工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START—UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。

很好,谢谢。

4 I am very well, Thank you.我很好,谢谢你。

工程项目管理英语对话

工程项目管理英语对话

Person A: Hi, John. How's the progress on the construction project?Person B: Hi, Alice. Everything is going smoothly so far. The foundation has been laid, and the walls are being constructed.Person A: Great to hear that. By the way, have you faced any challenges so far?Person B: Yes, we encountered a few issues. The weather has been quite unpredictable, causing delays in the construction process. Additionally, some suppliers didn't deliver the materials on time.Person A: That's a common problem in construction projects. How did you handle these challenges?Person B: We communicated with the suppliers and requested an extension of the delivery date. Regarding the weather, we adjusted the work schedule to ensure minimal disruption.Person A: I see. How's the project budget looking so far?Person B: The budget is still on track. We've allocated funds for unexpected expenses, and we've managed to stay within the allocated budget so far.Person A: Good. What about the project timeline? Are you on schedule?Person B: Yes, we are. We've established a realistic timeline, and we are currently on schedule. However, we will continuously monitor the progress and make adjustments if necessary.Person A: That's important. How do you handle project changes and updates?Person B: We have a well-defined change management process. Any proposed changes are reviewed, approved, and documented. This ensures that we maintain control over the project scope and minimize risks.Person A: Excellent. How do you communicate with the project team and stakeholders?Person B: We hold regular meetings to discuss project progress, challenges, and updates. We also use project management software totrack tasks, share documents, and communicate with the team. Additionally, we keep stakeholders informed through progress reports and meetings.Person A: That's a great approach. How do you handle conflicts withinthe team?Person B: We address conflicts openly and constructively. We encourage team members to express their concerns and work together to find solutions. It's important to maintain a positive work environment and foster teamwork.Person A: Absolutely. Lastly, how do you ensure quality control in the project?Person B: We have a comprehensive quality control plan in place. We conduct regular inspections, follow industry standards, and involve experts when needed. This ensures that the project meets the required quality standards.Person A: That's great to hear. Keep up the good work, John. We're confident that the project will be successful.Person B: Thank you, Alice. We appreciate your support and guidance throughout the project.This dialogue showcases the importance of effective communication, change management, and quality control in engineering project management. It also highlights the need for collaboration, teamwork, and proactive problem-solving to ensure project success.。

(完整)建筑施工英语常用对话

(完整)建筑施工英语常用对话

(完整)建筑施工英语常用对话范本1: 建筑施工英语常用对话1. 问候与交流 (Greeting and Communication)1.1 打招呼 (Greetings)- Good morning/ afternoon/ evening! (早上/下午/晚上好!)- Hello! How are you today? (你好!你今天怎么样?)1.2 自我介绍 (Self-Introduction)- My name is [Your Name]. I am a construction worker. (我叫[你的名字],我是一名施工人员。

)- Nice to meet you! I work for [Company Name]. (很高兴见到你!我在[公司名称]工作。

)1.3 交流基本内容 (Basic Conversation)- How can I assist you? (我能提供吗?)- Could you please repeat that? I didn't catch it. (你能再说一遍吗?我没有听清楚。

)- Thank you! That's very helpful. (谢谢!这对我很有。

)2. 工程计划 (Project Planning)2.1 讨论施工进度 (Discussing Construction Schedule)- What is the current status of the project? (项目目前的进展情况如何?)- Are we on track to meet the deadline? (我们能按时完成工程吗?)2.2 确定工作流程 (Determining Workflow)- How should we proceed with the next phase of construction? (我们应该如何进行下一阶段的施工?)- Who will be responsible for coordinating the different teams? (谁将负责协调不同的团队?)2.3 协商设备需求 (Negotiating Equipment Requirements)- We need additional machinery for this task. Can we arrange for that? (我们需要额外的机械设备来完成这项。

工程建设现场英语五百句

工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。

很好,谢谢。

4 I am very well, Thank you。

工程建设现场英语五百句

工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START—UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。

