水电施工图解

合集下载

水电施工图纸图例

水电施工图纸图例

水电施工图纸图例水电施工图纸图例《cad版本》以下CAD图纸截图截于水电施工视频教程全套,施工工艺目录下施工组织大全的CAD图纸图例部分截图and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If amajor accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fireextinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economicand special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsiblefor the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once everyquarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic系统图部分截图欢迎你来到此贴!这里详细带领你了解《水电施工视频教程全套》首先要了解到癿是:本套视频总共包括了几百个左右视频,17本关于水电癿电子书PDF格式,十几篇文档and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If amajor accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fireextinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economicWORD格式,压缩包版本20G以上。

施工工艺室内给水、排水管道节点图做法大全(节点图解)

施工工艺室内给水、排水管道节点图做法大全(节点图解)

施工工艺室内给水、排水管道节点图做法大全(节点图解)————————————————————————————————作者:————————————————————————————————日期:室内给水、排水管道节点图做法大全(工艺节点图解)本做法适用于住宅室内给水排水系统工程。

PP-R长期适用的水温≤70℃,系统工作压力≤0.6Mpa,dn≤100的室内冷热水的安装。

铝塑复合管适用长期的水温≤95℃,系统工作压力≤0.6Mpa,dn≤50的室内冷热水的安装。

U-PVC管道使用温度,室内连续排水温度不大于40℃,而瞬间排水水温不大于80℃。

给水暗装管道沟槽施工大样图1、埋地管线大样图说明:在楼板施工时要预留15 *60mm (深*宽的管槽),管道施工完,采用水泥砂浆做保护层,保护层高度不能高于成活地面高。

地面敷设管槽做法之一:地面敷设标准做法之二:2、嵌墙内管道施工大样图说明:管道嵌在卫生间、厨房墙内的管道,深和宽按照本图要求,但是表面不包括装饰层厚度;管道安装完,用水泥砂浆土填充。

如果材料为PP-R管,表面抹灰层内设钢丝网,钢丝网规格为10*10*0.5mm。

管道支架自由臂安装大样图本图为PP-R管道自由臂安装标准给水管道穿越楼板及墙大样图1、管道楼面套管。

PP-R管、铝塑复合管管道穿楼板距地面300mm设固定支架,钢管支架按照规范执行;将套管内壁清理干净,填料选用发泡聚乙烯或聚氨酯等材料,封堵前将套管内壁清理干净。

厨房、卫生间套管高出地面50mm。

穿楼板套管尺寸2.3表2、钢管、PP-R、铝塑复合管穿墙套管说明:管道穿墙套管表面用砂纸打毛,穿墙套管可采用U-PVC或钢管,穿越地下室外墙必须用钢套管;柔性填料选用聚氨酯发泡、油麻或石棉绳给水管线穿越基础施工大样图柔性填料可选用聚氨酯发泡材料,括号内的用于外保温管道给水管道穿越沉降缝抗震缝、伸缩缝大样图说明:管道穿墙外表面应砂纸打毛,弯管两侧必须设固定支架,安装完要用柔性填料封堵。

施工现场平面布置——水电布置

施工现场平面布置——水电布置

施工现场平面布置——水电布置建筑工程施工前,需要对施工现场进行平面布置,除此以外施工现场道路、机械、生产设施、水电、生活场所和另行设施等的布置。

合理的施工现场平面布置,有助于施工的顺利有序进行,提高施工效率。

施工现场平面布置,需要注意以下六个要点。

接着分享施工现场平面布置的第五个要点——现场水电布置。

一、临时用水临时用水包括生产用水、生活用水和消防用水。

给水、排水排水等系统的设置应严格遵行平面图,并根据综合摆放施工现场情况合理布置。

如粘土沉淀池应布置在钢结构地泵及砂浆搅拌机处;排水沟应沿施工场地便道施工人员两侧布置,并保证排水沟内的通畅等。

临时用水组织:计算用水量、选择供水水源、选择临时供水系统的配置方案、设计临时排污管网和设计供水成套构筑物和机械设备。

供水要求:(1)力争管网总长度最短。

(2)常用用水总管管径为100mm。

(3)消火栓间距不大于120m,住宅楼每层设消火栓口,并配备消防水带、水枪。

(4)排水管道需考虑排水坡度。

供水系统配置:管网布置表达方式有环状、枝状、混合式。

二、临时供电布置施工临电布置应沿外围墙内侧或施工道路边侧埋地敷设。

各用电点应设有二级配电箱,并在办公区和各施工用电接口设分配电箱,且每台用电机械设备各配备一台配电箱,同时电箱配置还应根据及施工阶段的用电做相应减少不同增加。

临时供电组织:用电量计算、电源选择、变压器确定、供电线路布置、导线截面计算。

用电线路:10kV输电线路→变压器→总配电箱→分配电箱→开关箱→插头→机械运转1、基本要求:1)采用三级配电系统内,采用TN-S接零保护系统,采用一级漏电保护系统;2)变压器一般设置在新设围墙外侧,总配箱一般设置在架设靠近变压器的围墙内侧,分配箱有多个,一般设在主要供气设备(塔式起重机、人货梯、井架、钢筋加工场,办公与生活用房);3)线路敷设采用架空或埋地,一般采用后者;4)供电线路与建筑物、塔式起重机需保持安全距离。

2、配电线路的安排:分为环状、枝状及混合式3种,一般采用枝状。

水电施工工艺图文讲解

水电施工工艺图文讲解
变通口必须安装于正上方。
2、非排污口必须安装存水弯防臭处理。 3、管件完整完毕后必须封堵管口避免后期 施工中掉入建渣或其他杂物堵塞管道。
4、施工完成后必须对水管进行加固处理 (图中采用水泥墩固定),形成排水坡度。
5、完工后清扫坑内垃圾。
异层排水系统
异层排水注意事项:
1、异层排水管吊杆抱箍必须安装牢固。 2、非排污口必须安装存水弯,改造蹲便下水 必须安装存水弯。
一个底盒下口只 允许出现两根, 两根以上线管正
确做法
线管接头统一,处于同一水平线
转交处折弯角度线统一、由内到外均匀 扩展,转角处两端线卡固定排列整齐
强电电流屏蔽处理,锡箔纸缠绕 长度规范统一、过桥弯度统一
案例分析示意讲解
冷热水管间距大于10mm,开槽宽度均匀,线槽笔直 水管整管,减少焊接点,减少漏点
为了防止间接触电和防接地系统故障引起的爆炸和火灾而做的等 电位联结,可以有效预防建筑物防雷系统故障和电子信息设备过 电压带来的损坏事故的干扰。
等电位联接端子箱将建筑物如高层住宅、医院、泳池等内的钢 筋网,配电盘中的PE线端子、插座、上下水管、暖气管道,煤 气管道,卫生间的金属浴盆、浴架、淋浴器扶手、电冰箱、空调、 导电地板的金属网络将其联接到各自的等电位联接端子箱内的端 子板上,从而构成各自的等电位体,保护人和设备的安全。
案例分析示意讲解
冷热水管分色、保温、降噪处理、转角处吊杆固定, 间距100mm以上,吊卡间距统一规范 顶面射灯线圆三通分线、波纹管套线保护 水电完工后,空开箱空开安装完毕、测试线路安装临时 开关及照明
墙面线管整齐排列,线卡整齐固定
强电在上,弱电在下,屏蔽处理
案例分析示意讲解
预留线波纹状缠绕
线卡排列整齐、 间距统一

水电工必看,水电安装现场施工图

水电工必看,水电安装现场施工图

水电工必看,水电安装现场施工图
楼层管道井成排立管
室内管道安装
左:排水管道安装右:桥架安装
蹲便布局合理,地漏找中,整体效果非常美观
左:给排水管道的墙体暗埋管均弹出墨线后进行敷设,整齐美观右:顶板内的接头规范,且均进行沾锡处理
户内箱安装电缆敷设
现场布管
顶板暗配管
顶板暗配管
采暖立管安装排水立管安装
管道预留洞
立管的安装箱体安装
A区地库电气暗配管;A区地库普通套管的安装
排水立管;电气配管
管道预留洞
电气配管
剪力墙线盒安装
3#楼地暖管敷设、PP-R安装
2#楼穿线及开关、插座、灯具安装
配管、接线盒安装
墙体配管
管道及风管安装
11层平台配管
三层平台配管;一层餐厅6~10轴明配管
二层餐厅1~6轴明配管
铸铁排水管安装
开关插座安装
电气配管
户内接地母线敷设
冷却塔安装风管保温
户内接地母线敷设柱主筋与地梁主筋焊接
电气配管、盒子安装
电气配管
电气配管、接线盒安装。

