger & 5pcs / otherCenter rail : 50 x 4 mm, painted with epoxy zinc topcoat"L" section : 3.0 mm thick6.10 Special Features6.10.1 Customs Seal ProvisionCustoms seal provision are made on the left locking handle and retainer of the right door in accordance with TIR requirements by "huck-bolt" rivets.6.10.2 Lashing Rings and Lashing Bars1) Lashing rings are welded to each bottom and top side rail at corresponding recessedarea of side wall.Lashing ring Qty. : Each bottom or top side rail : 10 pcs, Total: 40 pcs.2) Lashing bars are welded on each front & rear corner post slot.Lashing bars Qty. : Each front corner post : 4 pcs, Total : 8 pcs.Each rear corner post : 3 pcs, Total : 6 pcs.3) Capabilities of pull load of every lashing point are as following :Lashing rings on the side rails : 2,000 kg / each.Lashing bars on the corner posts : 1,500 kg / each.4) Treatment of lashing ring / bar : Electro zinc plated.6.10.3 VentilatorsOne ventilator with EPDM seal gasket is supplied on each side wall at the right-hand end when facing the side from outside of container, fixed by three aluminum huck-bolts, the seal is to be applied on the edges except the bottom side of the ventilator, after the completion of paint.Quantity : One for each side panel; Material : ABS labyrinth type.7. Preservation7.1 Surface Preparation of the Steelwork1) All the steel surface prior to forming or after will be degreased and shot blasted toSwedish Standard SA 2.5 to obtain the surface roughness at 25 to 35 microns which can result in the removement of all the rust, dirt, mill scale and all other foreign materials.2) Locking rod assemblies, which are welded with gear cams, bars holder and handlehinges, are hot-dipping galvanized (thickness : 75 microns).3) All fasteners such as bolts / nuts, washers, self-tapping screws, which are notmentioned in this Spec. will be electro zinc plated to 13 microns.4) Sealant for jointsEach perimeter of the floor, all the overlapped joints of inside, all the holes for bolts and nuts and all the places where may leak water will be sealed to prevent water entry. The sealant supplier shall according to china shipping nominate or approved .Sealant Materials :a. Chloroprene (Cargo contact area)b. Butyl (Hidden parts)7.2 Coating7.2.1 Prior to AssemblyAll the steel surface will be coated with primer paint immediately after shot-blasting.7.2.2 After AssemblyAll the weld joints will be shot-blasted to remove all the welding fluxes, spatters, burnt primer coatings caused by welding heat, and other foreign materials, and followed with the secondary paint operation immediately.7.2.3 PAINTING SPECIFICATION for NEW PRODUCTION CHINA SHIPPING STEEL DRYCONTAINER 1) EXTERIORProcess Kind of TreatmentOrName of PaintDry filmThickness(microns)Conditions for DryingOrPainting IntervalsSurface preparation All steel sheets and sectional parts to be blasted to ISO 8501 SIS Sa 2.5 Ideal surface roughness R-max. 30 ~ 50 microns.Shop Primer EPICON ZINC SC B-2 (M) 10 By an automated shop priming machineSecondary surface preparation All welding seams to be grit-blasted to ISO 8501 SIS Sa 2.5.Ideal surface roughness R-max 40 ~ 75 microns, white deposit, dust, oil, etc., and the surface shall be cleaned to be free from any foreign matters.Primer EPICON ZINC SC B-2 (M) 20 20 minutes at ambient temperatureUndercoat EPICON SC PRIMER 40 20 minutes at 60ºCTopcoat ACRI SC FINISH GREENCSC-510140 20 minutes at 70ºCTotal Dry Film Thickness 110 2) INTERIORProcess Kind of TreatmentOrName of PaintDry filmthickness(microns)Conditions for DryingOrPainting IntervalsSurface preparation All steel sheets and section parts to be blasted to ISO 8501 SIS Sa 2.5 Ideal surface roughness R-max. 30 ~ 50 microns.Shop Primer EPICON ZINC SC B-2 (M) 10 By an automated shop priming machineSecondary surface preparation All welding seams to be grit-blasted to ISO 8501 SIS Sa 2.5.Ideal surface roughness R-max 40 ~ 75 microns, white deposit, dust, oil, etc., and surface shall be cleaned to be free from any foreign matters.Primer EPICON ZINC SC B-2 (M) 15 20 minutes at ambient temperatureTopcoat EPICON SC INTERIOR NP *Grey CSC-910750 20 minutes at 70ºCTotal Dry Film Thickness 75 3) UNDERSTRUCTUREProcess Kind of TreatmentOrName of PaintDry filmthickness(microns)Conditions for DryingOrPainting IntervalsSurface preparation All steel sheets and sectional parts to be blasted to ISO 8501 SIS Sa 2.5 Ideal surface roughness R-max. 30 ~ 50 micronsShop Primer EPICON ZINC SC B-2 (M) 10 By an automated shop priming machineSecondary surface preparation All welding seams to be grit-blasted to ISO 8501 SIS Sa 2.5.Ideal surface roughness R-max 40 ~ 75 microns, white deposit, dust, oil, etc, shall be cleaned and surface must be free from any foreign matters.Primer EPICON ZINC SC B-2 (M) 15 20 minutes at ambient temperatureTopcoat BITUMINOUSPAINT 200 at ambient temperature Total Dry Film Thickness 225Remarks:* Zinc rich primer with a minimum zinc dust pigment content of 80% by mass (m/m) as described in ISO 12944/5 : 1988 (E), chapter 5, para 5.2;To check cutting panel with DSC result is specified as min. 55% zinc dust.Two different colors of zinc rich primers are separated for first and second priming application. * Comply with FDA Regulation.* The paint gloss of top coat : external – 40, internal – 20.* The DFT decision rules in practice is 95-5:For each area coating, less than 5% of the readings may be below the DFT specified. No readings may be below 95% of the DFT specified. Areas where the total DFT is more than twice the DFT specified are not acceptable and must be redone completely.1. The dry film thickness of these tables are minimum.2. The above specification are based on the shop-priming system subject to touching-up with 10microns zinc primer on blasting area after assembly.3. DFT of Bituminous paint are varied with product brand.4. The above painting interval and drying time are based on general guidance and the figuresare varied with applicable conditions, please consult with our technical engineer for more detail/practical figure.Zinc rich epoxy and epoxy topcoat are not applied to the wooden floor.5. Top face of crossmembers to be coated with interior paint for better anti-corrosion property. 8. Markings8.1 LetteringThe markings will be designed decal and arranged and nominated supplied according to china shipping’s requirement.The markings consist of the following contents :1) Owner’s emblems: According to owner’s design.2) Owner’s code, serial number and check digit (outside & inside)3) Size and type code (outside)4) Weight details (on door)5) UIC marking6) Other marking : According to owner’s requirements.7) Material of marking : Mactac 9800(ct), 3M.8.2 Consolidated Date Plate8.2.1 The containers will bear some of the marking plates in accordance with the requirementsof the Classification Authorities and owner such as mentioned in section 2.2 in this specification. The plate will be permanently riveted to the specified position by rivets and sealant. A piece of 1mm thick EPDM shim should be inserted between consolidated data plate and door panel for chemical resistance.Plate material :Stainless steel SUS304 Plate treatment :Chemically etched & enameled Rivets material :Stainless steel SUS304 Plate thickness :0.8 mm 8.2.2 Contents of the Plate :1) Owner’s plate (name and address)2) CSC approval No.3) Customs approval No.4) Australian wood treatmentThe engraved letters on this plate are as following :IM : ImmunizationXXXX : The name of preservativeXX : The time of immunization5) Inspection authority6) Date of manufacture (year and month − engraved or stamped)7) Owner’s serial number (stamped)8) Owner’s model number9. Testing and Inspection9.1 Proto-type ContainerProto-type container to be manufactured in accordance with this specification and shall be tested according to procedures described in the ISO 1496/1 and the Classification Society’s requirements. The containers will be fabricated & tested in advance of the mass production.9.2 Container in Mass Production9.2.1 Every container in mass production shall be manufactured under effectivequality control procedures to meet the specified standards. One in every 150 of containers shall meet the requirements of owner or classification society, and shall be tested for following items :a) Stacking testb) Lifting from top corner fitting testc) Lifting from bottom corner fitting testd) Floor testAfter completion, all the containers shall be subject to dimension check, door operation check, light leakage test & production type weather-proofness test. The containers shall be inspected by the surveyor of Classification Society and identified by the appropriate society seal.9.2.2 Each corner post structure will have tension test with 16,250 kg after welding on the line.9.3 The Proposed Criteria Table for General Prototype Testing : Test No.Test Load Method 1 Stacking Internal Load :1.8R-TTesting Load :97,200 kg/postHydraulic cylinder load to corner post through top corner fittings. Time duration : 5 mins. 2 Lifting from Top Corner FittingsInternal Load :2R-TLifting vertically from top corner fittings. Time duration : 5 mins.。

解密通用壳牌全合成机油的神秘面纱

解密通用壳牌全合成机油的神秘面纱

通用壳牌是否是真正全合成为什么价格又这么便宜这关系到了广大车主的切身利益。

:office: 1通用是一个企业是以盈利为目的的市面上正规渠道的各大全合成机油300元以下恐怕很难买到为啥这个通用壳牌才258通用难道真那么厚道吗亏本来让利给大家当然不会了这个是肯定的。

这个是心里基础。

这里公布一下通用壳牌的参数40C viscosity 57.47 cst 100C viscosity 10.51 cst CCS Viscosity cP C 4300 -30C MRV Viscosity cP C 17300 -35C 符合规格API SM ILSAC GF-4 GM 6094M FORD WSS-M2C929-A 此参数来源于壳牌喜力一位工程师由于涉及OEM保密仅能提供这么多了看不懂也没关系哈。

2要了解下通用在润滑油认证标准上有两种GM6094M 和GM4718M。

GM6094M是通用最低标准即出厂油标准。

4S的长城矿物油都是满足此标准的而通用的壳牌也仅仅为满足此标准。

GM4718M标准该标准认证的就是适合GM汽车使用的高性能润滑油标准。

这就注定通用壳仅仅是一款合格的机油而不是高性能机油。

但由于满足SM GF4 足以证明此油还是具有一定的性能完全可以放心使用。

3壳牌喜力在市面上目前有红喜力、黄喜力HX5/HX6、蓝喜力、灰喜力。

那个这个通用壳属于哪一种呢只有灰喜力是全合成但价格明显和通用壳不符通用不会是傻的把灰壳当通用壳卖。

红和黄都是矿物油蓝是半合成。

而通用口口声声称是全合成那是不是把前者全部排除了呢在这里我很佩服通用的市场策略和营销方针让你无法横向对比通用壳的本质和性能。

其实通用壳牌的确不是上述的任何一种。

4揭秘通用壳首先发一部分数据看不懂没关系看明白几个关键的就行了FULL SYNTHETIC MOTOR OIL Meets API Service Categories SM SL SJ Energy Conserving ILSAC GF-4 specification. Has enhanced wear protection and outstanding resistance to thermal breakdown at operating temperatures. PRODUCT DESCRIPTION: FormulaShell�0�3 FULL SYNTHETIC MOTOR OIL is a motor oil formulated for improved fuel economy and to provide the engine protection and performance required by engine manufacturers. FormulaShell�0�3 FULL SYNTHETIC MOTOR is compatible with other conventional and synthetic oils. It exceeds all automobile and light truck warranty requirements for gasoline and turbocharged engines where an API SM and ILSAC GF-4 oil is recommended. This oil can be used in place of API SL SJ SH or SG rated oils. Always follow the vehicle manufacturer’s recomme ndation for the right viscosity grade and API Service Category. FEATURES : FormulaShell�0�3 FULL SYNTHETIC MOTOR OIL meets or exceeds: �6�1 North American warranty requirements for U.S. European and Japanese cars and light trucks with gasoline and gasolineturbo-charged engines where API SM SL SJ SH or CF oils are specified. �6�1 ILSAC GF-4 Energy Conserving standards.�6�1 General Motors GM6094M specification �6�1 Chrysler MS 6395 specification. BENEFITS: Compared to conventional oils the results are: �6�1 Excellent lubrication at extremely low temperatures �6�1 Extra protection at extremely high temperatures �6�1 Lower oil consumption under high speed conditions �6�1 Extra protection against harmful deposits and acids which aids in a clean running and lasting engine 说到这儿可能部分英语好或者对机油比较了解的同学已经明白了这款通用壳是个什么玩意。

海上风机规范风浪荷载计算方法对比分析

海上风机规范风浪荷载计算方法对比分析

第 39 卷第 5 期2023 年10 月结构工程师Structural Engineers Vol. 39 , No. 5Oct. 2023海上风机规范风浪荷载计算方法对比分析李公豪1,2袁周驰1,2,*梁发云1,2(1.同济大学岩土及地下工程教育部重点实验室,上海 200092; 2.同济大学土木工程学院,上海 200092)摘要相比陆上风机,海上风机承受的环境荷载要更加复杂,合理地评估环境荷载对海上风机的设计与安全运行至关重要。

国内外海上风机规范关于风浪荷载计算的思路大致相同,但在计算参数选取等方面有所不同,可能会使得风浪荷载的计算结果存在差异,有必要针对风机规范的风浪荷载计算方法开展对比分析,探究不同方法对风浪荷载计算的影响。

选取最新的规范,包括中国船级社CCS规范、挪威船级社DNV GL规范及国际电工委员会的IEC规范,对比了三者的风荷载和波浪荷载计算差异。

结合典型算例开展了对比分析,计算结果表明,相较于DNV GL规范,根据CCS与IEC规范得出的风荷载值更大。

并且对风湍流的考虑更保守;对于粗糙构件,DNV GL规范的波浪荷载峰值比CCS大了4%~14%。

根据上述分析结果,针对风浪荷载计算方法的选择和参数选取提出了一些建议,可供海上风机设计时参考。

关键词海上风机,风荷载,波浪荷载,风机规范,对比分析Comparison and Analysis of Wind and Wave Load Calculation Methods in Offshore Wind Turbine SpecificationsLI Gonghao1,2YUAN Zhouchi1,2,*LIANG Fayun1,2(1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University, Shanghai 200092, China; 2.College of Civil Engineering,Tongji University, Shanghai 200092, China)Abstract Offshore wind turbines bear more complex environmental loads than onshore wind turbines. It is essential for the design and safety operation of offshore wind turbines to reasonably assessment environmental loads. The method of wind and wave load calculation in offshore wind turbine specifications are roughly same,but there are differences in the selection of calculation parameters, which may make the calculation results of wind and wave load different. It is necessary to carry out comparative analysis on the calculation methods of wind and wave load in wind turbine specifications to explore the influence of different methods on the calculation of wind and wave load. This paper selects the latest specifications, including CCS specification,DNV GL specification and IEC specification to compare the differences of wind load and wave load calculation. Combined with typical examples, the comparative analysis is carried out. The results show that the maximum wind load of CCS and IEC is larger than that of DNV GL, and the consideration of wind turbulence is more conservative. For rough components, the peak wave load of DNV GL specification is about 4 %~14 % larger than that of CCS. According to the above analysis results, some suggestions are put forward for the selection of wind and wave load calculation methods and parameter selection of offshore wind turbines, which can be used for reference in the design of offshore wind turbines.Keywords offshore wind turbine, wind load, wave load, wind turbine specification, comparative analysis收稿日期:2022-10-25基金项目:国家自然科学基金面上项目(52178346)作者简介:李公豪,男,硕士研究生,研究方向为海上风电基础。

ccs焊工认证标准

ccs焊工认证标准

ccs焊工认证标准English Answer:Certified Code of Welding (CCS), a welding quality standard accredited by the American Welding Society (AWS), is widely used to ensure the quality and safety of welded structures in various industries such as shipbuilding, construction, and petrochemical. The CCS standard specifies the requirements for welding materials, welding procedures, and welder qualification, and it is often used as a benchmark for welding contractors and fabricators to meet the highest quality standards.The main requirements of CCS welding certification include:Welding materials: The welding materials used must meet the requirements of AWS specifications.Welding procedures: The welding procedures must bedeveloped and qualified in accordance with AWS standards.Welder qualification: Welders must be qualified in accordance with AWS standards.The benefits of CCS welding certification include:Improved weld quality: CCS welding certification helps to ensure the quality and safety of welded structures.Increased productivity: By following standardized welding procedures, productivity can be increased.Reduced downtime: By using qualified welders and following standardized welding procedures, downtime can be reduced.Enhanced safety: CCS welding certification helps to ensure the safety of workers and the public.The process of obtaining CCS welding certification typically involves the following steps:Develop a welding procedure: The first step is to develop a welding procedure that outlines the specific welding parameters to be used.Qualify the welding procedure: The welding procedure must be qualified in accordance with AWS standards.Qualify the welders: Welders must be qualified in accordance with AWS standards.Implement the welding procedure: Once the welding procedure has been qualified and the welders have been certified, the welding procedure can be implemented.Maintain the welding certification: The welding certification must be maintained through periodic inspections and audits.CCS welding certification is a valuable tool for welding contractors and fabricators who want to ensure the quality and safety of their welded structures. By followingthe requirements of the CCS standard, welding contractors and fabricators can be confident that their welded structures will meet the highest quality standards.中文回答:经中国船级社(CCS)认证的焊接规范,是美国焊接协会 (AWS) 认可的焊接质量标准,广泛用于造船、建筑和石化等行业的焊接结构的质量和安全保障。

奥伟斯科技为您提供ADS四通道触摸芯片TS04应用设计解决方案

奥伟斯科技为您提供ADS四通道触摸芯片TS04应用设计解决方案

随着电子信息技术的发展,电子元器件应用逐渐多元化,智能化。

触摸芯片在现阶段的应用越来越广泛。

触摸芯片是特指单点或多点触控技术,应用范围是手机、电脑等。

四通道触摸芯片是一款能够触摸按键、触摸开关、触摸芯片、按键感应IC的芯片。

深圳市奥伟斯科技有限公司是一家专注触摸芯片,单片机,电源管理芯片,语音芯片,场效应管,显示驱动芯片,网络接收芯片,运算放大器,红外线接收头及其它半导体产品的研发,代理销售推广的高新技术企业。

