目录标题----------------------------------------------------------------------------6 设计总说明 -----------------------------------------------------------------7 第1章基本资料------------------------------------------------------------8 1.1 工程概况 ----------------------------------------------------------------8 1.3 工程地质及水文地质---------------------------------------------------8 1.4 水文资料-----------------------------------------------------------------9 1.4.1 渠首处河道水位~流量关系----------------------------------------9 1.4.2 泥沙资料---------------------------------------------------------------9 1.4.3 气象资料---------------------------------------------------------------9 1.5 设计补充资料---------------------------------------------------------10第2章选线、选型、枢纽布置------------------------------------------11 2.1 闸坝的选择------------------------------------------------------------11 2.2 枢纽布置形式-----------------------------------------------------------11 2.3 拦河建筑物形式(即采用拦河闸还是壅水坝)-------------------12 2.4 枢纽防沙设计-----------------------------------------------------------12第3章水闸的水力计算---------------------------------------------------13 3.1 闸孔设计---------------------------------------------------------------13 3.2 闸孔型式---------------------------------------------------------------13 3.3 闸底板高程的确定-----------------------------------------------------13 3.4闸孔尺寸的确定-------------------------------------------------------133.4.1 闸孔净宽计算----------------------------------------------------13 3.4.2 孔数几,单孔净宽b及闸孔总宽B -------------------------14 3.5 闸孔高度-------------------------------------------------------------15 3.5.1 闸顶高程-----------------------------------------------------------15 3.5.2 闸门顶高程--------------------------------------------------------15 第4章消能计算--------------------------------------------------------16 4.1 过闸水流特点-------------------------------------------------------16.4.2 消能防冲设计说明------------------------------------------------16 4.2.1 消能采用的方式--------------------------------------------------16 4.2.2 消能设计的内容 -------------------------------------------------16 4.2.3闸门的运用方式---------------------------------------------------17 4.2.4 闸门开启操作规程----------------------------------------------18 4.3池深设计----------------------------------------------------------18 4.3.1 池深设计条件-----------------------------------------------------18 4.3.2 求Q控-------------------------------------------------------------18 4.3.3 求池深d -----------------------------------------------------------20 4.3.4确定池长L K --------------------------------------------------------20 4.4 确定底板厚度--------------------------------------------------------21 4.5 海漫长L漫的确定--------------------------------------------------21 4.6 防冲槽设计-----------------------------------------------------------22 4.7 消力池构造-----------------------------------------------------------23 4.7.1 配筋----------------------------------------------------------------234.7.2 分缝止水------------------------------------------------------------23 第5章防渗排水设计-----------------------------------------------------245.1 设计说明--------------------------------------------------------------24 5.2 水闸地下轮廓线的型式和尺寸的设计----------------------------24 5.3渗透计算--------------------------------------------------------------25 5.3.1 地下轮廓线的简化-------------------------------------------------25 5.3.2 确定控制层的计算深度T计----------------------------------------26 5.3.3 分区并计算各区的阻力系数ξi-----------------------------------26 5.3.4 求每一区的水头损失h i -------------------------------------------27 5.4.5 求渗压水头H i--------------------------------------------------------27 5.4.6 求渗压水头H i分布图-----------------------------------------------27 5.4.7 求逸出坡降J出------------------------------------------------------28 第6章闸室结构设计------------------------------------------------------296.1 底板---------------------------------------------------------------------29 6.2闸墩-----------------------------------------------------------------------30 6.3闸门-------------------------------------------------------------------31 6.4工作桥----------------------------------------------------------------32 6.5检修桥----------------------------------------------------------------33 6.6交通桥----------------------------------------------------------------33 