很好,谢谢。

4 I am very well, Thank you。

工程施工对话英语

工程施工对话英语

工程施工对话英语Scene: A construction site bustling with activity, workers moving to and fro, heavy machinery in motion, and the sound of hammering and drilling filling the air.Characters:1. Jack - Construction foreman leading the project2. Sarah - Civil engineer overseeing the structural aspects of the project3. Mike - Construction worker responsible for carpentry work4. Lisa - Electrical engineer managing the installation of electrical systems5. Tom - Crane operator handling heavy lifting tasksJack: (addressing the team) Alright everyone, welcome to another day at the construction site. We have a lot to get done today so let's make sure we are all working efficiently and safely.Sarah: (approaching Jack) Jack, I wanted to discuss the status of the foundation work. Have we completed pouring the concrete for the footings?Jack: (checking his notes) Yes, Sarah, we finished pouring the footings yesterday. The concrete has set and the foundation walls are ready to be erected. I will assign a team to start working on that right away.Sarah: Great, let's make sure we follow the structural plans to ensure the walls are built properly and securely.Mike: (approaching the group) Hey Jack, do you want me to start working on the framing for the walls?Jack: Yes, Mike, that would be great. Get your team together and start setting up the wall frames. Make sure everything is level and plumb.Lisa: (joining the conversation) Jack, I need to coordinate with Mike to make sure we have electrical outlets and wiring conduits integrated into the walls as they are being built.Jack: Good point, Lisa. Make sure you are in constant communication with Mike to ensure the electrical systems are being installed correctly.Tom: (on the radio) Jack, I am ready to start lifting the steel beams into place for the roof. Are we clear to proceed?Jack: (responding on the radio) Yes Tom, go ahead and start lifting the beams. Make sure to follow all safety protocols and communicate with the ground crew to position the beams accurately.As the day progresses, the construction site hums with activity. Jack coordinates the various teams to ensure the project stays on schedule and meets quality standards. Sarah inspects the structural work to ensure it meets engineering specifications, while Mike and his crew focus on carpentry tasks. Lisa oversees the installation of electrical systems, making sure everything is wired correctly and safely. Tom uses the crane to lift heavy materials into place, working with precision and care.Jack: (addressing the team at the end of the day) Another productive day, everyone. Let's wrap up our tasks and make sure the site is clean and secure before we leave. Great job today!The team nods in agreement and begins to wind down their work, packing up tools and equipment. The construction site transforms as the sun sets, the sounds of activity giving way to a peaceful quiet. Tomorrow is another day of hard work and progress towards completing the project.(The scene fades to black as the team finishes up their tasks, ready to start anew the next day)。

工程建设现场英语五百句

工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS 2、交谈语言(24名)TALKING ABOUT LANGUAGES3、日期和时刻(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、打算与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)附录四、度量衡表ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量治理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 专门好,感谢。

4 I an very well, thank you. 我专门好,感谢你。

谈论工程项目常用英语口语句子-工程建设现场英语500句20

谈论工程项目常用英语口语句子-工程建设现场英语500句20

谈论工程项目常用英语口语句子-工程建设现场英语500句20工程项目ENGINEERING PROJECT135 A project execution is usually divided into some elementary phases, such as :engineering, procurement and transportation, and field construction.一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工。

136 We are building an ethylene plant with an annual capacity of 300,000 metric tons.我们正在建设一座年产三十万吨的乙烯工厂。

137 The contract number of this project is CJC78-8.这个项目的合同号是CJC78-8。

138 The Seller(vendor) is Toyo Engineering Corporation(TEC)of Japan.卖方(卖主)是日本的东洋工程公司。

139 The Buyer (customer, client) is China NationalTechnical Import Corporation.(CNTIC)买方(主顾、顾客)是中国技术进口总公司。

(简称CNTIC)140 China National Chemical Construction Corporation (CNCCC) contracts for domestic and overseas chemical projects. 中国化工建设总公司(简称CNCCC)承包国内和海外的化工工程。