安装水电图例大全

安装水电图例大全

水电图纸图例大全,电气、弱电、给排水常用图例
建筑水电学看图例,必须先知道图纸里各种样式符号的名称,我们通常称之为:图例。

图例通常设计在【设计总说明】,也有部分图纸图例设计在平面图旁。

建筑水电图纸识图必须先从图例看起,这是最基本,也是最基础的识图开始。

图例里,包括了各种水与电在平面图的设计样式,如:开关插座、龙头地漏等。

还有图例相对应的安装高度尺寸,比如开关插座的安装高度等,都可以在图例表里找到。

下面就给大家列出最常用的水电图纸图例:
电气图例:
建筑电气图例
建筑电气图例中,插座的分类一般用字母来代替,比如普通插座旁多了一个字母R,则用来表示热水器插座。

上图中,左边图例,右边为相对应的安装高度。

弱电图例
弱电图例给排水图例。

图解水电安装施工工艺ppt课件

图解水电安装施工工艺ppt课件

• 标准层或标准单元:必须以样板带路。样 板施工完成后,现场实际清理材料需用数 量,按样板用量提出材料计划。
• 贵重材料:如电缆、桥架等,必须按实地 丈量提出材料计划。
② 材料领用管理

现场必须建立封闭式安装库房,安装材料必须入
库管理,材料入库质量验收由安装工程师负责。

对于管件、线盒、弯头等配件材料及电线、灯具
5959upvc套管码放整齐下料长度符合要求管口封堵严密墙内upvc套管提前用砼预制做到坡度标高控制一次到位pvc空调套管制作工艺6060空调套管预留工艺在砼结构上钻孔插筋控制套管的标高和位置在砼结构上钻孔插筋控制套管的标高和位置6161浇砼前upvc立管上的套管先作填塞并保证套管四周的环形间隙一致卫生间排水支管甩口时一次把穿墙套管加上节点排水套管安装工艺6262空调套管安装质量要点一后砌墙上upvc套管预埋套管下料时应预留抹灰层厚度并抹灰完成后冒出墙面1020mm为宜不抹灰墙面upvc套管安装与墙面平齐6363upvc套管冒出抹灰面部分在粉刷前及时磨平upvc套管打磨后与装饰面层平齐空调套管安装质量要点二6464竣工验收套管质量验收标准立管套管空调套管排水穿墙套管给水套管6565第三章施工过程工艺质量要求工艺质量管控要点一
• 凡需报经业主、现场监理进行验收确认的工序,报检前必须内部组织进行预 检。
• 一般工序报检前的预检由安装负责人会同专业施工员进行,报质监站验收的 分项分部工程中间验收等,在报检前必须由技术负责人组织有关技术人员进 行预检。
• 预检原则上要求模拟正式验收的程序进行,并形成内部预检纪录。 • 竣工前由项目负责人组织进行工程整体内检,发现问题限时整改。。 17
作业人数
作业人员变动频繁或作业人数急剧增加,是品质下滑的重要 原因。

如何看懂水电施工图-一步一步教会看

如何看懂水电施工图-一步一步教会看

一步一步教你如何看懂施工图一、识图1、先看现场平面布置图,了解工程概况及周围建筑对本工程的影响.2、再看施工组织,大概了解工程的具体施工情况。

3、看施工结构图和建筑图,两图结合看,整体了解工程概况。

4、详细看施工图结合结构施工图集查看做法,建筑施工图结合建筑施工做法图集。

5、结构图从轴线尺寸看,查看剪力墙、柱、梁、板等配筋是否有无前后出入,结构是否与建筑图相符。

梁、板等原位标高是否正确,卫生间板面是否标注详细,沉降缝处的结构处理是否合适,楼梯的做法是否详细,各种洞口的详细做法.6、建筑图看每层的布置是否合理,非承重墙及承重墙的布置是否合理,梁、柱等布置是否美观,位置、尺寸与结构图是否一致,各种洞口有无遗漏。

7、建筑做法是否合理,防水材料,涂料,瓷砖等二、建筑图纸符号大全在建筑设计图中:l表示是梁、ll表示是连续梁、ql表示圈梁、jl表示基础梁、tl表示是梯梁、dl表示是地梁、z表示柱、gz表示构造柱、kz表示框架柱,m表示是门、c表示是窗。

@表示钢筋间距Φ表示钢筋型号。

下面谈谈一些经验,与博友共享。

1、正规的建筑设计,要有设计者签名,建筑图纸负责人签名,审定者签名,校对人签名,并加盖出图章,注册执业章。

2、建筑设计图纸中,长度一般以mm为,有加以说明的除外;看图时注意结合“建筑用料说明"与其他图纸进行综合。

“建筑用料说明”中,在各小项的前面有打上“√”的,为该设计所采用的做法。

没有打勾的,非该设计所采用的做法。

3、如在建筑设计图中:“c20钢筋砼jl(240400)配4φ16络φ6@200箍.”解读为:强度为c的钢筋混凝土结构的基础梁,宽240mm,高400mm,配4条直径16厘(16mm)螺纹的主钢筋,每间隔200mm箍一个直径6厘的钢筋长方形环络。

(长方形环络长约3 40-—350mm,宽约180mm——190mm)。

4、如在建筑设计图中:“c20砼小柱(240240)配4φ12箍]6@200。

建筑水电预埋施工工艺图解完整版

建筑水电预埋施工工艺图解完整版

建筑水电预埋施工工艺图解一、结构配管1、电气管道预埋电管预埋应提前做好暗埋管的预制工作。

暗埋管道应沿最短路径敷设,尽量减少转弯次数,管子的弯曲半径及加转线盒的个数应严格按国家规范执行。

接(转)线盒、定位必须准确,盒体端面紧贴模板,盒内用废纸、泡沫板等物体填实,并在模板内用红漆作上记号。

凡向上的管口和埋到砼体内的接线盒必须封堵严密,防止杂物进入管内。

管线与底筋用铁丝绑扎牢固,避免线管移位损坏,PVC管路固定点的间距为不大于1m,距端头、弯曲中点不大于500mm。

PVC管在混凝土浇筑时必须派专人值班加强保护,防止振捣时位移或损坏;值班人员必须看护至混凝土浇捣完毕,中途不得离岗,发现预埋管盒被损坏时应及时修复从地面弯起至板面的插座管,在浇捣混泥土时,做好支墩保护。