6.7启闭机----------------------------------------------------------------34 第7章闸室稳定及基底应力计算-----------------------------------------357.1 设计说明---------------------------------------------------------------367.1.1 计算的任务---------------------------------------------------------36 7.1.2 计算单元------------------------------------------------------------36 7.1.3 计算工况------------------------------------------------------------36 7.1.4 采用的公式---------------------------------------------------------36 7.1.5 控制标准------------------------------------------------------------37 7.2 荷载计算-------------------------------------------------------------37 7.2.1 结构自重------------------------------------------------------------37 7.2.2 水载------------------------------------------------------------------38 7.2.3 扬压力---------------------------------------------------------------38 7.2.4 水压力---------------------------------------------------------------38 7.2.5 地震荷载------------------------------------------------------------38 7.3 完建期闸室抗滑稳定及地基承载验算----------------------------39 7.3.1.由上节计算的荷载简化结果--------------------------------------39 7.3.2 地基承载力验算-----------------------------------------------------40 7.4 正常挡水时闸室抗滑稳定及地基承载力验算---------------------40 7.4.1正常挡水时的荷载简化表-----------------------------------------40 7.4.2 地基承载力验算-----------------------------------------------------41 7.5正常挡水+地震时验算抗滑稳定及地基承载力--------------------41` 7.5.1简化结果列表-------------------------------------------------------41 7.5.2 地基承载力验算-----------------------------------------------------42 第8章两岸连接建筑物--------------------------------------------------43 8.1 闸室与上下游连接----------------------------------------------------438.1.1 水闸上下游翼墙的平面布置形式----------------------------------43 8.1.2 岸翼墙结构形式------------------------------------------------------43 8.1.3构造-------------------------------------------------------------------- 44 8.2 与两岸的连接---------------------------------------------------------- 44 8.3 竖向连接---------------------------------------------------------------44 8.4 下游翼墙完建期稳定计算-------------------------------------------45 8.4.1 设计说明-------------------------------------------------------------45 8.4.2 完建期稳定计算---------------------------------------------------46 谢辞-----------------------------------------------------------------------49 参考文献---------------------------------------------------------------------50 附录---------------------------------------------------------------------51东明水利枢纽工程设计——拦河闸设计设计总说明本枢纽位于清河东明市附近河段,以清河明山水库为水源,除工业.城市及电站用水外,由该库至东明市区见的水量供给灌溉用水7.07亿立方米。
褒河拱坝枢纽设计_毕业设计说明书
褒河拱坝枢纽设计摘要本次毕业设计的题目是《褒河拱坝枢纽设计》。
褒河库区位于陕西省汉中平原堡河下游,汉中平原地区气候温和、湿润、土地开阔肥沃,是著名的粮仓。
由于现有的汉惠渠、褒惠渠等渠道,均系无坝引水灌溉,保证率低;有汉中地区属于三线,近年来大量工矿企业纷纷建立,电力负荷急剧增长,故拟在该地区修建水利枢纽,开发水资源,对于促进工农业的发展都有重要意义。
此次设计的目的是为了使水利水电专业学生了解和掌握我国各种拱坝设计方法与思路,理论与实践相结合,提高分析问题和解决问题的能力。
并通过此次设计系统了解拱坝设计过程,拟定拱坝的不同设计方案,科学合理的确定拱坝的建设规模和运行方式。
褒河水利枢纽主要任务为灌溉、发电,其次为防洪。
为此,枢纽定为:渠首电站、拦河坝(拱坝)、中孔泄洪、底孔、电站引水渠道等。
根据工程规模、效益,参照相关规范将褒河水库定为三级,建筑物级别:主要建筑物为三等,次要建筑物为四等,临时建筑物为五级。
褒河拱坝的设计过程主要包括坝型选择和枢纽布置、拱坝的平面布置、拱坝的应力计算、坝肩稳定、底孔应力和配筋计算。
关键词:混凝土拱坝、中心角、温度应力、应力计算、坝肩稳定AbstractThis graduation proj ect's topic is “Baohe arch dam. Design ”Baohe reservoir area is located Bao river downstream of Hanzhong plain shensi. The climate in Hanzhong plain region is mildness wetness and its tract open fecundity. It is famous granary. Owing to Hanhui & Baohui channel existing being non-dam irrigation by channeling water, the ensure rate is low. Due to Hanzhong plain belonging to the third line, a great deal of industrial and mining establishments having been established and electric power load rapid going up, hydro junction has been built in the area to develop water resources. It has important meaning to accelerate development of industry and agriculture.On the basis of scope of project benefit, refer to correlation criterion, Baohe reservoir has been confirmed as third class, key constructions as third class, subordination constructions as fourth class and temporary structures as fifth class.Shimen arch dam design process is introduced as follow:Select Type of Dam and Arrange Hydro Junction、Plan Layout of Arch Dam、Stress Calculation of Arch Dam、Rock Dam Abutment Stabilization、Basal Pore and Reinforce CalculationKeyword: ncrete arch dam, center angle, temperature should dint, should dint calculation, the dam shoulder stabilit1 坝型选择和枢纽布置(1) 根据褒河库区水文,地质、地形条件,决定修建拱坝,并从工程量(坝体工程量和金属安装)、泄洪安全性、计算方法和施工方法等几个方面阐述修建拱坝的优越性。
