工程项目管理常用词语

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
来自百度文库
kick-off meeting proposal kick-off meeting client kick-off meeting project kick-off meeting engineering kick-off meeting construction mobilization meeting review meeting contract effective date of the contract termination of contract frustration of contract lump-sum contract[L-S] (fixed) unit price contract (cost) reimbursible contract; cost-plus(fee) contract [C-P] cost plus fixed fee contract[CPFF] cost fluctuating fee contract; cost plus sliding scale fee contract (target) cost plus fee contract, with bonus or penalty conditions reimbursible guaranteed maximum price contract[RGMP]; guarantee maximum cost plus contractor subcontractor joint venture[JV] delivery delivery date; date of lead time delivery to jobsite delivery note delivery order bill of lading delivery terms free on board [FOB] free on rail [FOR]; free on truck [FOT] cost and freight[CFR] 或[C&F] cost insurance and freight; cost insurance freight[CIF] free alongside ship[FAS] free carrier[FCA] ex works[EXW]
piping design piping mechanical engineering instruments engineering electrical engineering architectural engineering civil engineering start-up commissioning start-up; test run; initial operations performance test run; performance guarantee tests client acceptance; plant acceptance terms of payment; conditions of payment; terms and conditions of payment advance payment; down payment progress payment schedule payment retention money final payment code; number group code standard classification of account numbers[SCAN]; account codes; code of accounts variable code; optional variable code generic activity type(numbers)[GAT] contigency issue; release bill of exchange; draft bill for negotiation owner client design; engineering engineering phase process design phase basic engineering phase analytical engineering phase planning engineering phase detailed engineering phase; fineal design phase; production engineering phase meeting
1 2 3 4 5 6 7 8
Process package process design process release initial process release scope of work; project scope work package work item line item breakdown structure work breakdown structrue(WBS) organizational breakdown structure(OBS) project summary work breakdown structure(PSWBS) Contractor's standard work breakdown structrue(CSWBS) Responsibility assignment matrix(RAM) risk risk analysis risk memorandum home office home office service utility plan project plan (project) engineering plan (project) procurement plan (project) construction plan (project) start-up plan patent patent right proprietary technology licensed technology know-how license licensor licensee royalty license fee know-how fee discipline process design; process engineering systems engineering equipment engineering plant layout engineering
milestone schedule control; progress control progress curve; "S" curve resource loading curve; Bell curve ahead of schedule schedule delay default default notice penalty clause liquidated damages freight [Frt.]; carriage freight paid; carriage free; carriage paid freight collect; freight to be collected; freight payable at destination freight prepaid; advance(d) freight freight forward; carriage forward freight indemnity freight note forwarding agent procurement pruchasing expediting inspection traffic; transport bill of entry report monthly cost and progress report (job) monthly progress report engineering monthly progress report project cost summary report project operation cost status report schedule report control index performance report productivity report exception report
estimate; cost estimate types of estimate detailed estimate; defined estimate defined equipment estimate; definitive estimate equipment estimate analysis estimate proposal estimate proposal estimate control estimate interim control estimate; initial control estimate[ICE] initial approved cost[IAC] check estimate first check estimate[FCE] production check estimate[PCE] man-hour estimate certificate certificate of origin mechanical completion certificate client acceptance cerificate(of plant) material; direct material equipment bulk materials; commodities material class material take-off[MTO] bill of materials[BOM] material management material control schedule progress; physical progress scheduling; time scheduling starter schedule; early work schedule project master schedule; master project schedule detailed schedule network(diagram) milestone network detailed network critical path method[CPM] critical activity activity float
material exception report[MER]; equipment& materials exception report procurement status report material status report purchase order and requisition status report vendor drawing status report; vendor data scheduling status report inspection report close-out report bid; quotation; proposal; tender; offer inquiry review committee[IRC] bid strategy meeting proposal manager proposal; quotation; bid; tender; offer bid evaluation bid tabultion form; tabulation of bids negotiation vendor coordination meeting[VCM]; coordination meeting commitment telex order; notification of commitment purchase order[PO] contract award inquiry; invitation to bid pre-qualification qualified bidders list; qualified vendors list inquiry(package); request for quotation(package) [RFQ]; request for proposal[RFP); invitation to bid [ITB] requisition(package); requisition documents purchasing specification[PS] instructions to bidders[ITB] change client change; contract change pending client change approved client change