141 We can contract to build turn-key plant, undertake single items of projects as a subcontractor or provide labor services. 我们可以承建成套工厂或分包单项工程或提供劳务。

工程建设现场英语口语:谈论计划和进度

工程建设现场英语口语:谈论计划和进度

工程建设现场英语口语:谈论计划和进度155 We should work according to the overall schedulechart(the construction time schedule )of the project.我们应该按照工程项目的总进度表(建设进度表)工作。

156 The effective date of this contract will begin from July sixth , nineteen eight-three.这个合同的有效期将从一九八三年七月六日开始。

157 The Seller will provide preliminary (final )technical documents for Buyer in May.卖方将于五月份向买方提供初步(最终)技术文件。

158 The basic (detailed) process design will be issued before August.基本的(详细的)工艺设计资料将于八月前发出。

159 Our major planning items contain estimating of cost and construction schedule.我们主要的计划工作项目包括费用预算和施工进度。

160 We shall have a design collecting (preliminary design, final design) meeting next month.下个月我们将召开设计数据收集(初步设计、最终设计)会议。

161 On our most projects Critical Path Method (CPM) is used for scheduling.在我们的绝大部分工程项目中都采用”统筹法”(即关键路线方法,简称CPM)安排计划。

162 Field erection work (civil work) will begin inOctober this year and complete on June first next year.现场安装工作(土建工作)将自今年十月开始至明年六月一日完工。

建设工程施工进度计划英语作文

建设工程施工进度计划英语作文

建设工程施工进度计划英语作文{z}Construction Project Schedule PlanIntroduction:A construction project schedule plan is a crucial aspect of any construction project.It outlines the timeline, tasks, and resources required to complete the project successfully.This document aims to provide a comprehensive construction project schedule plan for a hypothetical project.Project Overview:The project is a residential building consisting of 10 floors, located in the heart of the city.The project aims to provide modern and luxurious living spaces for families.The total estimated cost of the project is $50 million, and the expected completion date is 2 years from the start of construction.Construction Phases:The construction project will be divided into three main phases:1.Pre-construction Phase: This phase includes land acquisition, permits and approvals, design, and planning.It is expected to last for 6 months.2.Construction Phase: This phase includes the actual construction of the building, including foundation, columns, beams, slabs, and finishes.It is expected to last for 18 months.3.Post-construction Phase: This phase includes handover of the building to the client, defect liability period, and maintenance.It is expected to last for 6 months.Construction Schedule:The construction schedule is as follows:1.Pre-construction Phase:- Land acquisition: 3 months- Permits and approvals: 2 months- Design and planning: 1 month2.Construction Phase:- Foundation: 3 months- Columns and beams: 2 months- Slabs: 2 months- Finishes: 2 months- Other construction activities (elevators, HVAC, electrical, plumbing): 3 months3.Post-construction Phase:- Handover to client: 1 month- Defect liability period: 3 months- Maintenance: 2 monthsKey Milestones:The key milestones for the project are as follows:nd acquisition: Completion within 3 months of the project start date.2.Permits and approvals: Completion within 2 months of the project start date.3.Design and planning: Completion within 1 month of the project start date.4.Foundation completion: Completion within 3 months of the construction phase start date.5.Columns and beams completion: Completion within 2 months of the construction phase start date.6.Slabs completion: Completion within 2 months of the construction phase start date.7.Finishes completion: Completion within 2 months of the construction phase start date.8.Handover to client: Completion within 1 month of the post-construction phase start date.Resources:The resources required for the project include:1.Manpower: A team of 200 skilled workers, 50 engineers, and 10 project managers.2.Machinery and equipment: Cranes, excavators, concrete mixers, and other construction-related equipment.3.Materials: Cement, steel, concrete, bricks, and other construction materials.Risk Management:Risks associated with the project include delays in land acquisition, permits, and approvals, unfavorable weather conditions, and labor strikes.To mitigate these risks, the project management team will closely monitor the progress of the project, maintain effective communication with stakeholders, and have contingency plans in place.Conclusion:The construction project schedule plan provides a detailed timeline, tasks, and resources required for the successful completion of the residential building project.By closely monitoring the progress and managing risks effectively, the project team aims to deliver the project on time and within budget.。