[学士]拱坝毕业设计
14.28
∵Hd/Hnax=0.8 ∴查表得负压为0.8倍的定型设计水头
负压=0.4Hd=0.4×1.31=0.524m
可知该负压符合所规定的范围
3.1坝型确定
3.1.1对于中坝的挑坎落差S=4~8m,取S=5m;堰顶宽度B取24m,每孔净宽8m;反弧半径R=5m
溢流坝采用WES型曲线ຫໍສະໝຸດ 顶部曲线段采用两段圆弧相连,溢流剖面堰型采用幂曲线,其方程为: X1.85=1.80Hd1.85-1Y 即X1.85=2.26Y
1.67
8.47
0.54
14.15
-2.86
20.36
公斤/平方厘米
右
0.00
0.00
0.62
1.49
1.91
4.66
1.44
9.04
-0.18
15.16
-4.45
22.47
2号梁
主应力-1
左
0.00
0.00
0.83
0.38
2.92
2.37
3.05
5.97
1.79
10.71
0.83
15.40
-2.78
L=24m
h=Q/Lν=112.56/24×9.66=0.49mR=9.2h=9.2×0.49=4.5m
圆心高程=鼻坎高程+Rcosθ2
=505.48+4.50×cos10°=508.88m
Y0=509-509.88=-0.88m
反弧切点D:
X0= Xc+Rsinθ1=2.19+4.50sin55°=5.88m
注:n=0.03 i=0.05
流量水位-关系曲线
2.1.1已知: 校核洪水位(p=5%):510.15m
拱坝毕业设计
拱坝毕业设计拱坝是水利工程中常见的一种重要结构,毕业设计可以围绕拱坝的设计、分析、优化等方面展开。
以下是一个拱坝毕业设计的简要思路和参考内容:1. 研究背景和目的:介绍拱坝的概念、分类和应用领域,阐述拱坝设计的重要性和现实意义,明确毕业设计的目的和意义。
2. 拱坝基本理论:回顾拱坝的力学原理、稳定性分析方法等基本理论,了解拱坝结构的行为特点和作用机理。
3. 拱坝设计参数和约束条件:研究并列举拱坝设计中的主要参数和约束条件,如坝高、坝型、拱顶高程、坝线长度、水位变化等,探讨各参数对拱坝结构性能的影响。
4. 拱坝设计方法与流程:介绍拱坝设计的常用方法和流程,包括确定设计参数、选择合适的坝型、进行稳定性分析、优化设计等。
可以针对具体拱坝案例进行分析和比较。
5. 拱坝施工与安全:探讨拱坝的施工方法和安全考虑,包括坝体材料的选择、施工工艺控制、监测与评估等方面,关注施工对拱坝结构的影响和安全性的保障。
6. 拱坝工程实例案例研究:选取一座具体的拱坝工程实例,分析其设计、施工、运行等方面的技术特点和经验教训,通过实例研究加深对拱坝设计的理解和认识。
7. 拱坝设计软件与模拟仿真:介绍拱坝设计中常用的软件工具,如DAM、Ansys等,利用软件进行拱坝的模拟仿真分析,探讨不同参数对拱坝结构行为的影响。
8. 毕业设计成果与总结:总结并展示毕业设计过程中的研究成果,包括优化设计方案、模拟仿真结果、设计计算书等,对拱坝设计进行思考和总结,提出自己的见解和建议。
以上提供的思路和参考内容仅供参考,具体的拱坝毕业设计还需要根据个人的学术背景、实际情况和指导教师的要求来确定。
建议在确定设计方向和内容之前,与导师进行沟通和讨论,以确保设计的可行性和实用性。
褒河水库单曲拱坝设计设计说明含图纸
褒河水库单曲拱坝设计设计说明含图纸1.背景介绍褒河水库是位于某省某市的一座重要水利工程,主要用于灌溉、供水和发电等多种用途。
为了满足日益增长的用水需求,水库需要进行扩建和改造。
本文将重点介绍褒河水库单曲拱坝的设计方案,并附上相应的图纸。
2.单曲拱坝设计方案单曲拱坝是一种形状类似于半圆的拱形结构,通过拱形结构的强度来承受水压力,并将水力作用转移到水库两岸的基础上。
其主要设计步骤如下:2.1 坝型选择单曲拱坝的坝型选择需要考虑多个因素,包括地质条件、水库规模、成本等。
经过综合比较,本设计选择了具有良好适应性和经济性的抛物线形单曲拱坝。
2.2 坝高确定根据现有水库的用途和规模,以及地质勘察数据,经过分析计算,确定了褒河水库单曲拱坝的设计坝高为XX米。
2.3 强度计算为了确保单曲拱坝的安全性,需要进行强度计算。
在设计过程中,考虑了水压力、土压力、重力和温度等因素的影响。
通过计算,得出了单曲拱坝在水负荷和地震荷载下的稳定性和强度。
2.4 材料选择单曲拱坝的材料选择需要考虑抗压强度、耐久性和可持续性等因素。
本设计选择了高强度混凝土作为主要材料,同时考虑了混凝土的耐久性和抗裂性能。
2.5 坝顶排水设计为了防止坝顶积水对结构安全造成影响,需要进行坝顶排水设计。
本设计采用了有效排水系统,包括渗水收集管和排水沟等。
3.设计图纸下面是褒河水库单曲拱坝的设计图纸:•图纸1:单曲拱坝平面布置图•图纸2:单曲拱坝剖面图•图纸3:单曲拱坝细部设计图4.结论通过对褒河水库单曲拱坝的设计方案进行说明,我们可以看出该设计方案具有适应性强、经济性好、安全性高等优点。
同时,图纸的提供也为该设计方案的实施提供了可行性和参考依据。
希望该设计方案能够为褒河水库的扩建和改造提供有效的指导。
参考文献1.某省某市褒河水库规划报告2.某省某市褒河水库地质勘察报告。
(最终)2015年土石坝毕业设计
毕业设计E江水利枢纽工程——土石坝设计说明与计算书题目:E江水利枢纽工程设计专业:水利水电工程年级:2011级学生:温绍成学号:**********指导教师:***日期:2015年4月13日目录前言 (1)1工程提要 (1)1.1工程等别及建筑物级别 (1)1.2洪水调节计算 (1)1.3坝型选择与枢纽布置 (2)1.4大坝设计 (2)1.5泄水建筑物设计 (3)1.6施工组织设计 (3)2基本资料 (4)2.1水文 (4)2.2工程地质 (6)2.3建筑材料 (8)2.4经济资料 (11)3工程等别及建筑物级别 (12)4洪水调节计算 (13)4.1防洪标准 (13)4.2设计洪水 (13)4.3调洪演算 (14)5坝型选择与枢纽布置 (17)5.1坝址及坝型选择 (17)5.2枢纽布置 (18)6大坝设计 (20)6.1土石坝坝型的选型 (20)6.2大坝轮廓尺寸的拟定 (21)6.3土料设计 (27)6.4渗流计算 (30)6.5稳定计算 (34)6.6基础处理部分 (35)6.7细部构造设计 (36)7泄水建筑物设计 (39)7.1泄水方案选择 (39)7.2隧洞选择与布置 (39)7.3隧洞的体型设计 (39)7.4隧洞的水力计算 (41)7.5隧洞的细部构造 (45)7.6放空洞设计 (45)8施工组织设计 (1)8.1施工导流计划 (1)8.2施工控制性进度 (3)前言根据教学大纲要求,学生在毕业前必须完成毕业设计。
毕业设计是大学学习的重要环节,对培养工程技术人员独立承担专业工程技术任务重要。
通过毕业设计可以进一步培养和训练我们分析和解读工程实际问题及科学研究的能力。
通过毕业设计,我们能够系统巩固并综合运用基本理论和专业知识,熟悉和掌握有关的资料、规范、手册及图表,培养我们综合运用上述知识独立分析和解决工程设计问题的能力,培养我们对土石坝设计计算的基本技能,同时了解国内外该行业的发展水平。
大坝水库毕业设计
1、内容: (1)弄清枢纽任务,分析原始资料; (2)主要建筑物形式选择(重点是大坝)和枢纽布置; (3)主要建筑物设计及细部构造。 2、要求 (1)明确毕业设计的性质、目的、任务和要求。 (2)熟悉原始资料,弄清枢纽设计任务;按设计要求分析资料;注意资料的可靠性 和合理性,了解资料的用处和用法; (3)从工程的具体条件出发,应用最新科学技术成就进行设计,如期全面完成设计 任务并争取做到重点深入; (4)坝型选择应从实际出发提出方案,进行定性分析,充分论证后选择较优方案; 根据各建筑物形式组成几个枢纽布置方案,定性分析选择一个合理方案; (5)对主要建筑物应作得较详细,对其中个别部分可达到施工阶段的要求;对其他 建筑物(如河岸洪道、隧洞、涵管、灌溉进水闸、电站厂房、船闸)等的设计,视其情 况,由指导教师酌情增减; (6)学生在完成所规定的阶段设计内容后,应随即提出自己的设计成果。 3、设计成果 (1)设计大图 图是设计者的语言,是毕业设计的主要成果之一,规定用铅笔绘制,要求表达内容 和绘制图正确,图面饱满没有多余的空幅、没有重复的构造、图幅布局合理、主次分明、 大图应有标题、比例适当、尺寸齐全、绘制清晰、图面整洁和有必要的注释和说明。 (2)说明书和计算书 设计说明书也是毕业设计的主要成果。要求:内容(按设计规定)充实、论点正确、 论据可靠、结论明确;章节分明、条理清楚。语言精练、字迹工整;既要有计算参数、
第四章 溢流坝剖面设计…………………………………………… 22
第一节 溢流坝空口尺寸设计……………………………………… 26
第二节 溢流坝剖面图……………………………………………… 26
第三节 消能方式的选择…………………………………………… 27
第四节 闸门型式、尺寸及启闭机设备的选择……………………28 第五章 坝基处理设计………………………………………………29
土石坝毕业设计说明书
三百梯水库为一般小(2)型水库。水库大坝坝型为砂壤土均质坝,最大坝高为14.42m,大坝总长76.00m。根据《水利水电工程等级划分及洪水标准》SL252—2000及《防洪标准》GB50201-94之规定,确定为小(2)型水库系Ⅴ等工程,主要建筑物为5级,次要建筑物为5级。
