HP Piping( 高压管汇介绍)

合集下载
相关主题
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

ELBOW
Elbow Drawing
2. Fabrication
• Per ASME B31.3 Chapter V & Chapter IX. • misalignment of bore less than 1.5mm. • Alignment of ID and OD, and also keep total dimension as design require. • Not easy, take 2~3 hours. Fit-up and welding at same time.
6. Sandblasting, Painting and Packing
Questions?
• Fabrication records • Questions?
4.NDT (RT, MT)
• Wall thickness <19mm, X-ray, 30m distance • Wall thickness >19mm, γ-ray, 100m distance
RT & MT
5.Hydrostatic test
• Test pressure = 1.5 times design pressure.
Typical piping spool
百度文库
Standpipe consists of piping spools, blind plugs, clamps, ring gaskets, bolts, nuts... Piping spool consists of Pipe, Elbow, flange, hub, union, trunion support...
Component standards
• ASME B31.3, especially Chapter IX HP piping • NACE MR0175, on well test line
– All Hardness max. HRC22 – Nicole Content < 1%
• • • • • • • • • •
Test assembly
3.PWTH & Hardness Check
• • • • Local heat treatment vs. Furnace heat treatment Local: all joints, in winter, temp. difference Furnace: 10% joints, hardness good. Temp: 150°C/h heating, 600°C holding, 150°C cooling • Another is 630°C holding, 2 hours. • Suggested holding hour is 3~4 hours. • ODFII piping, furnace PWHT, 8hours holding, 80°C/h cooling doesn’t change pipe mechanical property.
Raw material chemical composition and mechanical test Steel pipe ASTM A519 Gr.4130 Flange API 6A, UT, PT Hub API 16A, UT Clamp API 16A, MT Union API 6A Elbow ASME B16.9, UT Ring Gasket AISI SS316L Bolt A193 B7 Nut A194 2H
Welding
• • • • • • • WPS PQR, Welding Electrode, PWHT Welder certificate Multiple Pass, NO weaving, max width 2.5 t Hardness after welding should be < HRC22 Last pass always higher, should end on pipe. 3D piping spool need test assembly. Also extremely cold weather, welds shrink.
High Pressure Piping of Offshore Derrick 海洋钻机上的 高压管汇
1. Piping Components
• HP piping system of offshore derrick nomally contains mud line, cement line and/or well test line. • 海洋钻机上的高压管汇通常包含泥浆立管,水 泥立管,和测试立管。 • A piping spool contains steel pipes connected with elbows and ended with flanges, hubs or unions. • 一个高压管段通常由钢管组成,中间由弯头连 接,末端是法兰,卡箍(头)或者由壬组成。
相关文档
最新文档