自成立以来一直致力于新半导体产品在国内的推广与销售,年销售额超过壹亿人民币,是一家具有综合竞争优势的专业电子元器件代理商。

主要品牌产品:一、OWEIS-TECH:OWEIS 触摸芯片、 OWEIS 接口芯片、 OWEIS 电源芯片、 OWEIS 语音芯片、 OWEIS 场效应管一、电容式触摸芯片、ADSEMI 触摸芯片代理、芯邦科技触控芯片、万代科技触摸按键芯片、博晶微触摸控制芯片、海栎创触摸感应芯片、启攀微触摸、 IC 融和微触摸感应、IC 合泰触摸按键、IC 通泰触摸芯片二、汽车电子/电源管理/接口芯片/逻辑芯片:IKSEMICON 一级代理、 ILN2003ADT、IK62783DT、 IL2596、IL2576 、ILX485、 ILX3485、 ILX232 、ILX3232三、功率器件/接收头/光电开关:KODENSHI、 AUK、 SMK系列、 MOS管、SMK0260F、 SMK0460F、SMK0760F、 SMK1260F、 SMK1820F、 SMK18T50F四、LED 显示驱动芯片:中微爱芯 AIP 系列: AIP1668、 AIP1628 、AIP1629 、AIP1616 、天微电子 TM 系列: TM1628 TM1668 TM1621五、电源管理芯片:Power Integrations LNK364PN LNK564PN 芯朋微 PN8012 PN8015 AP5054 AP5056 力生美晶源微友达天钰电子FR9886 FR9888六、语音芯片:APLUS 巨华电子AP23085 AP23170 AP23341 AP23682 AP89085 AP89170 AP89341 AP89341K AP89682七、运算放大器:3PEAK 运算放大器、聚洵运算放大器、圣邦微运算放大器八八、发光二极管:OSRAM 欧司朗发光二极管、Lite-On 光宝发光二极管、Everlight 亿光发光二极管、 Kingbright 今台发光二极管九、CAN收发器:NXP恩智浦CAN收发器、Microchip微芯CAN收发器十、分销产品线:ONSEMI安森美 TI德州仪器 ADI TOSHIBA东芝 AVAGO安华高十一、 MCU单片机ABOV现代单片机MC96F系列、 Microchip微芯单片机PIC12F PIC16F PIC18F系列、 FUJITSU富仕通单片机MB95F系列、STM单片机STM32F STM32L系列、 CKS中科芯单片机CKS32F系列、TI单片机 MSP430系列、TMS320F系列、 NXP单片机LPC系列下面,奥伟斯主要给大家详细介绍ADS四通道触摸芯片TS04的相关产品信息:1、Specification1.1 General Feature4-Channel capacitive sensor with auto sensitivity calibrationParallel output interfaceIndependently adjustable sensitivity with external capacitorAdjustable internal frequency with external resisterEmbedded high frequency noise elimination circuitLow current consumptionRoHS compliant 16QFN, 14SOP package1.2 ApplicationMobile application (mobile phone / PDA / PMP / MP3 etc) Membrane switch replacementSealed control panels, keypadsDoor key-lock matrix application1.3 Package (16 QFN / 14SOP)2、Pin Description 2.1 16 QFN package2.2 14 SOP3、Absolute Maximum RatingBattery supply voltage 5.0V Maximum voltage on any pin VDD+0.3 Maximum current on any PAD 100mA Power Dissipation 800mWStorage Temperature -50 ~ 150℃Operating Temperature -20 ~ 75℃Junction Temperature 150℃Note Unless any other command is noted, all above are operated in normal temperature.4、ESD & Latch-up Characteristics4.1 ESD Characteristics4.2 Latch-up Characteristics5 Electrical Characteristics▪ VDD=3.3V, Rb=510k, Sync Mode (Rsync = 2MΩ) (Unless otherwise noted), TA = 25℃Note 1 : The sensitivity can be increased with lower CS value. The recommended value of CS is 10pF when using 3T PC(Poly Carbonate) cover and 10 ㎜ x 7 ㎜ touch pattern.Note 2 : The lower RB is recommended in noisy condition.6、Implementation of TS046.1 RBIAS & SRBIAS implementationThe RBIAS is connected the resistor to decide the oscillator and internal bias current. The sensing frequency, internal clock frequency and current consumption are therefore able to be adjusted with R BThe current consumption curve of TS04 is represented in accordance with RB value as above. The lower RB requires more current consumption but it is recommended in noisy application. For example, refrigerator, air conditioner and so on.6.2 CS implementationThe TS04 has available sensing channel up to 4. The parallel capacitor CS1 is added to CS1 and CS4 to CS4 to adjust fine sensitivity. The sensitivity would increase when a smaller value of CS is used. (Refer to the below Sensitivity Example Figure) It could be useful in case detail sensitivity mediation is required. The internal touch decision process of each channel is separated from each other. The four channel touch key board application can therefore be designed by using only one TS04 without coupling problem. The RS is serial connection resistor to avoid mal-function from external surge and ESD. (It might be optional.) From 200Ω to 1kΩ is recommended for RS. The size and shape of PAD might have influence on the sensitivity. The sensitivity will be optimal when the size of PAD is approximately an half of the first knuckle (it’sabout 10 ㎜x 7 ㎜). The connection line of CS1 ~ CS4 to touch PAD is recommended to be routed as short as possible to prevent from abnormal touch detect caused by connection line.There are some sensitivity difference among CS1, CS2 and CS3, and CS4 caused by internal parasitic capacitance. That sensitivity difference could be compensated by using different CS capacitor or sensitivity setting with internal register. To use different touch pattern area could be used for sensitivity compensation but not recommended. The sensitivity of each channel can be represented as below.Sensitivity of CS1 ≥ Sensitivity of CS2, CS3 > Sensitivity of CS4(In case of the external parasitic capacitance value is same on each channel.)CCS1_PARA + about 3.5pF = CCS2,3_PARA + about 3pF = CCS4_PARA * CCS1_PARA : Parasitic capacitance of CS1* CCS2,3_PARA : Parasitic capacitance of CS2 and CS3* CCS4_PARA : Parasitic capacitance of CS46.3 Output Circuit ImplementationThe OUTPUT pins have an open drain structure. For this reason, the connection of pull-up resistor ROUT is required between OUTPUT and VDD. The maximum output sink current is 4mA,so over a few kΩ must be used as ROUT. Normally 10kΩ is used as ROUT.The OUTPUT is high in normal situation, and the value is low when a touch is detected on the corresponding CS.6.4 Internal reset operationThe TS04 has stable internal reset circuit to offer reset pulse to digital block. The supply voltage for a system start or restart should be under 0.3∙VDD of normal operation VDD. No external components required for TS04 power reset, that helps simple circuit design and to realize the low cost application.7 Recommended Circuit Diagram7.1 Application Example (16QFN)7.2 Application Example (14 SOP)7.3 Example – Power Line Split StrategyA. Not split power line (Bad power line design)B.Split power line (One 5V regulator used) – RecommendedC.Split power line (Separated 5V regulator used) –Strongly recommended8、MECHANICAL DRAWING8.1 Mechanical drawing (16 QFN)8.2 Mechanical Drawing (14 SOP)9、MARKING DESCRIPTIONNOTES: LIFE SUPPORT POLICYAD SEMICONDUCTOR’S PRODUCTS ARE NOT AUTHORIZED FOR USE AS CRITICAL COMPONENTS IN LIFE SUPPORT DEVICES OR SYSTEMS WITHOUT THE EXPRESS WRITTEN APPROVAL OF THE PRESIDENT AND GENERAL COUNSEL OF AD SEMICONDUCTOR CORPORATIONThe ADS logo is a registered trademark of ADSemiconductor ⓒ 2006 ADSemiconductor – All Rights Reserved以上是“奥伟斯科技”分享的产品信息,如果您需要订购此款物料,请查看我们的官网与我们联系,非常感谢您的关注与支持!奥伟斯科技提供专业的智能电子锁触摸解决方案,并提供电子锁整套的芯片配套:低功耗触摸芯片低功耗单片机马达驱动芯片显示驱动芯片刷卡芯片时针芯片存储芯片语音芯片低压MOS管TVS二极管。

船舶类缩写词大全

船舶类缩写词大全

船舶类缩写词--------------------------------------------------------------------------------缩写词The following abbreviations may be used in the specification:下列缩写词在规格书中可能会用到:A Ampere 安培AC Alternating current 交流电AM Amplitude modulation 调幅ACB Air Circuit Breaker 空气断路器AIS Automatic Indentification System 自动识别系统ACMS Automation, Control and Monitoring system 自动操作、控制和监视系统AFFF Aqueous Film-Forming Foam 水成膜泡沫ANSI American National Standards Institute 美国国家标准协会ARCS Admiralty Raster Chart ServiceARPA Automatic Radar Plotting Aids 自动雷达标绘仪BS British Standard 大不列颠标准B&W Black & White 黑和白CD Compact disk 光盘CAD Computer Aided Design 计算机辅助设计CCR Cargo Control Room 货舱控制室CCS Cargo Control Station 货舱控制站CIP Cleaning In Process 程序清洁处理COW Crude Oil Washing COW原油洗舱CRT Cathode-Ray Tube (Monitor) 阴极射线管CCMS Cargo Control and Monitoring System 货舱控制和监控系统CCTV Closed circuit television (camera system) 闭路电视(摄影机系统)COLREG Convention on International Regulation for Preventing Collision at Sea 国际海上防腐规章规范DC Direct current 直流电DN Diameter Nominal 公称直径DFT Dry film thickness 干膜厚度DIN Deutsche Industrial Normen 德国工业标准DSC Digital selective-call 数字选择呼叫DGPS Differential Global Positioning System 差全球定位系统ER Engine room 机舱EX Explosion (proof) 爆炸(防止)ECR Engine control room 机控室EGC Enhanced Group Call 加强群体呼号EMI Electro Magnetic Interference 电磁干扰ENC Electronic Navigation Chart (vector format) 电子导航图(向量格式)ESP Enhanced Survey ProgramFC Frequency Converter 变频器FM Frequency modulation 调频FO Fuel oil (Incl. such as HFO, MDO, 船用汽油) 燃油(包括重燃油、船用柴油、船用汽油)FU Follow up 硬反馈FW Fresh Water 淡水FRP Fiber Reinforced Polyester 纤维加强聚酯FMEA Failure Mode Effect Analysis 故障形式效果分析GA General Arrangement 总布置图GS General Service (pump) 一般用途(泵)GMT Greenwich Mean Time 格林卫制标准时间GPS Global Positioning System 全球定位系统GRE Glass fiber Reinforced Epoxy 玻璃纤维加固环氧GRP Glassfiber Reinforced Polyester 玻璃纤维增强塑料管GSM Global System for Mobile telecommunications 移动通信全球系统GMDSS Global Maritime Distress and Safety System 海上遇险和安全系统GRVE Glassfibre Reinforced Plastic with Vinyl ester resin 玻璃纤维强化乙烯基树脂塑料HF High frequency 高频(3000 kHz – 30 MHz)HFO Heavy Fuel Oil 重燃油HP High Pressure 高压HT High Temperature 高温HCL Hydrochloric Acid 盐酸HRC High Rupture Capacity 高断开能力HSD High Speed Data 高速率数据HDOP Horizontal Dilution Of Precision 水平精度因子HVAC Heat, Ventilation- and Air-condition 加热、通风和空调Hz Hertz 赫兹I/O In/Out 进/出IAS Integrated Automation System 综合自动控制系统IDD International Direct Dialing 国际直接拨号IEC International Electrotechnical Commission 国际电工技术委员会IGS Inert Gas System 惰性气体系统IHO International Hydrographic Organization 国际ILO International Labor Organization 国际劳动力组织IMO International Maritime Organization 国际海事组织ISO International Standardization Organization 国际标准化组织ITU International Telecommunication Union 国际电信联盟IACS International Association of Classification Societies 国际船级社联合会IALA International Association of Lighthouse Authorities 国际灯塔权协会IAPP International Air Pollution Prevention (certificate) 国际空气防污染(证书)ILLC International Load Line Convention 国际载重线规范ICCP Impressed Current Cathodic Protection 外加电流阴极保护ISPS International Code for the Security of Ships and of Port Facilities 国际船舶和港口设备安全编码IOPP International Oil Pollution Prevention 国际防油污染INMARSAT International Maritime Satellite Organization 国际海事卫星组织JSQC Japanese Shipbuilding Standard 日本造船标准kW Kilo Watt 千瓦LO Lube Oil 滑油LT Low Temperature 低温LAN Local Area Network 局域网LCD Liquid crystal display 液晶显示LCV Lower Calorific Value 低热值LMT Local Mean Time 地方平均时LS FO Low Sulphure Fuel Oil 低硫燃油ME Main engine 主机MF Medium frequency (300 kHz – 3000 kHz) 中频(300 kHz – 3000 kHz) MCB Moulded Circuit Breaker 模制断路器MCR Maximum Continues Rating 最大连续速率MCS Machinery Control Station 机控站MDO Marine Diesel Oil 船用柴油MGO船用汽油 Marine Gas Oil 船用汽油MOB Man Over-Board boatMSB Main Switchboard 主配电板MSC Maritime Safety Committee 海事安全委员会MAMS Machinery Alarm and Monitoring Station 海事报警和监控站MCCB Moulded Case Circuit Breaker (used for heavy consumers, in MSB etc) 断路器模制箱(用作大功率电器,在MSB等)MAMACS Machinery Alarm, Monitoring, Automation and Control System机械报警、监控、自动操作和控制系统MARPOL The International Convention for the Prevention of Pollution from Ships 国际船上防污染公约NDT Non Destructive Test 非破坏性试验NFU Non-Follow Up 软反馈NOx Nitrogen Oxide 氮的氧化物NMEA National Marine Electronics Association 国际海上电子协会OTP Oil Transfer Procedure 油输送程序OCIMF Oil Companies International Marine Forum 石油公司国际海事论坛ODME Oil Discharge Monitoring Equipment 油排放监控设备PC Personal Computer 个人计算机Ph Phase (current) 相(电流)PS Port Side 左舷侧PBS Planned Maintenance System 定期维修制PCB PolyChlorinated Biphenyls 多氯联二苯PCP PolyChloroPrene 氯丁橡胶PDF Portable Document Format (file format created by Adobe Systems) 便携式文件格式(Adobe系统开创的文件格式)PEP Peak Envelope Power (Average power of a signal at its largest amplitude peak.) 峰包功率(信号在其最大振幅时的平均功率)PMS Power Management System 动力管理系统PPI Plan Position Indicator 平面位置显示器PTT Press to talk 按键通话PVC Polyvinyl Chloride 聚氯乙烯PTFE Polytetrafluorethylene 聚四氟乙烯PVCS Polyvinyl Chloride Sheeted 片状聚氯乙烯QA Quality Assurance 质量保险QC Quality Control 质量控制RCD Residual Current Device (Earth leakage protection for socket outlets)剩余电流装置(电气保护漏电插座)RFI Radio Frequency Interference 射频干扰ROV Remotely Operated Vehicle 远程操作机车RPM Revolution per minute 每分钟转数SB Starboard 右舷SG Specific Gravity 比重SW Sea Water 海水SAR Search and Rescue 搜救SIS Swedish Industry Standard 瑞典工作标准SOx Sulphur Oxide 硫的氧化物SPM Short Puls MonitoringSRS Sound Receiption System 测深系统SSB Single side band 单边带SWL Safe working load 安全工作负载SART Search and Rescue Radar Transponder 搜救雷达应答器SSAS Ship Security Alarm System 船舶安全报警系统SFOC Specific Fuel Oil Consumption 燃油耗油率SSPC Steel Structures Painting Council (The Society for Protective Coatings) 钢结构喷涂委员会(涂层保护社)SOLAS International Convention for the Safety of Lifes At Sea 国际海上生命安全公约SMPEP Shipboard Marine Pollution Emergency Plan 海上船舶污染应急方案SATCOM Satellite Communications 卫星通TV Television 电视TFT Thin Film Transistor (Type of LCD flat screen) 薄膜晶体管(平面液晶显示屏幕)UK United Kingdom 联合王国US United States 美国UTI Universal Transducer Interface 通用传感界面UV Ultraviolet 紫外线UHF Ultra high frequency (300 MHz – 3000 MHz) 超高频(300 MHz – 3000 MHz)UPS Uninterrupted Power Supply 不间断电源USD United State Dollar 美元USCG United States Coast Guard 美国海岸警卫队V Voltage 电压VDU Video Display Unit 视频显示器VCG Vertical centre of gravity 重心VDR Voyage Data Recorder 电压数据记录器VHF Very high frequency (30 MHz – 300 MHz) 甚高频(30 MHz – 300 MHz) VHS Very High Speed 甚高速W Watt 瓦特WB Water Ballast 水压载WC Water closet 厕所加强检验(是入级附加标记)EEBD Emergency Escape Breathing Device 紧急脱险呼吸装置EIRP Equivalent Isotropically Radiated Power 等效全面辐射功率EPDM Ethylene-Propylene Diene- synthetic rubber 乙烯基-丙基二烯烃-合成橡胶ERWS Electric Resistance Welded steel. 电阻焊接钢EIAPP Engine International Air Pollution Prevention 国际发动机空气防污染EPIRB Electronic Position Indicating Radio Beacons 电子定位指示无线电灯塔。