1.3.
1.
大坝:三百梯水库于1956年10月动工,至1957年3月完工,根据“三查三定资料”,大坝坝型为砂壤均质土坝,坝顶高程为341.56m,坝顶长度76.0m,顶宽2.0m,最大坝高14.42m;上游坝坡上段坡比1:1.82,下段坡比1:3.5,下游坝坡上段坡比1:2.25和1:1.84,坝坡下段坡比1:2.35和1:2.86,下游坝脚未设排水棱体和反滤层,坝底总宽77.72m。
水库所在河流属长江水系璧南河的中段右岸支流上,库区内植被一般。水库大坝坝址河谷底高程327.14m(黄海高程系统,下同)。坝址以上集雨面积1.56km2,水库总库容32.26万m3(复核后成果),三百梯水库工程是一座以农业灌溉为主,兼有农村居民点供水、防洪以及养殖等综合效益的小㈡型水利工程,设计灌溉面积914亩,有效灌面593亩。
水库所在河流属长江水系璧南河中段右岸一支流,库区内植被一般。水库坝址是不对称“U”型河谷,谷底高程326.00m(黄海高程系统,下同)。原坝址以上集雨面积1.56km2。
三百梯水库大坝为砂壤土均质坝,最大坝高14.42m,总库容31.6万m3(复核前),根据SL252-2000《水利水电工程等级划分及洪水标准》和GB50201-94《防洪标准》规定,该水库工程规模为小㈡型水利工程,工程等别为Ⅴ级,主要建筑物为5级水工建筑物。洪水标准为20年一遇设计,设计洪水位为340.16m,相应洪峰流量为22.283/s,设计下泄流量为17.63m3/s;200年一遇校核,校核洪水位为340.77m,相应洪峰流量为34.75m3/s,校核下泄流量为29.86m3/s。
重力坝毕设说明书
毕业设计(论文)题目专业班级学生指导教师摘要商洛市二龙山水库枢纽位于秦岭南麓,长江二级支流、汉江一级支流丹江的上游段,是一座防洪、发电、灌溉、供水、养鱼等综合利用的年调节中型水库。
枢纽为Ⅲ等工程,水库防洪标准为50年一遇洪水设计、500年一遇洪水校核。
枢纽永久性建筑物等级为3级。
本毕业设计的主要内容包括:对所给工程资料和有关工程地质条件进行分析,对坝址、坝轴线、坝型进行选择和整体枢纽布置;利用《工程水文学》以及《水利水能规划》相关知识和所给水文气象资料进行调洪演算,确定特征水位及相应的特征库容;根据调洪演算的成果确定坝顶高程;根据水工建筑物的相关知识进行非溢流坝剖面拟定,根据极限状态分项系数法进行抗滑稳定、强度验算;进行溢流坝剖面拟定、根据水力计算的相关知识进行非溢流坝水力计算,包括水面线计算和下游冲刷坑以及挑距计算;泄水排沙底孔剖面拟定、水力计算;根据细部构造的相关规范规定进行细部构造设计等。
利用《工程造价》相关知识对大坝部分进行工程造价概算,确定大坝的土石方开挖量和混凝土用量等。
关键词:重力坝;枢纽布置;调洪演算;工程概算。
ABSTRACTKEY WORDS:Gravity dam;Project budget,Flood Routing, Project budget前言毕业设计是我们大学专业知识与实践相结合的重要环节,该设计的主要目的是对所学知识做以全面巩固和综合考核,联系实际工程,了解和熟悉水电工程设计的基本步骤和基本方法,熟悉各种设计规范,学会查阅各种与设计相关的资料,为走向工作岗位面临实际工作做好准备。
本设计依据国家水利部及电力部颁布的规范,并参考大量相关资料、教材以及设计手册,借鉴实际的类似工程,在老师的悉心指导下完成。
在本设计过程中,由于经验不足,出现过很多错误,所以重复计算了很多次。
在该设计中,主要完成了枢纽整体布置;坝轴线选、坝型以及泄水建筑物等的位置、形式和尺寸确定;调洪演算、水库特征水位与特征库容的计算;坝顶高程的确定;大坝非溢流坝段及溢流坝段的剖面拟定,坝体稳定与应力计算,结构设计和细部设计,溢流坝段的水力计算等;排沙底孔的体形,结构设计及水力计算等。
褒河水库单曲拱坝设计毕业设计说明书(含图纸) 精品
目 录0 绪论 (1)1 概述 (2)2 已知资料 (3)2.1 流域概况 (3)2.2 水文气象资料 (3)2.3 工程地质资料 (3)2.4 工程规划 (3)2.5 工程材料设计指标 (4)2.6 施工、天然建材、交通情况 (4)3 枢纽布置 (5)3.1 坝型的选择 (5)3.1.1 土石坝 (5)3.1.2 支墩坝 (5)3.1.3 重力坝和拱坝 (5)3.2 枢纽布置方案的选择 (6)3.2.1 坝轴线的选择 (6)3.2.2 引水隧洞的布置 (7)3.2.3 东、西干渠渠首布置 (7)3.2.4 泄洪方案的选择 (7)3.2.4.1 坝顶泄流 (8)3.2.4.2 坝面泄流 (8)3.2.4.3 滑雪道式泄流道 (8)3.2.4.4 坝身开孔泄洪 (8)4 拱坝设计 (10)4.1 拱坝体型设计 (10)4.1.1 基本原则 (10)4.1.2 拱坝基本尺寸的拟定 (10)4.1.2.1 拱坝分层 (10)4.1.2.2 坝顶厚度c T (10)4.1.2.3 坝底厚度B T (11)4.1.3 拱冠梁剖面设计 (12)4.1.3.1 基本原则 (12)4.2 拱坝的平面布置 (13)4.2.1 基本原则及假定 (13)4.2.1.1 基本原则 (13)4.2.2 拱圈中心角的确定 (13)4.2.3 拱圈的平面布置 (14)5 拱坝应力计算和内力计算 (17)5.1 荷载和荷载组合 (17)5.1.1 荷载 (17)5.1.2 荷载的组合 (17)5.1.2.1 基本组合 (17)5.1.2.2 特殊组合 (17)5.2 应力计算方法(拱冠梁法) (17)5.2.1 拱冠梁法的基本原理 (17)5.2.2 拱冠梁法的主要步骤 (18)5.3 应力和内力计算过程 (18)5.3.1 计算拱冠梁在垂直力等作用下产生的径向变位w i δ (18)5.3.2 计算拱冠梁单位三角形径向作用下径向变位系数ij a (28)5.3.3 拱冠梁径向变位i δ、i C 的求解 (35)5.3.4 拱梁分荷值的求解 (36)5.3.5 拱冠梁应力计算 (37)5.3.6 拱圈应力计算 (39)5.4 其他方案的计算 (39)5.5 方案计算结果和分析 (39)6 坝肩稳定计算 (41)6.1 稳定分析 (41)6.2 稳定计算 (42)6.2.1 当不考虑凝聚力c 时 (43)6.2.2 考虑凝聚力c 时 (44)6.3 计算成果和分析 (45)7 坝身孔口的设计 (47)7.1 中孔的设计 (47)7.2 底孔的设计 (47)7.2.1 孔口的形状和尺寸(体形设计) (47)7.2.1.1 进口控制段 (47)7.2.1.2 洞身段 (48)7.2.1.3 出口控制段 (48)7.2.2 底孔的应力计算 (48)7.2.2.l 作用于孔口的荷载 (48)7.2.1.2 应力计算 (48)7.2.3 底孔的配筋计算 (51)8 拱坝的构造及结构 (53)8.1坝顶 (53)8.2廊道与坝体排水 (53)8.3坝体临时收缩缝 (53)8.4坝体内廊道及交通 (54)9 拱坝的地基处理 (55)9.1坝基开挖 (55)9.2拱端开挖 (55)9.3固结灌浆和接触灌浆 (55)9.4防渗帷幕 (55)9.5坝基排水 (56)10 结论 (57)附录及参考文献 (58)谢辞 (59)0 绪论本次设计为毕业设计,是对大学五年来所学知识的一次综合性的总结概括;是考察学生理论知识与实践能力的一次演练;是为学生走向工作岗位打下一定基础的关键一步;是学生走向社会工作的第一步;是了解自我,自我定位的好机会。
土石坝毕业设计
陕西广播电视大学ZF水库水利枢纽工程土石坝课程设计分校(工作站) 水利厅工作站专业 2014水利水电本科学号学生姓名魏铎月 1 年 2016第一章基本资料第一节、工程概况及工程目的238。
该工程以灌溉发电为4990km河干流上,控制面积m总库容×10水库位于ZFQH 主,结合防洪,可引水灌溉农田万亩,远期可发展到万亩。
灌溉区由一个引水流量为3/s的总干渠和四条分干渠组成,在总干渠渠首及下游24km45m处分别修建枢纽电站和HZ电站,总装机容量,年发电量11290完千瓦时。
水库建成后,除为市区居民生活和工业提供给水外,还可使城市防洪能力得到有效的提高。
水库防洪标准为百年设计,万年校核。
枢纽工程由挡水坝、溢洪道和输水洞、灌溉发电洞及枢纽电站组成。
第二节、基本资料1、特征水位及流量挡水坝、溢洪道、输水洞的特征水位及流量见表2-1。
水库工程特征值2-1 ZF表.序其中溢洪81200设计洪水时最大泄流/相应下游水其中溢洪560683校核洪水时最大泄流/相应下游水水库水=校核洪水位=1设计洪水位兴利水汛限水死水水库容50501总库校核洪水位一下库防洪高水位至汛期限防洪库11360水防洪高水位至汛期限防洪库1231水1兴利库3510其中共用库111001050死库1库容系505多调解特导流泄洪工作阀门前为形明流隧隧洞直消能方挑123最大泄量=/最大流m/7mx闸门尺启闭30检修8mx进口底部高灌溉发电隧3形压力钢内灌溉支洞内3最大流进口底部高枢纽电气象、 2。
气象资料见表2-2月)2-2 气象资料表表地质3、坝址区工程地质条件1、。
主河槽770~810m水库的右岸较陡,坡度为30°左右,大部分基岩出露高程为ZF775m左右,山岭高程在米左右;左岸为堆积岸,左岸台地宽200m100在右岸,河宽月左右,岸坡较平缓,大都为土层覆盖。
水库枢纽处施工场地狭窄,枢纽建筑物全部布置在左岸,施工布置较为困难。
拱坝毕业设计
摘要洞门山水利枢纽工程位于位于西南某河干流中下游,是一座中型水利枢纽工程,其主要任务有发电,灌溉和防洪。
该工程主要由双曲拱坝、泄洪隧洞、取水建筑物以及厂房等组成。
本文扼要介绍设计中进行的主要工作和设计成果:调洪计算,枢纽布置,拱坝坝体设计,坝体应力计算,坝肩稳定分析,泄洪隧洞的设计,坝身泄水孔的设计,坝体的细部构造以及地基处理等。