防止电管根部被压弯压断管子进盒采用专用锁头(杯梳),锁母下应塞垫块,防止锁母被踩脱落或断开。

本项目灯头盒采用定制成品灯头盒,这样节省锁头,又有效的防止管盒脱落的通病。

暗配管的弯取半径不应小于管外径的10倍;弯曲处不应有折皱、凹陷和裂缝。

混合配管时,钢管或镀锌电线管在下,PVC管在上局部电线管太密集,部分线管间距少于15mm,线管重叠超过三层,影响楼板结构。

屋面电气配管必须使用镀锌电线管,禁止使用PVC塑料管。

2、入户管道与电井线槽连接电气竖井内入户管与桥架连接部位需按专业排序分布,防止后期入户线至桥架处造成交叉。

3、电气与给排水的定位电管、电盒避免预埋在排水管道旁,距离水管及预留洞的距离大于300mm,减少楼板漏水隐患。

空调插座位置与建筑图纸中空调预埋孔位置、空调板要相符(空调插座一般要比空调套管高100mm)。

洗衣机插座与洗衣机地漏要相符。

4、开关、插座、灯位盒定位开关、插座、灯位盒,必须严格按实际图纸和规范来定位。

开关插座的测量定位分为三个方面:平面位置、高度、与墙面凹凸距离。

要按各种器具设计高度安装其接线盒。

对剪力墙上的线盒,以土建柱筋上的红记顶端为50cm基准来测量,同时各接线盒之间用水平管复测标高是否一致。

水电安装工程各工序做法图文解析

水电安装工程各工序做法图文解析

水电安装工程各工序做法图文解析按照分项施工工序流程,图文解析以下十一项水电安装工程的施工工序及做法:一、砼结构板内PVC管/盒的施工二、砼剪力墙内PVC线/管的施工三、后砌墙内PVC线管/盒的施工四、户内强/弱电箱安装五、强/弱电桥架安装六、防雷接地及等电位施工七、砼楼板上立管孔洞预留和防水套管预埋八、砼剪力墙(后砌体)内套管的预埋九、UPVC排水立管安装十、PP-R给水管安装十一、消火栓管道安装清晰明了,一看就懂,分享给盟友参考借鉴!一、砼结构板内PVC管/盒的施工工序流程图纸固化→线盒定位、固定→线管敷设、固定→隐蔽验收→浇砼时值班看护→线管、盒清理→线管疏通→管内穿引铁丝→线盒标识→弱电线管移交控制要点图纸固化、线盒定位、线管敷设、弱电线管移交共四个方面工序流程图文解析:1、线盒固定牢固、排列整齐、预留接口方向准确2、线管弯曲半径符合要求、上下交叉合理3、线管隐蔽前监理复核坐标,进行施工质量验收4、线管、盒在浇砼前安装状态5、浇砼时派专职电工值班看护,保证线盒隐蔽6、后砌墙线管甩口排列整齐,长短一致、间距均匀7、线盒排列整齐、间距一致、盒内清洁干净8、线盒清理后及时穿引铁丝,保证管路畅通9、线盒标识清楚,便于移交和检查二、砼剪力墙内PVC线管/盒的施工工序流程墙体内线管预留→预留线盒位标高测定→泡沫板固定→砼墙体内泡沫清理→线盒固定→洞口修补→线盒打磨控制要点线管预留位置、泡沫板预埋标高和坐标、线盒安装共三个方面工序流程图文解析:1、砼剪力墙内采用泡沫板预留线盒安装位置,标高准确2、砼浇筑完成后预留线盒位的泡沫成型规矩、方正3、砼剪力墙上预留泡沫清理完成后,孔洞内干净整洁4、砼剪力墙上PVC线盒安装,标高准确5、砼剪力墙上线盒修补,填塞饱满、表面平整6、砼剪力墙上线盒安装完成后与墙面平齐三、后砌墙内PVC线管/盒的施工工序流程墙体上划线定位→开槽→垃圾清运→线盒安装→线管敷设及固定→管线疏通→管口保护→墙槽修补→空鼓检查和移交→抹灰前线盒成品保护→线盒打磨和清理控制要点划线定位、线盒安装、空鼓检查、成品保护共四个方面工序流程图文解析:1、后砌墙上开槽,槽宽度和深度符合要求,割缝顺直2、后砌墙上线盒固定,砂浆填塞饱满3、后砌墙内PVC暗配管,线管敷设顺直4、PVC线盒内管口成品保护5、后砌墙线槽修补,全部采用瓜米石填缝,表面平整、无空鼓6、抹灰完成后,线盒面冒出抹灰面1~2mm7、PVC线盒冒出抹灰面打磨,保证线盒面与墙面平整8、成排线盒标高一致、线盒面与墙面平齐9、墙面括完腻子后,线盒安装效果四、户内强/弱电箱安装工序流程砌体上留洞→箱体上开孔→箱体坐标和标高复核→箱体安装、固定→灌浆→配管→箱体成品保护和清理控制要点箱体上开孔、坐标和标高复核、灌浆、成品保护共四个方面户内强电箱安装工艺流程图文解析:1、砼墙上强电箱预留孔,洞口尺寸满足箱体安装要求2、后砌墙上强电箱预留孔,洞口尺寸满足箱体安装3、后砌体上强电箱固定,采用瓜米石填塞饱满,箱体安装标高准确,箱体上开孔符合要求4、强电箱暗配PVC管排列整齐、线管间距均匀,入箱锁扣固定牢固5、安装在有保温要求的砌体上的箱体,应预留保温板厚度,确保配电箱体与保温完成后墙面平齐6、强电箱安装完成后与装饰面平齐,标高准确,箱体内干净整洁户内弱电箱安装工艺流程图文解析:1、砼墙上弱电箱预留孔洞,固定牢靠,标高准确2、后砌体墙上弱电箱瓜米石填塞饱满,线管开孔位置准确、孔距均匀3、入箱线管排列整齐、管口封堵严密4、弱电箱安装完成与装饰平齐效果五、强/弱电桥架安装工序流程定位弹线→支架安装→支架水平、垂直度校验→桥架安装、固定、校平→支架接地扁钢敷设→扁钢搭接口焊接→扁钢上接地标识安装→桥架跨接安装→桥架标识控制要点弹线、支架安装、桥架安装、扁钢安装、跨接安装共五个方面工序流程图文解析:1、激光定位仪,用于桥架支架定位弹线2、墙体上弹标高控制线3、桥架支架安装控制线4、桥架上预留接管孔,排列整齐、间距均匀5、预留接管孔与顶板上线盒位对应6、桥架接缝严密、固定牢靠,支架设置合理7、桥架过桥弯美观、规范,避让合理8、桥架过桥处,接地扁钢制作规范9、桥架翻弯处接地扁钢制作规范10、在单根桥架中间位置增加接地扁钢固定支座,采用铆接11、桥架支架接地扁钢采用搭接,螺栓固定牢靠,接地标识清晰、规范12、桥架标识清晰,张贴规范13、桥架支架上接地扁钢,在阴角转角处的做法14、桥架支架上接地扁钢,在阳角转角处的做法15、桥架支架上接地扁钢,在变径处的做法16、桥架接地跨接做法规范17、公共过道上桥架安装整体效果图118、公共过道上桥架安装整体效果图2六、防雷接地及等电位施工工序流程基础内桩基引下线施工→接地扁钢敷设→柱内引下线施工→均压环焊接→门窗接地施工→等电位箱施工→屋面避雷网焊接→接地电阻测试→接地标识制作和安装控制要点搭接焊缝长度、引下线标记、等电位箱安装、屋面避雷网施工、接地电阻测试共五个方面基础接地施工工序流程图文解析:1、基础接地母线在穿越柱基时,预埋热镀锌接地扁钢,并与柱内引下线可靠焊接2、基础接地母线在穿越挡墙时,预埋热镀锌接地扁钢,并与墙体内引下线可靠焊接3、埋地接地扁钢的埋设深度符合设计和规范要求楼层防雷接地施工工序流程图文解析:1、柱内引下线与梁内均压环可靠焊接,采用双面焊接,焊缝长度符合规范要求2、梁内均压环焊接,采用双面焊接,焊缝长度符合规范要求3、外墙铝合金门窗预留接地连接板,与柱内引下线可靠焊接4、卫生间等电位用预留接地钢筋,与均压环可靠焊接5、卫生间等电位箱安装标高准确,与砌体间的填塞采用瓜米石且填塞饱满6、等电位箱安装完成后与墙面平齐,箱内整洁干净七、砼楼板上立管孔洞预留和防水套管预埋工序流程留孔用木盒及防水套管的制作→孔洞定位→木盒及套管的固定→浇砼前坐标的复核→浇砼后洞口清理→洞口安全防护控制要点孔洞定位、坐标复核、洞口防护、防水套管制作和安装共四个方面砼楼板上预留孔洞施工工艺流程图文解析:1、砼楼板上木盒预留孔洞,排列整齐、固定牢靠,加筋位置准确2、砼楼板上UPVC管预留孔洞,位置正确、排列整齐、固定牢靠,临时封填严密3、监理工程师对预留孔洞坐标复核4、砼楼板上预留孔洞位置准确,洞口内清理干净5、砼楼板上预留孔洞上方木板防护到位6、外立面挑板上预留孔洞整体效果图屋面防水套管施工工艺流程图文解析:1、屋面防水套管加工,焊缝平直、光滑,套管高度符合设计和规范的要求2、屋面防水套管安装,固定牢靠、封堵严密,防腐到位3、出屋面管道穿越防水套管时,防水封堵应严密不漏水八、砼剪力墙(后砌体)内套管的预埋工序流程套管下料→安装前定位→套管组合焊接→套管固定、封堵→坐标复核、隐蔽→套管内清理→套管标识控制要点套管下料、定位、复核、固定共四个方面砼剪力墙上钢套管施工工艺流程图文解析:1、钢套管码放整齐、长度符合要求,管口封堵严密2、砼墙内预埋用钢套管电焊组合固定,确保套管间距一致,防腐到位3、砼墙内钢套管预埋,固定牢靠,间距均匀,封堵严密4、砼墙内钢套管预埋效果图,标识清晰砼墙上UPVC套管施工工艺流程图文解析:1、UPVC套管码放整齐,下料长度符合要求,管口封堵严密2、砼墙内UPVC套管安装位置准确、固定牢靠、封堵到位3、砼墙上UPVC套管在拆模后的效果,标识清晰,坡度正确后砌墙上UPVC套管施工工艺流程图文解析:1、后砌墙上UPVC套管预埋,套管下料时应预留抹灰层厚度,并抹灰完成后冒出墙面10~20mm为宜2、UPVC套管冒出抹灰面10~20mm3、UPVC套管打磨后与装饰面层平齐4、不抹灰墙面与UPVC套管平齐九、UPVC排水立管安装工序流程立管上孔洞清理→上下吊线→支架安装→UPVC排水管安装→套管安装、固定→孔洞支模→浇砼→振捣→闭水试验→洞口二次浇砼、抹平→移交控制要点上下吊线、管道支架安装、排水管安装、支模、振捣、闭水试验共六个方面UPVC排水管道施工工艺流程图文解析:1、单根UPVC排水立管支架安装,上下采用铁丝作垂直吊线2、多根管道共用一个角钢支架,用铁丝作上下垂线,保证立管垂直度3、排水立管上钢套管预制,并作局部防腐处理4、UPVC排水立管与支架接触紧密固定牢靠,垂直度符合规范要求5、UPVC排水管与支架间采用塑料隔开,符合规范要求6、UPVC排水立管表面采用塑料薄膜缠绕作成品保护7、UPVC排水立管孔洞的吊模全部采用木方作支撑,保证砼结构板面下部平整8、浇砼前UPVC立管上的套管先作填塞,并保证套管四周的环形间隙一致9、UPVC排水立管孔洞在浇砼时,必须采用手持式振动器进行振捣10、UPVC排水立管在一次浇砼后进行蓄水试验11、UPVC排水立管孔洞闭水格后进行二次浇砼找平12、卫生间排水支管甩口时,一次把穿墙套管加上节点13、UPVC排水立管穿楼板处孔洞封堵后,下部与原结构板平齐14、UPVC排水立管上套管,冒出地面部分的做防腐处理十、PP-R给水管安装工序流程图纸固化→定位弹线→支吊架制作、安装→PP-R给水管热熔→管道水平校正→管道固定→穿墙套管内填塞→穿墙孔洞修补→管道水压试验控制要点图纸固化、弹线、热熔、校正、套管填塞、水压试验共六个方面PP-R给水管道施工工艺流程图文解析:1、PP-R给水管道的支架在施工前,须在砼结构板下弹控制线,保证支架在一直线上2、走道内PP-R给水管排列整齐、支架固定间距均匀,管道平整度符合规范要求PP-R管与固定支架间加设塑料软管作保护给水支管穿墙套管内封堵填塞3、PP-R冷热水管道安装,支架间距符合规范规定4、阳台PP-R给水管安装效果十一、消火栓管道安装工序流程管道除锈、刷漆→坡口制作→立管吊线→支架制安→管道固定、焊接→套管安装→立管洞吊模→洞口闭水→消火栓箱安装→消火栓支管甩口→消火栓安装→管道水压试验控制要点除锈刷漆、坡口、焊接、吊模、洞口闭水、水压试验共六个方面消火栓管道施工工艺流程图文解析:1、消火栓管道除锈、刷漆,钢管表面刷漆均匀2、焊接钢管管口处按规范要求(厚度大于4mm)应切坡口处理3、消火栓管道支架的制作,在安装前面对支架表面刷漆4、管道支架在安装时,须采用上下吊垂线法固定,保证管道垂直度5、立管固定支架上钢板暗埋做法,固定须牢靠6、修补完成后的立管支架,感观比较美观7、管道不切坡口时,在点焊时两管间应留有1~2mm间隙8、立管与支架固定牢靠,接触紧密9、层高大于5米时,立管上设两个支架焊口成型,外表做好防腐处理10、走道内消防环状管安装11、消火栓管与PP-R管、桥架间的交叉避让12、为保证走道吊顶标高,局部支管采用反抱形式固定管道13、消火栓支管安装完成后,须对管外表再做一道防腐处理14、消火栓口安装位置准确,标高符合规范要求。