高精度数字压力开关系列 ZSE20(F) ISE20 使用说明书

高精度数字压力开关系列 ZSE20(F) ISE20 使用说明书

Instruction ManualHigh Precision Digital Pressure SwitchThe intended use of this digital pressure switch is to measure, monitorand display pressure and to provide an output signal.These safety instructions are intended to prevent hazardous situationsand/or equipment damage. These instructions indicate the level ofpotential hazard with the labels of “Caution,” “Warning” or “Danger.”They are all important notes for safety and must be followed in additionto International Standards (ISO/IEC) *1), and other safety regulations.*1) ISO 4414: Pneumatic fluid power - General rules relating to systems.ISO 4413: Hydraulic fluid power - General rules relating to systems.IEC 60204-1: Safety of machinery - Electrical equipment of machines.(Part 1: General requirements)ISO 10218-1: Robots and robotic devices - Safety requirements forindustrial robots - Part 1: Robots.•Refer to product catalogue, Operation Manual and HandlingPrecautions for SMC Products for additional information.• Keep this manual in a safe place for future reference.Caution Caution indicates a hazard with a low level of risk which, ifnot avoided, could result in minor or moderate injury.Warning Warning indicates a hazard with a medium level of riskwhich, if not avoided, could result in death or serious injury.Danger Danger indicates a hazard with a high level of risk which, ifnot avoided, will result in death or serious injury.Warning•Always ensure compliance with relevant safety laws andstandards.•All work must be carried out in a safe manner by a qualified person incompliance with applicable national regulations.•This product is class A equipment intended for use in an industrialenvironment. There may be potential difficulties in ensuringelectromagnetic compatibility in other environments due to conductedor radiated disturbances.Otherwise electric shock, malfunction or product damage can result.•Refer to the operation manual on the SMC website (URL:https://) for more safety instructions.2 Specifications2.1 General specifications∗1: Value without digital filter (at 0 ms).∗2: If the applied pressure fluctuates around the set value, the hysteresis must beset to a value more than the amount of fluctuation or chattering will occur.∗3: This setting is only available for models with the units selection function. OnlyMPa or kPa is available for models without this function.∗4: The response time indicates when the set value is 90% in relation to the stepinput.2.2 Piping / Weight specificationsProduct No. M5 01 N01 C4H C6H N7H C4L C6L N7LPort size M5 x0.8 R1/8NPT1/8φ4 mmφ5/32inchφ6mmφ1/4inchφ4 mmφ5/32inchφ6mmφ1/4inchMaterialsinfluidcontactPressure-sensing part SiliconPiping port(Common) PBT, CB156, heat resistant PPS, O-ring: HNBRPiping port -C3604(electrolessnickelplating),SUS304,NBRPOM, SUS304, NBR, C3604Weight Body [g] 22 32 34 25 26 27 28 28 34Lead wire +connector +35 g2.3 Cable specificationsConductor area 0.15 mm2 (AWG26)Insulator outside diameter 1.0 mmColour Brown, Blue, Black (3 core)Sheath outside diameter φ3.4WarningSpecial products (-X) might have specifications different from thoseshown in this section. Contact SMC for specific drawings.3 Name and function of product partsOperation light: Displays the switch operating condition.LCD display: Displays the current status of pressure, setting mode,selected display units and error code.4 types of display can be selected for the main display:Single colour of constant red or green; or switching fromred to green or green to red corresponding to the output.The indication for the sub display is orange.SET button: Press this button to change mode and to confirmsettings.Unit display: Indicates the units currently selected (only for kPa andMPa).4 Installation4.1 InstallationWarningDo not install the product unless the safety instructions have been readand understood.4.1.1 Mounting•Mount the optional bracket and panel mount adapter to the pressureswitch.4.1.2 Mounting with bracket•Mount the bracket to the body with mounting screws (Self tappingscrews: Nominal size 3 x 8L (2 pcs)), then set the body to thespecified position.∗: Tighten the bracket mounting screws to a torque of 0.5 ±0.05 N•m.Self-tapping screws are used and should not be re-used several times.•Bracket A (Part No.: ZS-46-A1)•Bracket B (Part No.: ZS-46-A2)4.1.3 Mounting with panel mount adapter•Mount part (a) to the front of the body and fix it. Then insert the bodywith (a) into the panel until (a) comes into contact with the panel frontsurface. Next, mount part (b) to the body from the rear and insert ituntil (b) comes into contact with the panel.•Panel mount adapter (Part No.: ZS-46-B)∗: The panel mount adapter can be rotated through 90 degrees for mounting.ORIGINAL INSTRUCTIONSProduct No.ZSE20(Vacuumpressure)ZSE20F(Compoundpressure)ISE20(Positivepressure)Applicable fluid Air, non-corrosive and non-flammable gasPressureRated pressure range 0.0 to-101.0 kPa-100.0 to100.0 kPa-0.100 to1.000 MPaDisplay / Set pressurerange10.0 to-105.0 kPa-105.0 to105.0 kPa-0.105 to1.050 MPaDisplay / Min. settingunit 0.1 kPa 0.001 MPaProof pressure 500 kPa 1.5 MPaPowersupply Power supply voltage 12 to 24 VDC (±10%), ripple max. 10% (p-p)Current consumption 25 mA or lessProtection Polarity protectionAccuracy Display accuracy±2% F.S. ±1 digit(at ambient temperature 25 ±3 o C)Repeatability ±0.2% F.S. ±1 digitTemperaturecharacteristics ±2% F.S. (25o C standard)SwitchoutputOutput type NPN or PNP open collector 1 outputOutput mode Hysteresis mode, window comparator mode, erroroutput, switch output offSwitch operation Normal output, reversed outputMaximum loadcurrent 80 mAMaximum appliedvoltage 28 V (NPN output)Internal voltage drop(Residual voltage) 1 V or less (Load current 80 mA)Delay time ∗11.5 ms or less (delay time for anti-chatter function:20,100,500,1000,2000, 5000 ms)Hysteresis Hysteresis modeVariable from 0 ∗2WindowcomparatormodeShort circuitprotection ProvidedDisplayUnit ∗3MPa, kPa, kgf/cm2, bar, psi,InHg, mmHgMPa, kPa,kgf/cm2, bar,psiDisplay type LCDNumber of displays 3-screen display (Main display, sub display x 2)Display colour Main display: Red/GreenSub display: OrangeNumber of displaydigitsMain display: 4 digits (7-segments)Sub display: 4 digits (Upper 1 digit 11-segments,7-segments for others)Operation light LED is ON when switch output is ON(OUT1: Orange)Digital filter ∗40, 10, 50, 100, 500, 1000, 5000 msEnvironmentEnclosure IP40Withstand voltage 1000 VAC for 1 minute between terminals andhousingInsulation resistance 50 MΩ or more between terminals and housing(with 50 VDC megger)Ambient temperaturerangeOperation: -5 to 50 o C, Storage: -10 to 60 o C(no condensation or freezing)Operating humidityrangeOperation, Storage: 35 to 85%RH(no condensation)Length of lead wire withconnector 2 m4.2 EnvironmentWarning•Do not use in an environment where corrosive gases, chemicals, salt water or steam are present.•Do not use in an explosive atmosphere.•Do not expose to direct sunlight. Use a suitable protective cover. •Do not install in a location subject to vibration or impact. Check the product specifications.•Do not mount in a location exposed to radiant heat.4.3 PipingCaution•Before piping make sure to clean up chips, cutting oil, dust etc. •When installing piping or fittings, ensure sealant material does not enter inside the port. When using seal tape, leave 1 thread exposed on the end of the pipe/fitting.•Tighten fittings to the specified tightening torque.4.3.1 Tightening the connection thread•For connecting to the body (piping specification: -M5)After hand tightening, apply a spanner of the correct size to the spanner flats of the piping body, and tighten with a 1/6 to 1/4 rotation. As a reference, the tightening torque is 1 to 1.5 N•m.(When replacing the piping adapter ZS-46-N#, tighten it using the same method).•Piping specification: -01, -N01After hand tightening, hold the hexagonal spanner flats of the pressure port with a spanner, and tighten with 2 to 3 rotations.As a reference, the tightening torque is 3 to 5 N•m.Piping specification: -C4H, -C6H, -N7H, -C4L, -C6L, -N7LFirst, tighten by hand, then use a wrench appropriate for the hexagonflats of the body to tighten an additional 1/6 to 1/4 turn.As a reference, the tightening torque is 1 to 1.5 N•m.When tightening, do not hold the pressure switch body with a spanner.4.3.2 Wiring connections•Connections should be made with the power supply turned off.•Use a separate route for the product wiring and any power or highvoltage wiring. Otherwise, malfunction may result due to noise.•If a commercially available switching power supply is used, be sure toground the frame ground (FG) terminal. If the switching power supply isconnected for use, switching noise will be superimposed and it will notbe able to meet the product specifications. In that case, insert a noisefilter such as a line noise filter/ferrite between the switching powersupplies or change the switching power supply to a series powersupply.4.3.3 How to use connectorConnector attachment / detachment•When connecting the connector, insert it straight onto the pins, holdingthe lever and connector body, and lock the connector by pushing thelever hook into the concave groove on the housing.•To detach the connector, remove the hook from the groove by pressingthe lever downward, and pull the connector straight out.Connector pin numbers4.4 LubricationCaution•SMC products have been lubricated for life at manufacture, and donot require lubrication in service.•If a lubricant is used in the system, use turbine oil Class 1 (noadditive), ISO VG32. Once lubricant is used in the system, lubricationmust be continued because the original lubricant applied duringmanufacturing will be washed away.Power is supplied.The product code is displayedfor approximately 3 sec. after supplying power.∗: Within approximately 0.2 second after power-on, the switch starts.5.1 Default Pressure settingWhen the pressure exceeds the set value, the switch will turn on. Whenthe pressure falls below the set value by the amount of hysteresis ormore, the switch will turn off. The default setting is to turn on thepressure switch when the pressure reaches the center of theatmospheric pressure and upper limit of the rated pressure range. If thiscondition, shown to the below, is acceptable, then keep these settings.[3 step setting mode (hysteresis mode)]In the 3 step setting mode, the set value (P_1 or n_1, P_2 or n_2) andhysteresis (H_1 or H_2) can bethe set value, follow the operation below. The hysteresis setting can beon the sub display.The set value on the sub display (right) will start flashing.simultaneously for 1 second or longer, the set value is displayed as [- - -],and the set value will be the same as the current pressure valueThe Pressure switch turns on within a set pressure range (from P1L toP1H) during window comparator mode.Set P1L, the lower limit of the switch operation, and P1H, the upper limitof the switch operation and WH1 (hysteresis) following the instructionsgiven above. (When reversed output is selected, the sub display (left)shows [n1L] and [n1H].)∗: Set OUT2 in the same way. (ex. P_2, H_2)Setting of the normal/reverse output switching and hysteresis/window comparatormode switching are performed with the function selection mode [F 1] Setting ofOUT1 or [F 2] Setting of OUT2.7 Simple Setting mode(1) button between 1 and 3 seconds inmeasurement mode. [SEt] is displayed on the main display. When thebutton is released while in the [SEt] display, the current pressure valueis displayed on the main display, [P_1] or [n_1] is displayed on the subdisplay (left), and the set value is displayed on the sub display (right)(Flashing).button to set the value. Then, the setting moves to hysteresis setting.(The snap shot function can be used).button to set the value. Then, the setting moves to the delay time of theswitch output. (The snap shot function can be used).Delay time setting can prevent the output from chattering.The delay time can be set in the range 0.00 to 60.00 sec. in 0.01 sec.increments.button for 2 seconds or longer to complete the setting.(If the button is pressed for less than 2 seconds, the setting will move tothe OUT2 setting).In the window comparator mode, set P1L, the lower limit of the switchoperation, and P1H, the upper limit of the switch operation, WH1(hysteresis) and dt1 (delay time) following the instructions above.(When reversed output is selected, the sub display (left) shows [n1L]and [n1H]). ∗: Set OUT2 in the same way.button between 3 and 5 seconds,display the function to be changed [F□□].button for 2 seconds or longer in functionselection mode to return to measurement mode.∗:Some products do not have all the functions. If no function is available orselected due to configuration of other functions, [- - -] is displayed on the subdisplay (right).8.1 Default Function settingsThe default setting is as follows.If no problem is caused by this setting, keep these settings.•[F 0] Display units, switch output specifications and diagnosticinformation selection function.Units specification Pressure range Default setting"Nil" or MISE20 MPaZSE20(F) kPaPISE20psiZSE20(F)•[F 1] Setting of OUT1Item Default settingOutput mode Hysteresis modeReversed output Normal outputPressure settingISE20 : 0.500 MPaZSE20 : -50.5 kPaZSE20F : 50.0 kPaHysteresisISE20 : 0.050 MPaZSE20 : 5.1 kPaZSE20F : 5.0 kPaDelay time 1.5 msecDisplay colour OUT1 ON: Green / OUT1 OFF: Red•[F 2] Setting of OUT2 is the same setting as [F 1] OUT1.•Other parameter settingsItem Default setting[F 3] Digital filter setting 0.00 s[F 4] Auto-preset function Not used[F 6] Fine adjustment of display value 0%[F10] Sub display setting std (Standard)[F11] Display resolution setting 1000-split[F80] Power saving mode OFF[F81] Security code OFF[F82] Input of line name AAAA[F90] Setting of all functions OFF[F98] Output check N/A (normal output)[F99] Reset to default settings OFF•Snap shot functionThe current pressure value can be stored to the switch output ON/OFFset point.•Peak/bottom value indicationThe maximum (minimum) pressure when the power is supplied isdetected and updated.•Zero clear functionThe displayed value can be adjusted to zero if the measured pressureis within ±7%F.S (±3.5%F.S. for compound pressure) of the zero point•Key-lock functionThe key-lock function is used to prevent errors occurring due tounintentional changes of the set values.For further details refer to the operation manual on the SMC website(URL: https://).10 How to OrderRefer to the operation manual on the SMC website (URL:https://) for How to order information.11 Outline DimensionsRefer to the operation manual or catalogue on the SMC website (URL:https://) for Outline Dimensions.12 Maintenance12.1 General MaintenanceCaution•Not following proper maintenance procedures could cause theproduct to malfunction and lead to equipment damage.•If handled improperly, compressed air can be dangerous.•Maintenance of pneumatic systems should be performed only byqualified personnel.•Before performing maintenance, turn off the power supply and besure to cut off the supply pressure. Confirm that the air is released toatmosphere.•After installation and maintenance, apply operating pressure andpower to the equipment and perform appropriate functional andleakage tests to make sure the equipment is installed correctly.•If any electrical connections are disturbed during maintenance,ensure they are reconnected correctly and safety checks are carriedout as required to ensure continued compliance with applicablenational regulations.•Do not make any modification to the product.•Do not disassemble the product, unless required by installation ormaintenance instructions.13 Limitations of Use13.1 Limited warranty and Disclaimer/Compliance RequirementsRefer to Handling Precautions for SMC Products.Caution•SMC products are not intended for use as instruments for legalmetrology.Measurement instruments that SMC manufactures or sells have notbeen qualified by type approval tests relevant to the metrology(measurement) laws of each country.Therefore, SMC products cannot be used for business or certificationordained by the metrology (measurement) laws of each country.This product shall not be disposed of as municipal waste. Check yourlocal regulations and guidelines to dispose of this product correctly, inorder to reduce the impact on human health and the environment.15 ContactsRefer to or www.smc.eu for your local distributor /importer.URL: https:// (Global) https://www.smc.eu (Europe)SMC Corporation, 4-14-1, Sotokanda, Chiyoda-ku, Tokyo 101-0021, JapanSpecifications are subject to change without prior notice from the manufacturer.© 2021 SMC Corporation All Rights Reserved.Template DKP50047-F-085M。