设计最后提交的成果有:设计说明书一份,工程设计图纸3 张以及其他计算附图附表等。
关键字拱坝,调洪演算,应力分析,稳定分析。
summaryDongMen mountain water conservancy hub project is located in the southwest a river mainstream middle and lower reaches, is a medium-sized water conservancy hub project, its main task is power generation, irrigation and flood control.The project mainly by the hyperbolic arch dam,tunnel,water and flood building workshop etc.This paper briefly introduces the main work in the design and the design results:flood regulating calculation,the general layout,arch dam design, dam abutment dam stress calculation, stability analysis of flood discharge tunnel, the design,the design of water leakage, including the influences of the detail structure and foundation treatment, etc.The research results have submitted design: the design specification a, the engineering drawings three and other calculation schedule, etc. The appended drawingsKey wordsArch dam, flood regulating calculation,stress analysis, stability analysis.第一章第二章(3)山东科技大学学士学位论文目录工程概况 (1)设计基本资料及水库工程特性……………1.设计基本资料 (3)2.水库水位与库容关系及水位流量关系 (12)3.效益及淹没损失 (13)4.施工组织设计和建议 (14)5.坝址地形图+其他 (14)第三章(15)工程等级划分及水库运行方式…………1.确定工程等别和级别 (15)2.水库运用方式 (15)第四章(15)枢纽布置…………………………………1.调洪演算 (15)1.1.基本资料的收集 (15)1.2.孔口尺寸拟定 (18)1.3.调洪演算 (20)1.4.方案比较 (34)1.5.坝高的确定 (34)2.组成建筑物及枢纽布置 (35)第五章(36)混凝土拱坝设计…………………………1.拱坝形态和剖面尺寸的拟定 (36)1.1.拱圈形式的选择 (36)1.2.拱冠梁剖面尺寸的拟定 (36)1.2.1.坝顶厚度(T(36)C)………………………………1.2.2.坝底厚度(T B) (37)1.2.3.上游面曲线 (38)1.2.4.下游面曲线 (38)2.拱坝的布置 (39)3.拱坝的荷载及其组合 (40)3.1.荷载计算 (40)3.1.1.温度荷载 (40)3.1.2.净水压力+淤沙压力 (41)3.1.3.地震荷载 (42)3.1.4.坝体自重……………………………………(42)3.1.5.扬压力 (42)3.1.6.风浪压力(不予考虑) (43)3.2.荷载组合 (43)3.2.1.基本组合 (43)3.2.2.特殊组合 (43)4.拱坝的应力分析 (44)4.1.应力分析的基本方法 (44)4.2.应力分析(纯拱法) (45)4.拱坝的稳定分析 (48)5.1.稳定计算原理 (50)5.2.稳定验算 (53)5.2.1.工况一:(正常蓄水位+温升) (54)5.2.1.1坝肩局部稳定验算 (54)5.2.1.2左岸整体稳定验算 (56)5.2.2.工况二:(校核洪水位+温升) (56)5.2.2.1坝肩局部稳定验算 (57)5.2.2.2左岸整体稳定验算 (59)第六章山东科技大学学士学位论文泄水建筑物 (59)1.泄水建筑物的形式尺寸 (59)2.泄水建筑物的布置 (60)2.1.坝身泄水孔的布置 (60)2.2.泄槽设计计算 (60)2.3.泄水隧洞的布置 (61)第七章坝体细部构造及地基处理 (62)1.坝体构造与细部结构设计 (62)1.1.坝体与坝面 (62)1.2.坝体分缝 (63)1.3.坝内廊道 (63)1.4.坝后工作桥 (64)2.地基处理 (64)2.1坝基处理的基本要求 (64)2.2地基的处理和开挖 (64)2.3.坝基灌浆 (65)2.3.1固结灌浆 (65)2.3.2.帷幕灌浆 (66)2.4.坝基排水 (66)设计专题:拱坝的稳定性分析……………………(68)附录:外文文献及翻译 (77)参考文献 (89)结语 (90)第一章工程概况西南某河是南方河流中少有的多沙河流,为减少水库泥沙淤积量,通过设置底孔泄流排沙就可使水库基本处于冲刷状态,满足排沙要求,可使水库进出库泥沙保持平衡或略有冲刷。
重力坝毕业设计书--王圪堵水电站
毕业设计(论文)题目榆林王圪堵水库枢纽布置及重力坝设计专业水利水电工程班级学生指导教师2013 年摘要本毕业设计题目为《榆林王圪堵水库枢纽布置及重力坝设计》,题目来源于王圪堵水库工程实际,属设计类课题。
设计的目的及意义主要在于巩固、扩大和提高所学水利水电理论知识,使其得到实际运用,并使之系统化,锻炼和培养运用所学专业基础理论知识解决工程实际,并进行设计、计算、制图的能力,提高撰写专业技术报告的水平。
在本次设计中,依据所给的水文气象和水利动能资料,采用半图解法进行了该工程的调洪计算,取得了泄水和引水等建筑物的型式、孔口尺寸的大小和设计洪水工况和校核洪水工况下所对应的洪水水位;依据工程地质条件,采用比较筛选法,对该工程进行了坝址选择、坝轴线选择和坝型的选择,取得了大坝枢纽平面布置图;依据工程地质资料和重力坝设计规范要求,采用抗剪断强度公式和材料力学法分别对大坝进行了抗滑稳定分析和应力计算,得到的结果表明大坝的剖面设计满足规范要求;依据调洪计算的结果,采用三圆弧法和WES曲线法对溢流坝段进行了设计,得到溢流坝段的剖面尺寸;依据计算得到的泄水建筑物的形式和水工设计手册第六卷,进行了泄水建筑物的水力计算,得到了溢流坝段的水面线和侧墙的高度。
设计获得了坝型选择和枢纽布置,调洪计算,混凝土重力坝设计,泄水建筑物设计,构造设计,地基处理等成果。
具体设计详见设计说明书,另外除了设计说明书外,还有反映本次设计成果的CAD设计图纸,以及设计过程中攥写的开题报告、外文翻译报告各一份。
所获成果满足设计规范要求、满足毕业设计任务书要求等。
关键词:枢纽布置,混凝土重力坝,非溢流坝,溢流坝,坝体稳定Yu lin wanggedu plugging reservoir project layout and design of gravity damABSTRACTThe design is about the project layout of the wanggedu hydraulic complex and concrete gravity dam. The topic of the design comes from the wanggedu Engineering. The purpose of the design mainly is making the knowledge we learned for water resources and hydraulic engineering into practice and making it systematize, and the ability for designing, computing and writing.In this design, based on the kinetic energy of hydro-meteorological and water conservancy information to, use of semi-graphic method for flood regulating calculation of the project, has made building types, such as discharge and water orifice size size and design flood conditions and check under flood water level of the flood. Based on the engineering geological conditions, using the comparison method, for the project to be the axis of the dam dam site selection, selection and choice of dam type, hub of the dam had been made a floor plan. Based on an engineering geology and gravity dam design code requirements and material mechanics method on shear strength formula respectively on dam stability against