编号:×××
二十、10kV带电作业带负荷更换××线××分6#隔离开关
作业指导书
编写人:__________ __________年_______月_______日
工作负责人:__________ __________年_______月_______日
审核人:__________ __________年_______月_______日
批准人:__________ __________年_______月_______日
安全到位人员:
作业时间:年月日时分至年月日时分
××供电公司××供电分公司
目录
一、准备阶段 ·····························································第×页
1.1 准备工作安排··············································第×页
1.2 作业现场示意图··········································第×页
1.3 主要工器具··················································第×页
1.4 主要设备材料··············································第×页
1.5 旧设备材料回收··········································第×页
1.6 危险点分析及安全控制措施······················第×页
1.7 现场补充危险点分析及安全控制措施······第×页
1.8 人员分工······················································第×页二、作业阶段······························································第×页
2.1 开工 ······························································第×页
2.2 作业内容、步骤、要求及工艺标准 ··········第×页
2.3 作业结束 ······················································第×页
三、总结阶段······························································第×页附:
指导书执行情况评估
一、准备阶段
1.1 准备工作安排
1.2 作业现场示意图
10kV带电作业带负荷更换××线××分6#隔离开关作业现场示意图
1.3 主要工器具
工器具准备人:工器具收回人:年月日
1.4 主要设备材料
设备材料准备人:设备材料收回人:年月日
1.5 旧设备材料回收
旧设备材料回收人:年月日
1.6 危险点分析及安全控制措施
1.7 现场补充危险点分析及安全控制措施
1.8 人员分工
二、作业阶段
2.1 开工
2.2 作业内容、步骤、要求及工艺标准
2.3作业终结
三、总结阶段
召开班后会,对本次作业进行总结,进行技术资料整理归档,并对本次作业安全及质量进行评价。(见班后会记录、指导书执行情况评估)
附:
指导书执行情况评估