工程施工英语口语(3篇)

工程施工英语口语(3篇)

第1篇Introduction:Construction projects are complex and involve various stakeholders, including engineers, architects, contractors, and laborers. Effective communication is crucial in ensuring the smooth execution of projects. In this article, we will explore some essential construction English phrases and expressions that can help professionals communicate more efficiently in the construction industry.1. Greetings and Introductions- Good morning/afternoon/evening, everyone.- Hello, my name is [Your Name]. It's a pleasure to meet you.- How do you do?2. Project Briefing- Let's go over the project schedule and discuss the key milestones.- We need to address the issue of delay in the construction timeline.- I would like to remind everyone about the safety protocols on the site.3. Safety and Health- Please wear your hard hats and safety vests at all times.- In case of an emergency, follow the evacuation plan immediately.- We must ensure that all equipment is in good working condition.4. Technical Terms- This is a concrete mix design for the foundation.- The steel reinforcement is placed according to the structural design.- The waterproofing membrane needs to be applied evenly to prevent leaks.5. Progress Updates- The foundation work is progressing as per the schedule.- We have completed 50% of the electrical installations.- The roof has been successfully waterproofed.6. Issues and Solutions- There is a discrepancy in the materials delivered to the site.- We need to replace the damaged tiles on the facade.- The soil in this area is not suitable for construction; we should consider alternative foundations.7. Communication with Clients- We will provide a detailed report of the progress on a weekly basis.- The client has requested a modification in the design; please review the changes.- We appreciate your feedback on the project; it will help us improve our services.8. Closing Remarks- Thank you for your attention and cooperation.- Please feel free to reach out if you have any questions or concerns.- We look forward to completing this project successfully.Conclusion:Effective communication in construction English is vital for ensuring the successful execution of projects. By using these essential phrases and expressions, professionals can enhance their communication skills and facilitate smoother collaboration among all stakeholders involved in the construction process. Remember, clear and concise communication can make a significant difference in the overall success of a construction project.第2篇Introduction:In the field of construction engineering, effective communication is crucial for the successful completion of projects. English, being a global language, plays a significant role in this field. This article aims to provide some essential English oral communication phrases and tips for construction engineers.I. Greetings and Introductions1. Good morning/afternoon/evening, everyone.2. Hello, my name is [Your Name]. It's a pleasure to meet you.3. How do you do?4. Nice to meet you.II. Common Phrases for Construction Projects1. Can we start the meeting now?2. I would like to discuss the progress of the project.3. According to the schedule, we are ahead of schedule.4. We encountered some unexpected issues, and we need to find a solution.5. Let's prioritize the tasks to ensure we meet the deadline.6. I have reviewed the design plans, and I have some suggestions.7. The quality of the materials needs to be improved.8. The project is currently on track, and everything is going smoothly.III. Giving Instructions and Directions1. Please follow these safety procedures.2. The construction equipment needs to be checked before use.3. Make sure the foundation is stable before proceeding.4. The workers should wear protective gear at all times.5. The concrete needs to be mixed according to the specified proportions.IV. Expressing Opinions and Suggestions1. I think we should consider using a different material for this project.2. In my opinion, we need to allocate more resources to this task.3. I suggest we consult with the client before making any changes to the design.4. According to my experience, this approach will be more efficient.5. I believe that implementing this plan will lead to better results.V. Handling Conflicts and Issues1. I understand your concerns, but let's try to find a compromise.2. I appreciate your input, but we need to stick to the original plan.3. I apologize for the inconvenience, but this is the best solution we have.4. Let's discuss the issue and come up with a solution that benefits everyone.5. I understand that this is a sensitive topic, but we need to address it promptly.VI. Closing Conversations1. Thank you for your input; let's continue our discussion next week.2. I appreciate your hard work and dedication to this project.3. Have a great day/evening.4. I hope we can resolve this issue soon.5. Let's keep in touch and update each other on the progress.Conclusion:Effective English oral communication is essential for construction engineers to ensure the successful completion of projects. By using these essential phrases and tips, construction engineers can improve their communication skills and foster better collaboration with their colleagues and clients. Remember, clear and concise communication can make a significant difference in the construction industry.第3篇Introduction:Construction projects are a common occurrence in today's world.Effective communication is crucial in ensuring the success of these projects. As a result, construction professionals need to be proficient in construction English oral communication. This article will discuss some key phrases and expressions that are commonly used in construction projects.1. Greetings and Introductions- Good morning, everyone. How are you today?- Hello, my name is [Name]. I am the project manager. It's a pleasure to meet you all.- Nice to meet you. I am [Name], the site engineer.2. Discussing Project Details- Can you please provide me with the latest project schedule?- We need to address the issue of [problem] as soon as possible.- The foundation work is progressing well, but we need to accelerate the concrete pouring process.- Please ensure that all the materials meet the required quality standards.3. Safety and Health- Safety is our top priority. Please wear your hard hats and safety shoes at all times.- In case of an emergency, follow the evacuation plan and meet at the designated assembly point.- Report any hazards or near-miss incidents to the safety officer immediately.4. Quality Control- Please inspect the work completed by the team and ensure it meets the quality standards.- The rebar placement seems to be incorrect. Can you please rectify it?- The paint job on the wall is uneven. We need to redo it.5. Time Management- We are running behind schedule. We need to find ways to expedite the project.- Let's schedule a daily progress meeting to discuss any issues and challenges.- The project completion date is approaching. We need to work extra hours to meet the deadline.6. Budget and Costs- The budget allocation for this project is [amount]. Please stick to it.- We have exceeded the budget for the electrical work. We need to find a cost-effective solution.- The supplier has provided us with a discounted price for the steel materials. Let's proceed with the order.7. Closing Remarks- Thank you for your hard work and dedication to this project.- We have made significant progress, but we still have a long way to go. - I appreciate your cooperation and support throughout this project. Conclusion:Construction English oral communication is essential for the success of construction projects. By mastering these key phrases and expressions, construction professionals can ensure smooth communication, timely project completion, and a high-quality end product.。