sliding analysis and stress calculation, the result indicates that the cross section of the dam design meets regulatory requirements. Flood regulating calculation based on the results of a three-arc method and WES curve method for design of spillway dam section, be overflow dam section dimensions. Based on the calculated discharge structure of hydraulic design manual, sixth form and volume, for hydraulic calculation of discharge structures, got overflow dam of height of the water surface profile and side walls.Design of dam type selection and layout, flood regulating calculation, design of concrete gravity dam, discharge structure design, structural design, Foundation treatment results. Besides of having design instruction to describe the details, there are nine drawings to reflect the design achievements.Resultsobtained meet the design specification requirements and meet the requirements of the design plan descriptions of the graduation, etc.KEY WORDS:layout of hydro project,concrete gravity dam, non-overflow dam,overflow dam,corridor system目录前言 (1)1 工程概述 (2)1.1 工程概况 (2)1.2 工程特性表 (2)2 设计任务及依据 (4)2.1 设计任务及设计阶段 (4)2.2 工程等别及防洪标准 (4)2.3 设计依据 (5)2.3.1 设计标准、规范及规程 (5)2.3.2 设计基本资料 (5)3 基本资料 (6)3.1 水文气象 (6)3.1.1 流域概况 (6)3.1.2 坝址设计与校核洪水成果 (6)3.1.3 气象条件 (7)3.1.4 泥沙资料 (7)3.2 工程地质资料 (8)3.2.1 坝址区工程地质条件 (8)3.2.2 岩土工程特性 (8)3.2.3 坝基工程地质 (9)3.2.4 建筑材料 (9)3.3 水利与水能 (10)3.3.1 坝址下游水位流量关系 (10)3.3.2 枢纽的供水、灌溉和发电等概况 (11)3.4 其他资料 (11)4 枢纽布置设计 (13)4.1 坝址选择 (13)4.2 坝轴线选择 (13)4.3 坝型选择 (14)4.4 泄水和引水等建筑物的型式与孔口尺寸选择 (14)4.5 调洪计算 (15)4.5.1 调洪计算的原理 (15)4.5.2 起调水位的分析与选择 (16)4.5.3 调洪计算的过程 (16)4.5.3.1 泄水隧洞的尺寸计算 (17)4.5.3.2 方案拟订 (18)4.5.3.3 设计洪水工况的调洪的计算 (20)4.5.3.4 校核洪水工况的调洪计算 (27)4.5.3.5 调洪计算成果汇总及分析 (35)4.6 泄水建筑物设计 (36)4.6.1 排沙底孔设计 (36)4.6.2 溢流坝消能防冲计算 (37)4.6.2.1 挑流消能水面线计算 (37)4.6.2.2 溢流坝段挑流消能水力要素的计算 (43)5 混凝土重力坝专题设计 (44)5.1 非溢流坝段设计 (44)5.1.1 坝体断面设计 (44)5.1.2 坝基面荷载作用的标准值计算(以单宽计算) (47)5.1.3 坝基面稳定计算 (48)5.1.4 抗滑稳定分析 (49)5.1.5. 应力分析计算 (50)5.2 溢流坝段设计 (57)5.3 坝基处理 (59)5.3.1 坝基开挖 (59)5.3.2. 坝基帷幕灌浆 (59)5.3.3 坝基固结灌浆 (60)5.3.4 左坝肩防渗墙设计 (60)5.4 坝体构造设计 (60)5.4.1 坝顶构造 (60)5.4.2 廊道系统 (61)5.4.2.1 坝基灌浆廊道 (61)5.4.2.2检查和坝体排水廊道 (62)5.4.3 横缝构造 (62)6 结语 (63)7 致谢 (64)8 参考文献 (65)前言本次毕业设计是根据根据教学要求,对水利水电专业本科毕业生进行的最后一项教学环节。
擦玛沟水库大坝毕业设计说明书
擦玛沟水库沥青混凝土心墙坝设计摘要擦玛沟水库位于县境泽曲流域左岸的一级支流擦玛沟上,坝址距县城25km,距市353km。
其主要任务是城乡供水兼顾灌溉,主要解决优干宁镇以及荷日恒村、智后茂村、德日隆村的城乡供水,以及新增1.6万亩饲草料地的灌溉。
该毕业设计承担县擦玛沟水库挡水建筑物设计部分工作。
根据已有的原始资料和该处地形图进行设计,主要容有:擦玛沟水库工程坝址的选择;坝型、坝高及坝体基本剖面的确定;坝体的渗流分析,确定防渗体系;坝体稳定分析;细部结构设计。
并根据要求绘制相应的平面布置图和剖面图。
关键词:擦玛沟,沥青混凝土,心墙,坝体设计,渗流分析,稳定分析ABSTRATCamagou reservoir is located in jersey qu basin in HeNan County level tributaries of the left bank brush groove on, dam site from HeNan county 25 kilometers, 353 km away from XiNing city. Its main task is to urban and rural water supply both irrigation, mainly to solve water supply of YouGanNing town and HeRiHeng village, ZhiHouMao village, DeRiLong village, irrigation combination and added 16000 acres of grass.The graduation design for HeNan County camagou reservoir water retaining structure design part of the work.According to the existing raw data and topographic map to carry on the design, the main contents are: brush ma ditch reservoir project dam site choice; The dam type, the determination of high dam and dam base profile; Dam seepage analysis and determine the seepage control system; The dam stability analysis; Detail structure design. And draw the corresponding layout and section according to the requirements.Key words:camagou, asphalt concrete, core wall, dam design, seepage analysis, stability analysis目录1 绪论 ........................................................................................................................................................ - 1 -2 基本资料 ................................................................................................................................................ - 2 -2.1 工程规模 ..................................................................................................................................... - 2 -2.2 工程等级及标准.......................................................................................................................... - 2 -2.3 