3.1电气设备上安全工作的组织措施
Rules for safety work on electrical equipment
3.1.1工作票制度;
Working permitting card system
3.1.2工作许可制度;
Work license system
3.1.3工作监护制度;
Work monitoring system
15
2.进入隧道应有充足的照明,并有防火,防水通风 的措施;
Sufficient light should be provided in the cable tunnel, and the measurement for fire safety, water proof and ventilation should
9
2.高压设备工作的基本要求(3)
Basic requirement for the work of high voltage equipment 2.1.5 户外35kV及以上高压配电装置场所的行车通道上、应
根据表2-2设置行车安全限高标志.
There should be height limit mark on the truck where there was distribution device of 35Kv and above .
表2-2 车辆(包括装载物)外廓至无遮拦带电部分之间的安全 距离.
The safety distance between the edge of truck (including the cargos on the truck) and the unprotected conductive part.
be taken in the tunnel.
3.使用携带型火炉或喷灯时,火焰与带电部分的 距离:10kV及以下者不得小于1.5m;10kV以上者 不得小于3m.
The safety distance between the electrified part and flame: 10kV and below class should be 1.5m at least; 10kV and above class should be 3m at least.
17
3.电缆耐压试验分相进行时,另两相应接 地;
When test one phase, the other two phases must be earthed.
4.电缆试验结束,应对被试电缆充分放电.
表4-1 工作人员工作中正常活动范围与带电设备的安 全距离 the safety distance between the energized equipment
and the worker’s activity area.
电压等级 Voltage class
(kV) 安全距离 Safety distance
表2-1 设备不停电时的安全距离
Safety operating distance with equipment
电压等级
Voltage Class (kV)
安全距离
Distance (m)
10及 以下
0.7
20,35 1.00
63,66 220 330 500 110 1.50 3.00 4.00 5.00
through lessons.
4
三不伤害
1.不伤害自己
Don’t hurt yourself
2.不伤害别人
Don’t hurt others
3.不被别人伤害
Don’t be hurted by others
5
事故分析四不放过
Analyze the reason of accident
1.事故原因不清楚不放过;
(m)
10及 以下 0.35
20. 35 0.60
63 220 330 110 1.50 3.00 4.00
500 5.00
13
5.电力电缆工作(1)
works on power cable
5.1电力电缆工作的基本要求 Basic requirement for works on cable
1.办理工作票履行工作许可手续;
4.2.1工作地点应停电的设备如下:
The following equipment on site should be powered off:
4.2.1.2与工作人员在进行工作中正常活动范围的距离 小于表4-1规定的设备。The equipment within the area
mentioned in form 4-1.
2.1.3 无论高压设备是否带电,工作人员不得单独移开或越过遮拦进行 工作;若有必要移开时,应有监护人在场,并符合表2-1的安全距离.
The worker can not remove or step over the guardrail whether the high voltage equipment energized or not. If need to remove the guardrail, the custodian should be on site, and in accordance with the safety operating distance.
4.1.1停电 Cut off the power
4.1.2验电 Voltage testing
4.1.3接地 Grounding
4.1.4悬挂标示牌和装设遮拦(围栏) suspend the signboard and set up the guardrail
12
4.保证安全的技术措施(2)
Technical rules for keeping the safety
6
国家电网公司 电力安全工作规程
Safety Work process of State Gird Corporation
(变电站和发电厂电气部分) Electrical part of Transformer
substation and power plant
2.高压设备工作的基本要求(1)
Basic requirement for the work of high voltage equipment
Issue the work permit
2.核对电缆名称,标志牌;
Check the cable name and signboard
3.核对检查安全措施正确可靠;
Check whether the safety device was correct and reliable.
14
电力电缆工作(2)
8
2.高压设备工作的基本要求(2)
Basic requirement for the work of high voltage equipment
2.1.4 10、20、35kV配电装置的裸露部分在跨 越人行过道或作业区时、若导电部分对地高度 分别小于2.7、2.8、2.9m,该裸露部分两侧和 底部须装设护网。
3.1.4工作间断、转移和终结制度。
Work interruption, transmission and ending system
11
4.保证安全的技术措施(1)
Technical rules for keeping the safety
4.1电气设备上安全工作的技术措施 Technical rules for safety operation of electrical equipment
16
电力电缆工作(3)
works on power cable
5.2.2 电力电缆线路试验安全措施
Safety rules of testing the cable line
1.电缆耐压试验前,加压端做好安全措施,防止误入试验场
所.另一端挂警告牌或派人看守.