DCS SPECIFICATION

DCS SPECIFICATION

C ED O C U ME N T E S T N O T R E P R O P R I E T E E T N E D O I T E T R E N I U T I L I S E , N I R E P R O D U I T S A N S N O T R E A U T O R I S A T I O N E C R I T ET H I S D O C U M E N T I S O U R P R O P E R T Y A N D S H A L L N O T B E U S E D N O R R E P R O D U C E D W I T H O U T O U R W R I T T E N A U T H O R I Z A T I O NFUJIAN LNG TERMINAL AND TRUNKLINES PROJECTDISTRIBUTED CONTROL SYSTEM02REVISION RECORD02CONTENTS1 INTRODUCTION1.1 PURPOSE OF THIS DOCUMENT 1.2 GENERAL PROCESS DESCRIPTION 1.3 REFERENCES, CODES AND STANDARDS 1.4 ENVIRONMENTAL CONDITIONS 1.5 ABBREVIATIONS2 CENTRAL CONTROL SYSTEM (CCS) 2.1 CCS CONCEPT2.2 DISTRIBUTED CONTROL SYSTEM 3 GENERAL3.1 DEFINITIONS OF THE CONTROL LEVELS 3.2 GENERAL DESCRIPTION OF THE SYSTEM 3.3 FUNCTIONALITY AND GENERAL PERFORMANCES 4 ACQUISITION AND CONTROL SYSTEM4.1 HARDWARE CHARACTERISTICS4.2 SOFTWARE CHARACTERISTICS AND PERFORMANCES 5 SUPERVISORY SYSTEM5.1 SYSTEM ORGANISATION 5.2 HARDWARE CHARACTERISTICS5.3 SOFTWARE CHARACTERISTICS AND PERFORMANCES 6 COMMUNICATION SYSTEM6.1 INTERNAL DCS COMMUNICATION BUS6.2 COMMUNICATION WITH THIRD PARTY SYSTEMS 7ASSOCIATED SYSTEMS REQUIREMENT028 DOCUMENTATION8.1 HARDWARE DOCUMENTATION 8.2 SOFTWARE DOCUMENTATION 8.3 INSTRUCTION MANUALS 9 DCS ACCEPTANCE TESTS9.1 MANUFACTURER INTERNAL TEST (IFAT) 9.2 FACTORY ACCEPTANCE TESTS (FAT) 9.3SITE ACCEPTANCE TEST(SAT)021 INTRODUCTION1.1PURPOSE OF THIS DOCUMENTThis general specification covers the minimum requirements for the design, supply, configuration, programming et tests of the Distributed Control System to be installed for the FUJIAN LNG TERMINAL project.1.2 GENERAL PROCESS DESCRIPTIONThe Fujian LNG Terminal is an onshore import terminal with LNG carriers unloading facilities, LNG storage with vaporising facilities and gas export capability. The LNG terminal will be located at Xiuyu Harbor north shore development zone of PUTIAN city, Fujian province.Approximate latitude and longitude are North 25° 12’, East 110° 59’.The process of the Terminal can be described into three main functional sections: LNG unloadingLNG carriers are berthed along terminal jetty. LNG is pumped out from ship using ship pumps and sent to storage tanks through 3 unloading arms and an unloading collector routed to shore on an aerial trestle. Part of the vapour displaced during tank filling operation is sent back to carrier via a vapour return line connected to ship by means of a gas return arm. LNG storageLNG is stored in tanks at pressure close to atmosphere (two identical tanks are installed for phase I). Tanks pressure is mainly controlled by withdrawal of boil-off gas by reciprocating compressors (2 installed). In case of abnormal pressure increase in tank, boil-off gas in excess is sent to flare. LNG / NG send outLNG is withdrawn from tank by cryogenic pumps (two per tanks). Simultaneous operation of three in-tank pumps is required to provide peak flow. Part of the pumped flow can be sent to an LNG trucks loading station. Main flow is sent to the HP send-out pumps and to the vaporisers.Upstream HP send-out pumps, the LNG flow is split in two streams. One stream is routed to a recondenser where it is put in contact with compressed boil-off gas to make it condense. The rest of the flow bypasses the recondenser.Downstream recondenser, low pressure LNG is pressurised by cryogenic pumps and sent to vaporisers. There are two different vaporisation lines:02• a high pressure line (HP system) that supplies the trunklines to Wenzhou andto Zhangzhou, • a medium pressure line (MP system) dedicated to Putian power plant.Three identical HP pumps and three identical MP pumps are installed for phase I. Parallel operation of two pumps is required to provide peak flow.Under normal operating conditions LNG is vaporised by Open Rack Vaporisers (HP ORV and MP ORV) using seawater as warm fluid. For each pressure level (HP and MP), three ORV are installed during phase I with one spare.At terminal boundary, gas is delivered to two distribution pipelines. One metering station is provided on each export line, upstream Terminal battery limit.1.3REFERENCES, CODES AND STANDARDSAll equipment constituting the Distributed Control System shall be designed and manufactured in accordance with the last issues of regulations, codes, norms and standards listed in the specification “Applicable Codes and Standards” N° RC443.LL.000.B100.001.All the requirements of national legislation, regulations and codes, including regulations on environmental protection and safety, in force at site, take precedence over the minimum requirements cited in the context of this specification and must be complied with, even without explicit mention.The “General Control System Overview” architecture drawing number RC443.PL.I040.0001 has to be read in conjunction with this document.1.4ENVIRONMENTAL CONDITIONSRefer to “General Design requirement” technical note N° RC443.NT.000.P030.00011.5ABBREVIATIONSThe following abbreviations are used : BOG Boil Off GasCCS Central Control system CPU Central Processing Unit DCS Distributed Control System ESD Emergency Shut Down System FACP Fire and Gas Alarm Control Panel FGM Fire and Gas MimicFMSFacilities Management System02FOC Fibre Optic Cable FTA Field terminal Unit F&G Fire and Gas System I/O Input / Output TR Technical Room LCD Liquid Crystal Display MCC Motor Control CentreORV Open Rack seawater Vaporiser OTS Operator Training System PLC Programmable Logic Controller PMS Power Management System SIL Safety Integrated LevelSCV Submerged Combustion Vaporiser UPSUninterruptible Power Supply2 CENTRAL CONTROL SYSTEM (CCS) 2.1CCS CONCEPTThe Central Control System (CCS) will comprise a group of related, integrated control systems in charge of the control and safety of FACILITIES operations. Major systems in the CCS are: a. DCS Distributed Control Systems b. ESD Emergency Shutdown Systemc. F&G Fire & Gas System (including spillage detection)d. PMS Power Management Systeme. PA/GA Public Address and Gas Alarm Systemf.Packages control systems (such as Tank Gauging Systems, BOG compressors, SCV, ORV, emergency diesel generators, and air & nitrogen systems, unloading arms…) g. Metering systems h.InstrumentationThis specification covers the requirements for the Distributed Control System (DCS) only.022.2 DISTRIBUTED CONTROL SYSTEMThe Distributed Control System (DCS) will be the primary control system and the backbone of the CCS in order to control and supervise the Terminal operations. The CCS will utilise the DCS capabilities for managing CCS data and presenting them to the operator via interactive workstations. DCS shall be in charge of: • Operator Interface • Alarm Management • Historisation and reporting• Regulatory Control, Sequencing , Logic and Monitoring Functions • Interface to other PCS systems • Interface to other third party systems3 GENERAL3.1DEFINITIONS OF THE CONTROL LEVELS The following definitions are used in this document: Level 0: InstrumentationThis is the lowest level of the hierarchically ordered System structure. It regards all the field instruments like sensors, initiator and actuators. (They are not covered by this specification, refer to "Instrumentation General Specification” N° RC443.SG-000.1500.0100)Level 1: Acquisition and control systemThis is the intermediate level of the hierarchically ordered structure of the System. It regards all the System equipment dedicated to Data Acquisition, Control, Automation and functions. Level 2: Supervisory systemThis level regards the System equipment having the function of HUMAN-MACHINE Interface (HMI).Level 2 is the supervisory level of the Plant. Level 3: Management systemThis is the level dedicated to Advanced Control and Plant Optimisation (not covered by this specification).023.2 GENERAL DESCRIPTION OF THE SYSTEMThe system shall be based on microprocessor modules for the control and data acquisition. It shall be equipped with resident software to carry out the regulatory control algorithms, the interlock and sequential control functions.The operator interface shall be implemented through interactive workstations equipped with data display console, keyboard and printer and capable of managing the supervision, control, graphic presentation, alarm, message, diagnostic functions.An engineer workstation dedicated to the configuration of the System and the implementation/modification of the user software shall also be provided.The control modules and workstations shall be connected by a data communications system.The system shall be capable of carrying on a dialog through an appropriate interface module with external electronic computers and/or data communications standard networks (Ethernet or equivalent).3.2.1 Level 1: Acquisition and Control SystemThe Level 1 equipment shall be suitable to carry out the following functions: Interface with field instrumentation such as transmitters, initiators, switches and final elements.• Acquisition of process data from sensors to allow monitoring of process variables. • Performance of basic control functions.• Performance of calculation functions including arithmetic computation.• Performance of complex control functions including adaptive gain, feed forward, signal selection, etc • Execution of logic for performance of interlock, automation, and sequential functions. • Execution of combined regulatory and logic functions.• Handling of sequence of events with time recording for preparing alarms monitoring and data logging performed on level 2 • Transfer to Level 2 of all data, measurements and acquired events, calculated or produced by Level 1 itself. • Receive from Level 2 commands and set points.3.2.2 Level 2 : Supervisory SystemSupervisory system represents the Operator's interface towards the Plant.02• It handles and allows the following functions:• Indication of all analogue or digital process variables, open or closed loops and all related parameters • Manipulation of control loops, including: set-point change, operating mode, output, tuning, computation constants • Alarm announcing• Display of lived process graphics• Logging and possibility of both historical and trend recording • Display of sequence of events. • Display of self-diagnostics messages.• Still at Level 2, but through separate and independent equipment, the following functions are handled in addition to the above mentioned ones: • Changes, additions, canceling to the configuration of Level 2 (user software) or of the lower levels.3.2.3DCS Communication SystemThe equipment components forming the various levels are interconnected through a communication system allowing the functions described in the following paragraphs.The communication system shall be based on an open architecture using TCP/IP protocol or equivalent in a client/server environment.Also the communication medium shall be of standard manufacturers (Ethernet or equivalent).Proprietary communication systems are also acceptable; but they shall be submitted to review and approval. They shall be able to communicate with open systems based on TCP/IP protocol or equivalent.3.2.4Interface with other systemsDCS shall also communicate with CCS systems, third party control systems and management computers.3.3FUNCTIONALITY AND GENERAL PERFORMANCESThe DCS shall provide the following functionality and performances:3.3.1CapacityThe DCS must be capable of supporting the entire plant process units. Speed of response for both control functions and man-machine interface should not be02degraded under any conditions (such as, for instance, alarm overload) taking into account that this is a relatively fast-responding process.Multiple local area networks are allowed provided that the overall functionality is satisfied.3.3.2Reliability and AvailabilityThe system shall be implemented by holding reliability in the utmost consideration and in particular the selection of the electronic components and the individual entities forming the system is carried out on the basis of a continuous operating time of 2 years. AvailabilityThe System shall be highly reliable and available. The availability shall be better than 99.9 % with a MTTR of 12 hours for all functions. The Probability of Failure onDemand (PFD) shall be strictly lower than 10-2. No error propagation:The malfunction of a unit of the System, at any level, shall not propagate to other apparatuses of other levels.3.3.3ModularityThe system shall be of a modular construction and easily expansible. The module typology holds in due consideration the requirements of interchangeability and reduction of storage costs.3.3.4RedundancyHigh reliability is important if we take into account that the loss of critical process units would result in major upsets and costly restart time. The DCS should have ability to continue operation, without upsets, even in case of one critical equipment failure.Consequently, the System shall be configured in such a way that some equipment could be redundant.Particularly, all the following parts/functions of the System shall be completely redounded: • all CPU’s• all communication buses • all communication modules • all power supply modules• all parts dedicated to continuous control including I/O cards02• all parts dedicated to interlock or sequential logic controlAll boards or equipment shall be equipped with redounded supply system connected to separate supply systems.The redundancy layouts shall be implemented in such a way that the transfer from each element to its back-up in redundancy and return to normal situation is immediate, automatic and such as not to affect the process, the operator stations, the computation or other functions.The transfer from a unit to the back up one shall be in any case alarmed.The System is fitted with a redunded memory comparing automatic device, which generates an alarm signal in the event that the result of comparison is negative. In the event of a discrepancy between the contents of the memories, it shall be possible to eliminate such difference keeping the System running.The System will be implemented in such a way that it is possible to replace the unit in redundancy of the main one without affecting the operation of the System itself.3.3.5SecurityA DCS, by nature, is relatively easy to reconfigure. The system should provide various levels of password and/or key protection to allow for different levels of authorisation when maintenance is being performed.3.3.6MemoriesMemories of non-volatile type shall be provided for the configuration data. It shall not be necessary to reload other "offline" devices in case of System restarting. In the event that RAM are used with buffer batteries, these shall be suitable to maintain the memories for 30 days.The battery charge state shall be continuously monitored. A special alarm shall be generated when the required maintenance times cannot be ensured.All batteries shall be replaceable without needing to interrupt the functionality of the associated memories.The System is fitted with memory sufficient to carry out all the required control, protection and automation functions.The System configuration shall be such as to leave at least 30% of memory space available for future changes.It is preferred that all memory modules are expansible with no need of hardware or software changes.023.3.7 SynchronisationAll System apparatuses at any level shall maintain an internal clock having a resolution of 1 millisecond. Such clock shall be resettable from the operator station or from the configuration station. All system clocks shall be synchronised within 1 millisecond one from the other.Within the System there are more Master stations in such a way that the malfunction of an individual apparatus cannot affect the operation or the synchronisation of the others.Each Level 1 apparatus of the System shall be suitable to generate such synchronisation signal.3.3.8 Data BaseAll Input/Output signals to the System shall be identified with the same identifying tag name, generally that one of the field instrument.The System allows the input, output signals or internal variable to be identified with a name of 12 digits at least.For each input, output or internal variable, this name will be unique and can be used in any level of the DCS and for any function (acquisition, control, supervision, configuration and programming, visualisation, logging, etc..)3.3.9 Basic control.DCS shall allow implementation of standard control functions (PID, ratio, cascades, etc.).3.3.10 Extended controlThe DCS should provide ways to implement user functions including modifying standard algorithms or defining new ones.This functionality should be available by use of a high-level programming language from an industry standard. The ability to include logic functions (e.g. interlocks) may be necessary for implementing certain advanced control functions.3.3.11 Multivariable controlA highly desirable feature of the DCS is that multivariable predictive control (MPC) can be performed directly rather than in process control computer interfaced. This will allow high speed, high reliability and state-of-the-art advanced control within the basic instrumentation system.It also allows, for the operator interface, to be consistent with standard control functions display for all advanced process control applications.02Multivariable control should be able to run as fast as every 15 seconds, even if, typically, run once per minute is enough.3.3.12 Loop processingSome functions need to be processed rapidly, at least twice per second (4 to 10 times per second desired). Others can be done much less frequently (once per minute to 4 times per minute typically for multivariable controls).The DCS must provide a mechanism to distribute the processing load so that this wide range of loop execution frequency can be accommodated. The load distribution shall not affect any functionality.3.3.13 Communications with third party systemsThe DCS must offer possibility of interface with third party systems. Three types of communication may be considered:• For major CCS systems such as safety systems (ESD and Fire and Gas systems, etc…). • In this case, the preferred DCS interface shall be via the DCS's own internal communication system where the CCS subsystems appear as nodes on the system and have established and integrated software. • For external control systems such as machinery and package control systems, tank gauging systems, metering system, motorised valves management system, power management system, HVAC control system etc… • In that case, standard serial link (RS 232, 485, etc..) redundant or not according to application with proven protocol (such as MODBUS) shall be used. • High level of communication can be also considered after review and approval. • For management and associated systems such as Management information system, Asset management system, operator training system, advanced control system etc.. • In that case, DCS shall be able to carry on a dialog through appropriate interface module and communications standard network (Ethernet or equivalent).3.3.14 Installation of the systemThe system will be installed in a non-classified area (control room, technical room) - ISA S71.04 & S71.01 G1AXThe System shall be suitable to operate in a room with the following ambient parameters: Maximum: T = 40°CRelative Humidity = 90%02Minimum: T = 10° Relative Humidity = 20%The system shall be suitable to be stored in a warehouse with the following limit ambient parameters: T from 0 to + 50°CRelative Humidity from 20% to 95%DCS equipment shall be in accordance with IEC 6100 norms regarding EMC interference.Earth shake protectionShock of 15G, 10 millisecond duration or steady state vibration of 2.5G, 5-500 Hz shall not result in any damage or malfunction.3.3.15 System Electric SupplyThe system shall be supplied at 220 V - 50 Hz from a UPS supply with the following tolerances: Voltage220 V + 10%, 220 V - 10% Frequencies50 Hz + 3%, 50 Hz - 4%The system is to supply all external loops except those identified as "externally supplied".All supply units shall be redundant and implemented in such a way as to prevent that the malfunction of a unit may extend to the other units as well.The transfer of supply from the unit under failure to the back up one is instantaneous and without interruptions in the normal operation of the System. The outputs of all supply units shall be monitored by the System and any malfunctions shall be immediately identified and alarmed.In case of interruption then coming back of the power, the system shall automatically start with no need of a manual data reloading from disks, tapes or else.The starting and reset of each System component shall not require the performance of complex procedures.024 ACQUISITION AND CONTROL SYSTEM 4.1 HARDWARE CHARACTERISTICS 4.1.1Input /Output cards4.1.1.1 GeneralThe I/O cards shall be of a strong design, high quality and manufactured in such a way as to be suitable for the installation in an industrial environment.The System shall be implemented in such a way that all types of I/O cards may be installed in all positions of the relevant nest. It shall be implemented in such a way that every I/O card may be removed or inserted under voltage. The System shall be equipped with diagnostics suitable to prevent that the insertion and removal of I/O cards may cause errors in signal scanning.Each individual I/O channel shall be protected by fuses.All fuses shall be equipped with optical indicator; furthermore the fuses may be replaced with no need to remove the card, keeping in operation all channels not protected by the fuse to be replaced.The minimum insulation between I/O channels and between the channels and the common is 75 MΩ.4.1.1.2 Analogue Input CardsThe analogue input cards available are suitable for the following typologies of signals: • 1 - 5 VDC• 4 - 20 mA self supplied or externally supplied • thermocouples (I, K, T, E) • RTD 100 Ω PtThe analogue input cards 4-20mA shall be equipped with a device to check the functionality of the loop (open - short circuit detection).The supply to field transmitters for the 4-20 mA loops shall be 24 VDC.The thermocouple input cards shall be equipped with compensation of the cold junction and with a device to detect any burnout.The linearization of the signals from thermocouples or thermo-resistors shall be made at card level or at software level.The scan rate for analogue inputs, which are part of control loops, shall not be more than 0.25 seconds.02The scan rate for analogue inputs not involved in control loops, shall not be more than 1.0 seconds.The only exception to the above, can be the loop relevant to temperature measurement for which a scan rate of 5.0 seconds can be accepted. Each card shall be equipped with its own A/D conversion unit.4.1.1.3 Analogue Output CardsThe analogue output cards shall comply with the following technical requirements: • they are suitable to control a load of 400 Ω at least; • the output range is 4-20 mA • the resolution is 12 bits • the linearity is 0.1%• the action in the event of malfunction of the card or the logic shall be pre-selectable (high - low or unchanged) • The card circuitry shall be suitable to monitor the state of the loop connected and in particular the conditions of open loop or short circuit ones. • Analogue output cards shall have an individual D/A converter for each analogue output. • The scan rate (output update) for analogue outputs, which are part of control loops, shall not be more than 0.25 seconds.4.1.1.4 Digital Input CardsThe digital or low frequency pulse inputs cards shall comply with the following requirements:• each entry shall be optically isolated (2500 V),• each loop shall be supplied from the system, which recognises loop state changes with impedance of 1000 ohms at least (including the contact resistance), • the state of each digital input shall be visible on the card front through a special LED. • the digital input channels shall be equipped with filter suitable to discard signals having duration of less than 2 millisec. • the pulse counters shall have a range from 0.1 to 100 Hz; the duration of pulses may vary starting from a minimum of 5 millisec.024.1.1.5 Digital Output CardsOutput cards shall normally be solid state able to drive field solenoid valves and relays for electrical interface. Solid state outputs shall be 24 VDC and be capable providing at least 300 mA to the external coil. No interposing relays shall be used with exception of electrical interface. In this case the interposing relays could be installed in a dedicated cabinet located in the electrical sub-station.In case of relays mounted on digital output cards included in the DCS supply, the same shall comply with the following technical requirements: • they are capable of switching 2 A under 220 V 50 Hz • they bear a continuous peak load of 10 A• it is possible to select the state of each "normally open". or "normally close" output • the relays used on the cards are suitable to bear 1.000.000 operations at the provided load. • the relays shall be exempt from vibrations.4.1.1.6 Remote I/OThe DCS shall be able to drive remote control systems, which include dedicated DCS processors and I/O cards and/or remote I/O in order to implement the Electrical/Instrument Interface in electrical substation (if any) or when the distance between field instrumentation and Control Building becomes too long (e.g. jetty). The remote communication shall be via redundant fibre optic devices. All necessary equipment, FO converters and the accessories relevant to the fibre optic system will be part of the DCS supply.4.1.1.7 Fieldbus systemField bus system will not be used for this project4.1.1.8 ScanningIt shall be possible to assign, by configuration, various scanning times to I/O signals. The selection of the scanning time is carried out by taking in due consideration the speed with which each signal changes from its normal operating state to the abnormal one.The scanning time of some I/O signals may be automatically modified by program. This will allow that points with normally slow dynamics could be sampled at greater frequencies during some particular transients (starting).4.1.1.9 Checking of loop integrityThe system constantly shall check all the analogue I/O to verify that they are within02data relevant to the points in malfunction state shall be the last valid one measured; in this event the status "freeze value" shall be clearly indicated. As a rule the malfunction of an analogue input signal of a control loop shall cause the controller to be switched to the manual mode and an alarm to be generated in order to call the attention of the operator.4.1.2ControllersControllers shall be multiloops microprocessors based modules.Power supply modules such as interface modules with internal communication system shall be systematically redundant.Control processor unit (CPU) shall be redundant if regulatory functions are performed by the relevant controller.No processor shall be loaded at more than 70% of its processing capacity. Field I/O’s shall be grouped and assigned to CPU’s using the following guidelines: • Communication between CPU’s across the DCS communication network (peer to peer communication) shall be minimised. • CPU I/O assignment should be designed according to process area segregation. This means that generally each process area cannot be controlled by different CPUs.4.1.3InstallationAll equipment and modules related to acquisition and control system shall be completely installed and wired inside system cabinets.These cabinets shall be self-standing and designed for 19” rack mounting, standard Rittal type or equivalent. Nevertheless the following requirements must be taken into account:• Cabinets shall have front and rear access. • Cables entry shall be from bottom• Preferred dimensions (WxHxD) : 800 x 2100 x 800 mmField Terminal Assemblies (FTA) shall be separated from I/O cards.They shall be installed inside marshalling cabinets in which intrinsic safety barriers and marshalling related to field multicore cables shall be also mounted.Cross connections between marshalling and terminal units shall be part of vendor supply.Marshalling cabinets shall have the following characteristics:。