水库主要特性指标...................................................................................................................... - 2 -2.4 气象 ............................................................................................................................................. - 2 -2.5 工程地质 ..................................................................................................................................... - 2 -2.5.1地形地貌 ............................................................................................................................... - 2 -2.5.2地层岩性 ............................................................................................................................... - 3 -2.5.3地质构造 ............................................................................................................................... - 3 -2.5.4水文地质条件........................................................................................................................ - 3 -2.5.5物理地质现象........................................................................................................................ - 4 -3 大坝设计 ................................................................................................................................................ - 5 -3.1 坝址和坝型的比较。
某某重力坝毕业设计
某某重力坝毕业设计(总71页)--本页仅作为文档封面,使用时请直接删除即可----内页可以根据需求调整合适字体及大小--目录前言............................................ 错误!未定义书签。
第一部分设计说明书1基本资料....................................... 错误!未定义书签。
自然条件及工程 (3)坝址与地形情况............................... 错误!未定义书签。
水库规划资料................................. 错误!未定义书签。
2枢纽布置....................................... 错误!未定义书签。
枢纽组成建筑物及其等级...................... 错误!未定义书签。
枢纽布置..................................... 错误!未定义书签。
3洪水调节....................................... 错误!未定义书签。
基本资料..................................... 错误!未定义书签。
洪水调节基本原则 ............................ 错误!未定义书签。
调洪演算.................................... 错误!未定义书签。
4非溢流坝剖面设计............................... 错误!未定义书签。
设计原则.................................... 错误!未定义书签。
剖面拟订要素................................ 错误!未定义书签。
抗滑稳定分析与计算 .......................... 错误!未定义书签。
(精品)福州大学拱坝毕业课程设计计算说明书
《水工建筑物课程设计计算说明书》课程设计学生姓名:学号:专业班级:水利水电(2 )指导教师:二○一二年九月十四日目录1.课程设计目的 (3)2.课程设计题目描述和要求 (3)2.1设计的内容 (3)3.设计步骤 (4)3.1工程等级的确定 (4)3.2拱坝形式的选择与坝高的确定 (5)3.3拟定圆心角与坝轴线半径 (6)3.4 初步拟定拱冠梁的剖面尺寸 (6)3.5拱坝应力分析 (10)3.6 坝肩稳定分析 (12)3.7坝体细部构造设计 (15)4.结束语 (20)参考书目: (21)1.课程设计目的本课程设计的目的是为巩固和加强所学《水工建筑物》课程关于拱坝部分的知识,进一步理解拱坝的设计原理,为今后的工作学习设计拱坝做准备。
本课程设计的任务是设计某河水库混凝土双曲拱坝体型设计的合理布置。
2.课程设计题目描述和要求2.1设计的内容1.选择拱坝的布置型式。
2.进行坝体平面布置及断面初选。
3.通过拱冠梁法对坝体应力及坝肩稳定进行分析计算。
4.通过消能计算评价所选定的消能防冲措施的安全可靠性。
5.通过设计成果分析,对所选定的拱坝体型布置提出评价或修改意见2.2工程概况2.2.1设计标准设计标准,本水库总库容2.1千万方。
灌溉2万亩,电站装机1万千瓦2.2.2坝址地形地质条件1.坝址区峡谷呈“V””型,两岸谷坡陡削,高程300米以下较为对称,坡角40—50度。
唯右岸自高程300米以上地形转缓变为 25~30度。
两岸附近山高均超出 400米高程以上.河谷底宽11米高程260米,左岸受冲沟切割后山脊较为单薄。
2.河床和岸坡有大片基岩课露,距河床高47米范围内形成岩石陡壁。
以上为第四纪残、坡积的砂壤覆盖层。
厚度左岸2~5米,右岸3~5米,坝址区基岩一般风化不深,剧风化垂直深度,左岸为3~6米,右岸为4~8米,河床为0~3米,微风化或新鲜基岩距地表深度,在320米高程以下:两岸为10~20米,河床为4米左右。
混凝土拱桥毕业设计说明书
本科毕业论文(设计)论文(设计)题目:黄家大坡大桥初步设计学院:土木工程学院专业:桥梁与隧道工程班级:土木103学号: 44学生姓名:陈刘明指导教师:王学敏2014 年 6 月 6 日贵州大学本科毕业论文(设计)诚信责任书本人郑重声明:本人所呈交的毕业论文(设计),是在导师的指导下独立进行研究所完成。
毕业论文(设计)中凡引用他人已经发表或未发表的成果、数据、观点等,均已明确注明出处。
特此声明。
论文(设计)作者签名:日期:目录摘要......................................................................... . (III)ABSTRACT................................................................... .. (IV)第一章基本资料、技术标准及设计要求.......................................................................错误!未定义书签。
基本资料......................................................................... .........................................错误!未定义书签。
技术标准......................................................................... .........................................错误!未定义书签。
主要技术指标......................................................................... ......................错误!未定义书签。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
