汽车行业缩写汇总-2016-05-26

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Digital Shape Model Dimensional Technical Specifications Design Validation Design Verification Plan and Report Estimate At Completion Executive Committee Electronic Data Interchange Engineer Release Engineering Specifications Engineering Statement of Work Estimate To Completion Engineering Work Order First Article Inspection Function Evaluation Finish to Finish First In First Out Failure Mode and Effect Analysis Finish to Start Geometry Analysis & Assurance Geometric Dimensioning and Tolerancing Invitation For Bid
Key Performance Index
79 KU
23 CC
24 CCB
25 CDP
26 CED
27 CFD
28 CFT
29 CMM
30 CNC
31 COQ
COP
32 CP
33 CPI
34 CPK\CP
全称
8D work method Appearance Approve Report Actual Cost Analysis/Development/Validation Accelerated Life Testing
35 CPM
Critical Path Methodology
36 CTC
Component Timing Chart (DRE document)
37 CTQ
38 CTS
Component Technical Specifications
39 CVA/NVA
40 CVER
Concept Vehicle Engineering Release
Automotive Industry Action Group
Automated Issue Management System Advance Purchasing Advanced Product Quality Planning and Control Plan Attribute Quality Characteristic Audit and Risk Review Advanced Supplier Quality Engineer Budget At Completion
51 DPV
Defects per vehicle
52 DRE
Director of Research and Engineering
53 DSM 54 DTS 55 DV 56 DVP&R 57 EAC 58 EC 59 EDI 60 ER 61 ES 62 ESOW 63 ETC 64 EWO 65 FAI 66 FE 67 FF 68 FIFO 69 FMEA 70 FS 71 GAA 72 GD&T 73 IFB
41 DC
Design Complete
42 DCP
Dimensional Control Plan
43 DFA
Design For Assembly
44 DFM
Design For Manufacturing
45 DFMEA
Design Failure Mode and Effect Analysis
74 IMDS 75 J1
International Material Data System Job 1 (=SOP, start of production)
76 KCC
key control characteristic
77 KPC
key product characteristic
78 KPI
wk.baidu.com
46 DFSS
Design For Six Sigma
47 DOE(POKA-YOKE)
48 DMIS
Dimensional measurement interface standard
49 DPMO
defects per million opportunity
50 DPR
Design prerequisites
Budget Cost of Work Performed Budget Cost of Work Scheduled Body in White Bill Of Materials Bill of Process
An expansion of an existing facility
Capability of Accuracy Customer Business Management Critical Characteristic Change Control Board (Car Crossbeam) Conception of Document Procedure Customer Expected Documents Computational Fluid Dynamics Cross Function Team Coordinate Measuring Machine Computer Numerical Control Cost Of Quality Customer Oriented Process Control Plan Cost Performance Index Capability index of process
No. 缩写
1 8D 2 AAR 3 AC 4 A/D/V 5 ALT
6 AIAG
7 AIMS 8 AP
9 APQP&CP
10 AQC
11 ARR
12 ASQE
13 BAC
14 BAP
15 BCWP
16 BCWS
17 BIW
18 BOM
19 BOP
20
Brownfield Site
21 CA
22 CBM
相关文档
最新文档