关于散货船首尖舱防撞舱壁阀设置探讨

关于散货船首尖舱防撞舱壁阀设置探讨

关于散货船首尖舱防撞舱壁阀设置探讨作者:袁亚文朱强强付涛李家院来源:《广东造船》2019年第03期摘 ; ;要:在某散货船设计建造过程中,设计人员与船检人员对要求散货船防撞舱壁上设置阀的相关规则和规范条款理解存在异议。

本文结合该船案例,对SOLAS公约和CCS规范相关条款进行分析、研讨,提出了几个可行方案。

关键词:散货船;防撞舱壁;螺旋阀;操纵位置;封闭处所;通道中图分类号:U664.8 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ;文献标识码:AAbstract: During the construction of a multi-purpose cargo ship, it was found that the design and arrangement of the valves on the forepeak collision bulkhead didn’t met the relevant rules and regulations. Based on the case of this ship, the relevant clauses of SOLAS convention and CCS specification are analyzed and discussed and several feasible schemes are proposed.Key words: Bulk carrier; Forepeak; Collision bulkhead; Spiral valve; Control position; Closed space; Channel1 ; ;前言在入级CCS船级社的某散货船建造检验过程中,现场验船师提出该船安装在首尖舱防撞舱壁上用于注入或排出首尖舱内压载水的阀门为一个遥控蝶阀,不满足公约和规范的要求,且船厂也未向主管机关申请等效豁免。

General International 机器人说明书

General International 机器人说明书

THANK YOUfor choosing this General International machine. This tool has been carefully tested and inspected before shipment and if properly used and maintained, will provide you with years of reliable service. To ensure optimum performance and trouble-free operation, and to get the most from your investment, please take the time to read this manual before assembling, installing and operating the unit.The manual’s purpose is to familiarize you with the safe operation, basic function, and features of this tool as well as the set-up, maintenance and identification of its parts and components. This manual is not intendedas a substitute for formal woodworking instruction, nor to offer the user instruction in the craft of woodworking. If you are not sure about the safety of performing a certain operation or procedure, do not proceed until you can confirm, from knowledgeable and qualified sources, that it is safe to do so. Once you’ve read through these instructions, keep this manual handy for future reference.GENERAL® INTERNATIONAL WARRANTYAll component parts of General® International products are carefully inspected during all stages of production and each unit is thoroughly inspected upon completion of assembly.2-YEAR LImITEd WARRANTYAll products are warranted for a period of 2 years (24 months) from the date of purchase. General® International agrees to repair or replace any part or component which upon examination, proves to be defective in either workmanship or material to the original purchaser during this 2-year warranty period, subject to the “conditions and exceptions” as listed below. Repairs made without the written consent of General International will void the warranty.DisclaimerThe information and specifications in this manual pertain to the unit asit was supplied from the factory at the time of printing. Because we are committed to making constant improvements, General International reserves the right to make changes to components, parts or features of this unit as deemed necessary, without prior notice and without obligation to install any such changes on previously delivered units. Reasonable care is taken at the factory to ensure that the specifications and information in this manual corresponds with that of the unit with which it was supplied. However, special orders and “after factory” modifications may render some or all information in this manual inapplicable to your machine. Further, as several generations of this tool model and several versions of this manual may be in circulation, if you own an earlier or later version of this unit, this manual may not depict your machine exactly. If you have any doubts or questions contact your retailer or our support line with the model and serial number of your unit for clarification.To file a claimTo file a claim under our Standard 2-year Limited Warranty, all defective parts, components or machinery must be returned freight or postage prepaid to General® International, or to a nearby distributor, repair center or other location designated by General® International. For further details contact our service department: Usa toll-free (844) 877-5234 or (419) 877-5234 / canada toll-free (888) 949-1161 or (604) 420-2299 or through our website: .Along with the return of the product being claimed for warranty, a copy of the original proof of purchase and a “letter of claim” must be included (a warranty claim form can also be used and can be obtained, upon request, from General® International or an authorized distributor) clearly statingthe model and serial number of the unit (if applicable) and includingan explanation of the complaint or presumed defect in material or workmanship.coNDiTioNs aND eXcePTioNsThis coverage is extended to the original purchaser only. Prior warranty registration is not required but documented proof of purchase, i.e. a copy of original sales invoice or receipt showing the date and location of the purchase as well as the purchase price paid, must be provided at the time of claim.2wARNINGS AND CAUTIONS Be sure to read, understand and follow all safety warnings and instructions in the supplied operator’s manual.WORk AREA1. kEEP CHILDREN AND BYSTANDERS AWAY.All children should be kept away from the work area. Don’t let themhandle machines, tools or extension cords. Visitors can be a distraction and are difficult to protect from injury.2. kEEP WORkING AREA CLEANand be sure adequate lighting is available. Cluttered areas inviteinjuries.3. MAkE WORkSHOP kID-PROOFwith padlocks, master switches, or by removing starter keys.4. AVOID DANGEROUS ENVIRONMENTSDon’t use power tools in damp or wet locations. Keep work area well lit.Do not expose power tools to rain. Do not use the tool in the presence of flammable liquids or gases.5. STORE IDLE EQUIPMENT.Store equipment in a dry area to inhibit rust. Equipment also should be in a high location or locked up to keep out of reach of children. PERSONAL SAFETY1. LEARN THE MACHINE’S APPLICATIONS AND LIMITATIONS,as well as the specific potential hazards particular to this machine.Follow available safety instructions and safety rules carefully.2. DON’T OVERREACH.Keep proper footing and balance at all times. Do not reach over oracross machines that are running.3. STAY ALERTWatch what you are doing. Use common sense. Do not operate tool when you are tired. Do not operate while under medication or whileusing alcohol or other drugs.4. AVOID DISTRACTIONS WHILE OPERATING.5. WEAR APPROPRIATE APPARELDo not wear loose clothing, gloves, bracelets, necklaces,or jewellery while operating the tool. Wear face, eye, ear, respiratory and bodyprotection devices, as indicated for the operation or environment.6. ALWAYS WEAR SAFETY GLASSESAlso use face or dust mask if cutting operation is dusty, and ear plugs during extended periods of operation. Everyday eyeglasses have only impact resistant lenses, they are NOT safety glasses.7. GUARD AGAINST ELECTRIC SHOCkPrevent body contact with grounded surfaces. For example: pipes,radiators, ranges, refrigerator enclosures. When your body is grounded the risk of electric shock increases. When working wherever “live”electrical wires may be encountered, try to ascertain whether there isa danger of shock. Even so, DO NOT TOUCH ANY METAL PARTS OFtHe tOOL while using it.8. ALWAYS DISCONNECT TOOL BEFORE SERVICINGand when changing accessories such as blades, bits, cutters.9. kEEP GUARDS IN PLACEand in working order. If a guard must be removed for maintenance or cleaning make sure it is properly attached before using the tool again.10. E NSURE kEYS AND ADjUSTING WRENCHES ARE REMOVEDbefore turning power on. Left attached, these parts can fly off a rotating part and result in personal injury.11. MAkE SURE THAT SWITCH IS IN “OFF” POSITIONbefore plugging in cord to reduce the risk of unintentional starts.12. M AkE SURE TOOL IS PROPERLY GROUNDED.If tool is equipped with three-prong plug, it should be plugged into a three-pole electrical receptacle. Never remove the third prong.413. N EVER STAND ON TOOLSerious injury could occur if the tool is tipped or if the abrasive wheel isunintentionally contacted.14. W HEN REMOVING SHORT WORkPIECES,or cleaning up around the table, be sure that the switch is in the OFFposition and that the wheel has come to a complete stop.15. k EEP HANDS WELL AWAY FROM CUTTING SURFACESand all moving parts. Do not clear chips and sawdust away with hands.use a brush.16. W HENEVER POSSIBLE USE A DUST COLLECTORwith shaving hood to minimize health hazards.17. S ECURE WORk.Use clamps or a vise to hold the work. It’s safer than using your handsand it frees both hands to operate the tool.18. D ISCONNNECT THE PLUG FROM POWERbefore making any adjustments. Changing attachments or accessoriescan be dangerous if the tool could accidentally start.TOOL SAFETY1. MAkE SURE ALL CUTTING TOOLSare moving at operation speed before feeding.2. DO NOT FEED THE MATERIAL TOO QUICkLY.The cutting tool will perform better and be safer working at the rate forwhich it was designed.3. NEVER LEAVE THE MACHINE WITH THE POWER ON.4. DO NOT FORCE THE MACHINE.It will do the job better and be safer at a rate for which it was designed.Don’t force a small tool or attachment to do the work of a largerindustrial tool. Don’t use a tool for a purpose for which it was notintended.5. MAINTAIN TOOLS WITH CARE.Keep tools sharp and clean for better and safer performance. Followinstructions for lubricating and safe performance. Follow instructions forlubricating and changing accessories. Keep handles dry, clean and freefrom oil and grease.6. DO NOT USE THE TOOLif it cannot be switched on or off. Have your tool repaired before usingit.7. CHECk FOR DAMAGED PARTS.Before using this tool, any part that is damaged should be carefullychecked to determine that it will operate properly and perform itsintended function. Check for alignment of moving parts, binding ofmoving parts, breakage of parts, mountings, and other conditions thatmay affect its operation. Inspect screws and tighten any ones that areloose. Any part that is damaged should be properly repaired or replacedby an authorized service center unless otherwise indicated elsewherein the instruction manual. Have defective switches replaced by anauthorized service center. Don’t use the tool if switch does not turn it onand off properly.8. USE ONLY RECOMMENDED ACCESSORIES.Use of accessories NOT recommended by General International mayresult in a risk of injury.SAFETY PRECAUTIONS FORBENCh GRINDERBecause each shop situation is unique, no list of safety guidelines canever be complete. The most important safety feature in any shop is theknowledge and good judgement of the user. Use common sense andalways keep safety considerations, as they apply to your individual shopsituation first and foremost in mind. If you have any doubts about thesafety of an operation you are about to perform: STOP! Do not perform theoperation until you have validated from qualified individuals if the operationis safe to perform and what is the safest method to perform it.5E n g l is h 61. NEVER LEAVE THE TOOL RUNNINGwhile unattended.2. MAkE THE WORkSHOP CHILDPROOFLock the shop. Disconnect master switches. Store the tool away from children, and others not qualified to use the tool.3. CHECk FOR DAMAGE TO THE GRINDING WHEEL.Do a ring test. Be suspicious of any wheel that has been dropped or struck hard. Replace all cracked wheels immediately. They can explode with disasterous consequences.4. ALWAYS USE GUARDS AND EYE SHIELDS5. DO NOT OVER-TIGHTEN THE WHEEL NUT. Tighten it just enough that the wheel does not slip in use.6. USE ONLY FLANGES FURNISHED WITH THIS GRINDER and the blotters suppplied by the wheel manufacturer.7. STAND OFF TO THE SIDE OF THE WHEEL when turning on the power, and allow the grinder to come up to speed. It should be run for one full minute before applying work to the wheel.8. NEVER GRIND ON THE SIDE SURFACES OF THE WHEEL. Grind on the outer edge (face) of the wheel only.9. DRESS THE FACE OF THE WHEEL ONLY. Dressing the sides of the wheel should be unnecessary and may make it too thin for safe use.10. DO NOT APPLY COOLANT DIRECTLY TO THE GRINDING WHEEL.Coolants may deteriorate the bonding strength in some wheels and cause possibly catastrophic failure.11. ADjUST THE DISTANCE BETWEEN WHEEL AND WORk REST to maintain 1/16” (1.5 mm) or less separation as the diameter of the wheel decreases with use.12. F REQUENTLY CLEANthe grinding dust from beneath the wheel.13. P ROTECT YOUR EYESThe operation of any power tool can result in foreign objects being thrown into the eyes which can result in severe eye damage. Always wear eye protection during operation of the tool.14. C HECkfor proper grinding wheel size and type.15. C HECk FOR ALIGNMENT AND BINDINGof all moving parts, broken parts, mounting and any other conditions that may affect the tools operation.16. M AINTAIN TOOLS WITH CARE.Keep tools sharp and clean for best and safest performance. Follow instructions for lubricating and changing accessories.17. D O NOT USE GRINDER FOR OTHER THAN ITS INTENDED USE.If used for other purposes, General International disclaims any real or implied warranty and holds itself harmless for any injury,which may result from that use.hEALTh NOTICE: Some dust created by power sanding, sawing,grinding, drilling, and other construction activities contain chemicals known to cause cancer, birth defects or other reproductive harm. Some examples of these chemicals are: ─Lead from lead-based paints─Crystalline silica from bricks and cement and other masonry products ─Arsenic and chromium from chemically-treated lumberYour risk from these exposures varies, depending on how often you do this type of work. To reduce your exposure to these chemicals, work in a well ventilated area, and work with approved safety equipment, such as those dust masks that are specially designed to filter out microscopic particles.!English 9ATTACHING TOOL RESTS Tool rests are required for each high speed grinding wheel to assist in the grinding operation.wARNING! To reduce the risk of injury, never use a bench grinder on which the tool rest has not been fitted or where the tool rest has not been correctly adjusted.NOTE: The tool rests are right and left handed. Follow the diagrams to ensure the correct tool rest is fitted to the correct side.wARNING! To reduce the risk of injury, never connect plug to power source outlet until all assembly steps are complete and until you have read and understood the entire owner’s manual.1. Hold the tool rest in the correct position against the tool rest bracket on the wheel guard.2. Insert a short bolt through the tool rest bracket and then the tool rest, followed by a washer, lock washer, and locking knob.3. Tighten the locking knob sufficiently to support the tool rest but still allowing the tool rest to slide inwards and outwards.4. Slide the tool rest to within a maximum of 1/16” (1.5 mm) from the surface of the wheel.5. Rotate the wheel one full revolution by hand to ensure the wheel does not contact the tool rest.6. Tighten the locking knob firmly to retain the tool rest position and angle.7. Repeat the assembly operation for the second tool rest.MOUNTING ThE GRINDER We recommend you mount the grinder on a stable bench.wARNING! To reduce the risk of injury, never connect plug to power source outlet until all assembly steps are complete and until you have read and understood the entire owner’s manual.1. Before operating the bench grinder, it should be firmly mounted to a workbench or another rigid framework.2. Use the holes in the base of the bench grinder (L, fig 1) to mark and pre-drill the mounting holes. If it is to be used in one location, permanently secure it to the work surface. Use bolts, washers, lockwashers and nuts, keeping in mind the inherent vibration a bench grinder in operation produces.3. Alternatively, the bench grinder could be mounted to a piece of 3/4” (19 mm) thick plywood at least 12” x 18” (30 x 46 cm) to prevent tipping. This could then be attached to any convenient stable support with C-clamps when and where needed.OPERATIONPOwER SOURCE CONNECTIONPOWER REQUIREMENTS This tool is designed to operate on a properly grounded 120 volt, 60 Hz, single phase alternating current (AC) power source fused with a 15 amp time delayed circuit breaker. It is recommended that a qualified electrician verify the ACTUAL VOLTAGE at the receptacle into which the tool will be plugged and confirm that the receptacle is properly grounded. The use of the proper circuit size can eliminate nuisance circuit breaker tripping when using your tool.CAUTION: DO NOT OPERATE THIS TOOL if the ACTUAL power source voltage is less than 105 volts AC or greater than 132 volts AC. Contact a qualified technician if this problem exists. Improper performance, and/or, damage to the tool will result if operated on inadequate, or excessive power.!!!!15SChEMATIC DRAwING16。