目 录0 绪论 (1)1 概述 (2)2 已知资料 (3)2.1 流域概况 (3)2.2 水文气象资料 (3)2.3 工程地质资料 (3)2.4 工程规划 (3)2.5 工程材料设计指标 (4)2.6 施工、天然建材、交通情况 (4)3 枢纽布置 (5)3.1 坝型的选择 (5)3.1.1 土石坝 (5)3.1.2 支墩坝 (5)3.1.3 重力坝和拱坝 (5)3.2 枢纽布置方案的选择 (6)3.2.1 坝轴线的选择 (6)3.2.2 引水隧洞的布置 (7)3.2.3 东、西干渠渠首布置 (7)3.2.4 泄洪方案的选择 (7)3.2.4.1 坝顶泄流 (8)3.2.4.2 坝面泄流 (8)3.2.4.3 滑雪道式泄流道 (8)3.2.4.4 坝身开孔泄洪 (8)4 拱坝设计 (10)4.1 拱坝体型设计 (10)4.1.1 基本原则 (10)4.1.2 拱坝基本尺寸的拟定 (10)4.1.2.1 拱坝分层 (10)4.1.2.2 坝顶厚度c T (10)4.1.2.3 坝底厚度B T (11)4.1.3 拱冠梁剖面设计 (12)4.1.3.1 基本原则 (12)4.2 拱坝的平面布置 (13)4.2.1 基本原则及假定 (13)4.2.1.1 基本原则 (13)4.2.2 拱圈中心角的确定 (13)4.2.3 拱圈的平面布置 (14)5 拱坝应力计算和内力计算 (17)5.1 荷载和荷载组合 (17)5.1.1 荷载 (17)5.1.2 荷载的组合 (17)5.1.2.1 基本组合 (17)5.1.2.2 特殊组合 (17)5.2 应力计算方法(拱冠梁法) (17)5.2.1 拱冠梁法的基本原理 (17)5.2.2 拱冠梁法的主要步骤 (18)5.3 应力和内力计算过程 (18)5.3.1 计算拱冠梁在垂直力等作用下产生的径向变位w i δ (18)5.3.2 计算拱冠梁单位三角形径向作用下径向变位系数ij a ................. 28 5.3.3 拱冠梁径向变位i δ、i C 的求解 .. (35)5.3.4 拱梁分荷值的求解 (36)5.3.5 拱冠梁应力计算 (37)5.3.6 拱圈应力计算 (39)5.4 其他方案的计算 (39)5.5 方案计算结果和分析 (39)6 坝肩稳定计算 (41)6.1 稳定分析 (41)6.2 稳定计算 (42)6.2.1 当不考虑凝聚力c 时 (43)6.2.2 考虑凝聚力c 时 (44)6.3 计算成果和分析 (45)7 坝身孔口的设计 (47)7.1 中孔的设计 (47)7.2 底孔的设计 (47)7.2.1 孔口的形状和尺寸(体形设计) (47)7.2.1.1 进口控制段 (47)7.2.1.2 洞身段 (48)7.2.1.3 出口控制段 (48)7.2.2 底孔的应力计算 (48)7.2.2.l 作用于孔口的荷载 (48)7.2.1.2 应力计算 (48)7.2.3 底孔的配筋计算 (51)8 拱坝的构造及结构 (53)8.1坝顶 (53)8.2廊道与坝体排水 (53)8.3坝体临时收缩缝 (53)8.4坝体内廊道及交通 (54)9 拱坝的地基处理 (55)9.1坝基开挖 (55)9.2拱端开挖 (55)9.3固结灌浆和接触灌浆 (55)9.4防渗帷幕 (55)9.5坝基排水 (56)10 结论 (57)附录及参考文献 (58)谢辞 (59)0 绪论本次设计为毕业设计,是对大学五年来所学知识的一次综合性的总结概括;是考察学生理论知识与实践能力的一次演练;是为学生走向工作岗位打下一定基础的关键一步;是学生走向社会工作的第一步;是了解自我,自我定位的好机会。
本次设计的主要目的是让学生们体会在工作实践中所必须具备的精神,了解工程设计的过程程序,锻炼学生们的实践能力,为走向工作岗位打下一定基础。
本设计主要是混凝土拱坝设计方面的问题,要求设计成果合理,各项指标达到国家规范要求。
拱坝是固接于基岩的空间壳体结构,因在平面上呈凸向上游的拱形而得名,其拱冠剖面呈竖直的或向上游凸出的曲线形。
据现有资料,最早的圆筒面圬工拱坝可追溯到罗马帝国时代。
到 20 世纪,美国开始修建较高的拱坝。
并于 1936 年建成了高 221 米的胡佛重力拱坝。
1939 年意大利建成了高 75 米,设有垫座及周边缝的奥·西列塔薄拱坝,对双曲拱坝建设起到了很大的推动作用。
目前世界上最高的是格鲁及亚的英古里拱坝,最大坝高 272 米,T/H=0.19 。
中华人民共和国成立后,水利事业突飞猛进地发展,取得了举世瞩目的成就。
继葛洲坝水利枢纽建成后,三峡水利枢纽的开工、南水北调工程的规划设计等壮举进一步展示出人民水利蓬勃发展的强劲势头。
目前,我国在水利工程规模、水利人才素质以及水利科技水平等方面已达到世界前列。
中国的拱坝历史:我国在拱坝建设取得了很大的进展。
截止到 1988 年底的不完全统计,已建成 15 米坝高以上的各类拱坝已达 800 座,约占全世界已建拱坝总数 1/4 强。
中国之最:最高的拱坝——台湾省德基双曲拱坝,高 181 米, T/H=0.112 ;最高的砌石拱坝——河南省群英重力拱坝,高100.5 米;最薄的砌石拱坝——浙江省方坑双曲拱坝,高 76 米,T/H =0.147 。
本设计主要是让同学们了解工程设计的过程程序,知道工程实践中所牵涉的工作环节,应注意的关键问题,为以后走向工作岗位打下良好的基础;同时锻炼同学们的实践动手能力和操作能力,改变思维方法,提高工作效率。
1 概述褒河水库位于陕西省汉中平原褒河下游。
褒河规划作五级开发,其中枢纽在最下游。
汉中地区气候温和、湿润,土地开阔肥沃,是著名的粮仓,现有汉惠渠、褒惠渠等渠道,均系无坝引水,故灌溉保证率低;本地区又属三线,近年来大量工矿企业纷纷建立,电力负荷急剧增长,故在本地区修建褒河等一批水利枢纽,开发水力资源,对于促进工农业发展都有着重要意义。
根据规模、效益,参照相关规范将褒河水库定为三级,建筑物级别:主要建筑物为三等,次要建筑物为四等,临时建筑物为五等。
褒河水利枢纽主要任务为灌溉、发电,其次为防洪。
为此,枢纽定为:渠首电站、拦河坝(拱坝)、中孔泄洪、底孔、电站引水渠道等。
褒河水利枢纽对于汉中地区的工农业生产的发展起着相当重要的作用。
2 已知资料2.1 流域概况褒河属于山溪性河流,发源于秦岭南麓玉皇山及太白山,汇入汉江,整个流域面积上宽下窄呈漏斗状。
流域内植被尚好,水土流失不严重。
褒河水利枢纽控制流域面积3 861平方公里,拟装机4.12万千瓦,年发电量1.42亿度,可将原灌区19.5万亩农田灌溉保证率由50%提高到73.8%,并扩浇32万亩耕地。
褒河库区坝址为“U”形河谷,水面宽40m,水深2~7m,河床砂砾石2~8m,坝址两岸山坡陡峭,590m高程以上强风化岩石厚度为5m,以下为3~5m,河床2~4m。
迴水17km,面积3.2 2km,坝址附近平均水面宽度300m。
2.2 水文气象资料褒河水库坝址下游三公里河东店站水文有1935~1970共36年资料。
①该地区多年平均降雨量为905.6mm,其中6~9月雨量约占全年75%。
多年平均径流量138亿立米,多年平均流量43.6sm/3。
②多年平均输沙率为4.7skg/,多年平均输沙量为148万吨。
③多年平均气温14.4℃,绝对最高气温44℃,绝对最低气温13.4℃;绝对最高水温33.3℃,绝对最低水温0℃。
2.3 工程地质资料褒河库区在褒河峡谷出口段,大地构造上位于南秦岭褶皱带中断南缘,库区出露地层为石炭系,三迭系前海相沉积物经区域变质作用而成的变质岩,三迭系岩层为片岩、片麻岩,并夹有大理岩、白云岩,分布于将军铺至青桥铺一带,石炭系岩层为片岩及大理岩分布于坝区附近。
第四纪松散堆积物为砂质粘土冲击砾石,区内无大断裂。
经科学院西北地质大队判定该地区地震烈度为7度。
库区内虽有大理岩等露头,但两岸山势雄厚,水平方向溶洞发育不深,坝址处基岩透水性弱,单位吸水量小于0.01升/秒,故不存在渗漏问题。
库区内岸坡地段基岩裸露,不会产生塌岸。
2.4工程规划根据梯级水库运用规划,褒河正常高水位定为618米,相应库容1.05亿立米。
死水位595m。
死库容0.443亿立米。
该水库设计洪水设Q =4290s m /3,校核洪水位校Q =5590s m /3。
可能最大洪水流量10000 s m /3。
河床最低高程535m ,基岩高程532m 。
三十年淤积高程565m 。
下游水位:设计洪水位:548.75m ,校核洪水位:550.05m电站进口高程567m ,最大引水流量68.1s m /3。
东干渠进口高程588.5m ,引用流量30s m /3,灌溉27万亩农田。
西干渠进口高程592m ,引用流量6s m /3,灌溉5万亩农田。
淤沙浮容重7.53/m kN ,水下摩擦角10°。
2.5 工程材料设计指标坝址区岩石容重模量26.53/m kN ,弹性模量16GPa ,泊桑比0.2,摩擦系数0.6。
混凝土容重243/m kN ,弹模16GPa ,线膨胀系数0.00001,泊松比0.2。
2.6 施工、天然建材、交通情况① 施工、交通情况。
峡口地势开阔,有公路可通宝成铁路线上略阳。
坝址下游20公里联接宝成和襄与铁道德阳(平关)安(康)铁路即将建成通车。
承担褒河水利枢纽工程的水电三局拥有较强的技术力量和机械设备。
② 天然建筑材料。
坝址下游3.5~8.0kM 的中滩、红庙等储有砂砾石116万3m 。
砾石成分主要为花岗岩、石英岩,砂子以石英、长石为主,质地较好,交通运输便利。
土料很少,运距约4kM 。
3 枢纽布置3.1坝型的选择经过各方面的分析比较,拟订修建拱坝,下面从几方面说明修建拱坝的优越性。
由地质条件及地形资料可知能在这个坝址修建土石坝,重力坝,拱坝,支墩坝。
现分别比较如下:3.1.1 土石坝土石坝仅靠坝身自重与地基接触而产生的抗滑力维持稳定,因存在滑坡的问题,土石坝在各种坝型中体积最大,底宽最长,工程量也较大。
坝身不能泄流,须另外设置溢洪道,泄洪安全性不可靠,施工导流也不方便。
计算方法多采用材力法,手算占相当大的比例,为防止渗透变形须设置防渗心强,防渗材料的填筑受气候条件的影响较大。
另外,最主要原因为该地区的土料较少,没有足够的筑坝材料。
因此该坝址不选择修建土石坝。
3.1.2 支墩坝支墩坝与重力坝相比,混凝土用量小,能充分利用材料的强度,但侧向稳定性差,对地基的要求比重力坝更加严格,钢筋用量较多,施工散热条件好,温控措施简易,但模板复杂,用量大,混凝土标号要求高,每方混凝土的代价也高。
且单宽流量较大,但容易引起坝体振动,如果要在这里修建大坝,选择重力坝而不选择支墩坝,故也不修建支墩坝。