水电及设备安装工程图集

水电及设备安装工程图集

水电及设备安装工程图集→00DX001 建筑电气工程设计常用图形和文字符号→00G514 吊车轨道联结及车挡→00G514(六)吊车轨道连接及车挡→01D203-2 6~10kV配电所二次接线(直流操作部分)→01D303-3 常用水泵控制电路图→01G123 贮水罐选用及安装→01R405 压力表安装图集→01R409 管道穿墙、屋面防水套管→01S201 室外消火栓安装→01S302 雨水斗→01SJ914 住宅卫生间→01SS105 常用小型仪表及特种阀门选用安装→01架空输电线路图集---部件制造图→01架空输电线路图集---低压杆型及设备安装图→0205R103 热交换站工程设计施工图集→0298S102 98S102 卧式水泵隔振及其安装→02D501-2 等电位联结安装→02J915公共建筑卫生间→02R110 燃气(油)锅炉房工程设计施工图集→02R111 小型立、卧式油罐图集→02R112 拱顶油罐图集→02S101 矩形给水箱→02S106 中小型冷却塔选用及安装→02S403 钢制管件→02S404 防水套管→02S515 排水检查井→02S515 排水检查井图集→02S701砖砌化粪池→02SS104 二次供水消毒设备选用与安装→02SS405-1 硬聚氯乙烯(PVC-U)给水管安装→02SS405-1~4 给水塑料管安装→02SS405-2 无规共聚聚丙乙烯(PP-R)给水管安装→02SS405-3 铝塑复合给水管安装→02SS405-4 交联聚乙烯(PE-X)给水管安装→03D501-3 利用建筑物金属体做防雷接地装置→03D501-4 接地装置安装→03R102 蓄势式电锅炉房设计施工图集→03S401 管道和设备保温、防结露及电伴热→03S402 室内管道支架及吊架→03S402 室内管道支架及吊架图集(pdf格式)→03S407-1 建筑给水金属管道安装-铜管→03SG520-1 钢吊车梁→03SG520-2 钢吊车梁→03SS408 住宅厨、卫给排水管道安装→04D701-1 电气竖井设备安装→04D701-3 电缆桥架安装→04DX003 民用建筑工程电气施工图设计深度图样→04DX003 民用建筑工程电气施工图设计深度图样→04FD01 防空地下室电气设计示例→04FD02 防空地下室电气设备安装→04FK02 防空地下室通风设备安装图集→04FS01 防空地下室给排水设计图集→04FS02 防空地下室给排水设施安装→04G325 吊车轨道联结及车挡(适用于混凝土结构)→04S516 混凝土排水管道基础及接口→04S520 埋地塑料排水管道施工→04SG518-3 门式刚架轻型房屋钢结构(有吊车)→04X501—1火灾报警及消防控制→05D702-4 用户终端箱→05G525 吊车轨道联结及车挡(适用于钢结构)→05K232 分(集)水器分汽缸→05MR101 城市道路施工图设计深度图样→05RM0404 城市道路路缘石(2005年新标准)→05S108 倒流防止器安装→05SDX006 建筑电气常见问题分析及图示→05SDX006 民用建筑工程设计常见问题分析及图示(电气专业)》→10kV及以下供配电设计与安装图集(上册)→10KV及以下配电线路工程图集:设计·加工·安装.第二版→10KV及以下配电装置工程图集:设计·加工·安装→10kV开闭所配电站箱式变电站电缆分接箱典型方案图集→35~110KV送电线路工程图集:设计·加工·安装(上、下册)→35~110KV送电线路工程图集:设计·加工·安装.(上、下册)→35~110KV小型化无人值班变电站标准工程图集→86D170 380(220V)架空线路安装→86D171 6-10KV瓷横担架空线路安装→86D173 6-10千伏山区架空线路安装→86D265 杆上变压器台→86D266 落地式变压器台→86D468 钢管明配线安装→86SD566 利用建筑物金属体作防雷和接地装置安装→87J432 作业台钢梯及栏杆→87S159 管道和设备保温→87S R416-1 室外热力管道安装-地沟敷设→87SR416-2 室外热力管道地沟→88D263 变配电所常用设备构件安装(10KV及以下)→88D264 变压器室布置(200~1600KVA)→88D369 电气设备在轻钢龙骨隔墙及吊顶上的安装→89D174 35KV瓷横担架空线路→89D364 吊车移动电缆安装→89D462 钢索配线安装→90D367 常用低压配电设备安装→90D370 交流380伏鼠笼型电动机控制原理图→90D763 水箱及水池水位自动控制安装→90S319 水池附件→90S319水池附件→90S346 冷却塔→90T911(二)R型离心热水泵基础及安装→90T911(一)IS型离心水泵基础及安装→91D363 吊车裸滑触线安装→91D701-2 封闭式母线安装→92DQ13 防雷与接地装置图集→92S220 排水设备附件→92S220 排水设备附件构造及安装→92S220排水设备附件→92S303 医院卫生设备安装→93D165 户内电力电缆终端头→93D166 户外电力电缆终端头→93SD168 电力电缆终端头及接头→93T921-1 汽-水换热器→94D164 35KV及以下电缆敷设→94D801 爆炸和火灾危险环境电气线路和电气设备安装→94K101-1 轴流式通风机安装图→94K101-2 玻璃钢屋顶风机基础及安装→94K302 卫生间通风器安装图集→94R404 动力管道焊制管件设计选用图→94T903 集气罐制作及安装→94X104 地下通讯电缆敷设→95(03)G325 吊车轨道联结→95(03)G325 吊车轨道联结03局部修改→95G325 吊车轨道联结→95R402 室内热力管道支吊架→95R418 热力设备及管道保温(憎水膨胀珍珠岩制品)→95R419 低温设备及管道保冷(憎水膨胀珍珠岩制品)→95S223 排出口→95S235 雨水口→95S517排水管道出水口→95S518-1 雨水口(一)铸铁井圈→95S518-2 雨水口(二)混凝土井圈→95SS103 立式水泵隔振及其安装→96K150-1 筒形风帽及附件→96K150-2 圆伞形风帽→96K150-3 圆锥形风帽→96R311 燃油拱顶储罐选用图→96S341 建筑排水用PVC管安装→96S341 建筑排水用硬聚氯乙烯(PVC-U)管道安装→96SD181 线槽配线安装→96SD469 常用灯具安装→96SX501 火灾报警及消防控制→97D267 附设式变压器室布置(35kV)→97D374 低压母线分段断路器二次接线→97R407 热力设备与管道疏水装置→97SD576 等电位联结安装→97X700 智能建筑弱电工程设计施工图集(上、下册)→98D467 硬塑料管配线安装→98G359(三) 悬挂运输设备轨道→98K101-3 离心通风机安装图(A式在钢支架上安装)→98R109 常压密闭水箱→98S176 气压给水→98S176 增压稳压设备国标图集→98S205 消防增压稳压设备选用及安装(隔膜式气压罐)→98T901 管道及设备保温→98T902 管道及设备保冷→98系列建筑标准设计图集---防雷与接地工程→98系列建筑标准设计图集---燃气工程→99(03)D501-1建筑物防雷设施安装→99D163 矿物绝缘电缆敷设→99D176 6-10kV以下铁横担架空绝缘线路安装→99D268 干式变压器安装→99D270 35变6(10)KV变配电所二次接线(交流操作部分)→99D303-2 