工程建设常用英语口语

工程建设常用英语口语

在会议上常用的英语口语句子在会议上AT THE MEETING101 Our meeting will be next Tuesday at eight o’clock.我们的会议将在下星期二八点钟举行。

102 We want to change our meeting from Monday to Wednesday. 我们想把会议由星期一改为星期三。

103 Sit down, please. Have a smoke and a cup of tea.请坐,请抽烟、喝茶。

104 Which problems shall we discuss today?我们今天讨论哪些问题?105 Today we shall discuss the question of hydraulic (pneumatic)test.今天我们将讨论水压、(气压)试验问题。

106 Please give us your opinion.(point of view, ideas) 请把你的意见(观点、想法)告诉我们。

107 We must know your opinion.我们必须知道你的意见。

108 We are willing to accept your suggestion.(plan) 我们乐于采纳你的建议(计划)。

109 Your suggestion suits us. We agree.你的建议适合我们,我们同意。

110 Please forgive me. We have different (opposite) views on this. Our opinion is …请原谅,我们对此有不同的(相反的)看法.我们的意见是……111 I am very sorry, but I disagree with you.我很报歉,我不同意你说的。

112 We should be able to settle this question.我们应该能够解决这个问题。

工程建设现场英语五百句

工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START—UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。

很好,谢谢。

4 I am very well, Thank you。

工程建设现场英语五百句

工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks.很好,谢谢.4 I am very well, Thank you。