Before apply HV test to the cable, carefully prepare the safety procedure on the energizing side to protect someone uninvolved from entering into the test site. Hanging the warning plate or arrange someone to guard on the other side.
^ Safety is forever topics for Power production. ^ Safety came from alarm, accident came from careless. ^ Work ingeniously brought safety, act rashly
brought disaster. ^Stupid man gains lessons by blood, wise man avoid accident
安全基本知识
Basic safety principals
Authur: Zhu Boheng Date:2012.09.10
1
安全第一 预防为主
Safety first, precaution crucial
2
3
Safety Alarm
^ Safety first, precaution crucial
When the unprotected part of the energized equipment of 10,20,35Kv is across the pedestrian crossing or work area, there should have protective screen around the unprotected part, if the height of conductive part is lower than 2.7, 2.8, 2,9m,
2.试验过程中,更换试验引线时,应充分放电,并戴绝缘手
套;
During the testing, the cable should be fully discharged before change the test lead. And the operator should wear the insulating glooves.
3.没有采取防范措施不放过;
It cannot be let pass if the preventive measures are not taken
4.事故责任者没有受到处罚不放过.
it cannot be let passed if the responsible person is not punished
It can not be let pass if the reason of the accident is unclear.
2.事故责任者和应受教育者没受到教育不 放过;
It can not be let pass if the responsible person and messes of the accident obtain no lessons
电压等级 35 63 110 220 330 500
Voltage class (kV)
安全距离
(66) 1.15 1.40 1.65 2.55 3.25 4.55
Safety distance
(1.75)
(m)
10
3.保证安全的组织措施(1)
Organizational rules for keeping safety
works on power cable
5.2.电缆施工的安全措施:
Safety measures for the cable construction
1.锯电缆前应核对图纸并用专用仪器 确切证实电缆无电后,用接地的带绝缘 柄的铁钎钉入电缆线芯后,方可工作.
Check the drawing and test the cable with professional device to make sure it’s no power before cutting the cable. Grounding the cable by stick in one steel rod with insulated handle before start the work.
Rules for safety work on electrical equipment
3.1.1工作票制度;
Working permitting card system
3.1.2工作许可制度;
Work license system
3.1.3工作监护制度;
Work monitoring system
15
2.进入隧道应有充足的照明,并有防火,防水通风 的措施;
Sufficient light should be provided in the cable tunnel, and the measurement for fire safety, water proof and ventilation should
9
2.高压设备工作的基本要求(3)
Basic requirement for the work of high voltage equipment 2.1.5 户外35kV及以上高压配电装置场所的行车通道上、应
根据表2-2设置行车安全限高标志.
There should be height limit mark on the truck where there was distribution device of 35Kv and above .
表2-2 车辆(包括装载物)外廓至无遮拦带电部分之间的安全 距离.
The safety distance between the edge of truck (including the cargos on the truck) and the unprotected conductive part.
be taken in the tunnel.
3.使用携带型火炉或喷灯时,火焰与带电部分的 距离:10kV及以下者不得小于1.5m;10kV以上者 不得小于3m.
The safety distance between the electrified part and flame: 10kV and below class should be 1.5m at least; 10kV and above class should be 3m at least.
17
3.电缆耐压试验分相进行时,另两相应接 地;
When test one phase, the other two phases must be earthed.
4.电缆试验结束,应对被试电缆充分放电.
表4-1 工作人员工作中正常活动范围与带电设备的安 全距离 the safety distance between the energized equipment
and the worker’s activity area.
电压等级 Voltage class
(kV) 安全距离 Safety distance
表2-1 设备不停电时的安全距离
Safety operating distance with equipment
电压等级
Voltage Class (kV)
安全距离
Distance (m)
10及 以下
0.7
20,35 1.00
63,66 220 330 500 110 1.50 3.00 4.00 5.00
through lessons.