Crestron CCS-UC-1 集成音频视频系统及设备说明书

Crestron CCS-UC-1 集成音频视频系统及设备说明书

SECTION 27 41 16.28INTEGRATED AUDIO VIDEO SYSTEMS AND EQUIPMENT FOR CONFERENCEROOMSProduct Specified in this section:Crestron CCS-UC-1Crestron CCS-UC-1-AV KITTable of ContentsPART 1GENERAL (3)1.1SUMMARY (3)A.Section Includes: (3)B.Related Requirements (3)1.2REFERENCES (4)A.Abbreviations and Acronyms (4)B.Definitions .............................................................................. E rror! Bookmark not defined. PART 2PRODUCTS .. (4)2.1TABLETOP CONFERENCE SYSTEM (4)A.Manufacturers: (4)B.Basis of Design Product: (4)C.Tabletop Conference System Composition (4)D.External Device and System Integration (5)E.Video Presentation (5)F.Speakerphone (5)G.Room Occupancy Detection (5)H.Touch Screen User Interface (6)I.Mute Control (6)work Management (6)work Security (6)2.2HARDWARE SPECIFICATIONS (7)munications (7)B.Audio (7)C.Video (7)D.Occupancy Sensor (8)E.Touch Screen (8)F.Buttons & Indicators (8)G.Connectors (8)H.Power (9)I.Environmental (9)pliance (9)K. (9)2.3INTEGRATION (9)munication (9)PART 3EXECUTION (9)END OF SECTION 25 15 16 (9)SECTION 27 41 16.28INTEGRATED AUDIO VIDEO SYSTEMS AND EQUIPMENT FOR CONFERENCEROOMSSpecifier: The Specifier/Design Professional is responsible for the accuracy of all project specifications, including system application and coordination with related sections. This guide specification is provided as a convenience and requires editing to match actual project requirements. CRESTRON ELECTRONICS, INC. SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE SPECIFICATIONS. For Crestron design assistance and design review please contact Sales Support Ser-*****************************************************.PART 1GENERAL1.1SUMMARYA.Section Includes:1.An enterprise level networked tabletop conference system.2.Upon final installation and commissioning the system will provide:a.Voice Calling & Audio Conferencingb.BYOD Multimedia Presentation Capabilityc.Videoconferencing & Web Collaboration Capabilityd.Workplace IntegrationB.Related Requirements1.Section 12 24 13 — Roller Window Shades2.Section 23 09 23 — Direct Digital Control System for HVAC3.Section 25 08 00 — Commissioning of Integrated Automation4.Section 25 10 00 — Integrated Automation Network Equipment5.Section 25 11 13 — Integrated Automation Network Servers6.Section 25 13 13 — Integrated Automation Control and Monitoring NetworkSupervisory Control7.Section 25 13 16 — Integrated Automation Control and Monitoring NetworkIntegration Panels8.Section 25 13 19 — Integrated Automation Control and Monitoring NetworkInteroperability9.Section 25 15 16 — Integrated Automation Software for Control and MonitoringNetworks10.Section 25 50 00 — Integrated Automation Facility Controls11.Section 25 90 00 — Integrated Automation Control Sequences12.Section 26 09 43.13 — Digital-Network Lighting Controls13.Section 26 05 00 — Common Work Results for Electrical14.Section 26 09 23 — Lighting Control Devices15.Section 26 09 36 — Modular Dimming Controls16.Section 26 09 43 — Network Lighting Controls17.Section 27 15 00 — Communications Horizontal Cabling18.Section 27 41 00 — Audio-Video Systems19.Section 27 41 13 — Architecturally Integrated Audio-Video Equipment20.Section 27 41 16 — Integrated Audio-Video Systems and Equipment1.2REFERENCESA.Abbreviations and Acronyms1.BYOD – Bring Your Own Device2.UI – User Interface3.AV – Audio VideoPART 2PRODUCTS2.1TABLETOP CONFERENCE SYSTEMA.Manufacturers:1.Basis-of-Design Manufacturer: Subject to compliance with requirements, provideproducts of Crestron Electronics, Inc., Rockleigh, NJ 07647, Phone 800-237-2041, Fax: 201-767-1903, with the following components andcharacteristics.B.Basis of Design Product:1.Crestron CCS-UC-12.Crestron CCS-UC-1-AV KITSpecifier Note:Multiple CCS-U-1 models are offered to accommodate different applications and budgets. The base unit (CCS-UC-1) supports full SIP VoIP speakerphone, Bluetooth, and USB Audio capabilities. The video pack-age (CCS-UC-1-AV KIT) adds capabilities for multimedia presentation and videoconferencing, and in-cludes a USB camera. Both models are powerable using PoE+, and versions of each are also offered with a 100-240V universal power pack included (CCS-UC-1 W/PS KIT & CCS-UC-1-AV W/PS KIT). All models come complete with all required cables.C.Tabletop Conference System Composition1.The Tabletop Conference System shall be composed of the following systemcomponents:er Interfaceb.Microphonec.Speakerd.Optional external microphone connectione.HDMI input and outputB camera and audio portsN portsSpecifier: Edit the following system components to correspond to Project requirements.D.External Device and System Integrationptop running 3rd party soft codec2.Microsoft Exchange Server3.Crestron Fusion Cloud and Pinpoint App4.SIP compliant phone system5.Mobile phone with Bluetooth6.HDMI wired source device7.Wired or Wireless Ethernet video connectionSpecifier: Only the CCS-UC-1-AV KIT version includes video presentation features. Please see CCS-UC-1 Spec. Sheet Packages table for more information.E.Video Presentation1.The Tabletop Conference System shall include an HDMI input connection forconnection of a full-motion HD 1080p60 AV source to the room display.2.The Tabletop Conference System shall include a built-in Ethernet wired or wirelesspresentation gateway. In wireless Ethernet mode a video source may connect tothe system wirelessly.3.The Tabletop Conference System shall include a USB HD camera for integrationwith BYOD laptop with web video conferencing software.4.The HDMI and presentation gateway shall be internally routed to the TabletopConference System’s HDMI output for connection to the room display. Specifier Note:Videoconferencing & Web Collaboration• Mercury can turn any space into a videoconference room by simply connecting a laptop running Skype® for Business, Cisco WebEx®, GotoMeeting®, Slack®, or another web conferencing or UC appli-cation.• Connect the laptop via USB and Mercury provides enhanced audio along with a high-definition view of the whole room through the included USB camera.• No more huddling around a laptop to interact and share content with remote participants. Connect the laptop’s HDMI output to allow the whole room to view content and camera images on the main dis-play.Please see link for more details: /products/model/CCS-UC-1F.Speakerphone1.The Tabletop Conference System shall include full-duplex speakerphone supportfor the following:a.VoIP systemsb.Bluetooth paired mobile deviceptop Softphone softwareG.Room Occupancy Detection1.The Tabletop Conference System shall include built-in room occupancy sensingcapabilities using motion detection and voice activity for determining occupied orunoccupied status state.2.Controlled devices may be powered down in an unoccupied room state.3.Through software management systems an unoccupied room may be madeavailable on the management system calendar.H.Touch Screen User Interface1.The Tabletop Conference System shall include an integrated touch screen userinterface with the following capabilities:a.Dialing voice callsb.Answering voice callsc.Muting microphone(s)2.The Tabletop Conference System shall support integration with Microsoft Exchangeand Crestron Fusion Cloud software management systems. Through softwaremanagement system the following user interface features shall be supported:1)Manage room schedule2)View meeting progress showing time remaining3)Extend meeting end time4)Schedule new meeting5)Look up contactsI.Mute Control1.The Tabletop Conference system shall include a mute control with bright bi-colorindicator for mute state visibility.work Management1.The Tabletop Conference System shall support:a.Cloud-based provisioning enabling complete network configuration inadvance of hardware installation, with touchless updates followinginstallation.b.Individual configuration using a computer web browser.c.Crestron Fusion Cloud management enables monitoring and logging of roomand equipment usage, as well as centralized help desk support.work Security1.The Tabletop Conference System shall support advanced security featuresincluding:a.802.1x authenticationb.Active Directory credential managementc.LDAP directory managementd.SRTP, SSH, TLS, and HTTPS.e.Secondary LAN port:1)VoIP or built-in presentation gateway traffic may be isolated on asecondary network2.2HARDWARE SPECIFICATIONSmunications1.Ethernet: 10/100 Mbps (x2), auto-switching, auto-negotiating, auto-discovery,full/half duplex, TCP/IP, UDP/IP, CIP, DHCP, SSL, TLS, SSH, SFTP (SSH FileTransfer Protocol), SRTP, IEEE 802.1X, Active Directory authentication, LDAP,digest access authentication, password login, HTTPS secure provisioning, IEEE802.3at Type 2 compliant2.VoIP: Open SIP, SDP, IETF SIP (RFC 3261 & companion RFCs), DTMF tonegeneration (RFC 2833 & in-band), low-delay audio packet transmission, adaptivejitter buffers, packet loss concealment3.Bluetooth: Bluetooth4.0 device pairing for wideband speech (HFP) and multimediaaudio streaming (A2DP), proximity detection beaconB Device: USB 2.0 wired interface for computer running web conferencingsoftware or USB AudioB Host: USB 2.0 for camera input6.RS-232: 2-way display device control and monitoring up to 115.2k baud withsoftware handshaking7.IR/Serial: 1-way display device control via infrared up to 1.1 MHz or serial TTL/RS-232 (0-5 Volts) up to 19.2k baud8.HDMI: HDCP 1.4, EDID, CEC9.Presentation gateway: connects to mobile devices via wired or wireless Ethernet10.Mic Pod: A2B bus protocol, single master, multiple slave; synchronous data,multichannel I2S/TDM to I2S/TDMB.Audio1.Codec Support: G.711, G.722, G.7292.AEC: Limes Audio TrueVoice acoustic echo cancellation, automatic mic mixing,automatic gain control, and dynamic noise reduction; full-duplex IEEE 1329 Type 1compliant3.Microphones: Quad mic array with (4) cardioid electret elements; Pickup Range:20 ft. (6 m) typical4.Speaker: Full range speaker5.Amplifier Power: 11 Watts maximum6.Output Volume: 95 dB SPL at 0.5 m7.Frequency Response: 90 Hz to 22 kHzC.Video1.Content Input Signal Types: HDMI (DVI & Dual-Mode DisplayPort compatible withseparate adaptor), built-in presentation gateway2.Pass-through Camera Input/Output Signal Type: USB3.Display Output Signal Types: HDMI (DVI compatible with separate)4.Content Input Resolutions: Up to 1920x1080@60Hz (1080p60)5.Display Output Resolutions: 1280x720@50Hz (720p50), 1280x720@60Hz(720p60), 1920x1080@50Hz (1080p50), 1920x1080@60Hz (1080p60)D.Occupancy Sensor1.PIR Detection Range: 6 ft. (1.83 m) in front of touch screen, wakes system (touchscreen and video display) and reports room occupancy to Crestron Fusion2.Voice Activity Detection: Keeps room occupancy, touch screen, and display activeas long as speech is detected through the microphonesE.Touch Screen1.Display Type: TFT active matrix color LCD2.Size: 7 inch (178 mm) diagonal3.Aspect Ratio: 16:9 HD 7204.Resolution: 1280 x 720 pixel5.Touch Screen: Capacitive, multi-touch capable6.Character Support: Unicode UTF-8nguage Support: Arabic, Chinese (Simplified), Chinese (Traditional), Czech,Danish, Dutch (NL), English (UK), English (US), Finnish, French (FR), German(DE), Greek, Hebrew, Hungarian, Italian (IT), Japanese (JP), Korean, Norwegian(NO), Polish, Portuguese, Portuguese (Brazilian), Romanian, Russian (RU), Slovak,Spanish (ES), Swedish, ThaiF.Buttons & Indicators1.Mic Mute Symbol & Light Bar: (2) Capacitive “buttons” with bi-color LEDs, eitherbutton toggles between mute and unmute, the symbol LED blinks green when theunit is powering up, all LEDs illuminate red when the mic is muted (and a redborder appears around the touch screen display), all LEDs illuminate green whenthe mic is unmuted if a USB device is connected or a SIP call is activeG.Connectors1.G: (1) 6-32 screw; Chassis ground lugN: (1) 8-pin RJ45 female; 10Base-T/100Base-TX Ethernet port; PoE+ PD port3.AUX: (1) 8-pin RJ45 female; 10Base-T/100Base-TX Ethernet port; Alternate LANconnection for separate SIP or presentation gateway network.4.IR: (1) 3.5 mm mini-phone jack; IR output port for display device control.: (1) 3.5 mm TRS mini phone jack; Bidirectional RS-232 port for displaydevice control.B B: (1) Micro-USB Type B female USB 2.0 device port7.HDMI OUT: (1) 19-pin Type A HDMI female; Digital video/audio output for displaydevice.8.HDMI IN: (1) 19-pin Type A HDMI female; Digital video/audio input forpresentation content source9.MIC POD 1 – 2: (2) RJ9 4P4C female; For connection of up to two microphonepods.B/CAM: (1) USB Type A, female; USB 2.0 host port for camera.11.24V DC 2.5A: (1) 2.1 x 5.5 mm DC power connector; 24 Volt DC power input foruniversal power pack.H.Power1.Power Pack: Input: 100-240 Volts AC, 50/60 Hz2.Power over Ethernet: IEEE 802.3at Type 2, Class 4 (25.5 W) PoE+ PoweredDevice3.Power Consumption: 20 Watts typicalI.Environmental1.Operational Temperature: 32° to 95° F (0° to 35° C)2.Storage Temperature: -4° to 160° F (-20° to 70° C)3.Humidity: 5% to 95% RH (non-condensing)4.Heat Dissipation: 123 BTU/hrpliance1.UL 60950-1, FCC Part 15 Class A, Japan MIC/VCCI Class A, ICES-003 Issue 5 ClassA, EN55022:2010 Class A, AS/NZS CISPR22:2010 Class A, VCCI Class A,EN55024:2010, EN61000-3-2:2014, EN61000-3-3:2013, EN60950-1:2006,EN60950-A2:2013, EN60950-A11:2009, EN60950-A1:2010, EN60950-A12:2011,FCC 15.247, RSS 210 Issue 8, RSS Gen Issue 4, ETSI EN 301 489-1, ETSI EN 301489-17, AS/NZS 4268:2012, NZ Telepermit, Australia A&C Tick, RoHS compliant K.2.3INTEGRATIONmunication1.Tabletop Conference System shall connect to user network(s) via built-in Ethernetports.PART 3EXECUTIONNot UsedEND OF SECTION 25 15 16。

AspenPlus常用词汇中英文对照表

AspenPlus常用词汇中英文对照表

Aspen Plus常用词汇中英文对照表A boilupratio 再沸比adiabatic 绝热的bottomsrate 塔底产品流率adsorption 吸附bottoms to feed ratio塔底产品流率与进料流率比aircooler 空冷器brakepower 轴功率algorithm 算法Broyden 布洛伊顿拟牛顿法alias 又名,别名built-in内置align 使⋯⋯排成直线ambienttemperature 环境温度 Canalysis 分析calculator计算器annotation 注释capacity 通量apparent component approach 表观组分方法capacityfactor 通量负荷因子approach 方法cascade 层叠aqueou s 水溶液的,水的,含水的casestudy工况分析assay 化验(油品分析)category 类别,种类ADA (assay data analysis)化验数据分析chemicalequilibrium 化学平衡assign 指定Chem-Var 化学变量attach 连接class 分类attr-comps 组分属性clearance 间隙attr-scaling 属性标量co-current 并流available 可用的coefficient 系数column 塔B CGCCs (column grand compositecurves)塔的总组合曲backup ( 降液管内的清液层)高度线baffles 挡板columnspecifications 塔设定balance 平衡模块,平衡Compattr-Var 组分变量base components 基准组分component 组分base method 基本方法(包含了常见物性方法)composition 组成batch 批量处理,一Compr 压缩机或涡轮机模块批BatchFrac 间歇精馏comps-groups 组分分组binary interaction 二元交互作用conceptual design概念设计blank simulation 空白模拟condenser 冷凝器block 模块condenserspecification 冷凝器设定Block-Var 模块变量configuration 配置1consta nt 恒定的 downcomer 降液管constrain t 约束,约束条件 DSTWU 使用 Winn-Underwood-Gilliland方法的多组control panel 控制面板 分精馏的简捷设计模块Conv(convergence ) 收敛 Dupl 物流复制器 conventio nal 常规的coolan t 冷却剂 E coordinat e 坐标 efficienc y 效率countercurren t 逆流 elbow 肘管 criter ia 判据 Elec Wizard 电解质向导 cryogenic 深冷体系,低温环境 electroly te 电解质curren t 当前的 elevation高度curve 曲线energy balance 能量平衡 custom 用户自定义 entrainme nt 夹带 EO (equation oriented) 联立方程法 Dequilibrium constant 平衡常数 damping level 阻尼水平 errortolerance 收敛容差 data browser 数据浏览窗口 estimatio n 估算 data fit 数据拟合 exchange 交换 dataregression 数据回归 exchanger orientation 换热器方位 decant er 液- 液分相器 expor t 输出 defaul t 默认 expressio n 表达式define d 定义的 Extra ct 液 - 液萃取严格计算模块 de-lump 分解design spec 设计规定 Fdestinati on 目标位置 feed basis 进料基准 detail ed 详细的 feed stage 进料位置 diagnosti cs 诊断页面 filmcoefficients 膜层传热系数 direct 直接迭代法find 根据用户提供的信息查找到所要的物质discharge pressure 出口压力flanged welded 法兰连接或焊接displayplot 显示所做的图flash 闪蒸dist curve 蒸饱曲线Flash2 两相闪蒸器distillate rate 塔顶产品流率Flash3 三相闪蒸器distillate to feed ratio塔顶产品流率与进料流率比floodingfactor 液泛因子Distl 使用Edmister 方法的多组分精馏的简捷校核模块floodinglimit液泛限down time 辅助操作时间flow 流率2flow arrangement 流动方式inorganic 无机物flow basis 流动基准input 输入flowsheet 流程inputsummary 输入梗概flowsheet section 流程段insert 嵌入,插入flowsheeting options 流程模拟选项inside shelldiameter 壳内径fluid 流体isentropic 等熵模型format 格式化 ( 磁盘 ),格式iteration 迭代formula 分子式fouling 污垢Jfractionaloverflash 过汽化度jetflooding 喷射液泛FSplit 分流器KG kettle 釜式再沸器gatevalves 闸阀key componentrecoveries 关键组分回收率general with metricunits 使用公制单位的普通模板keycomponents 关键组分Generic 通用Gibbs-Duhem吉布斯 - 杜亥姆方程Lglobal 全局的label标签global data 全局(公用)数据library库lightends轻端分析数据H lightkey 轻关键组分head 扬程link 链接heatduty 热负荷local 局部的heatexchanger 换热器lock 锁定,锁住heat transfercoefficient 传热系数loop-retum 环回heat er 加热器或冷却器lower bound 下限Heat X 两股物流换热器lump 结合heavy key 重关键组分Henry comps 亨利组分Mhydraulic analysis 水力学分析manipulatedvariable操纵变量manipulators 调节器I manufacturer 厂家icon 图标mapping 映射inert 惰性的mass balance 质量平衡inlet 进口Mass-Cone 质量浓度3Mass-Flow 质量流率No. of tubepasses 管程数Mass-Frac 质量分率node 节点Mass-RR 质量回流比nominal 公称尺寸material 物质,物料nonideal 非理想算法materialstreams 流股物料表NBP (normal boilingpoint) 标准沸点maximum 最大的nozzle 管嘴mbar 压力单位,毫巴number of sealing strippairs 密封条数MCompr 多级压缩机或涡轮机模块number of shells inparallel 并联壳程数measurement 测量number of shells inseries串联壳程数MHeatX 多股物流换热器number of stages塔板数miscellaneousL/D 其余当量长度mixed mode 联立模块法Omixer 混合器object manager对象管理器mmHg 毫米萊柱objecttype对象类型mmwater 毫米水柱objectivefunction目标函数model 模型,模拟opening 阀门开度model analysistool 模型分析工具optimization优化,最优化modellibrary 模型库option 选项moisture comps 湿气组分outlet 出口molarity 以摩尔为基准overallrange灵敏度分析时变量变化范围molecular 分子的molecularstructure 分子结构PMole-Cone 摩尔浓度package 包Mole-Flow 摩尔流率packedheight填料高度Mole-Frac 摩尔分率page breakpreview 分页预览Mole-RR 摩尔回流比page setup页面设置Mult 物流倍增器panel 面板 parameter 参数MultiFrac 严格法多塔蒸馏模块parametricvariable 参变量multiplepasses 多管程流动partialcondenser部分冷凝器multiplicationfactor 缩放因子PCES (property constant estimationsystem )物性常Murphreeefficiencies 默弗里效率数估算系统performancecurve 特性曲线N Petchem聚酷化合物nesting 嵌套Petrocharacterization 石油馏分表征Newton牛顿法PetroFrac 石油炼制分馏模块4petrole um 石油 RadFra c 单个塔的两相或三相严格计算模块 phaseequilibrium 相平衡 rang e 范围 physical properties 物理性质,物性 RateFrac 非平衡级速率模块 piecewise integration 分片积分 rati ng 校核 pipe 单管段 pipeline 多段管线ratio 比率plot 绘图,图表 RBatch 间歇式反应器 plot type 绘图类型 RCSTR 全混釜反应器 poin t 指向 reacti on 反应 polyme r 聚合物reaction sets 反应集 positivedisplacement正排量模型 reacto r 反应器power 功率 React-Var 反应变量 Presrel ief 压力释放 (安全排放) reboiler duty 再沸器负荷 pressure changers 压力转换模块 reboil er 再沸器pressure drop 压降 reconc ile 重新赋予初值,使其与结果吻合 pressure profile 压力分布 reconnect 重新连接 proces s 过程 recove r 恢复 process type 过程类型 recove ry 回收 produc t 产品 RecovH 重关键组分回收率 profil e 分布 RecovL 轻关键组分回收率 proper ty 性质,物性 reference condition 参考条件 property sets 物性集 reference reactant 参考的反应物 pseudocomponent 虚拟组分 refine ry 炼油厂 psi 英制压力单位,镑 / 平方英寸 reflux rate 回流量 psig 英制压力单位,磅 / 平方英寸 ( 表压)reflux ratio 回流比 pump 泵或水轮机 regressio n ( 物性数据)回归 pumparounds 中段循环 reinitial ize 初始化 pure 纯的 relief 释放 purity 纯度 reorde rri 重新,排序REquil 平衡反应器Qresidence time 停留时间 Qcond 冷凝器热负荷residu al 残差Qreb 再沸器热负荷 result summary 结果梗概 qualifi ers 对所选的物性进行限定 retrie ve 重新得到(调用)retrieve parameter results 结果参数检索RRGibbs 吉布斯反应器5ROC-NO 辛烷值曲线Solids固体操作设备rodbaffle 杆式挡板solubility 溶解度roughne ss 粗植度solvent 溶剂route 路径solver求解器RPlug 平推流反应器Spec(specification) 规定RR 回流比species 物质种类RStoic 化学计量反应器specificgravity 比重run control panel 打开控制面板specification详细说明,输入规定,设定,规定run status 运行状态specificationtype设定类型run type 运行类型specify 指定RYiel d 产率反应器splitfraction产品分率SQP(successive quadraticprogramming)序列S 二次规划算法stage ( 理论)级,(理论)板SCFra c 简捷法多塔蒸馏模块standard 默认值,标准算法,标准screwed 螺纹连接statevariables 状态变量script 脚本statusbar 状态栏secant 割线法Stdvol-Flow标准体积流量section 部分,段,流程分段Stdvol-Frac标准体积分率segmentdata管段数据Stdvol-RR 标准液体体积回流比segmentgeometry 管段几何结构stepsize步长segmental baffle 圆缺挡板stoichiometry化学计量方程sensiti vity 灵敏度,灵敏度分析stream流股,物流,各个输入输出组分的流股Sep 组分分离器streamlibrary 物流库Sep2 两出口组分分离器Stream-Var物流变量separation 分离structure结构separator 分离器study研究sequencing 序列style 规格sequentialmodular 序贯模块法subroutine子程序series 系列substream 子物流sharpsplits 清晰分割sulfur 硫shell 壳(程)summary 汇总shellside 壳程Sum-Rates 流率加和法shortcu t 简捷计算support 支持simulation 模拟sync 同步sloppysplits 非清晰分割system foamingfactor 物系的发泡因子6U Tunits-sets 单位集 tabular data 列表数据 unplaced blocks 取消放置模块 targ et 期望值 upper bound 上限 tear 撕裂,断裂 util ity 公用工程 tear streams 撕裂物流Utility -Var 公用工程变量temperature 温度temperature approach 趋近平衡温度 Vtemperature profile 温度分布 vaiable 变量templat e 系统模板 valve 阔门 ternary 三重的,三元的 vapor fraction 汽相分率 thermal analysis 热力学分析 variabl e 变量 thermosipho n 热虹吸式再沸器 variable explorer 变量管理器 tile平铺view 视图toleran ce 容差toluene 甲苯 Wtopi c 主题wait 步长 Torr 真空度单位,托 Wegstei n 韦格斯坦法 total condenser 全凝器 wizard 向导 total cycle time 一个操作周期 workboo k 工作表trac e 跟踪组分阈值tray spacing 板间距 X troubleshoo ting 故障诊断 X Axis variable X轴变量TBP (true boiling point) 实沸点true component approach 真实组分方法 Y tube 管子 Y Axis variable Y 轴变量 tube fins 管翅yield 产率tube layout 管程布置tube side 管程 Ztype 类型zoom 图像放大或者缩小7。