常用风机控制电路图→99D501-1、99(03)D501-1建筑物防雷设施安装→99K103 防排烟设备安装图集→99S202 室内消火栓安装→99S203 消防水泵接合器安装→99S304 给排水卫生设备安装图集→99SD767 液位测量装置安装→CR312.1 粗燃油过滤器→CR312.2 中燃油过滤器→CR312.3 细燃油过滤器→CR315 中间油箱→CR316.1 油罐保温→CR316.2 油管保温→D301-1~2 室内管线安装2002年合订本→D565(二)独立避雷针→D565(一) 独立避雷针→D701-1~3 封闭式母线及桥架安装(2004年合订本)→DQ1 金属管敷设→FK01-02 防空地下室通风设计2004年合订本→JB 4737-95-T 椭圆形封头→JB4710-92(钢制塔式容器)→JB-T 6296.1-92汽轮机管道附件弯头、三通、缩节→JB-T 6296.2-92汽轮机管道附件多焊衬环→JB-T 6296.3-92汽轮机管道附件氩弧焊多焊衬环→JB-T 6296.4-92汽轮机管道附件压力表针阀→JB-T 6296.6-92汽轮机管道附件螺塞→JS1-1 给水工程标准图集→K110-1~3 通风机附件安装200年合订本→K120-1~2(2002合订本) 风管蝶阀→N105 水泵进出口软性接头→PS1-1 排水工程标准图集→R108(二)圆形开式水箱→R108(一)方形开式水箱→R901 弹簧压力表安装图→R902 工业用玻璃水银温度计安装图→S01 给水图集→S1 给排水标准图集合订本(下)→S143 套筒阀门井→S143 元形立式阀门进及阀门套筒→S143 元形立式阀门井及阀门套筒→S144 阀门井→S144 矩形卧式阀门井→S145 水表井→S147 井盖铁爬梯及阀门开关把→S151(一) 水箱→S160 栓室水栓→S2 给排水标准图集合订本(上)→S2 给排水标准图集合订本(下)→S203 消防水泵接合器安装 2003年局部修改版→S231 圆形雨水井→S3 给排水标准图集合订本(上)→S305 小型潜水排污泵选用与安装→S312 防水套管→S515 排水检查井2003年局部修改版→S517 排水管道出水口2003年局部修改版→S775(一) 40吨无阀滤池→S775_1_40吨无阀滤池→T905(二)圆形膨胀水箱→T905(一)方形膨胀水箱→T906(二)圆形凝结水箱→T906(一)方形凝结水箱→TJ16 单轨吊车梁通用图集→常用低压电器设备与成套装置外形安装尺寸及接线方案标准工程图集→城市居住区建筑电话通信设计安装图集→工艺管道安装设计施工图册(第三分册管道支吊架)→关于给排水国家标准设计图集号调整的情况→管架标准图→化工设备图册贮罐、计量罐→计算机防雷图集→建筑安装工程施工图集(第二版)01 消防、电梯、保温、水泵、风机工程→建筑安装工程施工图集(第二版)03 电气工程→建筑安装工程施工图集(第二版)04 给水排水卫生煤气工程→建筑安装工程施工图集(第二版)06 弱电工程→建筑安装工程施工图集(第一版)03 电气工程→建筑电气安装工程图集——设计·施工·材料第一集(第二版)→建筑电气设计实例图册(1)→建筑电气设计图集→建筑工程各类水泵电气控制图集→建筑工程设计施工安装图解全集→凯泉水泵系列安装图大样(16个)→冷却塔的组成和分类→辽 SJ802-2 2002厨房卫生间垂直排烟系统→林德标准的管道支吊架图集→排水工程标准图集→排水工程标准图集S1(上)→配电线路典型装置图集→实用电气控制线路图册→室内消火栓安装修编简介→通信管道人孔和管块组群图集→卫生工程标准图集→增强聚丙烯(FRPP)管室外排水管道设计通用图→智能建筑设计与施工系列图集 2 消防系统→智能建筑设计与施工系列图集 3 通信网络系统→住宅电气安装图集全套→_微机开关电源显示器电路图集(二)→→《防雷与接地装置》92DQ13图集→《强制性条文应用示例》一电气专业→→01D203-2 6~10kV配电所二次接线(直流操作部分)→01D303-3 常用水泵控制电路图→01R405 压力表安装图集→01s201室外消火栓→01s302雨水斗→01SS105常用小型仪表及特种阀门选用安装→0205R103热交换站工程设计施工图集→02R110 燃气(油)锅炉房工程设计施工图集→02S515排水检查井→03D501-3利用建筑物金属体做防雷接地装置→03D501-4接地装置安装→03K404 低温热水地板辐射供暖系统施工安装→03S402室内管道支架及吊架→04D701-1 电气竖井设备安装→04D701-3 电缆桥架安装→04DX101-1→04FD01 防空地下室电气设计示例→04FD02 防空地下室电气设备安装→05d702-4用户终端箱→05K232 分(集)水器分汽缸→05SDX006(小)→10kV及以下变配电工程通用图集→10kV及以下供配电设计与安装图集(上、中、下册)→10kV及以下供配电设计与安装图集(上册)→10kV及以下供配电设计与安装图集(下册)→10kV及以下供配电设计与安装图集(中册)→10KV及以下配电线路工程图集:设计·加工·安装第二版→10KV及以下配电装置工程图集:设计·加工·安装→10kV开闭所配电站箱式变电站电缆分接箱典型方案图集→12层住宅楼电气→27.98S205 消防增压稳压设备选用及安装(隔膜式气压罐)→35~110kV变电工程通用图集:设计·加工安装·设备材料→35~110KV送电线路工程图集:设计·加工·安装(上、下册)→35~110KV小型化无人值班变电站标准工程图集:设计、加工安装、设备材料、概算→35KV线路部件加工图→90S319水池附件→90S346(1)冷却塔→90T911(二)R型离心热水泵基础及安装→90T911(一)IS型离心水泵基础及安装→91D701-2 封闭式母线安装→92S213(1)化粪池1→92S220排水设备附件→92s340或92S303→93T921-1汽-水换热器→94T903集气罐制作及安装→95S223排出口→95S235雨水口→96D301-1 线槽配线安装→96SX501 火灾报警及消防控制→98T901管道及设备保温→98T902管道及设备保冷→98系列建筑标准设计图集燃气工程→99(03)S203水泵结合器→99D303-2 常用风机控制电路图→99D501-1建筑物防雷设施安装→99J201-1平屋面建筑构造→99S304卫生设备安装→J925-2001 压形钢板、夹芯板屋面及墙体建筑构造(1)→T905(二)圆形膨胀水箱→T905(一)方形膨胀水箱→T906(二)圆形凝结水箱→T906(一)方形凝结水箱→安全设施标志标识标准化图册→玻璃钢屋顶风机基础及安装 94K101-2→常用低压电器设备与成套装置外形安装尺寸及接线方案标准工程图集→初步设计深度图样 05K602→挡土墙04J008→等电位联结安装(02D501-2)→低温热水地板辐射供暖系统安装→地暖图集→地下人防通风设备安装图集FK02→电气设计禁忌500例→电气设计禁忌手册→电气图→防排烟设备安装图 