4
三不伤害
1.不伤害自己
Don’t hurt yourself
2.不伤害别人
Don’t hurt others
3.不被别人伤害
Don’t be hurted by others
5
事故分析四不放过
Analyze the reason of accident
1.事故原因不清楚不放过;
(m)
10及 以下 0.35
20. 35 0.60
63 220 330 110 1.50 3.00 4.00
500 5.00
13
5.电力电缆工作(1)
works on power cable
5.1电力电缆工作的基本要求 Basic requirement for works on cable
1.办理工作票履行工作许可手续;
4.2.1工作地点应停电的设备如下:
The following equipment on site should be powered off:
4.2.1.2与工作人员在进行工作中正常活动范围的距离 小于表4-1规定的设备。The equipment within the area
mentioned in form 4-1.
2.1.3 无论高压设备是否带电,工作人员不得单独移开或越过遮拦进行 工作;若有必要移开时,应有监护人在场,并符合表2-1的安全距离.
The worker can not remove or step over the guardrail whether the high voltage equipment energized or not. If need to remove the guardrail, the custodian should be on site, and in accordance with the safety operating distance.
4.1.1停电 Cut off the power
4.1.2验电 Voltage testing
4.1.3接地 Grounding
4.1.4悬挂标示牌和装设遮拦(围栏) suspend the signboard and set up the guardrail
12
4.保证安全的技术措施(2)
Technical rules for keeping the safety
6
国家电网公司 电力安全工作规程
Safety Work process of State Gird Corporation
(变电站和发电厂电气部分) Electrical part of Transformer
substation and power plant
2.高压设备工作的基本要求(1)
Basic requirement for the work of high voltage equipment
Issue the work permit
2.核对电缆名称,标志牌;
Check the cable name and signboard
3.核对检查安全措施正确可靠;
Check whether the safety device was correct and reliable.
14
电力电缆工作(2)
8
2.高压设备工作的基本要求(2)
Basic requirement for the work of high voltage equipment
2.1.4 10、20、35kV配电装置的裸露部分在跨 越人行过道或作业区时、若导电部分对地高度 分别小于2.7、2.8、2.9m,该裸露部分两侧和 底部须装设护网。
3.1.4工作间断、转移和终结制度。
Work interruption, transmission and ending system
11
4.保证安全的技术措施(1)
Technical rules for keeping the safety
4.1电气设备上安全工作的技术措施 Technical rules for safety operation of electrical equipment
16
电力电缆工作(3)
works on power cable
5.2.2 电力电缆线路试验安全措施
Safety rules of testing the cable line
1.电缆耐压试验前,加压端做好安全措施,防止误入试验场
所.另一端挂警告牌或派人看守.
Before apply HV test to the cable, carefully prepare the safety procedure on the energizing side to protect someone uninvolved from entering into the test site. Hanging the warning plate or arrange someone to guard on the other side.
^ Safety is forever topics for Power production. ^ Safety came from alarm, accident came from careless. ^ Work ingeniously brought safety, act rashly
brought disaster. ^Stupid man gains lessons by blood, wise man avoid accident
安全基本知识
Basic safety principals
Authur: Zhu Boheng Date:2012.09.10
1
安全第一 预防为主
Safety first, precaution crucial
2
3
Safety Alarm
^ Safety first, precaution crucial
When the unprotected part of the energized equipment of 10,20,35Kv is across the pedestrian crossing or work area, there should have protective screen around the unprotected part, if the height of conductive part is lower than 2.7, 2.8, 2,9m,
2.试验过程中,更换试验引线时,应充分放电,并戴绝缘手
套;
During the testing, the cable should be fully discharged before change the test lead. And the operator should wear the insulating glooves.
3.没有采取防范措施不放过;
It cannot be let pass if the preventive measures are not taken
4.事故责任者没有受到处罚不放过.
it cannot be let passed if the responsible person is not punished
It can not be let pass if the reason of the accident is unclear.
2.事故责任者和应受教育者没受到教育不 放过;
It can not be let pass if the responsible person and messes of the accident obtain no lessons
电压等级 35 63 110 220 330 500
Voltage class (kV)
安全距离
(66) 1.15 1.40 1.65 2.55 3.25 4.55
Safety distance
(1.75)
(m)
10
3.保证安全的组织措施(1)
Organizational rules for keeping safety
works on power cable
5.2.电缆施工的安全措施:
Safety measures for the cable construction
1.锯电缆前应核对图纸并用专用仪器 确切证实电缆无电后,用接地的带绝缘 柄的铁钎钉入电缆线芯后,方可工作.
Check the drawing and test the cable with professional device to make sure it’s no power before cutting the cable. Grounding the cable by stick in one steel rod with insulated handle before start the work.