工程建设现场英语对话200句

工程建设现场英语对话200句

工程建设现场英语对话200句一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 很好,谢谢。

4 I am very well, Thank you. 我很好,谢谢你。

5 Good morning Mr.Jack. 早安,贾克先生。

6 Good afternoon Miss Mary. 午安,玛利小姐。

7 Good evening DrJohn. 晚安,约翰博士。

8 Very pleased to meet you, you are welcome.见到你很高兴,欢迎你。

9 I am very glad to see you. 我很高兴见到你。

10 Welcome to China. 欢迎你到中国来。

11 Welcome to our job site. 欢迎你到我们工地来。

12 For our friendship and cooperation , I wish we shall havea friendly cooperation in coming days.祝愿友谊与合作,希望今后友好共事。

13 Let us work together for our common job.让我们为共同的事业一起工作吧!14 Happy New year! 新年快乐!15 Happy Spring Festival! 春节快乐!16 Merry Christmas! 圣诞节愉快!17 Congratulations to your National Day!祝贺你们的国庆节!18 Happy birthday to you! 祝你生日快乐!19 Allow me to introduce myself, my name is Li Han.请允许我介绍自己,我的名字叫李汉。

工程口语英语

工程口语英语

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1How do you do?你好吗?(初次见面)2How are you?你好吗?(日常见面)3Fine,thanks.很好,谢谢。

4I am very well,Thank you.我很好,谢谢你。

(建筑工程管理)工程建设现场英语五百句

(建筑工程管理)工程建设现场英语五百句

工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24名)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY 14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS 16、设备安装(24句)ERECTION OF THE EQUIPMENT 17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 很好,谢谢。

4 I an very well, thank you. 我很好,谢谢你。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

工程建设现场英语口语:谈论计划和进度
155 We should work according to the overall schedule
chart(the construction time schedule )of the project.
我们应该按照工程项目的总进度表(建设进度表)工作。

156 The effective date of this contract will begin from July sixth , nineteen eight-three.
这个合同的有效期将从一九八三年七月六日开始。

157 The Seller will provide preliminary (final )technical documents for Buyer in May.
卖方将于五月份向买方提供初步(最终)技术文件。

158 The basic (detailed) process design will be issued before August.
基本的(详细的)工艺设计资料将于八月前发出。

159 Our major planning items contain estimating of cost and construction schedule.
我们主要的计划工作项目包括费用预算和施工进度。

160 We shall have a design collecting (preliminary design, final design) meeting next month.
下个月我们将召开设计数据收集(初步设计、最终设计)会议。

161 On our most projects Critical Path Method (CPM) is used for scheduling.
在我们的绝大部分工程项目中都采用”统筹法”(即关键路线方法,简称CPM)安排计划。

162 Field erection work (civil work) will begin in
October this year and complete on June first next year.
现场安装工作(土建工作)将自今年十月开始至明年六月一日完工。

163 This contract plant will start-up (put in commissioning ) on November thirty this year.
这座合同工厂将于今年十一月三十日开车(投产)。

164 The date of acceptance of this plant will be April sixth, nineteen eighty-four.
这座工厂的交工验收期将在一九八四年四月六日。

165 The plant is scheduled to be completed around 1985.
工厂计划于一九八五年前后建成。

166 The Seller’s operating group (A crew of specialists) will remain on the job until guarantees are met.
卖方操作组(专业工作组)将在现场,一直工作到生产符合保证条件。

167 We must take the plant through the test run and
finally into commercial operation.
我们必须使工厂通过试运转并最终投入工业生产。

168 Every month we shall establish construction schedule
每个月我们都要制订建设进度计划。

169 We shall also make the project schedule report every day .
我们也将每天提出项目进度报告。

170 We are going to begin this work tomorrow.(next week ,next month).
我们准备明天(下周、下月)开始这项工作。

171 We must take this work plan into consideration.
我们必须考虑这个工作计划。

172 We have to change our plan for lack of materials (construction machinery, erection tools)
因缺少材料(施工机械、安装工具),我们只能改变计划。

173 What is your suggestion about this schedule?
你对这个计划进度有何建议?
174 Give me your opinion on this plan.
请把你对这个计划的意见告诉我。