99K103→风管蝶阀K120-1~2(2002合订本)→风管支吊架图集→钢筋混凝土梁图集→钢制管件02S403→高层钢结构建筑设计资料集→给水工程标准图集→管道工程施工及验收标准规范实务全书→国标图集04S901《民用建筑工程给水排水施工图设计深度图样》_高程表→国标图集04S901《民用建筑工程给水排水施工图设计深度图样》2_原理图→国标图集04S901《民用建筑工程给水排水施工图设计深度图样》设备和主要材料表→国标图集04S901《民用建筑工程给水排水施工图设计深度图样》图纸目录、说明及图例→华北地区98J1-工程做法→化粪池大样→家庭常用电子电器产品电路图集1→建筑安装工程施工图集(4)给水工程→建筑安装工程施工图集(电气工程)→建筑电气安装工程图集——设计·施工·材料第一集(第二版)→建筑电气工程设计常用图形和文字符号00DX001→建筑电气设计实例图册→建筑工程各类水泵电器控制图集→建筑工程设计施工安装图解全集→建筑工程设计施工系列图集工业管道工程(上、下册)→建筑设计施工安装图集全解→建筑围墙图集→建筑与装饰设计灯具图集→矩形钢筋混凝土清水池国标图集→矩形水箱图0102S101→空调机维修实用图集大全→矿物绝缘电缆敷设-99d163→离心通风机安装图(A式在钢支架上安装)98K101-3→牛脚→暖通空调常用标准图集→暖通空调常用图集→→CLass100无尘台设计图→→ROOFTOP风冷机组大样→→厂房地板辐射采暖图→→除尘器标准大样图→→阀门图块→→风机房平面布置大样图→→风机盘管、风口选用图→→风机盘管安装详图→→风口保温安装大样图纸→→高压蒸汽管道接点详图→→管道常用管件大样图→→管道管件图块→→管道横断面及支墩详图→→柜式空调机组配管图→→锅炉地基及辅机布置图→→过滤器风口安装祥图→→换热器总安装示意图→→空调机组各功能段样图→→空调设备侧视图大全→→→泵-聯軸式→→→泵-同軸式→→→風車-離心式吊掛→→→風車-離心式落地→→→風車-箱型吊掛→→→風車-箱型落地→→→風車-軸流吊掛→→→空調箱-吊掛式1→→→空調箱-吊掛式2→→→空調箱-立式1→→→空調箱-立式2→→→空調箱-臥式1→→→空調箱-臥式2→→→冷卻水塔-200~1K RT→→→冷卻水塔-3~605RT→→→冷卻水塔-70~175RT→→→冷卻水塔-低噪音方型→→→冷卻水塔-方型→→→主機-離心式→→→主機-螺旋式→→→主機-往復式→→空调箱标准大样图→→冷气机安装大样图→→暖通空调控制大样图二→→暖通空调控制大样图一→→皮带机标准大样图→→普通闸阀标准大样图→→室外空冷机组配管图→→水泵安装标准大样图→→水泵接管及浮动基础图→→水泵配管标准图→→水泵图块→→水泵轴测标准大样图→→水泥窑余热锅炉图→→酸雾净化塔局部大样图→→通风机标准大样图→→卫生洁具图块→→小天鹅中央空调产品库→→新风机组控制大样图→→仪器仪表图块→→制冷设计常用图例→→→常用制冷阀件图块→→→制冷设计常用图例→→综合楼空调施工图→排水工程标准图集→排水工程标准图集S1(上)→排水检查井图集02S515→青岛现场安全文明施工标准图籍→→01.木工棚、钢筋棚做法示意图→→02.和灰机、搅拌机防护棚示意图→→03.安全通道示意图(多层)→→04.安全通道示意图(高层)→→05.总、分配电箱防雨棚做法示意图Ⅰ→→06.总、分配电箱防雨棚做法示意图Ⅱ→→07.总分箱护栏及地面硬化图→→08.总分箱护栏及硬化地面尺寸图→→09.楼梯楼层阳台临边防护示意图→→10.屋面和楼层临边防护图→→11.基坑周边防护栏示意图→→12.洞口防护图→→13.电梯井口、内防护图→→14.脚手架搭设安全色踢脚板图→→15.脚手架内平网设置图→→16.脚手架外排阳角处做法示意图→→17.型钢悬挑处双斜支撑系统示意图→→18.落地式钢管接料平台→→19.悬挑式钢接料平台→→20.接料平台门正立面图→→21.接料平台门侧立面图→→22.接料平台门俯视图→→23.限重牌→→24.轮子锯钢丝网防护挡板图→人防通风FK01→弱电产品标准图集→→1.封面→→10.多层住宅访客对讲一层平面图→→11.多层住宅访客对讲标准层平面图→→12.高层大厦型访客对讲一层平面图→→13.高层大厦型访客对讲标准层平面图→→14.小区别墅报警及访客系统图→→15.小区别墅抄表及访客系统图→→16.小区别墅抄表、报警及访客系统图→→2.目录→→3.前言→→4.对讲图集→→5.带感应卡访客对讲系统图→→6.带感应卡可视访客对讲系统图→→7.别墅访客对讲一层平面图→→8.别墅访客对讲二层平面图→→9.别墅访客对讲三层平面图→→别墅访客对讲二层平面图→→别墅访客对讲三层平面图→→别墅访客对讲一层平面图→→带感应卡访客对讲系统图→→带感应卡可视访客对讲系统图→→对讲图集→→→1.前言→→→10.小区别墅联网系统图→→→11.三带一访客对讲系统图→→→12.多层住宅访客对讲一层平面图→→→13.多层住宅访客对讲标准层平面图→→→14.高层大厦型访客对讲一层平面图→→→15.高层大厦型访客对讲标准层平面图→→→16.别墅访客对讲一层平面图→→→17.别墅访客对讲二层平面图→→→18.别墅访客对讲三层平面图→→→2.目录→→→22.小区智能化一卡通系统方框图→→→23.电视监控系统示意图→→→24.医院护理呼叫系统图→→→25.医院护理呼叫系统图(单联网)→→→26.住宅小区四表远传系统图→→→3.直通式非可视访客对讲系统图→→→4.单元户户访客对讲系统图→→→5.高层大厦型访客对讲系统图→→→6.小区抄表和访客对讲联网系统图→→→7.小区多路报警和访客对讲联网系统图→→→8.小区抄表,多路报警和访客对讲联网系统图→→→9.门禁和访客对讲系统图→→对讲图集→→多层住宅访客对讲标准层平面图→→多层住宅访客对讲一层平面图→→封面→→高层大厦型访客对讲标准层平面图→→高层大厦型访客对讲一层平面图→→目录→→前言→→小区别墅报警及访客系统图→→小区别墅抄表、报警及访客系统图→→小区别墅抄表及访客系统图→施工图设计深度图样 05K601→→1_图纸目录、说明及图例→→→07_住宅采暖设计及施工说明(下分双管式)→→→12_公共建筑采暖图纸目录、设计及施工说明、图例(下供下回双管系统) →→→17_空调通风图纸目录、使用标准图纸目录→→→18-19_空调通风设计及施工说明→→→43-44_图例→→→45_电制冷水冷式制冷机房图纸目录、设计及施工说明、图例→→→53_燃油蒸汽锅炉房设计施工说明、图纸目录、图例→→→60_水-水热交换站设计及施工说明→→→64_室内燃气管线设计及施工说明→→→66_液化气自然气化瓶组间设计及施工说明→→→68_室外热力管线图纸目录、设计及施工说明、图例(直埋敷设)→→2_系统、流程、原理图→→→20-21_空调水路系统流程图→→→22_空调通风风路系统流程图→→→27_防排烟系统流程图→→→34-35_空调自控原理图→→→39_户式中央空调水系统图(水管型式)→→→46_电制冷水冷式制冷机房管路系统流程图→→→54_燃油蒸汽锅炉房管路系统流程图→→→61_水-水热交换站管路系统流程图→→3_立管图→→→08_住宅采暖立管图(下分双管式)→→→13_公共建筑采暖立管图(下供下回双管系统)→→4_设备表→→→72-78_设备表→实用电气控制线路图册→室内管道支架及吊架03S402→室内热力管道支吊架→数字万用表电路图集→水表井及安装(S145)→水电站机电设计图集→水箱标准图→通风机附件安装K110-1~3→通用图例集→筒形风帽及附件 96K150-1→卫生工程标准图集→屋面变形缝图集→现代UPS电源及电路图集→小型水电站机电设计图集→压力表安装图01R405→一户一表工程图集→硬塑料管配线安装98D467→园林景观设计详细图集→圆伞形风帽 96K150-2→圆形钢筋砼清水池→圆锥形风帽 96K150-3→智能建筑弱电工程设计施工图集97X700 (上、下册)→中南通用加固图集→轴流式通风机安装图 94K101-1。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