CCS焊接实用工艺认可表格

CCS焊接实用工艺认可表格

FORM: pWPS-1/3焊接工艺计划书(pWPS)Preliminary Welding Procedure Specification基本参数工作控制号:Essential parameters No. 焊接工艺名称及编号Name and serial number制造厂名称及地址Manufacture’s Name and address焊接方法:Welding process 单道焊Single pass多道焊Multi pass组合焊Multi process单面焊One side双面焊Double side背面清根Back gouging接头型式:Joint type焊接位置:Welding position母材级别/交货状态:Parent metal grade /delivery condition 焊接设备的型号:Welding equipment母材厚度Thickness车间底漆:Shop primer管子外径尺寸:Pipe outside Dia.保护气体(种类/纯度):Shielding gas(type/purity)坡口设计(草图)Test joint details (sketch with dimensions)焊道布置和焊接顺序(草图)Bead sequence details(sketch)焊接参数Welding parameters焊道Run 焊接方法Process焊材直径Size offillermaterial(mm)电流种类和极性Type ofcurrent/Polarity焊接电流Current (A)电弧电压Voltage (V)焊接速度*Travelspeed*(cm/min)热输入* Heatinput*[kJ/cm]气体流量 Gasflow rate(1/min)*如有必要时*If required焊接工艺计划书(pWPS)(续) FORM: pWPS-2/3 焊接材料(型号/规格/等级):Filler material (type /size / grade)衬垫材料(厂家及型号):Backing(manufacture and type):施焊环境:Welding site conditions焊前预热温度Preheat temperature道间温度Inter-pass temperature焊后热处理:Post-weld heat treatment最低值Min. ℃最低值Min.℃最高值Max.℃预热方法:Preheat method其它有关特殊要求*:Other information**如焊条/焊丝最大摆动宽度、焊道清洁方式、脉冲电流特性等*e.g. Weaving(max. Width of run), Method of inter-pass cleaning, characteristic of pulse current etc.试验项目Test items1、非破坏性检查Non-destructive examination目检☐Visual 射线探伤☐Radiography超声波探伤☐Ultrasonic磁粉探伤☐Magnetic particle渗透探伤☐Liquid penetrate2、破坏性试验Destructive examination1)拉伸试验Tensile tests 横向拉伸☐Transverse纵向拉伸☐Longitudinal2)弯曲试验Bend tests 正弯☐Face反弯☐Root侧弯☐Side3)冲击试验Impact tests 试验温度:Test temperature℃焊缝根部Root of weld 焊缝中心☐center of weld熔合线☐fusion line距熔合线2mm☐2mm from FL焊缝表面Face of weld 焊缝中心☐center of weld熔合线☐fusion line距熔合线2mm☐2mm from FL距熔合线5mm ☐5mm from FL距熔合xx mm ☐xx mm from FL4)宏观检查☐Macro examination 5)硬度试验☐Hardness test6)角接焊破断试验☐Fillet weld fracture3、其他检查和试验Additional test(s) 焊缝金属的化学成分☐Chemical analysis of weld试件母材的化学成分☐Chemical analysis of parent plate 接头金相照片(×倍)☐metallographic of the joint(× )点蚀试验☐Pitting test晶间腐蚀试验☐Intercrystalline corrosion test签名: Signature制造厂代表日期Manufacturer DateFORM pWPS-3/3焊接工艺计划书(pWPS)(续)Preliminary Welding Procedure Specification (continued)以下由验船师填写:The following is to be filled in by the Surveyor:上述焊接工艺计划书经审核,同意按本焊接工艺计划书进行焊接工艺试验………………☐The above-mentioned pWPS has been reviewed and implementation of WPT in accordance with this pWPS is approved.上述焊接工艺计划书经审核,审核意见如下:(请及时回复并与担当验船师联系)…………☐签名:SignatureCCS 验船师日期CCS Surveyor Date填写说明:Remarks :×————适用Applicable ————不适用Inapplicable下列缩写可用于表格填写:The following abbreviation may be used in this form.焊接方法:Welding process:手工电弧焊:SMAW,埋弧焊:SAW,金属极气体保护焊:GMAW,钨极气体保护焊:GTAW,药芯焊丝气体保护焊:FCAW,气电立焊:EGW焊接位置:Welding position平焊: F;立焊(上行) V(up);立焊(下行) V(down);横焊 H;仰焊 O船形角焊: FF ; 平角焊:FH; 立向上角焊:FVu; 立向下角焊:FVd;仰角焊FO;电流种类和极性:Type of current & Polarity:交流 AC;直流正接 DCSP;直流反接 DCRP;脉冲电流 Pulsed焊接工艺认可试验报告(WPQR)FORM:WPQR-1/4Welding Procedure Qualification Record工作控制号:No.: 制造厂焊接工艺编号Manufacture's welding procedureNo.制造厂名称及地址Manufacture's name and address材料及焊接工艺Material and Welding process 焊接工艺试验日期:Date of welding procedure test:焊接方法: SAW Welding process 单道焊☐单面焊☐Single pass One side多道焊☐双面焊☐Multi pass Both side组合焊☐背面清根☐Multi process Back gouging坡口设计(草图)Test joint details(sketch with dimensions)焊道布置和焊接顺序(草图)Bead sequence details(sketch)接头形式:Joint type焊接位置:平焊FWelding position母材(等级/厚度/交货状态):Parent metal(grade/thickness/delivery condition)焊接材料(型号/规格/等级):Filler material(type/size/grade)衬垫材料(厂家及型号):Backing(manufacture and type):保护气体(种类/纯度):Shielding gas(type/purity)管子外径尺寸:Outside diameter of pipe 焊剂:Flux:预热及热处理:Preheat and post-weld heat treatment焊前预热温度Preheat temperature道间温度Interpass temperature最低值Min ℃最低值Min℃最高值Max℃焊后热处理:Post-weld hear treatment 其他说明:Other information焊接细节Welding details焊道Run 焊接方法Process焊材直径Size offiller电流种类和极性Type of current/polarity焊接电流Current[A]电弧电压Voltage[V]焊接速度 2Travelspeed2热输入2Heatinput2气体流量Gas flowratematerial(mm)[cm/min] [kJ/cm] (l/min)焊工姓名Welder's name环境温度:℃Ambient Temperature相对湿度: %Relative Humidity 焊接工艺认可试验报告(续) FORM:WPQR-2/4 Welding Procedure Qualification Record (continued)试验项目及结果Test items and results1.非破坏性试验Non-destructive testing目检Visual ☐射线探伤Radiography☐超声波探伤Ultrasonic☐磁粉探伤Magneticparticle☐渗透探伤Liquidpenetrate☐2.破坏性试验Destructive testing 拉伸试验Tensile tests试样Test assembly 抗拉强度Tensilestrength(N/mm2)屈服强度Yield strength(N/mm2)伸长率Elongation%断面收缩率Reduction of area%断裂位置Locationof rupture试验温度Testtemperature℃横向拉伸1Transverse 1横向拉伸2Transverse 2纵向拉伸Longitudinal/弯曲试验Bend tests 角接焊破断试验Fillet weld fracture试样Test assembly 压头直径/弯曲角度Former/angle结果Result1.正弯Face bend2.正弯Face bend3.反弯Root bend焊缝断面宏观检验(照片和结果)反弯Root bend纵向弯曲Longitudinal冲击试验Impact tests 试验温度Temp. ℃要求:Require ment 尺寸:Size 类型:Type 缺口位置Notchlocation试验值Values(J)1 2 3平均值Average(J)备注Remarks缺口位置Notchlocation试验值Values(J)1 2 3平均值Average(J)备注Remarks复试Retest硬度测试Hardness test测试形式和载荷: Type and load 测试位置小示意图Location of hardness measurements(sketch)区域Area Hardness range 硬度范围母材Parent material热影响区H.A.Z焊缝Weld焊接工艺认可试验报告(续)FORM:WPQR-3/4Welding Procedure Qualification Record (continued)附加试验(规范3.2.4.3款要求):Additional test(s) and result(s) (According to 3.2.4.3 of Rules for Material and Welding)注:Notes:1、如焊条/焊丝最大摆动宽度、焊道清洁方式、脉冲电流特性等e.g. weaving(max、width of run), method of interpass cleaning, characteristic of pulse current2、如有必要时If required×————适用Applicable ————不适用Inapplicable下列缩写可用于表格填写:The following abbreviation may be used in this form焊接方法:Welding process手工电弧焊 SMAW;埋弧焊 SAW;金属极气体保护焊 GMAW;钨极气体保护焊 GTAW;药芯焊丝气体保护焊 FCAW;气电立焊 EGW焊接位置:Welding position:平焊F;立焊(上行) V(up);立焊(下行)V(down);横焊 H;仰焊 O 电流种类和极性:Type and polarity of current:交流 AC;直流正接 DCSP;直流反接 DCRP;脉冲电流 Pulsed船形角焊: FF ; 平角焊:FH; 立向上角焊:FVu; 立向下角焊:FVd;仰角焊FO;兹证明本焊接工艺认可过程和试验结果,符合中国船级社《材料与焊接规范》。

