Revision Change History
Rev
Creation Date
(YYYY/MM/DD) Originator
Originator’s function Description of Change
(ECO#, Brief description)
Note 1: Can keep the latest three revision change records;
Note 2: Use red triangle marked in the changing area.
Printed copies are NOT controlled unless marked "CONTROLLED"
The information in this document is the property of Boston Power. No part of this document may be disclosed, reproduced, or distributed without the express written permission of Boston Power. Boston Power reserves the right to alter the design and specifications of its products at any time without notice, as part of its continuing program of product development.“Boston-Power®”, “Sonata®” and “Swing™” are registered trademarks of Boston-Power, Inc., which retains sole rights to their use.© Boston-Power, Inc., 2009. All rights reserved.
目录
1. 目的: (2)
中等/重大故障故障现象
发生时间
处理方式
IT工程师/经理
故障分析
解决故障
建立存档
IT总监
预防措施季度汇总
IT 故障处理流程
处理过程
阶段
用户提交故障
是否IT 故障3155/3576
通知用户
结案处理
否IT 工程师是
是否完成是
二线工程师供应商
否
是否完成是
三线工程师
厂商
否
是否完成
是
变更事件流程
否
电话/邮件告知