关于水电的规范施工和注意事项“水电施工”属于隐蔽工程,在装修中占有极为重要的地位,它的重要性大家都能明白的,尤其是水,一旦发生事故,,自己损失不说,殃及了邻居,。

电也一样,危及生命,实在马虎不得,千万不能因小失大,安全第一,规范施工。

先说电的施工:一、家庭装修中,要涉及强电(照明、电器用电)和弱电(电视、电话、音响、网络等)。

电路线在现代装修中一般要求埋暗线(即管线暗敷),一旦出了问题,维修起来很麻烦,所以,线材就一定要选择比较好的,目前的装修市场,强电线材一般选****的硬芯护套线,弱电线材一般选***品牌的,品牌的线材,质量有保障的。

切记,这部分的钱绝对不能省!二、电线规格的选用(未经计算,经验值):家庭装修中,一般说来,照明、开关、插座要用2.5平方的电线,空调要用4.0平方的电线,热水器要用6.0平方的电线。

但是实际操作中,很多人为省钱都把照明线选用1.5平方的电线。

三、目前电的施工安装方法很多,听到客户在谈论价格问题,有的说他找的是10元/平方,还有说12元,还有说15元,其实大家都忽略了一个关键的问题,就是施工做法问题,现在的主要做法有:1、功能性的做法:就是说,不用分很多组,只要能达到用电的目的就可以了,这样的做法大多是房产商为了交房提供的水电安装,一个三房两厅的房子也就是分4组线。

这样的做法很不安全,大家也知道,凡是这样的水电安装,大家都要全部打掉重新作的。

这样的做法一般就是10元的做法。

2、分组做法:分组就是说,每个空间的照明都要单独分组,每个空间的空调还要单独分组,这样的话,一个三房两厅的房子就需要房间3组,客厅1组,餐厅1组,两个卫生间2组,厨房1组,三个房间的空调要3组,客厅空调1组,总共要12组线,每组都要需要单独的空气开关控制。

如果用普通的PVC管穿线,就是12元/平方的人工费。

3、参照2 的做法一样,用冷弯管穿线的,人工费就是15元/平方了,因为每个弯头都需要用弯管器作弯头,很费工时的,所以贵一点。

最多的客户选择的是这个做法。

4、参照3 的做法一样,强弱电分槽布线的,要加3元,就是18了,说白了,就是加多开槽的钱。

5、国标的做法就要22元了,完全不开横槽,只开竖槽,也就是下面要讲的做法。

四、水电施工的基本原则:水电的施工有个原则就是,走顶不走地,顶不能走,考虑走墙,墙也不能走,才考虑走地,为什么呢?走顶的线在吊顶或者石膏线里面,即使出了故障,检修也方便,损失不大,如果全部走地了,检修就要把地板掀起来,那损失就大了,还有,地面是混凝土结构,要埋线管,必然会伤害到混凝土层,甚至钢筋,很危险的啊。

很多的工人会为了省事,全部都走地面了。

电的规范施工和施工原则施工原则:一、定位:首先要根据你对电的用途进行电路定位,比如,那里要开关、那里要插座、那里要灯等要求,电工会根据你的要求进行定位。

二、开槽:定位完成后,电工根据定位和电路走向,开布线槽,线路槽很有讲究,要横平竖直,不过,规范的做法,不允许开横槽,因为会影响墙的承受力。

三:布线:布线一般采用线管暗埋的方式。

线管有冷弯管和PVC管两种,冷弯管可以弯曲而不断裂,是布线的最好选择,因为它的转角是有弧度的,线可以随时更换,而不用开墙。

四、弯管:冷弯管要用弯管工具,弧度应该是线管直径的10倍,这样穿线或拆线,才能顺利。

布线要遵循的原则:布线原则(1)如下图:强弱电的间距要在30---50公分,他们只能作远邻,不能作近亲,不知道什么时候,也不管你愿不愿意,他们就会串门,打扰你的电视和电话。

布线原则(2)如下图:强弱电更不能同穿一根管内布线原则(3)管内导线总截面面积要小于保护管截面面积的40%,比如20管内最多穿4根2.5平方的线,布线原则(4):长距离的线管尽量用整管,布线原则(5):线管如果需要连接,要用接头,接头和管要用胶粘好布线原则(6):如果有线管在地面上,应立即保护起来,防止踩裂,影响以后的检修。