武钢板材介绍

武钢板材介绍

武钢轧板厂产品一览表产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name 造船用构造钢板Structural plate for shipbuildingσs=235Mpa 级船板 A 、B 、 C、 D、 E 级σs=315MPa 级船板 A 、 D、 E 级σs=355MPa 级船板 A 、 D、 E 级CCS 规范 LR 造船规范 GL 造船规范 BV 造船规范 ABS 造船规范 DNV 造船规范 GB712ASTM A131M JISG3106桥梁用钢板Steel plate for bridge buildingQ345qC 、Q345qD 、Q345qE 、 WQ490D 、 WQ490E 、 14MnNbq Q/WG(ZB)02 GB/T714BS EN10025 DIN EN10025 JISG3106锅炉用碳素用钢板Carbon & low alloy steel plate for boiler钢号 Grade 20g 410 级 16Mng履行标准 Standard YB ( T)41 GB713 CCS 规范 CCS specification 对应外国标准Correspforeign standardISO9328-2 DIN17155 ASTM A515M JISG3103产品名称 Name 压力容器用钢板 Pressure vessel steel plate钢号 Grade 16MnR 20R履行标准 Standard YB (T) 40 GB6654对应外国标准Correspforeign standardISO9328-2 DIN17155 JISG3103 ASTM A537M产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name钢号Grade履行标准Standard对应外国标准Corresp foreign standard产品名称Name钢号Grade履行标准Standard 优良碳素构造钢板High quality carbon structual steel plate 10 15 20 25 30 35 40 45 50 5520Mn 25Mn 30Mn 40Mn 50Mn 60Mn 65MnYB(T)67 GB/T711ISO683/1 JISG4051 ASTM A29M DIN EN10083-2一般碳素钢构造厚钢板Plain carbon steel plateQ195 Q215 Q235 Q255 Q275Q/WG (ZB )01 GB700ISO630 JISG3101 JISG3106 DIN EN10025 ASTM A283M 低合金高强度构造钢板HSLA structural steel plateQ295 Q345 Q390 Q420 Q460GB/T1591ISO4951 ASTM A572M JISG 3114工程机械用钢板Steel plate for engineering machineryHJ50 HJ53 HG60 NM150K YZ350K YZ500KWJX(ZB) Q/WG(ZB)ASTM A633M JISG3114特别用途钢板Steel plate for special purposesGY4 902 903 907A 921A 956 945GJB产品名称Name开发新试产品Newly developed product钢号 Grade WDL 系列 WH 系列 HJ 系列 HG 系列 CF80履行标准 Standard WJX(ZB) Q/WG(ZB)05大型厂产品产品名称 Name 重轨 Heavy rail型号或规格 Specification 38 、43、 45、50、 60、75A 、 75R 、90A 、 100A 、 UIC54U71Mn 、U71 、 U71Cu 、U70MnSi 、U71MnSiCu 、 BS11 耐磨 A 级、牌号 Steel gradeUIC900A技术标准 Technical standard GB2585-81 BS11-85 TB/T2344-93 Q/WG(DX)01-85 UIC860主要用途 Typical usage 铁路 Railway产品名称 Name 起重机用钢轨Rail for crane型号或规格 Specification QU80牌号 Steel grade U71Mn技术标准Technical standard YB/T5055-93主要用途Typical usage 起重机专用Crane产品名称 Name 工字钢 I-beam型号或规格 Specification 16 、18、 20、22、 25牌号 Steel grade Q235 、SS400GB706-88 GB700-88 GB/T14292-93 JISG3192-1994技术标准 Technical standardJISG3101-1995主要用途 Typical usage 建筑 Construction产品名称Name槽钢Channel steel型号或规格Specification16 、18 、 20 、22 、 24 、25 、 28 、30 、 32牌号Steel grade Q235 、Q345 、 09CuPTiRE 、SS400技术标准Technical standard GB706-88 GB700-88 GB/T14292-93 GB/T1591-94 JISG3192-1994JISG3101-1995主要用途Typical usage建筑构造车辆构造Construction structure, vehicle structure产品名称 Name 角钢 Angle steel型号或规格 Specification 15 、126 、18 、 20牌号 Steel grade Q345 、09CuPTiRE Q235GB9787-88 GB700-88 GB/T14292-93 GB/T1591-94 JISG3192-1994 技术标准 Technical standardJISG3101-1995建筑、电力构造、车辆构造 Construction, vehicle structure, structural 主要用途 Typical usagepieces for electric industry大型厂产品产品名称 Name 元钢 Round steel型号或规格 Specification φ75-130牌号 Steel grade Q235 、45# 等技术标准 Technical standard GB704-88 GB702-96 GB699-88 Q/WG(DX)03-79主要用途 Typical usage 轴用坯、钢球料等 Axle, steel ball产品名称 Name 扁钢 Flat steel型号或规格 Specification 150×25 180×20牌号 Steel grade Q235技术标准Technical standard GB704-88 GB700-88 Q/WG (DX )04-86主要用途Typical usage 铁路专用扁钢 Railway产品名称Name球扁钢Fiat bulb steel型号或规格Specification20 、22牌号Steel grade A、 B技术标准Technical standard GB9945-88 、CCS 、BV 、 LR 、GL 、 DNV 、 A.B.S Specification主要用途Typical usage船用骨架Skeleton frame of ships产品名称 Name 拖沓机大梁用槽钢 Channel steel for tractor型号或规格 Specification 18C牌号 Steel grade Q345技术标准Technical standard YB/T5048-93 GB700-88主要用途Typical usage 拖沓机大梁专用材 Girder frame of tractor矿山巷道支护用 U 型钢 U-steel for propping structure in mine产品名称 Nametunnel型号或规格 Specification U25 U29牌号 Steel grade Q275 、Q345技术标准 Technical standard Q/WG ( DX) 08-94 GB4697-91主要用途 Typical usage 巷道支护 Tunnel propping and protecting大型厂产品产品名称 Name 矿用工字钢 Mine I-beam型号或规格 Specification 工 11、工 12牌号 Steel grade Q275 、Q345技术标准 Technical standard YB2006-78 YB/T5047-93 Q/WG (DX )07-87主要用途 Typical usage 巷道支护 Tunnel propping and protecting低碳钢无扭控冷热轧盘条Low carbon steel wire ob product by产品名称 Nametwistless hot-rolled with controlled cooling型号或规格 Specification φφ20牌号 Steel grade Q195 、Q215 、 Q235 、SWRM6 、 SWRM8 、 SWRM10 、 SAE1006GB/T14981-94 YB4027-91 ZBH44001-88 ASTMA510-91技术标准 Technical standardGB/T701-1997 JISG3505-1980拉丝材、用于镀锌、镀铜、镀铬钢纯正及民用建筑Zn-,Cu-,and Cr- 主要用途Typical usagecoating wire drawing, civilian construction优良碳素钢无扭控冷热轧盘条Quality carbon steel wire rod product产品名称 Nameby twistless hot-rolled controlled controlled cooling型号或规格 Specification φφ20牌号 Steel grade 45#-80# 40Mn-70Mn 67A 、72A 、 72B 、82A 、 82B 、72A-LGGB/T14981-94 ZBH44002-88 JISG3506-80 GB/T4354-94 WJX技术标准 Technical standard(DX)钢帘线、弹簧钢丝、予应力钢丝、钢丝绳桥梁 Spring wire, prestressed 主要用途 Typical usageconcrete wire, steel cable bridge高线产品一览表PRODUCT LIST----WIRE ROD CIIL碳素焊条钢无扭控冷热轧盘条Carbon steel wire rod by twistless产品名称Namehot-rolled controlled cooling for welding electrode型号或规格 Specification φφ10牌号 Steel grade H08A 、H08C 、H08MnSiCuCrNi 、H08Mn2SiA WQ-1 、WQ-2 、WQ-3 技术标准 Technical standard GB/T3429-94 GB/T14981-94 WJX ( DX)用于工业、交通运输、造船等电弧焊条焊芯Welding rod of electric arc 主要用途 Typical usageelectrode for industry, communication and shipbuilding purposes大型厂产品碳素焊条钢无扭控冷热轧盘条Carbon steel wire rod by产品名称 Name twistless hot-rolled controlled cooling for weldingelectrode型号或规格 Specification φφ10牌号 Steel grade H08A 、H08C 、H08MnSiCuCrNi 、H08Mn2SiA WQ-1 、WQ-2 、WQ-3 技术标准 Technical standard GB/T3429-94 GB/T14981-94 WJX ( DX)用于工业、交通运输、造船等电弧焊条焊芯Welding rod of electric arc 主要用途 Typical usageelectrode for industry, communication and shipbuilding purposes冷镦钢无扭控冷热轧盘条Cold heading steel wire rod by twistless产品名称 Namehot-rolled controlled cooling型号或规格 Specification φφ20牌号 Steel grade ML10-ML45 SWRCH6A技术标准 Technical standard GB/T14981-94 GB6478-86 JISG3507-1991用于建筑、运输、桥梁、汽车等行业Construction, transportation,主要用途 Typical usagebridge, automobile, etc带肋钢筋无扭控冷热轧盘条Hot-rolled ribbed steel bar for reinforced产品名称 Nameconcete型号或规格 Specification φφ16牌号 Steel grade 20MnSi技术标准 Technical standard GB1499-1998工业、民用建筑、水利、电力、铁路桥梁等 Industry, civil construction, 主要用途 Typical usagewater conservancy, electric power, railway,bridge,etc产品名称 Name 钢筋混凝土用热轧光圆钢筋型号或规格 Specification 16 、18、 20、22、 24、25、 28、30、 32牌号 Steel grade φφ20技术标准Technical standard GB13013-91主要用途Typical usage 混凝土构造件产品名称Name 纯铁 Pure iron型号或规格 Specification φ6.5,10牌号 Steel grade WDT4技术标准Technical standard WJX ( DX)主要用途Typical usage蕊棒、永远磁铁炉料Cored bar, permanent magnet, furnace burdens产品名称 Name 管桩钢筋 Rebar for pipe pile 型号或规格 Specification φφ20牌号 Steel grade 32B 30MnSi技术标准Technical standard WJX ( DX)主要用途Typical usage 管桩用钢筋 Pipe pile产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name热轧厂产品普碳钢和低合金钢系列碳素构造钢板、带Q195 Q215A-B Q235A-DGB912-89 GB3274-88.Q/WG(RZ)07-99DIN1614 DINEN10025 JISG3101 ISO630优良碳素钢板、带15 20 08 08AlGB710-91 GB711-88JISG3131 DIN1614 ASTMA415 ISO3573 ASTMA113 DIN EN10025低合金构造钢板、带Q295A-B Q345A-EGB912-89 GB3274-88JISG3101 DIN EN10025 ASTMA440 ISO630耐大气腐化钢系列耐大气腐化钢板、带牌号09CuPCrNi 09CuPTiRE-A-C履行标准Standard Q/WG(RZ)04-2001对应外国标准CorrespJISG3125 JISG3444 DIN17172 foreign standard产品名称Name高耐候构造钢牌号09CuP 09CuPCrNi-A-B履行标准Standard GB4171-2000产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard热轧厂产品船体用构造钢系列造船用碳素构造钢板A BCCS.GL.LR.BV.DNV.ABS GB712-2000自行车用钢系列自行车用热轧碳素钢及低合金钢带ZQ195 、ZQ215 、 ZQ235 、ZQ215Al 、ZQ236Al 、 Z06Al 、Z09Al 、Z09Mn 、 Z13Mn 、 Z17Mn 、 Z21MnRE YB/T5066-93ASTMA569产品名称Name牌号履行标准Standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard产品名称Name牌号焊接气瓶用钢系列焊接气瓶用系列钢板HP295 HP325GB6653-94汽车梁及汽车构造钢系列汽车大梁用含钛钢板T52Q/WG(RZ)02-99JISG3116 ASTMA20冷冲压用含钛钢板T52 、 T42Q/WG(RZ)02-99JISG3106 ASTMA441热轧厂产品汽车梁及汽车构造钢系列汽车车厢用纵切钢带QG42Q/WG(RZ)02-99汽车传动轴管用热轧钢带08Zh履行标准Standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name牌号履行标准Standard产品名称Name牌号履行标准Standard产品名称Name牌号履行标准Standard对应外国标准Corresp foreign standard产品名称Name Q/WG(RZ)02-99高强度汽车车轮用钢RS50Q/WG(RZ)02-99JIS3113 ASTMA283 ISO630 DIN EN10025热轧双相钢钢板和钢带RS55Q/WG(RZ)02-99载重车横梁热轧钢板W375LQ/WG(RZ)02-99热轧厂产品石油管线钢系列石油管线系列钢带S205 、S240(A 、B )S290 、S315 、S360 、S385(X42 、X46 、X52 、X56) S415 、S450(X60 、X65) 、L210 、L245 、L290 、L320 、L360 、L390 、 L415DIN1614 DINEN10025 JISG3101 ISO630直缝焊油井套管用钢牌号J55履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard WJX(RZ)62-2001焊接构造钢系列高强度焊接构造钢HG60Q/WG(RZ)22-99低合金焊接构造钢HJ50 HJ53 HJ58WJX(RZ)03-93 WJX(RZ)04-93 WJX(RZ)15-2001船用集装箱钢系列集装箱用钢SPA-H SM490A SS400、SS490JISG3125 JISG3106 JISG3101热轧厂产品矿用钢系列矿用钢YZ350K NM150KQ/WG(RZ)19-93 Q/WG(RZ)20-99出口材系列一般构造用轧制钢材SS330 、SS400JISG3101产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard产品名称Name 牌号履行标准Standard 热轧低碳钢板和钢带SPHC 、SPHDJISG3131管用热轧碳素钢钢带SPHT1 、 SPHT2JISG3132碳素钢和高强度低合金钢SAE1006 、 SAE1008 ASTMA568/A568M-91a热轧非合金构造钢RSt37-2DIN EN10025-1990其余热轧化工搪瓷钢板08HTQWG(RZ)14-99热轧花纹钢板09CuPTIRE-AGB3277-91 Q/WG(RZ)04-2001二热轧产品供冷轧用卷产品名称Name DIN 标准JIS 标准GB 标准产品名称Name DIN 标准JIS 标准GB 标准产品名称Name DIN 标准JIS 标准GB 标准产品名称Name DIN 标准JIS 标准GB 标准产品名称Name DIN 标准JIS 标准GB 标准镀锌板带ST01Z-ST05Z STE250-2Z STE280-2ZSPGC,SPGR,SPGA,SPGS,SPGH,SPGW,SPGD,SPGDD SYB超深冲钢板带ST14SPCE08Al构造钢板带St12,RRST13,St37-2G,St50SPCC SPCD08,15,30,45,Q215,Q235,16Mn低碳钢板带Stw22,Stw23,Stw24SPHC,SPHD,SPHE08构造钢板带St37-2,St52-3,C22,C45,STE255SS34,SS41,SS55,SM42A,SM50B,SM53C,S35C,SM570 Q215,Q235,10#-50#,16Mn-65Mn二热轧产品二热轧商品卷产品名称Name DIN 标准JIS 标准产品名称Name DIN 标准JIS 标准GB 标准产品名称Name DIN 标准JIS 标准GB 标准产品名称Name API 标准汽车用钢板带构造钢板带QSTE340TM QSTE500TM SAPH310 SAPH340锅炉及压力容器用钢板带19Mn6,HI,HIISB72 SB4916Mng造船用钢板带A,B,CA,B,CA,B,C管线钢X42-X70二热轧产品产品规格带钢厚度 (mm)带钢宽度(mm)钢卷外径(mm)最大卷重(t)单位宽度卷重(kg/mm) 700-21301000-215038棒材厂产品一栏表名称规格( mm )牌号履行标准定尺热轧带肋钢筋10-50HRB335 、HRB400GB1499-19986-12 Q195-255GB700-88GB699-8845#-80#圆钢10-50 GB6478-86 6-12ML10 、 ML20 、GB3077-88ML40 40Cr 、GB13013-9120CrMoGB702-86纯铁棒材16-50 WDT0 、WDT4 WJX[BC]01-2001 6-12 轴承钢12-50 GCr15 GB/T18254-2000 6-12共1页 1。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

CCS robot cutting lineSpecifications CCS 600, 900, 1250© 2014, Kranendonk Production Systems BV. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying and recording, for any purpose without the express written permission of KRANENDONK. KRANENDONK reserves the right to make changes to any and all parts of the documentation, at any time, without obligation to notify any person or entity of such changes.© 2014, Kranendonk Production Systems BV1 The CCS cutting conceptThe CCS is a standardized system for the cutting of steel profiles. A CCS can handle all common profile types and can be supplied with plasma and OFC cutting equipment. Programming is automated with the ARAC software. Because of the easy programming there is no limitation on the cuts which can be made. KRANENDONK has a standard library for the most common cuts. Due to the open software, cuts can be programmed without the help of KRANENDONK.Main benefits• • • • • • • • • Rigid main frame holding all components Takes little floor space Quick installation Automated programming with ARAC software Cutting paths adapted to product deviations (DFP module in ARAC) Large robot means no sliders, thus less maintenance In-flow measuring (no ‘gripper’), means less maintenance Continuous non-repetitive production flow Plasma hole-cutting, so can replace a drilling/sawing lineCCS Robot Cutting Line specifications Page 2 of 10© 2014, Kranendonk Production Systems BV2 Basic configurationsThe system is available in three dimensions and with two different cutting processes, being OFC and Plasma. For operator safety, a sound proof cabin with fume extraction unit is supplied with the plasma option.2.1 Dimensions• CCS 600 – maximum profile 600 * 300 mm • CCS 900 - maximum profile 900 * 300 mm • CCS 1250 - maximum profile 1250 * 500 mmThree CCS models2.2 Processes• Oxy-fuel cutting • Plasma cutting • Combined OXY fuel and plasma cutting, with tool changerCCS without cabinCCS with sound proof cabinCCS Robot Cutting Line specifications Page 3 of 10© 2014, Kranendonk Production Systems BV2.3 ControlsA continuous, non-repetitive, production flow can only be realized when there is no times spend on programming of the system. Our software eliminates the need for programming. The central controller of a CCS is the ARAC software. The operator can manually insert the preferred dimensions, after which the system will measures the beam and adapts the cutting shape to reach a perfectly fitting part. The preferred dimensions can also be derived from a CAD system. If needed, adjustments can be made on the shopfloor. The operator is provided with: • Two large touch-screens with camera system • Operator interface with clear graphics, no language barriers • Remote controlCCS Robot Cutting Line specifications Page 4 of 10© 2014, Kranendonk Production Systems BV3 General functionalityThe general functionalities of the system are explained below. Continuous flow Profiles are cut in any order, without set-up time between different profiles. All production functions such as cutting, transport and positioning are automatic, and completely integrated. In-flow profile positioning Profiles are accurately positioned with in-flow rollers. This eliminates the need for a length-measuring trolley (‘gripper’), which is often high on maintenance. Fitting constructions The cutting path is adapted to deviations in the raw profiles. Also, deviations in connecting profiles can be taken into account. Perfect fits are the result. Robust design The CCS concept is based on the integration of components in a rigid main frame. The main frame increases durability and shortens the installation time. Cutting holes with plasma A CCS station can replace a sawing/drilling line, because holes can be cut with plasma as well. The robot’s movements compensate for the plasma bevel. No programming Operation is easy: with a CAD connection or direct input on the shopfloor, no time is lost with complex programming tasks. Safety and environment Safety provisions according European regulations, optionally with fencing. With plasma cutting, a sound proof cabin with fume extraction is supplied for operator safety.CCS 1250 with sound proof cabinCCS Robot Cutting Line specifications Page 5 of 10© 2014, Kranendonk Production Systems BV4 Production flowThe production process involves the following steps: 1. Transfer of one raw profile from the infeed buffer onto the rollerbed. 2. Positioning of the profile under the robot for the first cut. 3. Clamping and making the first end cut. 4. Transport and intermediate cuts. 5. Transport and making the final end cut. 6. Output of the finished profile onto the output buffer. 7. These steps are repeated for next profiles in a nest. This process is repeated for all profiles in the infeed buffer. The infeed buffer can be loaded during production, without disturbing the flow.4.1 Handling and logisticsThe CCS system has an in-flow positioning system. This means that there is no limitation to the maximum length of the profiles, as it eliminates the need for a separate positioning device (‘gripper’). Also, maintenance costs are reduced. The accuracy that is reached with the in-flow positioning rollers is within 1 mm on every 10 meters of profile length. Infeed and outfeed buffers can be supplied with the system. The buffers are automatically operated, creating a continuous production flow. Other processes, such as shot blasting, edge milling and marking/printing are options which can be integrated in the system. The production software makes sure that the machine can run continuously. Our software also controls additional machines in the production flow, such as a shot blasting station or text-marking station.CCS Robot Cutting Line specifications Page 6 of 10© 2014, Kranendonk Production Systems BV5 ComponentsThe CCS cutting system consists of the following subsystems: Main frame • ABB industrial robot (IRB 2600 with CCS 600 and CCS 900, IRB 4600 with CCS 1250) • IRC5 robot control system • In-flow measuring rollers Control components (integrated in main frame) • 17” touch screen with graphical interface • 17” screen for camera view • Remote control for real time adjustments • ICS3000 industrial computer Other components • Standard with 12 meter infeed conveyor, 12 meter outfeed conveyor • ESAB EPP450 plasma power source, gas switch box and high power plasma cutting torch (PT-36) • Camera system • Scrap container (capacity of 1000 kg)CCS Robot Cutting Line specifications Page 7 of 10© 2014, Kranendonk Production Systems BV6 DimensionsOverall dimensions CCS basic configuration Roller bed in feed Roller bed out feed Overall length (approx) Overall width (approx) Height above floor, roller beds Height above floor, chain conveyors 12,000 mm 12,000 mm 20,500 mm 4,000 mm 900 mm 960 mmGeneral profile specification Length before cutting Length after cutting into standard buffer Profile height when laying on roller bed Profile width Profile weight, roller bedmin. 2,000 mm 600 mm 12 mm 80 mmmax. Equal to rollerbed length Equal to rollerbed length 500 mm 1250 mm Approx. 500 kg/mThe above specifications are based upon the standard design for robot profile cutting lines. On request, special solutions can be engineered to suit specified customer demands exceeding the given limits.Profile types HE, IPE, INP beams* UNP Flat strips L-beams Bulb (HP) profiles Rectangular tubes (RHS, SHS-HSS) (turning with optional turning device (r max.: 25) T-bars* * Small adjustments to the buffer may be neededminimumCCS 600 H 600 x 300 U 600 x 300CCS 900 H 900 x 300 U 900 x 300 900 x 50 L 900 x 300 HP 430 x 17 300 x 300 T 500 x 300CCS 1250 H 1250 x 500 U 914 x 100 1250 x 50 L 1250 x 500 HP 430 x 17 500 x 500 T 1250 x 500H 10080 x 08 L 80 x 40 HP 80 x 5 80 x 80 T 80 x 80600x50 L 600 x 300 HP 430x17 300 x 300 T 500 x 300CCS Robot Cutting Line specifications Page 8 of 10© 2014, Kranendonk Production Systems BVOptions6.1 Customization and consultancyKRANENDONK develops custom automation solutions for manufacturing companies. We do this by combining hardware, software and sensors. In this way, we can automate non-repetitive production processes with robotics. As a result, we can fit the CCS cutting cell in the existing production flow, or build a complete factory layout from the ground up. We have a large experience in shipbuilding, offshore and structural steel industries.6.2 ServicesImplementing robot technology is a major step. Therefore we offer services to assist with this transition.6.2.1 Training and installationFull installation of equipment Work preparation training • Operator training • Start-up assistance• •6.2.2 Customer supportYearly inspections (service contract) Local support by ABB and ESAB • Remote Assistance from our two support offices (Holland and Japan)• •Remote Assistance We can monitor your system through an internet connection. In this way we can quickly solve issues, often through the telephone. Various service packages are available in combination with inspections.CCS Robot Cutting Line specifications Page 9 of 10© 2014, Kranendonk Production Systems BV8ImpressionsCCS Robot Cutting Line specifications Page 10 of 10。

相关文档
最新文档