布线原则(7):当布线长度超过15米或中间有3个弯曲时,在中间应该加装接线盒,因为拆装电线时,太长或弯曲多了,线可能穿过不去。

布线原则:一般情况下,空调插座安装应离地2米以上。

电线线路要和煤气管道相距40公分以上布线原则(9):一般情况下,空调插座安装应离地2米以上。

布线原则(10):没有特别要求的前提下,插座安装应离地30公分高度。

布线原则(11):开关、插座面板,应该左侧零线右侧火线。

布线原则(12):家庭装修中,电线只能并头连接,绝对不是我们平时随便一接就OK那么简单布线原则(13):接头处采用按压接线法,必须要结实牢固布线原则(14):接好的线,要立即用绝缘胶布包好布线原则(15):家装过程中,如果确定了火线、零线、地线的颜色,那么任何时候,颜色都不能用混了,要不,会出事故的。

布线原则(16)家里不同区域的照明、插座、空调、热水器等电路都要分开分组布线,一旦哪部分需要断电检修时,不影响其他电器的正常使用。

布线原则(17):很关键的,在做完电路后,一定要让施工方给你一份备份电路布置图,一旦以后要检修或墙面修整或在墙上打钉子,防止电线被打坏。

水的规范施工原则--给水给水施工原则水的施工在家庭装修中的重要性是第一位的,要么水管漏水,造成家具发霉腐朽,要么就是水漫金山,还有就是你家用水,人家楼下“免费”淋浴,到时就得:) “赔礼、赔钱、赔功夫”。

给水材料:现代装修中水管一般采用PPR热熔给水管,有纯PPR的,还有PPR不锈钢的,还有PPR紫铜的,功能上分为PPR冷水管和热水管,冷热不能混用,尤其冷水管不能作为热水管使用,市场上比较有名的有江特、金德、万能、日丰等品牌,都有很高的质量保证的。

一、给水施工原则施工原则(1):家庭装饰中,水管最好走顶不走地,因为水管安装在地上,要承受瓷砖和人在上面的压力,有踩裂水管的危险。

另外,走顶的好处在于检修方便。

但就是工价高很多的,一般人较少采用。

施工原则(2):水管开槽的深度是有讲究的,冷水埋管后的批灰层要大于1厘米,热水埋管后的批灰层要大于1.5厘米施工原则(3):冷热水管要遵循左侧热水右侧冷水,上热下冷的原则施工原则(4):现在的家庭装修的给水管一般用PPR热熔管,它的好处在于密封性好,施工快,但是一定要提醒工人不要太急,用力不正的情况下,可能使管内堵塞,致使水流减小,如果是厕所冲水阀水管出现这种情况的话,会冲洗力不够的。

施工原则(5):水管铺设完成后,封槽前,要用管卡固定,冷水管卡间距不大于60厘米,热水管卡间距不大于25厘米施工原则(6):水平管道管卡的间距,冷水管卡间距不大于60厘米,热水管卡间距不大于25厘米施工原则(7):安装好的冷热水管管头的高度应在同一个水平面上,只有这样以后安装冷热水开关才会美观。

施工原则(8):水管安装好后,应立即用管堵把管头堵好,如果有杂物掉进去,那就有麻烦了!施工原则(9):水管安装完成了,千万不要忘记打压测试啊,打压测试就是为了检测所安装的水管有没有滲水或漏水现象,只有经过打压测试,才能放心封槽。

施工原则(10):打压测试时,打压机的压力一定要达到0.6以上,等待20-30分钟以上,如果压力表的指针位置没有变化,就说明所安装的水管是密封的,可以放心封槽了施工原则(11):下水管虽然没有压力,也要放水检查,仔细检查是否有漏水或滲水现象水施工中如果有滲水现象,哪怕很微弱,也一定要坚持返工,绝对不能含糊!!!水的施工规范原则--防水防水施工原则防水,在家庭装修中同样有着很重要的作用,它是最容易产生隐患的环节,如果防水作不好的话,自己家受损失事情还小,如果殃及邻居的话,你就三陪吧,“赔礼、赔钱、赔功夫、”。

防水剂防水剂的品种很多(蓝美高NP2、NP3、德高、美高、三鑫),当然施工方法也是不一样的,有和水泥直接混合使用的,还有沥青融化浇面的,还有直接涂刷的,但施工原则是一样的,一般位置防水剂要刷2遍,横竖各一遍,特殊位置要多刷一遍,不能漏刷或有砂眼!!!施工原则(1):作防水前,一定要把需要作防水的墙面和地面打扫干净,否则,再好的防水剂也起不到防水的作用。

施工原则(2):一般的墙面防水剂要刷到30厘米的高度施工原则(3):如果墙面背后有柜子或其他家具的,至少要刷到1.8米的高度。

最好整版墙全刷。

施工原则(4):地面要全部刷到,而且必须等第一遍干了后,才能刷第二遍。

防水重点位置重点位置:墙角位置,要多刷1-2遍重点位置:下水管周围,要多刷1-2遍施工原则(5):防水做完了,不要以为就没有事了,还要“开闸放水”,试水施工原则(6):试水一试就是24个小时,看周围墙面有没有滲水现象,如果有的话,返工没商量!!!面子工程--泥工施工规范--地砖泥工、腻子、木工、油漆工在家庭装修中叫做面子工程内在好不好看水电,外在好不好就看这些面子工程了,所谓面子工程,就是人一眼就能看到的部分,所以很多人都特别注意这些项目,。

泥工说到泥工,就要讲到瓷砖(瓷砖的挑选方法在材料部分谈)的功能,装修中用瓷砖,主要目的是美观、防水和防污,现在的瓷砖已经不像以前那样单一,厂家为了满足市场的要求,开发出许多优质种类,花色繁多,种类齐全,价格也是各档次都有。

按形状可以分为条形砖,方形砖;按用途可以分外内墙砖,外墙砖,墙裙砖;而在花色上又有水晶描金花片,水晶凸釉描金砖,亚光砖等;另类些的有文化砖,火岩石,仿古砖.在需要强化色彩的空间,都可以运用瓷砖来强调视觉效果,例如在厨房中,一大面素色的墙中,用蓝色小鹿的瓷砖拼在一起点缀厨房的空间,其余的墙面选用单色,厨房的感觉就很干净整洁,而且把它看出一个充满情趣,享受生活的地方。

在家做饭不是必须,而是一种概念。

所以,对于年轻朋友,选择一种更有现代味道的瓷砖,更符合他们的性格特征,比如印象派的画,创意味十足的图案来丰富厨房空间。

在卫浴空间墙面瓷砖的选择上,可以选择一些卡通效果等等。

对于价格昂贵的,买一两块来装饰一下就可以,比如一条装饰线同样可以起到画龙点睛的作用。

昆虫,油画,动画人物都可以。

而且可以发挥你的想象,自由发挥,将它们任意组合搭配。

施工原则施工原则(1):家庭装修中如果没有特殊的要求,水泥一般用325号的水泥,出厂一个月以内的水泥质量是可以保障的。

施工原则(2):水泥、沙子的比例1:3。

沙子的选用:贴墙砖要用泥沙,粉墙、砌墙、封各种槽要用中沙。

铺地砖要用粗沙。

呵呵,沙子的用法我碰到过笑话。

一次,给空军学院师长家装修,贴墙砖的时候,拉的泥沙让师长夫人看到了,她大怒:“我们砌猪圈也不用这种沙子”。

呵呵,泥沙的样子的确不好看,可贴墙砖只能用它。

地砖铺贴原则(按照以下原则施工,想做不好都难啊)原则一:铺贴地砖前第一件事就是,根据你买的地砖的尺寸和地面尺寸进行预排,原则二:预排的原则就是,同一个房间里,横向纵向半块砖不能超过一行,并且半块砖应留在将来要放家具的一边或不显眼的地方.地砖铺贴原则(按照以下原则施工,想做不好都难啊)原则三:预排规划好了,还要纵横拉两条基准线,有了基准线,才能保证这个房间的地砖贴得规矩.原则四:要检查基准线是否标准,沿交叉点量出1.6米点和1.2米点,量两点之间的距离如果是2.0米的话,就证明基准线是垂直的、是标准的,就可以开始贴砖了原则五:沿着这个基准线铺贴第一块基准砖(贴法参照铺地砖九步走),那么后面沿着基准线贴出的地砖才会横竖排垂直,不拉线或不精确的拉线,很难达到规矩的效果。

相关文档
最新文档